Bill Text: MN HF113 | 2017-2018 | 90th Legislature | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Natural gas combined cycle electric generation plant construction and operation authorized.
Spectrum: Partisan Bill (Republican 3-0)
Status: (Passed) 2017-03-01 - Secretary of State Chapter 5 02/28/17 [HF113 Detail]
Download: Minnesota-2017-HF113-Introduced.pdf
Bill Title: Natural gas combined cycle electric generation plant construction and operation authorized.
Spectrum: Partisan Bill (Republican 3-0)
Status: (Passed) 2017-03-01 - Secretary of State Chapter 5 02/28/17 [HF113 Detail]
Download: Minnesota-2017-HF113-Introduced.pdf