OR HB3325 | 2019 | Regular Session
Status
Completed Legislative Action
Sponsorship: Committee Bill
Status: Failed on June 30 2019 - 100% progression
Action: 2019-06-30 - In committee upon adjournment.
Text: Latest bill text (Introduced) [PDF]
Sponsorship: Committee Bill
Status: Failed on June 30 2019 - 100% progression
Action: 2019-06-30 - In committee upon adjournment.
Text: Latest bill text (Introduced) [PDF]
Summary
Requires public utility to meet certain requirements for processing applications from nonresidential customer-generators to interconnect to electric distribution system net metering facility that has generating capacity of more than 25 kilowatts but less than two megawatts. Requires Public Utility Commission to adopt rules requiring public utilities to equitably apportion costs of engineering, construction or installation of facilities within public right of way that will allow for safe interconnection of multiple net metering facilities.
Title
Relating to net metering.
Sponsors
History
| Date | Chamber | Action |
|---|---|---|
| 2019-06-30 | House | In committee upon adjournment. |
| 2019-03-26 | House | Public Hearing held. |
| 2019-03-21 | House | Public Hearing held. |
| 2019-03-11 | House | Referred to Energy and Environment. |
| 2019-03-04 | House | First reading. Referred to Speaker's desk. |
Oregon State Sources
| Type | Source |
|---|---|
| Summary | https://olis.oregonlegislature.gov/liz/2019R1/Measures/Overview/HB3325 |
| Text | https://olis.oregonlegislature.gov/liz/2019R1/Downloads/MeasureDocument/HB3325/Introduced |