Bill Text: NY S01801 | 2015-2016 | General Assembly | Introduced


Bill Title: Relates to alternative project delivery methodologies.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2016-01-06 - REFERRED TO TRANSPORTATION [S01801 Detail]

Download: New_York-2015-S01801-Introduced.html
                           S T A T E   O F   N E W   Y O R K
       ________________________________________________________________________
                                         1801
                              2015-2016 Regular Sessions
                                   I N  S E N A T E
                                   January 14, 2015
                                      ___________
       Introduced  by  Sen.  DILAN  -- read twice and ordered printed, and when
         printed to be committed to the Committee on Transportation
       AN ACT to amend the highway law,  the  state  finance  law,  the  public
         authorities  law  and  the  education  law, in relation to alternative
         project delivery methodologies
         THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND  ASSEM-
       BLY, DO ENACT AS FOLLOWS:
    1    Section  1. Legislative finding and intent. The federal government and
    2  numerous states regularly engage in what is termed "alternative  project
    3  delivery"  options for the procurement and construction of both building
    4  and transportation projects. These methods, which include  design-build,
    5  construction manager at-risk, public/private partnerships and integrated
    6  project delivery have become proven methods for the efficient and effec-
    7  tive  delivery  of public construction projects. Such methodologies have
    8  often produced high-quality projects  at  lower  costs  and  at  greatly
    9  improved timeframes.
   10    Although  design-bid-build should remain the primary method to deliver
   11  most public construction projects, the  legislature  declares  that  the
   12  department of transportation, the office of general services, the dormi-
   13  tory authority, the thruway authority, the state university construction
   14  fund,  the  city  university construction fund, the New York city school
   15  construction authority and  the  metropolitan  transportation  authority
   16  should  be  permitted  to  engage in such "alternative project delivery"
   17  methods, subject to certain limitations and protections.
   18    S 2. Section 38 of the highway law is amended by adding a new subdivi-
   19  sion 10 to read as follows:
   20     10. NOTWITHSTANDING ANY  OTHER  PROVISION  OF  THIS  SECTION  OR  THE
   21  PROVISIONS  OF SECTION ONE HUNDRED SIXTY-THREE OF THE STATE FINANCE LAW,
   22  THE DEPARTMENT MAY PROCURE SERVICES TO  CONSTRUCT  OR  IMPROVE  A  STATE
   23  HIGHWAY  PURSUANT  TO  AN  ALTERNATIVE  PROJECT  DELIVERY METHODOLOGY AS
        EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
                             [ ] is old law to be omitted.
                                                                  LBD06760-01-5
       S. 1801                             2
    1  PROVIDED FOR IN SECTION ONE HUNDRED SIXTY-THREE-C OF THE  STATE  FINANCE
    2  LAW.
    3    S 3. The state finance law is amended by adding a new section 163-c to
    4  read as follows:
    5    S 163-C. ALTERNATIVE PROJECT DELIVERY METHODS. 1. FOR PURPOSES OF THIS
    6  SECTION:
    7    A.   "ALTERNATIVE   PROJECT   DELIVERY  METHODOLOGY"  SHALL  MEAN  ANY
    8  CONSTRUCTION PROJECT DELIVERY METHODOLOGY WHEREBY  THE  PROCUREMENT  FOR
    9  THE CONSTRUCTION SERVICES IS OTHER THAN THE TRADITIONAL DESIGN-BID-BUILD
   10  PROCESS.
   11    B.  "STATE  CONTRACTING  AGENCY"  OR "AGENCY" SHALL MEAN THE OFFICE OF
   12  GENERAL SERVICES AND/OR THE DEPARTMENT OF TRANSPORTATION.
   13    C. "EVALUATION TEAM" SHALL MEAN A TEAM OF NOT LESS THAN  FIVE  PERSONS
   14  KNOWLEDGEABLE  IN  THE  CONSTRUCTION  INDUSTRY,  TO BE FORMED BY A STATE
   15  CONTRACTING AUTHORITY  TO  EVALUATE  THE  QUALIFICATIONS  AND  PROPOSALS
   16  SUBMITTED FOR THAT PROJECT.
   17    2.  NOTWITHSTANDING  THE PROVISIONS OF SECTION ONE HUNDRED SIXTY-THREE
   18  OF THIS ARTICLE, SECTION THIRTY-EIGHT OF THE HIGHWAY LAW, OR ANY  GENER-
   19  AL,  SPECIAL  OR LOCAL LAW THAT MAY REQUIRE AN AGENCY TO AWARD CONTRACTS
   20  TO THE LOWEST RESPONSIBLE BIDDER AFTER ADVERTISING FOR  SEALED  BIDS,  A
   21  STATE  CONTRACTING  AGENCY  MAY PROCURE CONSTRUCTION SERVICES THROUGH AN
   22  ALTERNATIVE PROJECT DELIVERY METHODOLOGY FOR ANY PROJECT HAVING  A  COST
   23  OF  TWENTY-FIVE  MILLION  DOLLARS  OR  MORE,  PROVIDED  THAT  THE  STATE
   24  CONTRACTING AGENCY DETERMINES THAT  SUCH  ALTERNATIVE  PROJECT  DELIVERY
   25  METHODOLOGY,  RATHER THAN THE TRADITIONAL DESIGN-BID-BUILD PROCESS, WILL
   26  PROVIDE BEST VALUE TO THE  STATE.  PRIOR  TO  UTILIZING  AN  ALTERNATIVE
   27  PROJECT  DELIVERY  METHODOLOGY, THE AGENCY SHALL MAKE A WRITTEN DETERMI-
   28  NATION IDENTIFYING THE REASONS FOR USING AN ALTERNATIVE PROJECT DELIVERY
   29  METHODOLOGY, AND THE METHODOLOGY SELECTED. SUCH REASONS MAY INCLUDE, BUT
   30  NEED NOT BE LIMITED TO, BENEFITS RELATING TO THE PROJECT SCHEDULE,  COST
   31  OF THE PROJECT, AND PROJECT FEASIBILITY.
   32    3.  A  STATE  CONTRACTING  AGENCY  THAT  ELECTS  TO USE AN ALTERNATIVE
   33  PROJECT DELIVERY METHODOLOGY SHALL AWARD A CONTRACT FOR SUCH SERVICES BY
   34  COMPLETING A TWO STEP PROCESS: A. STEP ONE. THE AGENCY SHALL GENERATE  A
   35  LIST  OF  ENTITIES  THAT  HAVE  DEMONSTRATED  THE  GENERAL CAPABILITY TO
   36  PROVIDE  THE  ALTERNATIVE  PROJECT  DELIVERY  SERVICES  CHOSEN  FOR  THE
   37  PROJECT.  SUCH  LIST SHALL BE GENERATED BASED ON THE AGENCY'S EVALUATION
   38  TEAM'S REVIEW OF RESPONSES TO A PUBLICLY ADVERTISED REQUEST  FOR  QUALI-
   39  FICATIONS.  THE  AGENCY'S  REQUEST  FOR  QUALIFICATIONS  SHALL INCLUDE A
   40  GENERAL DESCRIPTION OF THE PROJECT, THE MAXIMUM NUMBER OF ENTITIES TO BE
   41  INCLUDED ON THE LIST, AND THE SELECTION CRITERIA TO BE USED IN DETERMIN-
   42  ING WHICH ENTITIES ARE ELIGIBLE TO RECEIVE REQUESTS FOR PROPOSALS PURSU-
   43  ANT TO PARAGRAPH B OF THIS SUBDIVISION.  THE  SELECTION  CRITERIA  SHALL
   44  INCLUDE  A  DESCRIPTION  OF  THE  RELATIVE WEIGHT TO BE ASSIGNED TO EACH
   45  CRITERIA. IN DETERMINING WHETHER AN ENTITY QUALIFIES  FOR  INCLUSION  ON
   46  SUCH  LIST, THE EVALUATION TEAM SHALL CONSIDER THE EXPERIENCE, EXPERTISE
   47  AND PAST PERFORMANCE OF THE ENTITY, THE ENTITY'S  ABILITY  TO  UNDERTAKE
   48  THE PROJECT, THE FINANCIAL CAPABILITY, RESPONSIBILITY AND RELIABILITY OF
   49  THE  ENTITY, AND SUCH OTHER QUALIFICATIONS AS THE AGENCY DEEMS APPROPRI-
   50  ATE. THE EVALUATION TEAM SHALL ALSO CONSIDER SKILLED LABOR FORCE  AVAIL-
   51  ABILITY,  WHETHER  PROPOSED KEY PERSONNEL HAVE SUFFICIENT EXPERIENCE AND
   52  TRAINING TO COMPETENTLY MANAGE AND COMPLETE THE DESIGN AND  CONSTRUCTION
   53  OF  THE  PROJECT,  AND OTHER NON-PRICE RELATED FACTORS. IN ADDITION, THE
   54  AGENCY SHALL CONSIDER  THE  ENTITY'S  WORKERS'  COMPENSATION  EXPERIENCE
   55  HISTORY  AND  WORKER SAFETY PROGRAMS. THE EVALUATION TEAM SHALL EVALUATE
   56  AND RATE ALL ENTITIES RESPONDING  TO  THE  REQUEST  FOR  QUALIFICATIONS.
       S. 1801                             3
    1  BASED  UPON  SUCH  RATINGS,  THE EVALUATION TEAM SHALL LIST THE ENTITIES
    2  THAT SHALL RECEIVE A REQUEST FOR PROPOSALS IN ACCORDANCE WITH  PARAGRAPH
    3  B OF THIS SUBDIVISION.
    4    B.  STEP  TWO.  THE  AGENCY SHALL ISSUE A REQUEST FOR PROPOSALS TO THE
    5  ENTITIES LISTED PURSUANT TO PARAGRAPH A OF THIS SUBDIVISION. IF SUCH  AN
    6  ENTITY  CONSISTS  OF  A  TEAM  OF  SEPARATE  ENTITIES, THE ENTITIES THAT
    7  COMPRISE SUCH A TEAM MUST REMAIN UNCHANGED FROM  THE  ENTITY  AS  LISTED
    8  PURSUANT  TO  PARAGRAPH  A  OF  THIS SUBDIVISION, UNLESS APPROVED BY THE
    9  AGENCY. THE REQUEST FOR PROPOSALS SHALL SET FORTH THE PROJECT'S SCOPE OF
   10  WORK, AND OTHER REQUIREMENTS AS DETERMINED BY THE  AGENCY.  THE  REQUEST
   11  FOR  PROPOSALS SHALL SPECIFY THE SELECTION CRITERIA TO BE USED TO EVALU-
   12  ATE THE RESPONSES AND THE RELATIVE WEIGHT TO BE ASSIGNED TO EACH  CRITE-
   13  RION.  THE  RESPONSES  SHALL  THEN  BE EVALUATED BASED UPON THE WEIGHTED
   14  CRITERIA  AND  SELECTION  PROCEDURES  IDENTIFIED  IN  THE  REQUEST   FOR
   15  PROPOSALS.  SUCH CRITERIA SHALL INCLUDE THE PROPOSAL'S COST, THE QUALITY
   16  OF THE PROPOSAL'S SOLUTION, THE QUALIFICATIONS  AND  EXPERIENCE  OF  THE
   17  DESIGN  AND CONSTRUCTION TEAM, AND OTHER FACTORS DEEMED PERTINENT BY THE
   18  AGENCY, WHICH MAY INCLUDE, BUT SHALL NOT BE LIMITED TO,  THE  PROPOSAL'S
   19  PROJECT  IMPLEMENTATION, ABILITY TO COMPLETE THE WORK IN A TIMELY, COST-
   20  EFFECTIVE AND SATISFACTORY MANNER, THE SIZE, TYPE,  AND  DESIRED  DESIGN
   21  CHARACTER OF THE PROJECT, PERFORMANCE SPECIFICATIONS COVERING THE QUALI-
   22  TY  OF  MATERIALS,  EQUIPMENT,  WORKMANSHIP,  PRELIMINARY PLANS, AND ANY
   23  OTHER INFORMATION THAT THE AGENCY DEEMS PERTINENT TO THE CONSTRUCTION OF
   24  THE PROJECT. ANY CONTRACT AWARDED PURSUANT  TO  THIS  SECTION  SHALL  BE
   25  AWARDED  TO  THE  RESPONSIVE  AND  RESPONSIBLE  ENTITY  THAT SUBMITS THE
   26  PROPOSAL, WHICH OFFERS THE BEST VALUE TO THE STATE, AS DETERMINED BY THE
   27  EVALUATION TEAM IN ACCORDANCE WITH THE ESTABLISHED SELECTION CRITERIA.
   28    4. WITHIN NINETY  DAYS  FOLLOWING  THE  SELECTION,  THE  AGENCY  SHALL
   29  PROVIDE  A  REPORT  OF  THE  FINDINGS OF THE EVALUATION TEAM. THE REPORT
   30  SHALL BE AVAILABLE TO THE PUBLIC FOR REVIEW.
   31    5. ANY CONTRACT ENTERED INTO PURSUANT TO THIS  SECTION  SHALL  REQUIRE
   32  THAT  ANY PROFESSIONAL SERVICES REGULATED BY ARTICLES ONE HUNDRED FORTY-
   33  FIVE, ONE HUNDRED FORTY-SEVEN AND ONE HUNDRED FORTY-EIGHT OF THE  EDUCA-
   34  TION  LAW  SHALL  BE  PERFORMED BY A PROFESSIONAL LICENSED IN ACCORDANCE
   35  WITH SUCH ARTICLES.
   36    6. ANY PROJECT UNDERTAKEN PURSUANT TO THIS SECTION SHALL BE  DEEMED  A
   37  PUBLIC WORK TO BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE
   38  EIGHT  OF  THE  LABOR  LAW AND SUBJECT TO ENFORCEMENT OF PREVAILING WAGE
   39  REQUIREMENTS BY THE DEPARTMENT OF LABOR.
   40    7. EACH CONTRACT ENTERED INTO BY THE AGENCY PURSUANT TO  THIS  SECTION
   41  SHALL  COMPLY  WITH THE OBJECTIVES AND GOALS OF MINORITY AND WOMEN-OWNED
   42  BUSINESS ENTERPRISES PURSUANT TO ARTICLE FIFTEEN-A OF THE EXECUTIVE  LAW
   43  AND,  FOR  PROJECTS  RECEIVING FEDERAL AID, SHALL COMPLY WITH APPLICABLE
   44  FEDERAL REQUIREMENTS FOR DISADVANTAGED BUSINESS ENTERPRISES.
   45    S 4. The public authorities law is amended by  adding  a  new  section
   46  2880-b to read as follows:
   47    S 2880-B. ALTERNATIVE PROJECT DELIVERY METHODS. 1. FOR THE PURPOSES OF
   48  THIS SECTION:
   49    A.   "ALTERNATIVE   PROJECT   DELIVERY  METHODOLOGY"  SHALL  MEAN  ANY
   50  CONSTRUCTION PROJECT DELIVERY METHODOLOGY WHEREBY  THE  PROCUREMENT  FOR
   51  THE CONSTRUCTION SERVICES IS OTHER THAN THE TRADITIONAL DESIGN-BID-BUILD
   52  PROCESS.
   53    B.  "STATE CONTRACTING AUTHORITY" OR "AUTHORITY" SHALL MEAN THE DORMI-
   54  TORY AUTHORITY, THE NEW YORK STATE THRUWAY AUTHORITY, THE NEW YORK  CITY
   55  SCHOOL CONSTRUCTION AUTHORITY, AND THE METROPOLITAN COMMUTER TRANSPORTA-
   56  TION AUTHORITY.
       S. 1801                             4
    1    C.  "EVALUATION  TEAM" SHALL MEAN A TEAM OF NOT LESS THAN FIVE PERSONS
    2  KNOWLEDGEABLE IN THE CONSTRUCTION INDUSTRY, TO  BE  FORMED  BY  A  STATE
    3  CONTRACTING  AUTHORITY  TO  EVALUATE  THE  QUALIFICATIONS  AND PROPOSALS
    4  SUBMITTED FOR THAT PROJECT.
    5    2.   NOTWITHSTANDING  ANY  OTHER  PROVISIONS  OF  THIS  TITLE  OR  THE
    6  PROVISIONS OF ANY GENERAL, SPECIAL OR LOCAL  LAW  THAT  MAY  REQUIRE  AN
    7  AUTHORITY  TO  AWARD  CONTRACTS  TO  THE LOWEST RESPONSIBLE BIDDER AFTER
    8  ADVERTISING FOR SEALED BIDS, A STATE CONTRACTING AUTHORITY  MAY  PROCURE
    9  CONSTRUCTION  SERVICES THROUGH AN ALTERNATIVE PROJECT DELIVERY METHODOL-
   10  OGY FOR ANY PROJECT HAVING A COST  OF  TWENTY-FIVE  MILLION  DOLLARS  OR
   11  MORE, PROVIDED THAT THE STATE CONTRACTING AUTHORITY DETERMINES THAT SUCH
   12  ALTERNATIVE  PROJECT  DELIVERY  METHODOLOGY, RATHER THAN THE TRADITIONAL
   13  DESIGN-BID-BUILD PROCESS, WILL PROVIDE BEST VALUE TO THE STATE. PRIOR TO
   14  UTILIZING AN ALTERNATIVE PROJECT  DELIVERY  METHODOLOGY,  THE  AUTHORITY
   15  SHALL  MAKE A WRITTEN DETERMINATION IDENTIFYING THE REASONS FOR USING AN
   16  ALTERNATIVE PROJECT DELIVERY METHODOLOGY, AND THE METHODOLOGY  SELECTED.
   17  SUCH  REASONS MAY INCLUDE, BUT NEED NOT BE LIMITED TO, BENEFITS RELATING
   18  TO THE PROJECT SCHEDULE, COST OF THE PROJECT, AND PROJECT FEASIBILITY.
   19    3. A STATE CONTRACTING AUTHORITY THAT ELECTS  TO  USE  AN  ALTERNATIVE
   20  PROJECT DELIVERY METHODOLOGY SHALL AWARD A CONTRACT FOR SUCH SERVICES BY
   21  COMPLETING A TWO STEP PROCESS: A. STEP ONE. THE AUTHORITY SHALL GENERATE
   22  A  LIST  OF  ENTITIES  THAT  HAVE DEMONSTRATED THE GENERAL CAPABILITY TO
   23  PROVIDE  THE  ALTERNATIVE  PROJECT  DELIVERY  SERVICES  CHOSEN  FOR  THE
   24  PROJECT.  SUCH  LIST  SHALL BE GENERATED BASED ON THE AUTHORITY'S EVALU-
   25  ATION TEAM'S REVIEW OF RESPONSES TO A PUBLICLY  ADVERTISED  REQUEST  FOR
   26  QUALIFICATIONS. THE AUTHORITY'S REQUEST FOR QUALIFICATIONS SHALL INCLUDE
   27  A  GENERAL DESCRIPTION OF THE PROJECT, THE MAXIMUM NUMBER OF ENTITIES TO
   28  BE INCLUDED ON THE LIST, AND THE SELECTION CRITERIA TO BE USED IN DETER-
   29  MINING WHICH ENTITIES ARE ELIGIBLE TO  RECEIVE  REQUESTS  FOR  PROPOSALS
   30  PURSUANT  TO  PARAGRAPH  B  OF  THIS SUBDIVISION. THE SELECTION CRITERIA
   31  SHALL INCLUDE A DESCRIPTION OF THE RELATIVE WEIGHT  TO  BE  ASSIGNED  TO
   32  EACH  CRITERIA. IN DETERMINING WHETHER AN ENTITY QUALIFIES FOR INCLUSION
   33  ON SUCH LIST, THE EVALUATION TEAM SHALL CONSIDER THE EXPERIENCE,  EXPER-
   34  TISE  AND PAST PERFORMANCE OF THE ENTITY, THE ENTITY'S ABILITY TO UNDER-
   35  TAKE THE PROJECT, THE FINANCIAL CAPABILITY, RESPONSIBILITY AND RELIABIL-
   36  ITY OF THE ENTITY, AND SUCH OTHER QUALIFICATIONS AS THE AUTHORITY  DEEMS
   37  APPROPRIATE. THE EVALUATION TEAM SHALL ALSO CONSIDER SKILLED LABOR FORCE
   38  AVAILABILITY,  WHETHER PROPOSED KEY PERSONNEL HAVE SUFFICIENT EXPERIENCE
   39  AND  TRAINING  TO  COMPETENTLY  MANAGE  AND  COMPLETE  THE  DESIGN   AND
   40  CONSTRUCTION  OF  THE  PROJECT,  AND OTHER NON-PRICE RELATED FACTORS. IN
   41  ADDITION, THE AUTHORITY SHALL CONSIDER  THE  ENTITY'S  WORKERS'  COMPEN-
   42  SATION  EXPERIENCE  HISTORY  AND  WORKER SAFETY PROGRAMS. THE EVALUATION
   43  TEAM SHALL EVALUATE AND RATE ALL ENTITIES RESPONDING TO THE REQUEST  FOR
   44  QUALIFICATIONS.  BASED UPON SUCH RATINGS, THE EVALUATION TEAM SHALL LIST
   45  THE ENTITIES THAT SHALL RECEIVE A REQUEST FOR  PROPOSALS  IN  ACCORDANCE
   46  WITH PARAGRAPH B OF THIS SUBDIVISION.
   47    B.  STEP TWO. THE AUTHORITY SHALL ISSUE A REQUEST FOR PROPOSALS TO THE
   48  ENTITIES LISTED PURSUANT TO PARAGRAPH A OF THIS SUBDIVISION. IF SUCH  AN
   49  ENTITY  CONSISTS  OF  A  TEAM  OF  SEPARATE  ENTITIES, THE ENTITIES THAT
   50  COMPRISE SUCH A TEAM MUST REMAIN UNCHANGED FROM  THE  ENTITY  AS  LISTED
   51  PURSUANT  TO  PARAGRAPH  A  OF  THIS SUBDIVISION, UNLESS APPROVED BY THE
   52  AUTHORITY. THE REQUEST FOR PROPOSALS SHALL SET FORTH THE PROJECT'S SCOPE
   53  OF WORK, AND OTHER REQUIREMENTS AS  DETERMINED  BY  THE  AUTHORITY.  THE
   54  REQUEST FOR PROPOSALS SHALL SPECIFY THE SELECTION CRITERIA TO BE USED TO
   55  EVALUATE  THE  RESPONSES  AND THE RELATIVE WEIGHT TO BE ASSIGNED TO EACH
   56  CRITERION. THE RESPONSES SHALL THEN BE EVALUATED BASED UPON THE WEIGHTED
       S. 1801                             5
    1  CRITERIA  AND  SELECTION  PROCEDURES  IDENTIFIED  IN  THE  REQUEST   FOR
    2  PROPOSALS.  SUCH CRITERIA SHALL INCLUDE THE PROPOSAL'S COST, THE QUALITY
    3  OF THE PROPOSAL'S SOLUTION, THE QUALIFICATIONS  AND  EXPERIENCE  OF  THE
    4  DESIGN  AND CONSTRUCTION TEAM, AND OTHER FACTORS DEEMED PERTINENT BY THE
    5  AUTHORITY,  WHICH  MAY  INCLUDE,  BUT  SHALL  NOT  BE  LIMITED  TO,  THE
    6  PROPOSAL'S  PROJECT  IMPLEMENTATION,  ABILITY  TO COMPLETE THE WORK IN A
    7  TIMELY, COST-EFFECTIVE AND SATISFACTORY  MANNER,  THE  SIZE,  TYPE,  AND
    8  DESIRED  DESIGN  CHARACTER  OF  THE  PROJECT, PERFORMANCE SPECIFICATIONS
    9  COVERING THE QUALITY OF MATERIALS, EQUIPMENT,  WORKMANSHIP,  PRELIMINARY
   10  PLANS,  AND  ANY OTHER INFORMATION THAT THE AUTHORITY DEEMS PERTINENT TO
   11  THE CONSTRUCTION OF THE PROJECT. ANY CONTRACT AWARDED PURSUANT  TO  THIS
   12  SECTION  SHALL  BE AWARDED TO THE RESPONSIVE AND RESPONSIBLE ENTITY THAT
   13  SUBMITS THE PROPOSAL, WHICH OFFERS THE   BEST VALUE  TO  THE  STATE,  AS
   14  DETERMINED  BY  THE  EVALUATION  TEAM IN ACCORDANCE WITH THE ESTABLISHED
   15  SELECTION CRITERIA.
   16    4. WITHIN NINETY DAYS FOLLOWING THE SELECTION, THE  STATE  CONTRACTING
   17  AUTHORITY SHALL PROVIDE A REPORT OF THE FINDINGS OF THE EVALUATION TEAM.
   18  THE REPORT SHALL BE AVAILABLE TO THE PUBLIC FOR REVIEW.
   19    5.  ANY  CONTRACT  ENTERED INTO PURSUANT TO THIS SECTION SHALL REQUIRE
   20  THAT ANY PROFESSIONAL SERVICES REGULATED BY ARTICLES ONE HUNDRED  FORTY-
   21  FIVE,  ONE HUNDRED FORTY-SEVEN AND ONE HUNDRED FORTY-EIGHT OF THE EDUCA-
   22  TION LAW SHALL BE PERFORMED BY A  PROFESSIONAL  LICENSED  IN  ACCORDANCE
   23  WITH SUCH ARTICLES.
   24    6.  ANY  PROJECT UNDERTAKEN PURSUANT TO THIS SECTION SHALL BE DEEMED A
   25  PUBLIC WORK TO BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE
   26  EIGHT OF THE LABOR LAW AND SUBJECT TO  ENFORCEMENT  OF  PREVAILING  WAGE
   27  REQUIREMENTS BY THE DEPARTMENT OF LABOR.
   28    7.  EACH  CONTRACT  ENTERED  INTO  BY  THE  AUTHORITY PURSUANT TO THIS
   29  SECTION SHALL COMPLY WITH THE  OBJECTIVES  AND  GOALS  OF  MINORITY  AND
   30  WOMEN-OWNED  BUSINESS  ENTERPRISES  PURSUANT TO ARTICLE FIFTEEN-A OF THE
   31  EXECUTIVE LAW AND, FOR PROJECTS RECEIVING FEDERAL AID, SHALL COMPLY WITH
   32  APPLICABLE FEDERAL REQUIREMENTS FOR DISADVANTAGED BUSINESS ENTERPRISES.
   33    S 5. The education law is amended by adding a  new  section  376-b  to
   34  read as follows:
   35    S 376-B. ALTERNATIVE PROJECT DELIVERY METHODS. 1. FOR PURPOSES OF THIS
   36  SECTION:
   37    A.   "ALTERNATIVE   PROJECT   DELIVERY  METHODOLOGY"  SHALL  MEAN  ANY
   38  CONSTRUCTION PROJECT DELIVERY METHODOLOGY WHEREBY  THE  PROCUREMENT  FOR
   39  THE CONSTRUCTION SERVICES IS OTHER THAN THE TRADITIONAL DESIGN-BID-BUILD
   40  PROCESS.
   41    B.  "EVALUATION  TEAM" SHALL MEAN A TEAM OF NOT LESS THAN FIVE PERSONS
   42  KNOWLEDGEABLE IN THE CONSTRUCTION INDUSTRY, TO  BE  FORMED  BY  A  STATE
   43  CONTRACTING  AUTHORITY  TO  EVALUATE  THE  QUALIFICATIONS  AND PROPOSALS
   44  SUBMITTED FOR THAT PROJECT.
   45    2. NOTWITHSTANDING THE PROVISIONS OF SECTION THREE HUNDRED SEVENTY-SIX
   46  OF THIS ARTICLE, OR THE PROVISIONS OF ANY GENERAL, SPECIAL OR LOCAL  LAW
   47  THAT  MAY REQUIRE AN AGENCY TO AWARD CONTRACTS TO THE LOWEST RESPONSIBLE
   48  BIDDER  AFTER  ADVERTISING  FOR  SEALED  BIDS,  THE  FUND  MAY   PROCURE
   49  CONSTRUCTION  SERVICES THROUGH AN ALTERNATIVE PROJECT DELIVERY METHODOL-
   50  OGY FOR ANY PROJECT HAVING A COST  OF  TWENTY-FIVE  MILLION  DOLLARS  OR
   51  MORE,  PROVIDED  THAT  THE FUND DETERMINES THAT SUCH ALTERNATIVE PROJECT
   52  DELIVERY METHODOLOGY, RATHER THAN THE TRADITIONAL DESIGN-BID-BUILD PROC-
   53  ESS, WILL PROVIDE BEST VALUE TO THE STATE. PRIOR TO UTILIZING AN  ALTER-
   54  NATIVE  PROJECT  DELIVERY  METHODOLOGY,  THE  FUND  SHALL MAKE A WRITTEN
   55  DETERMINATION IDENTIFYING THE REASONS FOR USING AN  ALTERNATIVE  PROJECT
   56  DELIVERY  METHODOLOGY,  AND  THE  METHODOLOGY SELECTED. SUCH REASONS MAY
       S. 1801                             6
    1  INCLUDE, BUT NEED NOT BE LIMITED TO, BENEFITS RELATING  TO  THE  PROJECT
    2  SCHEDULE, COST OF THE PROJECT, AND PROJECT FEASIBILITY.
    3    3. IF THE FUND ELECTS TO USE AN ALTERNATIVE PROJECT DELIVERY METHODOL-
    4  OGY,  THE  FUND SHALL AWARD A CONTRACT FOR SUCH SERVICES BY COMPLETING A
    5  TWO STEP PROCESS: A. STEP ONE. THE FUND SHALL GENERATE A LIST  OF  ENTI-
    6  TIES THAT HAVE DEMONSTRATED THE GENERAL CAPABILITY TO PROVIDE THE ALTER-
    7  NATIVE PROJECT DELIVERY SERVICES CHOSEN FOR THE PROJECT. SUCH LIST SHALL
    8  BE  GENERATED  BASED ON THE FUND'S EVALUATION TEAM'S REVIEW OF RESPONSES
    9  TO A PUBLICLY ADVERTISED REQUEST FOR QUALIFICATIONS. THE FUND'S  REQUEST
   10  FOR  QUALIFICATIONS  SHALL INCLUDE A GENERAL DESCRIPTION OF THE PROJECT,
   11  THE MAXIMUM NUMBER OF ENTITIES TO BE  INCLUDED  ON  THE  LIST,  AND  THE
   12  SELECTION CRITERIA TO BE USED IN DETERMINING WHICH ENTITIES ARE ELIGIBLE
   13  TO RECEIVE REQUESTS FOR PROPOSALS PURSUANT TO PARAGRAPH B OF THIS SUBDI-
   14  VISION.  THE SELECTION CRITERIA SHALL INCLUDE A DESCRIPTION OF THE RELA-
   15  TIVE WEIGHT TO BE ASSIGNED TO EACH CRITERIA. IN DETERMINING  WHETHER  AN
   16  ENTITY  QUALIFIES  FOR INCLUSION ON SUCH LIST, THE EVALUATION TEAM SHALL
   17  CONSIDER THE EXPERIENCE, EXPERTISE AND PAST PERFORMANCE OF  THE  ENTITY,
   18  THE ENTITY'S ABILITY TO UNDERTAKE THE PROJECT, THE FINANCIAL CAPABILITY,
   19  RESPONSIBILITY  AND RELIABILITY OF THE ENTITY, AND SUCH OTHER QUALIFICA-
   20  TIONS AS THE FUND DEEMS APPROPRIATE.  THE  EVALUATION  TEAM  SHALL  ALSO
   21  CONSIDER  SKILLED LABOR FORCE AVAILABILITY, WHETHER PROPOSED KEY PERSON-
   22  NEL HAVE SUFFICIENT EXPERIENCE AND TRAINING TO  COMPETENTLY  MANAGE  AND
   23  COMPLETE THE DESIGN AND CONSTRUCTION OF THE PROJECT, AND OTHER NON-PRICE
   24  RELATED FACTORS. IN ADDITION, THE FUND SHALL CONSIDER THE ENTITY'S WORK-
   25  ERS'  COMPENSATION  EXPERIENCE  HISTORY  AND WORKER SAFETY PROGRAMS. THE
   26  EVALUATION TEAM SHALL EVALUATE AND RATE ALL ENTITIES RESPONDING  TO  THE
   27  REQUEST FOR QUALIFICATIONS. BASED UPON SUCH RATINGS, THE EVALUATION TEAM
   28  SHALL  LIST  THE  ENTITIES THAT SHALL RECEIVE A REQUEST FOR PROPOSALS IN
   29  ACCORDANCE WITH PARAGRAPH B OF THIS SUBDIVISION.
   30    B. STEP TWO. THE FUND SHALL ISSUE A REQUEST FOR PROPOSALS TO THE ENTI-
   31  TIES LISTED PURSUANT TO PARAGRAPH A OF  THIS  SUBDIVISION.  IF  SUCH  AN
   32  ENTITY  CONSISTS  OF  A  TEAM  OF  SEPARATE  ENTITIES, THE ENTITIES THAT
   33  COMPRISE SUCH A TEAM MUST REMAIN UNCHANGED FROM  THE  ENTITY  AS  LISTED
   34  PURSUANT  TO  PARAGRAPH  A  OF  THIS SUBDIVISION, UNLESS APPROVED BY THE
   35  FUND. THE REQUEST FOR PROPOSALS SHALL SET FORTH THE PROJECT'S  SCOPE  OF
   36  WORK,  AND OTHER REQUIREMENTS AS DETERMINED BY THE FUND. THE REQUEST FOR
   37  PROPOSALS SHALL SPECIFY THE SELECTION CRITERIA TO BE  USED  TO  EVALUATE
   38  THE  RESPONSES AND THE RELATIVE WEIGHT TO BE ASSIGNED TO EACH CRITERION.
   39  THE RESPONSES SHALL THEN BE EVALUATED BASED UPON THE  WEIGHTED  CRITERIA
   40  AND  SELECTION  PROCEDURES IDENTIFIED IN THE REQUEST FOR PROPOSALS. SUCH
   41  CRITERIA  SHALL  INCLUDE  THE  PROPOSAL'S  COST,  THE  QUALITY  OF   THE
   42  PROPOSAL'S SOLUTION, THE QUALIFICATIONS AND EXPERIENCE OF THE DESIGN AND
   43  CONSTRUCTION TEAM, AND OTHER FACTORS DEEMED PERTINENT BY THE FUND, WHICH
   44  MAY  INCLUDE, BUT SHALL NOT BE LIMITED TO, THE PROPOSAL'S PROJECT IMPLE-
   45  MENTATION, ABILITY TO COMPLETE THE WORK IN A TIMELY, COST-EFFECTIVE  AND
   46  SATISFACTORY MANNER, THE SIZE, TYPE, AND DESIRED DESIGN CHARACTER OF THE
   47  PROJECT,  PERFORMANCE  SPECIFICATIONS COVERING THE QUALITY OF MATERIALS,
   48  EQUIPMENT, WORKMANSHIP, PRELIMINARY PLANS,  AND  ANY  OTHER  INFORMATION
   49  THAT  THE  FUND  DEEMS PERTINENT TO THE CONSTRUCTION OF THE PROJECT. ANY
   50  CONTRACT AWARDED PURSUANT TO  THIS  SECTION  SHALL  BE  AWARDED  TO  THE
   51  RESPONSIVE  AND  RESPONSIBLE  ENTITY  THAT  SUBMITS  THE PROPOSAL, WHICH
   52  OFFERS THE BEST VALUE TO THE STATE, AS DETERMINED BY THE EVALUATION TEAM
   53  IN ACCORDANCE WITH THE ESTABLISHED SELECTION CRITERIA.
   54    4. WITHIN NINETY DAYS FOLLOWING THE SELECTION, THE FUND SHALL  PROVIDE
   55  A  REPORT  OF  THE  FINDINGS OF THE EVALUATION TEAM. THE REPORT SHALL BE
   56  AVAILABLE TO THE PUBLIC FOR REVIEW.
       S. 1801                             7
    1    5. ANY CONTRACT ENTERED INTO PURSUANT TO THIS  SECTION  SHALL  REQUIRE
    2  THAT  ANY PROFESSIONAL SERVICES REGULATED BY ARTICLES ONE HUNDRED FORTY-
    3  FIVE, ONE HUNDRED FORTY-SEVEN AND ONE HUNDRED FORTY-EIGHT OF THIS  CHAP-
    4  TER  SHALL  BE  PERFORMED  BY A PROFESSIONAL LICENSED IN ACCORDANCE WITH
    5  SUCH ARTICLES.
    6    6.  ANY  PROJECT UNDERTAKEN PURSUANT TO THIS SECTION SHALL BE DEEMED A
    7  PUBLIC WORK TO BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE
    8  EIGHT OF THE LABOR LAW AND SUBJECT TO  ENFORCEMENT  OF  PREVAILING  WAGE
    9  REQUIREMENTS BY THE DEPARTMENT OF LABOR.
   10    7.  EACH  CONTRACT  ENTERED  INTO BY THE FUND PURSUANT TO THIS SECTION
   11  SHALL COMPLY WITH THE OBJECTIVES AND GOALS OF MINORITY  AND  WOMEN-OWNED
   12  BUSINESS  ENTERPRISES PURSUANT TO ARTICLE FIFTEEN-A OF THE EXECUTIVE LAW
   13  AND, FOR PROJECTS RECEIVING FEDERAL AID, SHALL  COMPLY  WITH  APPLICABLE
   14  FEDERAL REQUIREMENTS FOR DISADVANTAGED BUSINESS ENTERPRISES.
   15    S 6. The education law is amended by adding a new section 6284 to read
   16  as follows:
   17    S  6284. ALTERNATIVE PROJECT DELIVERY METHODS. 1. FOR PURPOSES OF THIS
   18  SECTION:
   19    A.  "ALTERNATIVE  PROJECT  DELIVERY  METHODOLOGY"   SHALL   MEAN   ANY
   20  CONSTRUCTION  PROJECT  DELIVERY  METHODOLOGY WHEREBY THE PROCUREMENT FOR
   21  THE CONSTRUCTION SERVICES IS OTHER THAN THE TRADITIONAL DESIGN-BID-BUILD
   22  PROCESS.
   23    B. "EVALUATION TEAM" SHALL MEAN A TEAM OF NOT LESS THAN  FIVE  PERSONS
   24  KNOWLEDGEABLE  IN THE CONSTRUCTION INDUSTRY, TO BE FORMED BY THE FUND TO
   25  EVALUATE THE QUALIFICATIONS AND PROPOSALS SUBMITTED FOR THAT PROJECT.
   26    2. NOTWITHSTANDING THE PROVISIONS OF ANY GENERAL, SPECIAL OR LOCAL LAW
   27  THAT MAY REQUIRE AN AGENCY TO AWARD CONTRACTS TO THE LOWEST  RESPONSIBLE
   28  BIDDER   AFTER  ADVERTISING  FOR  SEALED  BIDS,  THE  FUND  MAY  PROCURE
   29  CONSTRUCTION SERVICES THROUGH AN ALTERNATIVE PROJECT DELIVERY  METHODOL-
   30  OGY  FOR  ANY  PROJECT  HAVING  A COST OF TWENTY-FIVE MILLION DOLLARS OR
   31  MORE, PROVIDED THAT THE FUND DETERMINES THAT  SUCH  ALTERNATIVE  PROJECT
   32  DELIVERY METHODOLOGY, RATHER THAN THE TRADITIONAL DESIGN-BID-BUILD PROC-
   33  ESS,  WILL PROVIDE BEST VALUE TO THE STATE. PRIOR TO UTILIZING AN ALTER-
   34  NATIVE PROJECT DELIVERY METHODOLOGY,  THE  FUND  SHALL  MAKE  A  WRITTEN
   35  DETERMINATION  IDENTIFYING  THE REASONS FOR USING AN ALTERNATIVE PROJECT
   36  DELIVERY METHODOLOGY, AND THE METHODOLOGY SELECTED.   SUCH  REASONS  MAY
   37  INCLUDE,  BUT  NEED  NOT BE LIMITED TO, BENEFITS RELATING TO THE PROJECT
   38  SCHEDULE, COST OF THE PROJECT, AND PROJECT FEASIBILITY.
   39    3. IF THE FUND ELECTS TO USE AN ALTERNATIVE PROJECT DELIVERY METHODOL-
   40  OGY, THE FUND SHALL AWARD A CONTRACT FOR SUCH SERVICES BY  COMPLETING  A
   41  TWO  STEP  PROCESS: A. STEP ONE. THE FUND SHALL GENERATE A LIST OF ENTI-
   42  TIES THAT HAVE DEMONSTRATED THE GENERAL CAPABILITY TO PROVIDE THE ALTER-
   43  NATIVE PROJECT DELIVERY SERVICES CHOSEN FOR THE PROJECT. SUCH LIST SHALL
   44  BE GENERATED BASED ON THE FUND'S EVALUATION TEAM'S REVIEW  OF  RESPONSES
   45  TO  A PUBLICLY ADVERTISED REQUEST FOR QUALIFICATIONS. THE FUND'S REQUEST
   46  FOR QUALIFICATIONS SHALL INCLUDE A GENERAL DESCRIPTION OF  THE  PROJECT,
   47  THE  MAXIMUM  NUMBER  OF  ENTITIES  TO  BE INCLUDED ON THE LIST, AND THE
   48  SELECTION CRITERIA TO BE USED IN DETERMINING WHICH ENTITIES ARE ELIGIBLE
   49  TO RECEIVE REQUESTS FOR PROPOSALS PURSUANT TO PARAGRAPH B OF THIS SUBDI-
   50  VISION. THE SELECTION CRITERIA SHALL INCLUDE A DESCRIPTION OF THE  RELA-
   51  TIVE  WEIGHT  TO BE ASSIGNED TO EACH CRITERIA. IN DETERMINING WHETHER AN
   52  ENTITY QUALIFIES FOR INCLUSION ON SUCH LIST, THE EVALUATION  TEAM  SHALL
   53  CONSIDER  THE  EXPERIENCE, EXPERTISE AND PAST PERFORMANCE OF THE ENTITY,
   54  THE ENTITY'S ABILITY TO UNDERTAKE THE PROJECT, THE FINANCIAL CAPABILITY,
   55  RESPONSIBILITY AND RELIABILITY OF THE ENTITY, AND SUCH OTHER  QUALIFICA-
   56  TIONS  AS  THE  FUND  DEEMS  APPROPRIATE. THE EVALUATION TEAM SHALL ALSO
       S. 1801                             8
    1  CONSIDER SKILLED LABOR FORCE AVAILABILITY, WHETHER PROPOSED KEY  PERSON-
    2  NEL  HAVE  SUFFICIENT  EXPERIENCE AND TRAINING TO COMPETENTLY MANAGE AND
    3  COMPLETE THE DESIGN AND CONSTRUCTION OF THE PROJECT, AND OTHER NON-PRICE
    4  RELATED FACTORS. IN ADDITION, THE FUND SHALL CONSIDER THE ENTITY'S WORK-
    5  ERS'  COMPENSATION  EXPERIENCE  HISTORY  AND WORKER SAFETY PROGRAMS. THE
    6  EVALUATION TEAM SHALL EVALUATE AND RATE ALL ENTITIES RESPONDING  TO  THE
    7  REQUEST FOR QUALIFICATIONS. BASED UPON SUCH RATINGS, THE EVALUATION TEAM
    8  SHALL  LIST  THE  ENTITIES THAT SHALL RECEIVE A REQUEST FOR PROPOSALS IN
    9  ACCORDANCE WITH PARAGRAPH B OF THIS SUBDIVISION.
   10    B. STEP TWO. THE FUND SHALL ISSUE A REQUEST FOR PROPOSALS TO THE ENTI-
   11  TIES LISTED PURSUANT TO PARAGRAPH A OF  THIS  SUBDIVISION.  IF  SUCH  AN
   12  ENTITY  CONSISTS  OF  A  TEAM  OF  SEPARATE  ENTITIES, THE ENTITIES THAT
   13  COMPRISE SUCH A TEAM MUST REMAIN UNCHANGED FROM  THE  ENTITY  AS  LISTED
   14  PURSUANT  TO  PARAGRAPH  A  OF  THIS SUBDIVISION, UNLESS APPROVED BY THE
   15  FUND. THE REQUEST FOR PROPOSALS SHALL SET FORTH THE PROJECT'S  SCOPE  OF
   16  WORK,  AND OTHER REQUIREMENTS AS DETERMINED BY THE FUND. THE REQUEST FOR
   17  PROPOSALS SHALL SPECIFY THE SELECTION CRITERIA TO BE  USED  TO  EVALUATE
   18  THE  RESPONSES AND THE RELATIVE WEIGHT TO BE ASSIGNED TO EACH CRITERION.
   19  THE RESPONSES SHALL THEN BE EVALUATED BASED UPON THE  WEIGHTED  CRITERIA
   20  AND  SELECTION  PROCEDURES IDENTIFIED IN THE REQUEST FOR PROPOSALS. SUCH
   21  CRITERIA  SHALL  INCLUDE  THE  PROPOSAL'S  COST,  THE  QUALITY  OF   THE
   22  PROPOSAL'S SOLUTION, THE QUALIFICATIONS AND EXPERIENCE OF THE DESIGN AND
   23  CONSTRUCTION TEAM, AND OTHER FACTORS DEEMED PERTINENT BY THE FUND, WHICH
   24  MAY  INCLUDE, BUT SHALL NOT BE LIMITED TO, THE PROPOSAL'S PROJECT IMPLE-
   25  MENTATION, ABILITY TO COMPLETE THE WORK IN A TIMELY, COST-EFFECTIVE  AND
   26  SATISFACTORY MANNER, THE SIZE, TYPE, AND DESIRED DESIGN CHARACTER OF THE
   27  PROJECT,  PERFORMANCE  SPECIFICATIONS COVERING THE QUALITY OF MATERIALS,
   28  EQUIPMENT, WORKMANSHIP, PRELIMINARY PLANS,  AND  ANY  OTHER  INFORMATION
   29  THAT  THE  FUND  DEEMS PERTINENT TO THE CONSTRUCTION OF THE PROJECT. ANY
   30  CONTRACT AWARDED PURSUANT TO  THIS  SECTION  SHALL  BE  AWARDED  TO  THE
   31  RESPONSIVE  AND  RESPONSIBLE  ENTITY  THAT  SUBMITS  THE PROPOSAL, WHICH
   32  OFFERS THE BEST VALUE TO THE STATE, AS DETERMINED BY THE EVALUATION TEAM
   33  IN ACCORDANCE WITH THE ESTABLISHED SELECTION CRITERIA.
   34    4. WITHIN NINETY DAYS FOLLOWING THE SELECTION, THE FUND SHALL  PROVIDE
   35  A  REPORT  OF  THE  FINDINGS OF THE EVALUATION TEAM. THE REPORT SHALL BE
   36  AVAILABLE TO THE PUBLIC FOR REVIEW.
   37    5. ANY CONTRACT ENTERED INTO PURSUANT TO THIS  SECTION  SHALL  REQUIRE
   38  THAT  ANY PROFESSIONAL SERVICES REGULATED BY ARTICLES ONE HUNDRED FORTY-
   39  FIVE, ONE HUNDRED FORTY-SEVEN AND ONE HUNDRED FORTY-EIGHT OF THIS  CHAP-
   40  TER  SHALL  BE  PERFORMED  BY A PROFESSIONAL LICENSED IN ACCORDANCE WITH
   41  SUCH ARTICLES.
   42    6. ANY PROJECT UNDERTAKEN PURSUANT TO THIS SECTION SHALL BE  DEEMED  A
   43  PUBLIC WORK TO BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE
   44  EIGHT  OF  THE  LABOR  LAW AND SUBJECT TO ENFORCEMENT OF PREVAILING WAGE
   45  REQUIREMENTS BY THE DEPARTMENT OF LABOR.
   46    7. EACH CONTRACT ENTERED INTO BY THE FUND  PURSUANT  TO  THIS  SECTION
   47  SHALL  COMPLY  WITH THE OBJECTIVES AND GOALS OF MINORITY AND WOMEN-OWNED
   48  BUSINESS ENTERPRISES PURSUANT TO ARTICLE FIFTEEN-A OF THE EXECUTIVE  LAW
   49  AND,  FOR  PROJECTS  RECEIVING FEDERAL AID, SHALL COMPLY WITH APPLICABLE
   50  FEDERAL REQUIREMENTS FOR DISADVANTAGED BUSINESS ENTERPRISES.
   51    S 7. This act shall take effect immediately.