The provisions of this act shall not apply to a clean baseload generating plant if such plant is rated at three hundred megawatts or less. Before any such construction work begins, an electrical corporation seeking to include construction work in progress in its rates shall file a plan detailing the projected costs of such plan and a plan to recover such costs through rates with the Public Service Commission.
Costs recovered by an electrical corporation under this act are subject to inclusion or exclusion from rates in a ratemaking proceeding. If the Commission determines that such construction work was not completed within a reasonable time, the Commission shall reduce rates in an amount equal to all amounts recovered in advance by an electrical corporation from ratepayers as described in this act.
This act is identical to HCS/HB 1804 (2024), similar to SB 928 (2024), SB 333 (2023), HB 1684 (2022) and HB 261 (2021).