Bill Text: MI SB0282 | 2015-2016 | 98th Legislature | Introduced


Bill Title: Public utilities; electric utilities; Michigan electric infrastructure act; create. Creates new act.

Spectrum: Moderate Partisan Bill (Republican 8-2)

Status: (Introduced - Dead) 2015-04-21 - Referred To Committee On Energy And Technology [SB0282 Detail]

Download: Michigan-2015-SB0282-Introduced.html

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SENATE BILL No. 282

 

 

April 21, 2015, Introduced by Senators CASPERSON, HORN, KNEZEK, O'BRIEN, STAMAS, SCHMIDT, SCHUITMAKER, ANANICH, KOWALL and SHIRKEY and referred to the Committee on Energy and Technology.

 

 

 

     A bill to regulate the siting and construction of certain

 

electric transmission lines; to prescribe powers and duties of

 

certain state and local entities and officials; to create a board;

 

to prescribe the board's powers and duties; and to provide for

 

certain fees.

 

THE PEOPLE OF THE STATE OF MICHIGAN ENACT:

 

     Sec. 1. This act shall be known and may be cited as the

 

"Michigan electric infrastructure act".

 

     Sec. 2. As used in this act:

 

     (a) "Board" means the Michigan electric infrastructure board

 

created in section 3.

 

     (b) "Commission" means the Michigan public service commission

 

created in section 1 of 1939 PA 3, MCL 460.1.


     (c) "Construction" means any substantial action constituting

 

placement or erection of the foundations, trenches, facilities,

 

equipment, or structures supporting a transmission line including,

 

but not limited to, the conductors, wires, or other equipment

 

attached to the structures. Construction does not include

 

preconstruction activity or the addition of circuits to an existing

 

transmission line.

 

     (d) "Electric utility" means a person, partnership,

 

corporation, association, or other legal entity whose transmission

 

or distribution of electricity the commission regulates under 1909

 

PA 106, MCL 460.551 to 460.559, or 1939 PA 3, MCL 460.1 to 460.11.

 

Electric utility does not include an independent transmission

 

company.

 

     (e) "Good cause" means an event or circumstance, whether or

 

not foreseeable, not caused by a qualified developer that prevents

 

the qualified developer from complying with an obligation under

 

this act. Good cause does not include a strike or other labor

 

unrest that affects only the qualified developer, an increase in

 

prices or other change in general economic conditions, or a change

 

in law or regulations.

 

     (f) "Independent transmission company" means that term as

 

defined in section 2 of the electric transmission line

 

certification act, 1995 PA 30, MCL 460.562.

 

     (g) "Municipality" means a city, township, or village.

 

     (h) "Notice to construct" means a notice issued by the board

 

granting an entity the sole right to construct a transmission line

 

until the notice to construct expires.


     (i) "Preconstruction activity" means that term as defined in

 

section 2 of the electric transmission line certification act, 1995

 

PA 30, MCL 460.562.

 

     (j) "Qualified developer" means either of the following:

 

     (i) An independent transmission company that commits to

 

support and advocate for the implementation of 1 resource adequacy

 

zone that includes both the Upper and Lower Peninsulas of this

 

state.

 

     (ii) An entity that the board determines meets all of the

 

criteria stated in section 5(4).

 

     (k) "Resource adequacy zone" means a geographic area, defined

 

by a regional transmission organization, for which there must be

 

access to sufficient total generation capacity, both internal and

 

importable into the zone, to serve load in accordance with the

 

regional transmission organization's requirements.

 

     (l) "Route" means real property or other infrastructure on or

 

across which a transmission line is constructed or proposed to be

 

constructed.

 

     (m) "Transmission line" means all structures, equipment, and

 

real property necessary to transfer electricity at system bulk

 

supply voltage of 100 kilovolts or more.

 

     (n) "Utility corridor" means the geographic area necessary to

 

accommodate the construction and operation of 1 or more electric

 

transmission or distribution lines.

 

     Sec. 3. (1) The Michigan electric infrastructure board is

 

created within the department of licensing and regulatory affairs.

 

The board shall consist of 7 members, appointed by the governor as


follows:

 

     (a) One individual representing the department of

 

environmental quality.

 

     (b) One individual representing the department of natural

 

resources.

 

     (c) One individual representing the state energy office.

 

     (d) One individual representing the Michigan economic

 

development corporation.

 

     (e) One individual representing the technical staff of the

 

commission.

 

     (f) One resident of the Upper Peninsula.

 

     (g) One resident of the Lower Peninsula.

 

     (2) The members initially appointed under subsection (1) shall

 

be appointed within 30 days after the effective date of this act.

 

     (3) The board shall exercise its powers, duties, and decision-

 

making authority independently of the commission.

 

     (4) The board shall ensure that adequate resources will be

 

able to reach electric consumers in this state through the

 

construction of transmission infrastructure that will reduce

 

congestion and energy prices in this state, provide for additional

 

transmission capacity in this state, ensure reliable and efficient

 

operation of the integrated electrical transmission system in this

 

state, and support this state's energy policy goals.

 

     Sec. 5. (1) Within 30 days of the initial appointment of the

 

board under section 3, the board shall publish a list of counties

 

within this state that contain transmission facilities on which

 

constraints have caused congestion in the 5 years preceding the


publication of that list, leading to increased electricity prices.  

 

(2) Within 60 days after the board publishes the list under

 

subsection (1), the board shall request interested entities to

 

submit proposals identifying any proposed transmission line

 

necessary to do any of the following:

 

     (a) Provide additional transmission capacity to the geographic

 

areas of this state that include the counties identified in

 

subsection (1), reduce congestion, constraints, and losses on the

 

electrical system in this state, and reduce the overall cost of

 

delivered energy in this state.

 

     (b) Ensure the deliverability of generation resources both

 

internal and external to this state to loads throughout this state

 

for purposes of resource adequacy.

 

     (c) Facilitate generation resource diversification.

 

     (d) Increase the electrical connectivity between the Upper and

 

Lower Peninsulas of this state beyond the capability provided by

 

the 2 circuits connecting the Upper and Lower Peninsulas of this

 

state existing on the effective date of this act by adding

 

additional circuitry beyond the normal power carrying capacity of

 

these circuits to enable the formation of 1 resource adequacy zone

 

within the Midcontinent Independent System Operator footprint in

 

this state.

 

     (3) Any proposals submitted under subsection (2) must include

 

all of the following:

 

     (a) A preliminary cost estimate for the identified

 

transmission line.

 

     (b) An analysis of the estimated cost impact to retail


ratepayers if the cost of the transmission line were allocated to

 

all retail electric customers located in the Midcontinent

 

Independent System Operator footprint in this state.

 

     (c) Any benefits associated with the transmission line.

 

     (d) A statement from the entity submitting the proposal that

 

indicates why that entity is a qualified developer.

 

     (4) After receiving a proposal under subsection (2), the board

 

shall determine whether an interested entity is a qualified

 

developer. To be considered a qualified developer, an entity must

 

be an independent transmission company or must demonstrate all of

 

the following:

 

     (a) A commitment to support and advocate for the

 

implementation of a resource adequacy zone that includes both the

 

Upper and Lower Peninsulas of this state.

 

     (b) Managerial expertise and capability, as demonstrated by

 

all of the following:

 

     (i) A history of singular corporate focus on transmission.

 

     (ii) The continuous operation of a networked transmission

 

system in this state during the 5 years before a proposal is

 

submitted under subsection (2).

 

     (iii) A governance structure or control of the entity that is

 

independent of the users of the transmission facilities, and that

 

no member of the entity's board of directors has an affiliation

 

with a user of the transmission facilities or with an affiliate of

 

a user during the member's tenure on the board, that would unduly

 

affect the entity's performance. As used in this subparagraph,

 

"user" means any entity or affiliate of that entity that buys or


sells electricity in the entity's region or in a neighboring

 

region.

 

     (iv) Technical and engineering qualifications and experience

 

in the design, construction, operation, and maintenance of

 

transmission lines.

 

     (c) Financial strength and capability, as demonstrated by all

 

of the following:

 

     (i) That securities of that entity have been issued through an

 

initial public offering.

 

     (ii) That the entity has securities traded on at least 1 stock

 

exchange or in the over-the-counter market.

 

     (iii) That the entity has a registration statement on file

 

with the federal Securities and Exchange Commission.

 

     (iv) That the entity has an investment grade credit rating

 

from a nationally recognized statistical rating organization.

 

     (v) That the entity has access to capital markets.

 

     (vi) That the entity has the ability to cover losses resulting

 

from damage to or failure of any part of the facilities of the

 

transmission line in the normal course of business or financial

 

strategy and experience to facilitate timely replacements or

 

rebuilds as a result of catastrophic destruction or natural aging.

 

     (d) Transmission planning expertise and capability, as

 

demonstrated by all of the following:

 

     (i) That the entity has qualified engineers responsible for

 

planning functions.

 

     (ii) The entity's prior experience in multiple regional

 

transmission organization planning processes.


     (iii) The entity's experience in planning transmission lines

 

with a voltage level of at least 300 kilovolts.

 

     (iv) The entity's experience in complying with transmission

 

planning criteria and guidelines, including those relevant to

 

interconnection with existing facilities.

 

     (v) The entity's experience in addressing public concerns

 

regarding transmission lines.

 

     (e) Construction expertise and capability, as demonstrated by

 

all of the following:

 

     (i) The entity's history of successful construction of

 

transmission lines at voltage levels of at least 300 kilovolts.

 

     (ii) The entity's ability to meet a schedule for the

 

development and completion of the transmission line consistent with

 

the identified date by which the project is needed.

 

     (iii) The entity's demonstrated ability to construct projects

 

in accordance with project budgets.

 

     (iv) The entity's experience in acquiring rights-of-way to

 

facilitate approval and construction of transmission lines.

 

     (v) The entity's land acquisition experience.

 

     (vi) The entity's permitting and siting experience.

 

     (vii) Whether the entity has a sufficiently sized skilled

 

workforce.

 

     (viii) The entity's established supply chain and vendor

 

relationships.

 

     (f) Operations and maintenance capability, as demonstrated by

 

all of the following:

 

     (i) The entity's performance on benchmarking studies in the


areas of reliability, storm response, and safety.

 

     (ii) Whether the entity has been registered with the North

 

American Electric Reliability Corporation as a transmission owner,

 

transmission operator, and transmission planner for the 5 years

 

before a proposal is submitted under subsection (2).

 

     (iii) The entity's compliance with the North American Electric

 

Reliability Corporation registration requirements and regional

 

entity reliability standards for the 5 years before a proposal is

 

submitted under subsection (2).

 

     (iv) Ownership training, certification, and operations center

 

experience.

 

     (v) Operation of diverse equipment types, including poles,

 

conduits, insulators, and transformers.

 

     (vi) Sufficiently sized skilled workforce.

 

     (vii) Sufficient capabilities and competencies to perform

 

operations, maintenance, testing, inspection, repair, and

 

replacement tasks including outage response, switching, emergency

 

repairs, preventative or predictive maintenance, management of

 

spare equipment, real-time operations monitoring and control

 

capabilities, and major facility replacements or rebuilds.

 

     (viii) Capability to maintain real-time reliability of the

 

electric transmission system, ensuring comparable and

 

nondiscriminatory transmission access and necessary services,

 

minimizing system congestion, and further addressing real or

 

potential transmission constraints.

 

     (ix) Intention to construct, own, operate, and maintain an

 

electric transmission facility that is under consideration by an


applicable regional transmission organization.

 

     (x) Established supply chain and vendor relationships.

 

     (g) Exemplary corporate citizenship, as demonstrated by all of

 

the following:

 

     (i) Community outreach.

 

     (ii) Communication and information-sharing during all phases

 

of transmission line development, construction, and operation.

 

     (iii) Civic contributions to regional, state, and local

 

communities.

 

     (iv) Whether the transmission entity operates under policies

 

that promote positive performance designed to satisfy the

 

electricity requirements of customers.

 

     (v) A dedicated customer service department.

 

     (5) Within 120 days after receiving a proposal from a

 

qualified developer under subsection (2), the board shall issue a

 

letter to the qualified developer either rejecting the

 

qualifications or recommendations of the qualified developer in

 

full, requesting that the qualified developer provide more

 

information, or recommending the construction of the proposed

 

transmission line. If the board requests more information under

 

this subsection, the board shall, within 45 days of receiving that

 

information from a qualified developer, either reject the

 

recommendations or recommend construction of the proposed

 

transmission line. If the board issues a letter recommending

 

construction of a proposed transmission line, the qualified

 

developer receiving the letter shall, within 30 days after the

 

board issues the letter, submit an expression of interest in


constructing the transmission line identified by the board. If the

 

qualified developer does not submit an expression of interest

 

within 30 days after the board issues a letter under this

 

subsection, the board may issue a new request for submission of

 

proposals under subsection (2). Within 7 days after a qualified

 

developer has submitted an expression of interest, the board shall

 

issue the qualified developer that submitted the expression of

 

interest a notice to construct.

 

     (6) The board may take any actions necessary and appropriate

 

to support a transmission line for which a notice to construct has

 

been issued, including coordination with the Midcontinent

 

Independent System Operator, supporting any out-of-cycle review

 

request, execution of any contracts or agreements, and preparation,

 

submission, and support for filings related to that project before

 

the Federal Energy Regulatory Commission or any other regulatory

 

body.

 

     (7) The board shall initially give priority to proposals for a

 

transmission line that accomplishes the purpose stated in

 

subsection (2)(d).

 

     (8) A document submitted to the board under this section is

 

not subject to disclosure under the freedom of information act,

 

1976 PA 442, MCL 15.231 to 15.246. The business that the board may

 

perform shall be conducted at a public meeting of the board held in

 

compliance with the open meetings act, 1976 PA 267, MCL 15.261 to

 

15.275.

 

     Sec. 6. (1) Within 60 days after receiving a notice to

 

construct under section 5, a qualified developer shall submit any


necessary documents to the Midcontinent Independent System Operator

 

or other applicable regional transmission organization for any

 

required review and approval.

 

     (2) Within 120 days after obtaining any required reviews and

 

approvals from the Midcontinent Independent System Operator or

 

other applicable regional transmission organization, the qualified

 

developer shall apply to the commission for an expedited siting

 

certificate under this act. If a qualified developer does not apply

 

to the commission within 120 days after obtaining any required

 

reviews and approvals from the applicable regional transmission

 

organization, the commission shall revoke the notice to construct

 

and the board may solicit expressions of interest for the

 

transmission line project under section 5. The commission may waive

 

the 120-day time limit if it determines the qualified developer had

 

good cause for failing to apply to the commission for an expedited

 

siting certificate within 120 days.

 

     (3) A qualified developer shall include all of the following

 

in an application for an expedited siting certificate:

 

     (a) Evidence that the applicant obtained a notice to construct

 

for the transmission line under section 5.

 

     (b) The planned date to begin construction of the proposed

 

transmission line.

 

     (c) A detailed description, route, and expected configuration

 

and use of the proposed transmission line.

 

     (d) Information indicating that the proposed transmission line

 

will comply with all applicable state and federal environmental

 

standards, laws, and rules.


     (e) A description and evaluation of 1 or more alternate

 

transmission line routes for the proposed transmission line, and a

 

statement of why the proposed route was selected.

 

     (f) If a zoning ordinance prohibits or regulates the location

 

or development of any portion of the proposed route, a description

 

of the location and manner in which the zoning ordinance prohibits

 

or regulates the location or construction of the proposed route.

 

     (g) Other information reasonably required by commission rules.

 

     (4) After applying for an expedited siting certificate, an

 

applicant shall give public notice in the manner and form the

 

commission prescribes of an opportunity to participate in a

 

contested case under subsection (5) regarding the application.

 

Notice shall be published in a newspaper of general circulation in

 

the municipalities through which the proposed transmission line

 

project would run within 14 days after an application is submitted

 

to the commission under subsection (2). The notice shall be sent to

 

each affected municipality and each affected landowner on whose

 

property a portion of the proposed transmission line will be

 

constructed. The notice shall be written in plain, nontechnical,

 

and easily understood terms and contain a title that includes the

 

name of the applicant and the words "Notice of Intent to Construct

 

a Transmission Line".

 

     (5) The commission shall conduct a proceeding on an

 

application for an expedited siting certificate as a contested case

 

under the administrative procedures act of 1969, 1969 PA 306, MCL

 

24.201 to 24.328. Upon receiving an application for a certificate,

 

the commission shall grant each affected municipality and each


affected landowner full intervener status as of right in commission

 

proceedings concerning the proposed transmission line.

 

     (6) The commission shall grant an expedited siting certificate

 

under this act if the commission determines that all of the

 

following requirements are met:

 

     (a) The applicant has received a notice to construct for the

 

proposed transmission line under section 5.

 

     (b) The proposed transmission line does not represent an

 

unreasonable threat to the public convenience, health, and safety.

 

     (c) The proposed or alternate route to be authorized by the

 

expedited siting certificate is feasible and reasonable.

 

     (7) If the commission grants an expedited siting certificate

 

for a transmission line under this act, the certificate takes

 

precedence over a conflicting local ordinance, law, rule,

 

regulation, policy, or practice that prohibits or regulates the

 

location or construction of the transmission line. A zoning

 

ordinance or limitation imposed after a qualified developer applied

 

for an expedited citing certificate does not limit or impair the

 

transmission line's construction, operation, or maintenance.

 

     (8) In an eminent domain or other related proceeding arising

 

out of or related to a transmission line for which an expedited

 

siting certificate is issued under this act, an expedited siting

 

certificate issued under this act is conclusive and binding as to

 

the public convenience and necessity for that transmission line and

 

the transmission line's compatibility with the public health and

 

safety or any zoning or land use requirements in effect when the

 

application was filed.


     (9) The commission shall grant or deny an expedited siting

 

certificate within 180 days after receiving an application under

 

this section.

 

     Sec. 8. If a transmission line constructed under this act is

 

located within an existing utility corridor owned by an electric

 

utility or independent transmission company other than the

 

qualified developer constructing the transmission line, in addition

 

to any fees or payments related to acquiring the rights to use the

 

utility corridor, the qualified developer constructing the

 

transmission line under this act shall make a 1-time payment to the

 

electric utility or independent transmission company owning that

 

corridor. The payment shall be equal to 50% of the tax assessed to

 

the electric utility or independent transmission company in the

 

prior tax year under the general property tax act, 1893 PA 206, MCL

 

211.1 to 211.155, for the utility corridor in which the

 

transmission line constructed under this act is located.

 

     Sec. 9. (1) The costs of a transmission line for which a

 

notice to construct is issued under this act shall be allocated to

 

all retail electric customers located in the Midcontinent

 

Independent System Operator footprint within this state.

 

     (2) The revenue requirement for a transmission line for which

 

a notice to construct is issued shall be calculated pursuant to the

 

open access transmission, energy and operating reserve markets

 

tariff administered by the Midcontinent Independent System

 

Operator.

 

     (3) The board shall cooperate with the recipient of the notice

 

to construct, the commission, and the Midcontinent Independent


System Operator in making any filings necessary to implement the

 

cost allocation established in this section.

 

     Sec. 10. The commission shall issue a report to the governor

 

and the legislature on or before the first Monday of March of each

 

year. The report shall include all of the following:

 

     (a) A summary of the impact of this act.

 

     (b) A list of any transmission lines constructed or approved

 

under this act during the previous year.

 

     Sec. 11. Except for a transmission line for which another

 

entity holds a valid notice to construct that has not expired under

 

this act, this act does not prohibit an entity from constructing a

 

transmission line without obtaining an expedited siting

 

certificate.

 

     Sec. 12. (1) A commission order relating to any matter

 

provided for under this act is subject to review as provided in

 

section 26 of 1909 PA 300, MCL 462.26.

 

     (2) In administering this act, the commission has only those

 

powers and duties granted to it under this act.

 

     Sec. 13. This act does not confer the power of eminent domain.

 

     Enacting section 1. This act takes effect 90 days after the

 

date it is enacted into law.

feedback