1 | Urging the Environmental Protection Agency to stop its unlawful |
2 | application of the Guidance Memo relating to the Federal |
3 | Water Pollution Control Act, which is a substantive change to |
4 | the permitting procedure conferred on the states, and restore |
5 | the regulatory environment that existed prior to the release |
6 | of the Guidance Memo. |
7 | WHEREAS, Under section 402 of the Federal Water Pollution |
8 | Control Act (62 Stat. 1155, 33 U.S.C. § 1342), National |
9 | Pollutant Discharge Elimination System (NPDES) permits are |
10 | typically issued by states for discharge of nondredged and |
11 | nonfill material; and |
12 | WHEREAS, Once the Environmental Protection Agency (EPA) |
13 | approves a state permitting program, the state has exclusive |
14 | authority to issue NPDES permits; and |
15 | WHEREAS, Through a 1991 Memorandum of Agreement executed |
16 | between the Commonwealth of Pennsylvania and the EPA, the |
17 | Department of Environmental Protection (DEP) was identified as |
18 | the lead agency with exclusive authority for administering and |
|
1 | granting NPDES permits for mining-related activities in this |
2 | Commonwealth; and |
3 | WHEREAS, In September 2010, the EPA informed the DEP that it |
4 | was altering the Commonwealth's administration of its permitting |
5 | program and would conduct its own additional review of NPDES |
6 | permits; and |
7 | WHEREAS, This abrupt change in the Commonwealth's permitting |
8 | process was not the result of any accompanying Federal statutory |
9 | or regulatory changes; and |
10 | WHEREAS, As a result of this change, the DEP is required to |
11 | provide the EPA's Region 3 field office with all pending mining- |
12 | related NPDES permit applications, whose activity will either |
13 | discharge into the Monongahela River or into any designated |
14 | total maximum daily load impaired stream for its independent |
15 | review; and |
16 | WHEREAS, The EPA's Region 3 field office is not sufficiently |
17 | staffed to perform these types of reviews in a timely manner, |
18 | causing indefinite delays in the permitting process; and |
19 | WHEREAS, The EPA's objections to the issuance of these permit |
20 | applications vary, but generally are based on what the Federal |
21 | agency perceives are inconsistencies between the applications |
22 | and an interim final Guidance Memo that the EPA released in |
23 | April 2010, designed to provide a framework for regional reviews |
24 | of surface mining projects in Appalachia based on conductivity |
25 | levels it associated with adverse impacts to streams; and |
26 | WHEREAS, Although the stated intent of the Guidance Memo is |
27 | to limit its applicability to surface mining projects only, a |
28 | number of the permits being delayed in this Commonwealth are for |
29 | activities other than this type of mining; and |
30 | WHEREAS, The Guidance Memo is based on flawed studies with |
|
1 | limited application and unconfirmed conclusions that cannot be |
2 | used to develop a predictive cause and effect relationship |
3 | between the EPA's established benchmark threshold for |
4 | conductivity levels and healthy streams in this Commonwealth; |
5 | and |
6 | WHEREAS, Despite the representation that the Guidance Memo is |
7 | an interim document, it nevertheless is applied by the EPA in a |
8 | binding manner in its current version, even though the EPA |
9 | continues to receive comments on it; and |
10 | WHEREAS, The EPA's application of the Guidance Memo |
11 | constitutes a substantive change in the basic application of the |
12 | permitting process; and |
13 | WHEREAS, By substituting the issuance of agency guidance for |
14 | formal rulemaking, the EPA circumvents the clear requirements of |
15 | the Administrative Procedure Act (60 Stat. 237, 5 U.S.C. § 551 |
16 | et seq.) for public notice and comments; and |
17 | WHEREAS, This unnecessary extended review of NPDES permit |
18 | applications by the EPA has led to a significant backlog of |
19 | permits that could result in coal contracts being lost, mining |
20 | jobs being destroyed and this Commonwealth losing its major |
21 | source of affordable and reliable electric generation; therefore |
22 | be it |
23 | RESOLVED, That the House of Representatives of the |
24 | Commonwealth of Pennsylvania urge the Environmental Protection |
25 | Agency to stop its unlawful application of the Guidance Memo |
26 | relating to the Federal Water Pollution Control Act, which is a |
27 | substantive change to the permitting procedure conferred on the |
28 | states, and restore the regulatory environment that existed |
29 | prior to the release of the Guidance Memo; be it further |
30 | RESOLVED, That the Commonwealth of Pennsylvania reassert its |
|
1 | rightful role as the sole agency with permitting authority of |
2 | mining-related National Pollutant Discharge Elimination System |
3 | permits; and be it further |
4 | RESOLVED, That the Chief Clerk of the House of |
5 | Representatives transmit a copy of this resolution to the |
6 | Governor of Pennsylvania, the Environmental Protection Agency |
7 | Administrator and all members of the Pennsylvania Congressional |
8 | Delegation. |
|