Votes: IL SB1775 | 2011-2012 | 97th General Assembly
Bill Title: Amends the Metropolitan Water Reclamation District Act. Authorizes the Metropolitan Water Reclamation District to enter into "design-build" contracts. Defines "design-build". Specifies the solicitation process for design-build proposals. Sets forth the requirements for the award of design-build contracts. Provides that the Metropolitan Water Reclamation District must use a 2-phase procedure for the selection of the successful design-build entity for projects where the budgeted construction cost is over $12,000,000.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Failed) 2013-01-08 - Session Sine Die [SB1775 Detail]
Text: Latest bill text (Introduced) [HTML]
States not producing parsable votes may be available as images in Supplemental Documents.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Failed) 2013-01-08 - Session Sine Die [SB1775 Detail]
Text: Latest bill text (Introduced) [HTML]
Voting Records
Chamber | Vote | Date | Yea | Nay | NV | Abs | Total | Result | Source | View |
---|---|---|---|---|---|---|---|---|---|---|
No roll call record information currently on file. |