Bill Text: MA H3787 | 2009-2010 | 186th General Court | Introduced
Bill Title: That the Highway Department create a timeline for interchange improvements along Route 128 from the city of Peabody to the town of Gloucester
Sponsorship: Partisan Bill (Democrat 1)
Status: (Introduced - Dead) 2009-01-20 - Public Hearing date 9/10 at 11:00 AM in Hearing Room B1 [H3787 Detail]
Download: Massachusetts-2009-H3787-Introduced.html
The Commonwealth of Massachusetts
_______________
PRESENTED BY:
Mary E. Grant
_______________
To the
Honorable Senate and House of Representatives of the Commonwealth of
Massachusetts in General
��������������� Court assembled:
��������������� The undersigned legislators and/or citizens respectfully petition for the passage of the accompanying bill:
An Act to Route 128 interchange improvements.
_______________
PETITION OF:
|
Name: |
District/Address: |
|
Mary E. Grant |
6th Essex |
|
Theodore C. Speliotis |
13th Essex |
|
Bruce E. Tarr |
First Essex and Middlesex |
|
Ann-Margaret Ferrante |
5th Essex |
The Commonwealth of
Massachusetts
_______________
In the Year Two Thousand and Nine
_______________
An Act to Route 128 interchange improvements.
��������������� Be
it enacted by the Senate and House of Representatives in General Court
assembled, and by the authority of the same, as follows:
SECTION 1.�� The Massachusetts Highway Department is hereby directed to create a timeline of implementation of the completed plan for interchange improvements along Route 128, from the City of Peabody to the Town of Gloucester.� The completed study includes the traffic patterns along the corridor, improvements and or reconstruction of interchanges, upgrades to the acceleration and deceleration lanes.� A report of the implementation plan shall include a proposed start date and date of completion.� The result is to be delivered to the Joint Committee on Transportation no later than December 31, 2009.