Bill Title: Amends the Energy Transition Act. Provides that Climate Works Hubs shall be awarded grants in multi-year increments not to exceed 36 months with the opportunity for grant renewal and modification for subsequent years. Provides that each Climate Works Hub that receives funding from the Energy Transition Assistance Fund shall: recruit, prescreen, and provide preapprenticeship training to equity investment eligible persons; provide training information related to opportunities and certifications relevant to clean energy jobs in the construction and building trades; and provide preapprentices with stipends not less than the State minimum wage unless a higher wage is required by the locality where the preapprenticeship training program is situated. Provides that priority shall be given to Climate Works Hubs that have an agreement with the North American Building Trades Union to utilize the Multi-Craft Core Curriculum or successor curriculums. Amends the Illinois Power Agency Act. Provides that projects less than or equal to 25 kilowatts on the waitlist for this capacity that are moved to the waitlist for the first block of annual capacity shall not be required to be in compliance with the Agency's long-term renewable resources plan. Removes language providing that projects that were on the waitlist for the first block of annual capacity prior to the opening of the next block are not required to be in compliance with the Agency's long-term renewable resources plan.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2022-03-04 - Rule 19(a) / Re-referred to Rules Committee [HB4731 Detail]

Download: Illinois-2021-HB4731-Introduced.html


102ND GENERAL ASSEMBLY
State of Illinois
2021 and 2022
HB4731

Introduced , by Rep. Lawrence Walsh, Jr.

SYNOPSIS AS INTRODUCED:
20 ILCS 730/5-40
20 ILCS 3855/1-75

Amends the Energy Transition Act. Provides that Climate Works Hubs shall be awarded grants in multi-year increments not to exceed 36 months with the opportunity for grant renewal and modification for subsequent years. Provides that each Climate Works Hub that receives funding from the Energy Transition Assistance Fund shall: recruit, prescreen, and provide preapprenticeship training to equity investment eligible persons; provide training information related to opportunities and certifications relevant to clean energy jobs in the construction and building trades; and provide preapprentices with stipends not less than the State minimum wage unless a higher wage is required by the locality where preapprenticeship training program is situated. Provides that priority shall be given to Climate Works Hubs that have an agreement with North American Building Trades Union to utilize the Multi-Craft Core Curriculum or successor curriculums. Amends the Illinois Power Agency Act. Provides that projects less than or equal to 25 kilowatts on the waitlist for this capacity that are moved to the waitlist for the first block of annual capacity shall not be required to be in compliance with the Agency's long-term renewable resources plan. Removes language that provides that projects that were on the waitlist for the first block of annual capacity prior to the opening of the next block is not required to be in compliance with the Agency's long-term renewable resources plan.
LRB102 24633 AMQ 33871 b

A BILL FOR

HB4731LRB102 24633 AMQ 33871 b
1 AN ACT concerning State government.
2 Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
4 Section 5. The Energy Transition Act is amended by
5changing Section 5-40 as follows:
6 (20 ILCS 730/5-40)
7 (Section scheduled to be repealed on September 15, 2045)
8 Sec. 5-40. Illinois Climate Works Preapprenticeship
9Program.
10 (a) Subject to appropriation, the Department shall
11develop, and through Regional Administrators administer, the
12Illinois Climate Works Preapprenticeship Program. The goal of
13the Illinois Climate Works Preapprenticeship Program is to
14create a network of hubs throughout the State that will
15recruit, prescreen, and provide preapprenticeship skills
16training, for which participants may attend free of charge and
17receive a stipend, to create a qualified, diverse pipeline of
18workers who are prepared for careers in the construction and
19building trades and clean energy jobs opportunities therein.
20Upon completion of the Illinois Climate Works
21Preapprenticeship Program, the candidates will be connected to
22and prepared to successfully complete an apprenticeship
23program.

HB4731- 2 -LRB102 24633 AMQ 33871 b
1 (b) Each Climate Works Hub that receives funding from the
2Energy Transition Assistance Fund shall provide an annual
3report to the Illinois Works Review Panel by April 1 of each
4calendar year. The annual report shall include the following
5information:
6 (1) a description of the Climate Works Hub's
7 recruitment, screening, and training efforts, including a
8 description of training related to construction and
9 building trades opportunities in clean energy jobs;
10 (2) the number of individuals who apply to,
11 participate in, and complete the Climate Works Hub's
12 program, broken down by race, gender, age, and veteran
13 status;
14 (3) the number of the individuals referenced in
15 paragraph (2) of this subsection who are initially
16 accepted and placed into apprenticeship programs in the
17 construction and building trades; and
18 (4) the number of individuals referenced in paragraph
19 (2) of this subsection who remain in apprenticeship
20 programs in the construction and building trades or have
21 become journeymen one calendar year after their placement,
22 as referenced in paragraph (3) of this subsection.
23 (c) Subject to appropriation, the Department shall provide
24funding to 3 Climate Works Hubs throughout the State,
25including one to the Illinois Department of Transportation
26Region 1, one to the Illinois Department of Transportation

HB4731- 3 -LRB102 24633 AMQ 33871 b
1Regions 2 and 3, and one to the Illinois Department of
2Transportation Regions 4 and 5. Climate Works Hubs shall be
3awarded grants in multi-year increments not to exceed 36
4months with the opportunity for grant renewal and modification
5for subsequent years. The Department shall initially select a
6community-based provider in each region and shall subsequently
7select a community-based provider in each region every 3
8years.
9 (d) Each Climate Works Hub that receives funding from the
10Energy Transition Assistance Fund shall: The Climate Works
11Hubs shall recruit, prescreen, and provide preapprenticeship
12training to equity investment eligible persons. This training
13shall include information related to opportunities and
14certifications relevant to clean energy jobs in the
15construction and building trades.
16 (1) recruit, prescreen, and provide preapprenticeship
17 training to equity investment eligible persons;
18 (2) provide training information related to
19 opportunities and certifications relevant to clean energy
20 jobs in the construction and building trades; and
21 (3) provide preapprentices with stipends not less than
22 the State minimum wage unless a higher wage is required by
23 a locality where the preapprenticeship training program is
24 sited.
25 (d-5) Priority shall be given to Climate Works Hubs that
26have an agreement with North American Building Trades Unions

HB4731- 4 -LRB102 24633 AMQ 33871 b
1(NABTU) to utilize the Multi-Craft Core Curriculum or
2successor curriculums.
3 (e) Funding for the Program is subject to appropriation
4from the Energy Transition Assistance Fund.
5 (f) The Department shall adopt any rules deemed necessary
6to implement this Section.
7(Source: P.A. 102-662, eff. 9-15-21.)
8 Section 10. The Illinois Power Agency Act is amended by
9changing Section 1-75 as follows:
10 (20 ILCS 3855/1-75)
11 Sec. 1-75. Planning and Procurement Bureau. The Planning
12and Procurement Bureau has the following duties and
13responsibilities:
14 (a) The Planning and Procurement Bureau shall each year,
15beginning in 2008, develop procurement plans and conduct
16competitive procurement processes in accordance with the
17requirements of Section 16-111.5 of the Public Utilities Act
18for the eligible retail customers of electric utilities that
19on December 31, 2005 provided electric service to at least
20100,000 customers in Illinois. Beginning with the delivery
21year commencing on June 1, 2017, the Planning and Procurement
22Bureau shall develop plans and processes for the procurement
23of zero emission credits from zero emission facilities in
24accordance with the requirements of subsection (d-5) of this

HB4731- 5 -LRB102 24633 AMQ 33871 b
1Section. Beginning on the effective date of this amendatory
2Act of the 102nd General Assembly, the Planning and
3Procurement Bureau shall develop plans and processes for the
4procurement of carbon mitigation credits from carbon-free
5energy resources in accordance with the requirements of
6subsection (d-10) of this Section. The Planning and
7Procurement Bureau shall also develop procurement plans and
8conduct competitive procurement processes in accordance with
9the requirements of Section 16-111.5 of the Public Utilities
10Act for the eligible retail customers of small
11multi-jurisdictional electric utilities that (i) on December
1231, 2005 served less than 100,000 customers in Illinois and
13(ii) request a procurement plan for their Illinois
14jurisdictional load. This Section shall not apply to a small
15multi-jurisdictional utility until such time as a small
16multi-jurisdictional utility requests the Agency to prepare a
17procurement plan for their Illinois jurisdictional load. For
18the purposes of this Section, the term "eligible retail
19customers" has the same definition as found in Section
2016-111.5(a) of the Public Utilities Act.
21 Beginning with the plan or plans to be implemented in the
222017 delivery year, the Agency shall no longer include the
23procurement of renewable energy resources in the annual
24procurement plans required by this subsection (a), except as
25provided in subsection (q) of Section 16-111.5 of the Public
26Utilities Act, and shall instead develop a long-term renewable

HB4731- 6 -LRB102 24633 AMQ 33871 b
1resources procurement plan in accordance with subsection (c)
2of this Section and Section 16-111.5 of the Public Utilities
3Act.
4 In accordance with subsection (c-5) of this Section, the
5Planning and Procurement Bureau shall oversee the procurement
6by electric utilities that served more than 300,000 retail
7customers in this State as of January 1, 2019 of renewable
8energy credits from new utility-scale solar projects to be
9installed, along with energy storage facilities, at or
10adjacent to the sites of electric generating facilities that,
11as of January 1, 2016, burned coal as their primary fuel
12source.
13 (1) The Agency shall each year, beginning in 2008, as
14 needed, issue a request for qualifications for experts or
15 expert consulting firms to develop the procurement plans
16 in accordance with Section 16-111.5 of the Public
17 Utilities Act. In order to qualify an expert or expert
18 consulting firm must have:
19 (A) direct previous experience assembling
20 large-scale power supply plans or portfolios for
21 end-use customers;
22 (B) an advanced degree in economics, mathematics,
23 engineering, risk management, or a related area of
24 study;
25 (C) 10 years of experience in the electricity
26 sector, including managing supply risk;

HB4731- 7 -LRB102 24633 AMQ 33871 b
1 (D) expertise in wholesale electricity market
2 rules, including those established by the Federal
3 Energy Regulatory Commission and regional transmission
4 organizations;
5 (E) expertise in credit protocols and familiarity
6 with contract protocols;
7 (F) adequate resources to perform and fulfill the
8 required functions and responsibilities; and
9 (G) the absence of a conflict of interest and
10 inappropriate bias for or against potential bidders or
11 the affected electric utilities.
12 (2) The Agency shall each year, as needed, issue a
13 request for qualifications for a procurement administrator
14 to conduct the competitive procurement processes in
15 accordance with Section 16-111.5 of the Public Utilities
16 Act. In order to qualify an expert or expert consulting
17 firm must have:
18 (A) direct previous experience administering a
19 large-scale competitive procurement process;
20 (B) an advanced degree in economics, mathematics,
21 engineering, or a related area of study;
22 (C) 10 years of experience in the electricity
23 sector, including risk management experience;
24 (D) expertise in wholesale electricity market
25 rules, including those established by the Federal
26 Energy Regulatory Commission and regional transmission

HB4731- 8 -LRB102 24633 AMQ 33871 b
1 organizations;
2 (E) expertise in credit and contract protocols;
3 (F) adequate resources to perform and fulfill the
4 required functions and responsibilities; and
5 (G) the absence of a conflict of interest and
6 inappropriate bias for or against potential bidders or
7 the affected electric utilities.
8 (3) The Agency shall provide affected utilities and
9 other interested parties with the lists of qualified
10 experts or expert consulting firms identified through the
11 request for qualifications processes that are under
12 consideration to develop the procurement plans and to
13 serve as the procurement administrator. The Agency shall
14 also provide each qualified expert's or expert consulting
15 firm's response to the request for qualifications. All
16 information provided under this subparagraph shall also be
17 provided to the Commission. The Agency may provide by rule
18 for fees associated with supplying the information to
19 utilities and other interested parties. These parties
20 shall, within 5 business days, notify the Agency in
21 writing if they object to any experts or expert consulting
22 firms on the lists. Objections shall be based on:
23 (A) failure to satisfy qualification criteria;
24 (B) identification of a conflict of interest; or
25 (C) evidence of inappropriate bias for or against
26 potential bidders or the affected utilities.

HB4731- 9 -LRB102 24633 AMQ 33871 b
1 The Agency shall remove experts or expert consulting
2 firms from the lists within 10 days if there is a
3 reasonable basis for an objection and provide the updated
4 lists to the affected utilities and other interested
5 parties. If the Agency fails to remove an expert or expert
6 consulting firm from a list, an objecting party may seek
7 review by the Commission within 5 days thereafter by
8 filing a petition, and the Commission shall render a
9 ruling on the petition within 10 days. There is no right of
10 appeal of the Commission's ruling.
11 (4) The Agency shall issue requests for proposals to
12 the qualified experts or expert consulting firms to
13 develop a procurement plan for the affected utilities and
14 to serve as procurement administrator.
15 (5) The Agency shall select an expert or expert
16 consulting firm to develop procurement plans based on the
17 proposals submitted and shall award contracts of up to 5
18 years to those selected.
19 (6) The Agency shall select an expert or expert
20 consulting firm, with approval of the Commission, to serve
21 as procurement administrator based on the proposals
22 submitted. If the Commission rejects, within 5 days, the
23 Agency's selection, the Agency shall submit another
24 recommendation within 3 days based on the proposals
25 submitted. The Agency shall award a 5-year contract to the
26 expert or expert consulting firm so selected with

HB4731- 10 -LRB102 24633 AMQ 33871 b
1 Commission approval.
2 (b) The experts or expert consulting firms retained by the
3Agency shall, as appropriate, prepare procurement plans, and
4conduct a competitive procurement process as prescribed in
5Section 16-111.5 of the Public Utilities Act, to ensure
6adequate, reliable, affordable, efficient, and environmentally
7sustainable electric service at the lowest total cost over
8time, taking into account any benefits of price stability, for
9eligible retail customers of electric utilities that on
10December 31, 2005 provided electric service to at least
11100,000 customers in the State of Illinois, and for eligible
12Illinois retail customers of small multi-jurisdictional
13electric utilities that (i) on December 31, 2005 served less
14than 100,000 customers in Illinois and (ii) request a
15procurement plan for their Illinois jurisdictional load.
16 (c) Renewable portfolio standard.
17 (1)(A) The Agency shall develop a long-term renewable
18 resources procurement plan that shall include procurement
19 programs and competitive procurement events necessary to
20 meet the goals set forth in this subsection (c). The
21 initial long-term renewable resources procurement plan
22 shall be released for comment no later than 160 days after
23 June 1, 2017 (the effective date of Public Act 99-906).
24 The Agency shall review, and may revise on an expedited
25 basis, the long-term renewable resources procurement plan
26 at least every 2 years, which shall be conducted in

HB4731- 11 -LRB102 24633 AMQ 33871 b
1 conjunction with the procurement plan under Section
2 16-111.5 of the Public Utilities Act to the extent
3 practicable to minimize administrative expense. No later
4 than 120 days after the effective date of this amendatory
5 Act of the 102nd General Assembly, the Agency shall
6 release for comment a revision to the long-term renewable
7 resources procurement plan, updating elements of the most
8 recently approved plan as needed to comply with this
9 amendatory Act of the 102nd General Assembly, and any
10 long-term renewable resources procurement plan update
11 published by the Agency but not yet approved by the
12 Illinois Commerce Commission shall be withdrawn. The
13 long-term renewable resources procurement plans shall be
14 subject to review and approval by the Commission under
15 Section 16-111.5 of the Public Utilities Act.
16 (B) Subject to subparagraph (F) of this paragraph (1),
17 the long-term renewable resources procurement plan shall
18 attempt to meet the goals for procurement of renewable
19 energy credits at levels of at least the following overall
20 percentages: 13% by the 2017 delivery year; increasing by
21 at least 1.5% each delivery year thereafter to at least
22 25% by the 2025 delivery year; increasing by at least 3%
23 each delivery year thereafter to at least 40% by the 2030
24 delivery year, and continuing at no less than 40% for each
25 delivery year thereafter. The Agency shall attempt to
26 procure 50% by delivery year 2040. The Agency shall

HB4731- 12 -LRB102 24633 AMQ 33871 b
1 determine the annual increase between delivery year 2030
2 and delivery year 2040, if any, taking into account energy
3 demand, other energy resources, and other public policy
4 goals. In the event of a conflict between these goals and
5 the new wind and new photovoltaic procurement requirements
6 described in items (i) through (iii) of subparagraph (C)
7 of this paragraph (1), the long-term plan shall prioritize
8 compliance with the new wind and new photovoltaic
9 procurement requirements described in items (i) through
10 (iii) of subparagraph (C) of this paragraph (1) over the
11 annual percentage targets described in this subparagraph
12 (B). The Agency shall not comply with the annual
13 percentage targets described in this subparagraph (B) by
14 procuring renewable energy credits that are unlikely to
15 lead to the development of new renewable resources.
16 For the delivery year beginning June 1, 2017, the
17 procurement plan shall attempt to include, subject to the
18 prioritization outlined in this subparagraph (B),
19 cost-effective renewable energy resources equal to at
20 least 13% of each utility's load for eligible retail
21 customers and 13% of the applicable portion of each
22 utility's load for retail customers who are not eligible
23 retail customers, which applicable portion shall equal 50%
24 of the utility's load for retail customers who are not
25 eligible retail customers on February 28, 2017.
26 For the delivery year beginning June 1, 2018, the

HB4731- 13 -LRB102 24633 AMQ 33871 b
1 procurement plan shall attempt to include, subject to the
2 prioritization outlined in this subparagraph (B),
3 cost-effective renewable energy resources equal to at
4 least 14.5% of each utility's load for eligible retail
5 customers and 14.5% of the applicable portion of each
6 utility's load for retail customers who are not eligible
7 retail customers, which applicable portion shall equal 75%
8 of the utility's load for retail customers who are not
9 eligible retail customers on February 28, 2017.
10 For the delivery year beginning June 1, 2019, and for
11 each year thereafter, the procurement plans shall attempt
12 to include, subject to the prioritization outlined in this
13 subparagraph (B), cost-effective renewable energy
14 resources equal to a minimum percentage of each utility's
15 load for all retail customers as follows: 16% by June 1,
16 2019; increasing by 1.5% each year thereafter to 25% by
17 June 1, 2025; and 25% by June 1, 2026; increasing by at
18 least 3% each delivery year thereafter to at least 40% by
19 the 2030 delivery year, and continuing at no less than 40%
20 for each delivery year thereafter. The Agency shall
21 attempt to procure 50% by delivery year 2040. The Agency
22 shall determine the annual increase between delivery year
23 2030 and delivery year 2040, if any, taking into account
24 energy demand, other energy resources, and other public
25 policy goals.
26 For each delivery year, the Agency shall first

HB4731- 14 -LRB102 24633 AMQ 33871 b
1 recognize each utility's obligations for that delivery
2 year under existing contracts. Any renewable energy
3 credits under existing contracts, including renewable
4 energy credits as part of renewable energy resources,
5 shall be used to meet the goals set forth in this
6 subsection (c) for the delivery year.
7 (C) The long-term renewable resources procurement plan
8 described in subparagraph (A) of this paragraph (1) shall
9 include the procurement of renewable energy credits from
10 new projects in amounts equal to at least the following:
11 (i) 10,000,000 renewable energy credits delivered
12 annually by the end of the 2021 delivery year, and
13 increasing ratably to reach 45,000,000 renewable
14 energy credits delivered annually from new wind and
15 solar projects by the end of delivery year 2030 such
16 that the goals in subparagraph (B) of this paragraph
17 (1) are met entirely by procurements of renewable
18 energy credits from new wind and photovoltaic
19 projects. Of that amount, to the extent possible, the
20 Agency shall procure 45% from wind projects and 55%
21 from photovoltaic projects. Of the amount to be
22 procured from photovoltaic projects, the Agency shall
23 procure: at least 50% from solar photovoltaic projects
24 using the program outlined in subparagraph (K) of this
25 paragraph (1) from distributed renewable energy
26 generation devices or community renewable generation

HB4731- 15 -LRB102 24633 AMQ 33871 b
1 projects; at least 47% from utility-scale solar
2 projects; at least 3% from brownfield site
3 photovoltaic projects that are not community renewable
4 generation projects.
5 In developing the long-term renewable resources
6 procurement plan, the Agency shall consider other
7 approaches, in addition to competitive procurements,
8 that can be used to procure renewable energy credits
9 from brownfield site photovoltaic projects and thereby
10 help return blighted or contaminated land to
11 productive use while enhancing public health and the
12 well-being of Illinois residents, including those in
13 environmental justice communities, as defined using
14 existing methodologies and findings used by the Agency
15 and its Administrator in its Illinois Solar for All
16 Program.
17 (ii) In any given delivery year, if forecasted
18 expenses are less than the maximum budget available
19 under subparagraph (E) of this paragraph (1), the
20 Agency shall continue to procure new renewable energy
21 credits until that budget is exhausted in the manner
22 outlined in item (i) of this subparagraph (C).
23 (iii) For purposes of this Section:
24 "New wind projects" means wind renewable energy
25 facilities that are energized after June 1, 2017 for
26 the delivery year commencing June 1, 2017.

HB4731- 16 -LRB102 24633 AMQ 33871 b
1 "New photovoltaic projects" means photovoltaic
2 renewable energy facilities that are energized after
3 June 1, 2017. Photovoltaic projects developed under
4 Section 1-56 of this Act shall not apply towards the
5 new photovoltaic project requirements in this
6 subparagraph (C).
7 For purposes of calculating whether the Agency has
8 procured enough new wind and solar renewable energy
9 credits required by this subparagraph (C), renewable
10 energy facilities that have a multi-year renewable
11 energy credit delivery contract with the utility
12 through at least delivery year 2030 shall be
13 considered new, however no renewable energy credits
14 from contracts entered into before June 1, 2021 shall
15 be used to calculate whether the Agency has procured
16 the correct proportion of new wind and new solar
17 contracts described in this subparagraph (C) for
18 delivery year 2021 and thereafter.
19 (D) Renewable energy credits shall be cost effective.
20 For purposes of this subsection (c), "cost effective"
21 means that the costs of procuring renewable energy
22 resources do not cause the limit stated in subparagraph
23 (E) of this paragraph (1) to be exceeded and, for
24 renewable energy credits procured through a competitive
25 procurement event, do not exceed benchmarks based on
26 market prices for like products in the region. For

HB4731- 17 -LRB102 24633 AMQ 33871 b
1 purposes of this subsection (c), "like products" means
2 contracts for renewable energy credits from the same or
3 substantially similar technology, same or substantially
4 similar vintage (new or existing), the same or
5 substantially similar quantity, and the same or
6 substantially similar contract length and structure.
7 Benchmarks shall reflect development, financing, or
8 related costs resulting from requirements imposed through
9 other provisions of State law, including, but not limited
10 to, requirements in subparagraphs (P) and (Q) of this
11 paragraph (1) and the Renewable Energy Facilities
12 Agricultural Impact Mitigation Act. Confidential
13 benchmarks shall be developed by the procurement
14 administrator, in consultation with the Commission staff,
15 Agency staff, and the procurement monitor and shall be
16 subject to Commission review and approval. If price
17 benchmarks for like products in the region are not
18 available, the procurement administrator shall establish
19 price benchmarks based on publicly available data on
20 regional technology costs and expected current and future
21 regional energy prices. The benchmarks in this Section
22 shall not be used to curtail or otherwise reduce
23 contractual obligations entered into by or through the
24 Agency prior to June 1, 2017 (the effective date of Public
25 Act 99-906).
26 (E) For purposes of this subsection (c), the required

HB4731- 18 -LRB102 24633 AMQ 33871 b
1 procurement of cost-effective renewable energy resources
2 for a particular year commencing prior to June 1, 2017
3 shall be measured as a percentage of the actual amount of
4 electricity (megawatt-hours) supplied by the electric
5 utility to eligible retail customers in the delivery year
6 ending immediately prior to the procurement, and, for
7 delivery years commencing on and after June 1, 2017, the
8 required procurement of cost-effective renewable energy
9 resources for a particular year shall be measured as a
10 percentage of the actual amount of electricity
11 (megawatt-hours) delivered by the electric utility in the
12 delivery year ending immediately prior to the procurement,
13 to all retail customers in its service territory. For
14 purposes of this subsection (c), the amount paid per
15 kilowatthour means the total amount paid for electric
16 service expressed on a per kilowatthour basis. For
17 purposes of this subsection (c), the total amount paid for
18 electric service includes without limitation amounts paid
19 for supply, transmission, capacity, distribution,
20 surcharges, and add-on taxes.
21 Notwithstanding the requirements of this subsection
22 (c), the total of renewable energy resources procured
23 under the procurement plan for any single year shall be
24 subject to the limitations of this subparagraph (E). Such
25 procurement shall be reduced for all retail customers
26 based on the amount necessary to limit the annual

HB4731- 19 -LRB102 24633 AMQ 33871 b
1 estimated average net increase due to the costs of these
2 resources included in the amounts paid by eligible retail
3 customers in connection with electric service to no more
4 than 4.25% of the amount paid per kilowatthour by those
5 customers during the year ending May 31, 2009. To arrive
6 at a maximum dollar amount of renewable energy resources
7 to be procured for the particular delivery year, the
8 resulting per kilowatthour amount shall be applied to the
9 actual amount of kilowatthours of electricity delivered,
10 or applicable portion of such amount as specified in
11 paragraph (1) of this subsection (c), as applicable, by
12 the electric utility in the delivery year immediately
13 prior to the procurement to all retail customers in its
14 service territory. The calculations required by this
15 subparagraph (E) shall be made only once for each delivery
16 year at the time that the renewable energy resources are
17 procured. Once the determination as to the amount of
18 renewable energy resources to procure is made based on the
19 calculations set forth in this subparagraph (E) and the
20 contracts procuring those amounts are executed, no
21 subsequent rate impact determinations shall be made and no
22 adjustments to those contract amounts shall be allowed.
23 All costs incurred under such contracts shall be fully
24 recoverable by the electric utility as provided in this
25 Section.
26 (F) If the limitation on the amount of renewable

HB4731- 20 -LRB102 24633 AMQ 33871 b
1 energy resources procured in subparagraph (E) of this
2 paragraph (1) prevents the Agency from meeting all of the
3 goals in this subsection (c), the Agency's long-term plan
4 shall prioritize compliance with the requirements of this
5 subsection (c) regarding renewable energy credits in the
6 following order:
7 (i) renewable energy credits under existing
8 contractual obligations as of June 1, 2021;
9 (i-5) funding for the Illinois Solar for All
10 Program, as described in subparagraph (O) of this
11 paragraph (1);
12 (ii) renewable energy credits necessary to comply
13 with the new wind and new photovoltaic procurement
14 requirements described in items (i) through (iii) of
15 subparagraph (C) of this paragraph (1); and
16 (iii) renewable energy credits necessary to meet
17 the remaining requirements of this subsection (c).
18 (G) The following provisions shall apply to the
19 Agency's procurement of renewable energy credits under
20 this subsection (c):
21 (i) Notwithstanding whether a long-term renewable
22 resources procurement plan has been approved, the
23 Agency shall conduct an initial forward procurement
24 for renewable energy credits from new utility-scale
25 wind projects within 160 days after June 1, 2017 (the
26 effective date of Public Act 99-906). For the purposes

HB4731- 21 -LRB102 24633 AMQ 33871 b
1 of this initial forward procurement, the Agency shall
2 solicit 15-year contracts for delivery of 1,000,000
3 renewable energy credits delivered annually from new
4 utility-scale wind projects to begin delivery on June
5 1, 2019, if available, but not later than June 1, 2021,
6 unless the project has delays in the establishment of
7 an operating interconnection with the applicable
8 transmission or distribution system as a result of the
9 actions or inactions of the transmission or
10 distribution provider, or other causes for force
11 majeure as outlined in the procurement contract, in
12 which case, not later than June 1, 2022. Payments to
13 suppliers of renewable energy credits shall commence
14 upon delivery. Renewable energy credits procured under
15 this initial procurement shall be included in the
16 Agency's long-term plan and shall apply to all
17 renewable energy goals in this subsection (c).
18 (ii) Notwithstanding whether a long-term renewable
19 resources procurement plan has been approved, the
20 Agency shall conduct an initial forward procurement
21 for renewable energy credits from new utility-scale
22 solar projects and brownfield site photovoltaic
23 projects within one year after June 1, 2017 (the
24 effective date of Public Act 99-906). For the purposes
25 of this initial forward procurement, the Agency shall
26 solicit 15-year contracts for delivery of 1,000,000

HB4731- 22 -LRB102 24633 AMQ 33871 b
1 renewable energy credits delivered annually from new
2 utility-scale solar projects and brownfield site
3 photovoltaic projects to begin delivery on June 1,
4 2019, if available, but not later than June 1, 2021,
5 unless the project has delays in the establishment of
6 an operating interconnection with the applicable
7 transmission or distribution system as a result of the
8 actions or inactions of the transmission or
9 distribution provider, or other causes for force
10 majeure as outlined in the procurement contract, in
11 which case, not later than June 1, 2022. The Agency may
12 structure this initial procurement in one or more
13 discrete procurement events. Payments to suppliers of
14 renewable energy credits shall commence upon delivery.
15 Renewable energy credits procured under this initial
16 procurement shall be included in the Agency's
17 long-term plan and shall apply to all renewable energy
18 goals in this subsection (c).
19 (iii) Notwithstanding whether the Commission has
20 approved the periodic long-term renewable resources
21 procurement plan revision described in Section
22 16-111.5 of the Public Utilities Act, the Agency shall
23 conduct at least one subsequent forward procurement
24 for renewable energy credits from new utility-scale
25 wind projects, new utility-scale solar projects, and
26 new brownfield site photovoltaic projects within 240

HB4731- 23 -LRB102 24633 AMQ 33871 b
1 days after the effective date of this amendatory Act
2 of the 102nd General Assembly in quantities necessary
3 to meet the requirements of subparagraph (C) of this
4 paragraph (1) through the delivery year beginning June
5 1, 2021.
6 (iv) Notwithstanding whether the Commission has
7 approved the periodic long-term renewable resources
8 procurement plan revision described in Section
9 16-111.5 of the Public Utilities Act, the Agency shall
10 open capacity for each category in the Adjustable
11 Block program within 90 days after the effective date
12 of this amendatory Act of the 102nd General Assembly
13 manner:
14 (1) The Agency shall open the first block of
15 annual capacity for the category described in item
16 (i) of subparagraph (K) of this paragraph (1). The
17 first block of annual capacity for item (i) shall
18 be for at least 75 megawatts of total nameplate
19 capacity. The price of the renewable energy credit
20 for this block of capacity shall be 4% less than
21 the price of the last open block in this category.
22 Projects on a waitlist shall be awarded contracts
23 first in the order in which they appear on the
24 waitlist. Notwithstanding anything to the
25 contrary, for those renewable energy credits that
26 qualify and are procured under this subitem (1) of

HB4731- 24 -LRB102 24633 AMQ 33871 b
1 this item (iv), the renewable energy credit
2 delivery contract value shall be paid in full,
3 based on the estimated generation during the first
4 15 years of operation, by the contracting
5 utilities at the time that the facility producing
6 the renewable energy credits is interconnected at
7 the distribution system level of the utility and
8 verified as energized and in compliance by the
9 Program Administrator. The electric utility shall
10 receive and retire all renewable energy credits
11 generated by the project for the first 15 years of
12 operation. Renewable energy credits generated by
13 the project thereafter shall not be transferred
14 under the renewable energy credit delivery
15 contract with the counterparty electric utility.
16 (2) The Agency shall open the first block of
17 annual capacity for the category described in item
18 (ii) of subparagraph (K) of this paragraph (1).
19 The first block of annual capacity for item (ii)
20 shall be for at least 75 megawatts of total
21 nameplate capacity.
22 (A) The price of the renewable energy
23 credit for any project on a waitlist for this
24 category before the opening of this block
25 shall be 4% less than the price of the last
26 open block in this category. Projects on the

HB4731- 25 -LRB102 24633 AMQ 33871 b
1 waitlist shall be awarded contracts first in
2 the order in which they appear on the
3 waitlist. Any projects that are less than or
4 equal to 25 kilowatts in size on the waitlist
5 for this capacity shall be moved to the
6 waitlist for paragraph (1) of this item (iv).
7 Notwithstanding anything to the contrary,
8 projects less than or equal to 25 kilowatts on
9 the waitlist for this capacity that are moved
10 to the waitlist for paragraph (1) of this item
11 (iv) shall not be required to be in compliance
12 with the requirements of subparagraph (Q) of
13 paragraph (1) of this subsection (c) projects
14 that were on the waitlist prior to opening of
15 this block shall not be required to be in
16 compliance with the requirements of
17 subparagraph (Q) of this paragraph (1) of this
18 subsection (c). Notwithstanding anything to
19 the contrary, for those renewable energy
20 credits procured from projects that were on
21 the waitlist for this category before the
22 opening of this block 20% of the renewable
23 energy credit delivery contract value, based
24 on the estimated generation during the first
25 15 years of operation, shall be paid by the
26 contracting utilities at the time that the

HB4731- 26 -LRB102 24633 AMQ 33871 b
1 facility producing the renewable energy
2 credits is interconnected at the distribution
3 system level of the utility and verified as
4 energized by the Program Administrator. The
5 remaining portion shall be paid ratably over
6 the subsequent 4-year period. The electric
7 utility shall receive and retire all renewable
8 energy credits generated by the project during
9 the first 15 years of operation. Renewable
10 energy credits generated by the project
11 thereafter shall not be transferred under the
12 renewable energy credit delivery contract with
13 the counterparty electric utility.
14 (B) The price of renewable energy credits
15 for any project not on the waitlist for this
16 category before the opening of the block shall
17 be determined and published by the Agency.
18 Projects not on a waitlist as of the opening
19 of this block shall be subject to the
20 requirements of subparagraph (Q) of this
21 paragraph (1), as applicable. Projects not on
22 a waitlist as of the opening of this block
23 shall be subject to the contract provisions
24 outlined in item (iii) of subparagraph (L) of
25 this paragraph (1). The Agency shall strive to
26 publish updated prices and an updated

HB4731- 27 -LRB102 24633 AMQ 33871 b
1 renewable energy credit delivery contract as
2 quickly as possible.
3 (3) For opening the first 2 blocks of annual
4 capacity for projects participating in item (iii)
5 of subparagraph (K) of paragraph (1) of subsection
6 (c), projects shall be selected exclusively from
7 those projects on the ordinal waitlists of
8 community renewable generation projects
9 established by the Agency based on the status of
10 those ordinal waitlists as of December 31, 2020,
11 and only those projects previously determined to
12 be eligible for the Agency's April 2019 community
13 solar project selection process.
14 The first 2 blocks of annual capacity for item
15 (iii) shall be for 250 megawatts of total
16 nameplate capacity, with both blocks opening
17 simultaneously under the schedule outlined in the
18 paragraphs below. Projects shall be selected as
19 follows:
20 (A) The geographic balance of selected
21 projects shall follow the Group classification
22 found in the Agency's Revised Long-Term
23 Renewable Resources Procurement Plan, with 70%
24 of capacity allocated to projects on the Group
25 B waitlist and 30% of capacity allocated to
26 projects on the Group A waitlist.

HB4731- 28 -LRB102 24633 AMQ 33871 b
1 (B) Contract awards for waitlisted
2 projects shall be allocated proportionate to
3 the total nameplate capacity amount across
4 both ordinal waitlists associated with that
5 applicant firm or its affiliates, subject to
6 the following conditions.
7 (i) Each applicant firm having a
8 waitlisted project eligible for selection
9 shall receive no less than 500 kilowatts
10 in awarded capacity across all groups, and
11 no approved vendor may receive more than
12 20% of each Group's waitlist allocation.
13 (ii) Each applicant firm, upon
14 receiving an award of program capacity
15 proportionate to its waitlisted capacity,
16 may then determine which waitlisted
17 projects it chooses to be selected for a
18 contract award up to that capacity amount.
19 (iii) Assuming all other program
20 requirements are met, applicant firms may
21 adjust the nameplate capacity of applicant
22 projects without losing waitlist
23 eligibility, so long as no project is
24 greater than 2,000 kilowatts in size.
25 (iv) Assuming all other program
26 requirements are met, applicant firms may

HB4731- 29 -LRB102 24633 AMQ 33871 b
1 adjust the expected production associated
2 with applicant projects, subject to
3 verification by the Program Administrator.
4 (C) After a review of affiliate
5 information and the current ordinal waitlists,
6 the Agency shall announce the nameplate
7 capacity award amounts associated with
8 applicant firms no later than 90 days after
9 the effective date of this amendatory Act of
10 the 102nd General Assembly.
11 (D) Applicant firms shall submit their
12 portfolio of projects used to satisfy those
13 contract awards no less than 90 days after the
14 Agency's announcement. The total nameplate
15 capacity of all projects used to satisfy that
16 portfolio shall be no greater than the
17 Agency's nameplate capacity award amount
18 associated with that applicant firm. An
19 applicant firm may decline, in whole or in
20 part, its nameplate capacity award without
21 penalty, with such unmet capacity rolled over
22 to the next block opening for project
23 selection under item (iii) of subparagraph (K)
24 of this subsection (c). Any projects not
25 included in an applicant firm's portfolio may
26 reapply without prejudice upon the next block

HB4731- 30 -LRB102 24633 AMQ 33871 b
1 reopening for project selection under item
2 (iii) of subparagraph (K) of this subsection
3 (c).
4 (E) The renewable energy credit delivery
5 contract shall be subject to the contract and
6 payment terms outlined in item (iv) of
7 subparagraph (L) of this subsection (c).
8 Contract instruments used for this
9 subparagraph shall contain the following
10 terms:
11 (i) Renewable energy credit prices
12 shall be fixed, without further adjustment
13 under any other provision of this Act or
14 for any other reason, at 10% lower than
15 prices applicable to the last open block
16 for this category, inclusive of any adders
17 available for achieving a minimum of 50%
18 of subscribers to the project's nameplate
19 capacity being residential or small
20 commercial customers with subscriptions of
21 below 25 kilowatts in size;
22 (ii) A requirement that a minimum of
23 50% of subscribers to the project's
24 nameplate capacity be residential or small
25 commercial customers with subscriptions of
26 below 25 kilowatts in size;

HB4731- 31 -LRB102 24633 AMQ 33871 b
1 (iii) Permission for the ability of a
2 contract holder to substitute projects
3 with other waitlisted projects without
4 penalty should a project receive a
5 non-binding estimate of costs to construct
6 the interconnection facilities and any
7 required distribution upgrades associated
8 with that project of greater than 30 cents
9 per watt AC of that project's nameplate
10 capacity. In developing the applicable
11 contract instrument, the Agency may
12 consider whether other circumstances
13 outside of the control of the applicant
14 firm should also warrant project
15 substitution rights.
16 The Agency shall publish a finalized
17 updated renewable energy credit delivery
18 contract developed consistent with these terms
19 and conditions no less than 30 days before
20 applicant firms must submit their portfolio of
21 projects pursuant to item (D).
22 (F) To be eligible for an award, the
23 applicant firm shall certify that not less
24 than prevailing wage, as determined pursuant
25 to the Illinois Prevailing Wage Act, was or
26 will be paid to employees who are engaged in

HB4731- 32 -LRB102 24633 AMQ 33871 b
1 construction activities associated with a
2 selected project.
3 (4) The Agency shall open the first block of
4 annual capacity for the category described in item
5 (iv) of subparagraph (K) of this paragraph (1).
6 The first block of annual capacity for item (iv)
7 shall be for at least 50 megawatts of total
8 nameplate capacity. Renewable energy credit prices
9 shall be fixed, without further adjustment under
10 any other provision of this Act or for any other
11 reason, at the price in the last open block in the
12 category described in item (ii) of subparagraph
13 (K) of this paragraph (1). Pricing for future
14 blocks of annual capacity for this category may be
15 adjusted in the Agency's second revision to its
16 Long-Term Renewable Resources Procurement Plan.
17 Projects in this category shall be subject to the
18 contract terms outlined in item (iv) of
19 subparagraph (L) of this paragraph (1).
20 (5) The Agency shall open the equivalent of 2
21 years of annual capacity for the category
22 described in item (v) of subparagraph (K) of this
23 paragraph (1). The first block of annual capacity
24 for item (v) shall be for at least 10 megawatts of
25 total nameplate capacity. Notwithstanding the
26 provisions of item (v) of subparagraph (K) of this

HB4731- 33 -LRB102 24633 AMQ 33871 b
1 paragraph (1), for the purpose of this initial
2 block, the agency shall accept new project
3 applications intended to increase the diversity of
4 areas hosting community solar projects, the
5 business models of projects, and the size of
6 projects, as described by the Agency in its
7 long-term renewable resources procurement plan
8 that is approved as of the effective date of this
9 amendatory Act of the 102nd General Assembly.
10 Projects in this category shall be subject to the
11 contract terms outlined in item (iii) of
12 subsection (L) of this paragraph (1).
13 (6) The Agency shall open the first blocks of
14 annual capacity for the category described in item
15 (vi) of subparagraph (K) of this paragraph (1),
16 with allocations of capacity within the block
17 generally matching the historical share of block
18 capacity allocated between the category described
19 in items (i) and (ii) of subparagraph (K) of this
20 paragraph (1). The first two blocks of annual
21 capacity for item (vi) shall be for at least 75
22 megawatts of total nameplate capacity. The price
23 of renewable energy credits for the blocks of
24 capacity shall be 4% less than the price of the
25 last open blocks in the categories described in
26 items (i) and (ii) of subparagraph (K) of this

HB4731- 34 -LRB102 24633 AMQ 33871 b
1 paragraph (1). Pricing for future blocks of annual
2 capacity for this category may be adjusted in the
3 Agency's second revision to its Long-Term
4 Renewable Resources Procurement Plan. Projects in
5 this category shall be subject to the applicable
6 contract terms outlined in items (ii) and (iii) of
7 subparagraph (L) of this paragraph (1).
8 (v) Upon the effective date of this amendatory Act
9 of the 102nd General Assembly, for all competitive
10 procurements and any procurements of renewable energy
11 credit from new utility-scale wind and new
12 utility-scale photovoltaic projects, the Agency shall
13 procure indexed renewable energy credits and direct
14 respondents to offer a strike price.
15 (1) The purchase price of the indexed
16 renewable energy credit payment shall be
17 calculated for each settlement period. That
18 payment, for any settlement period, shall be equal
19 to the difference resulting from subtracting the
20 strike price from the index price for that
21 settlement period. If this difference results in a
22 negative number, the indexed REC counterparty
23 shall owe the seller the absolute value multiplied
24 by the quantity of energy produced in the relevant
25 settlement period. If this difference results in a
26 positive number, the seller shall owe the indexed

HB4731- 35 -LRB102 24633 AMQ 33871 b
1 REC counterparty this amount multiplied by the
2 quantity of energy produced in the relevant
3 settlement period.
4 (2) Parties shall cash settle every month,
5 summing up all settlements (both positive and
6 negative, if applicable) for the prior month.
7 (3) To ensure funding in the annual budget
8 established under subparagraph (E) for indexed
9 renewable energy credit procurements for each year
10 of the term of such contracts, which must have a
11 minimum tenure of 20 calendar years, the
12 procurement administrator, Agency, Commission
13 staff, and procurement monitor shall quantify the
14 annual cost of the contract by utilizing an
15 industry-standard, third-party forward price curve
16 for energy at the appropriate hub or load zone,
17 including the estimated magnitude and timing of
18 the price effects related to federal carbon
19 controls. Each forward price curve shall contain a
20 specific value of the forecasted market price of
21 electricity for each annual delivery year of the
22 contract. For procurement planning purposes, the
23 impact on the annual budget for the cost of
24 indexed renewable energy credits for each delivery
25 year shall be determined as the expected annual
26 contract expenditure for that year, equaling the

HB4731- 36 -LRB102 24633 AMQ 33871 b
1 difference between (i) the sum across all relevant
2 contracts of the applicable strike price
3 multiplied by contract quantity and (ii) the sum
4 across all relevant contracts of the forward price
5 curve for the applicable load zone for that year
6 multiplied by contract quantity. The contracting
7 utility shall not assume an obligation in excess
8 of the estimated annual cost of the contracts for
9 indexed renewable energy credits. Forward curves
10 shall be revised on an annual basis as updated
11 forward price curves are released and filed with
12 the Commission in the proceeding approving the
13 Agency's most recent long-term renewable resources
14 procurement plan. If the expected contract spend
15 is higher or lower than the total quantity of
16 contracts multiplied by the forward price curve
17 value for that year, the forward price curve shall
18 be updated by the procurement administrator, in
19 consultation with the Agency, Commission staff,
20 and procurement monitors, using then-currently
21 available price forecast data and additional
22 budget dollars shall be obligated or reobligated
23 as appropriate.
24 (4) To ensure that indexed renewable energy
25 credit prices remain predictable and affordable,
26 the Agency may consider the institution of a price

HB4731- 37 -LRB102 24633 AMQ 33871 b
1 collar on REC prices paid under indexed renewable
2 energy credit procurements establishing floor and
3 ceiling REC prices applicable to indexed REC
4 contract prices. Any price collars applicable to
5 indexed REC procurements shall be proposed by the
6 Agency through its long-term renewable resources
7 procurement plan.
8 (vi) All procurements under this subparagraph (G)
9 shall comply with the geographic requirements in
10 subparagraph (I) of this paragraph (1) and shall
11 follow the procurement processes and procedures
12 described in this Section and Section 16-111.5 of the
13 Public Utilities Act to the extent practicable, and
14 these processes and procedures may be expedited to
15 accommodate the schedule established by this
16 subparagraph (G).
17 (H) The procurement of renewable energy resources for
18 a given delivery year shall be reduced as described in
19 this subparagraph (H) if an alternative retail electric
20 supplier meets the requirements described in this
21 subparagraph (H).
22 (i) Within 45 days after June 1, 2017 (the
23 effective date of Public Act 99-906), an alternative
24 retail electric supplier or its successor shall submit
25 an informational filing to the Illinois Commerce
26 Commission certifying that, as of December 31, 2015,

HB4731- 38 -LRB102 24633 AMQ 33871 b
1 the alternative retail electric supplier owned one or
2 more electric generating facilities that generates
3 renewable energy resources as defined in Section 1-10
4 of this Act, provided that such facilities are not
5 powered by wind or photovoltaics, and the facilities
6 generate one renewable energy credit for each
7 megawatthour of energy produced from the facility.
8 The informational filing shall identify each
9 facility that was eligible to satisfy the alternative
10 retail electric supplier's obligations under Section
11 16-115D of the Public Utilities Act as described in
12 this item (i).
13 (ii) For a given delivery year, the alternative
14 retail electric supplier may elect to supply its
15 retail customers with renewable energy credits from
16 the facility or facilities described in item (i) of
17 this subparagraph (H) that continue to be owned by the
18 alternative retail electric supplier.
19 (iii) The alternative retail electric supplier
20 shall notify the Agency and the applicable utility, no
21 later than February 28 of the year preceding the
22 applicable delivery year or 15 days after June 1, 2017
23 (the effective date of Public Act 99-906), whichever
24 is later, of its election under item (ii) of this
25 subparagraph (H) to supply renewable energy credits to
26 retail customers of the utility. Such election shall

HB4731- 39 -LRB102 24633 AMQ 33871 b
1 identify the amount of renewable energy credits to be
2 supplied by the alternative retail electric supplier
3 to the utility's retail customers and the source of
4 the renewable energy credits identified in the
5 informational filing as described in item (i) of this
6 subparagraph (H), subject to the following
7 limitations:
8 For the delivery year beginning June 1, 2018,
9 the maximum amount of renewable energy credits to
10 be supplied by an alternative retail electric
11 supplier under this subparagraph (H) shall be 68%
12 multiplied by 25% multiplied by 14.5% multiplied
13 by the amount of metered electricity
14 (megawatt-hours) delivered by the alternative
15 retail electric supplier to Illinois retail
16 customers during the delivery year ending May 31,
17 2016.
18 For delivery years beginning June 1, 2019 and
19 each year thereafter, the maximum amount of
20 renewable energy credits to be supplied by an
21 alternative retail electric supplier under this
22 subparagraph (H) shall be 68% multiplied by 50%
23 multiplied by 16% multiplied by the amount of
24 metered electricity (megawatt-hours) delivered by
25 the alternative retail electric supplier to
26 Illinois retail customers during the delivery year

HB4731- 40 -LRB102 24633 AMQ 33871 b
1 ending May 31, 2016, provided that the 16% value
2 shall increase by 1.5% each delivery year
3 thereafter to 25% by the delivery year beginning
4 June 1, 2025, and thereafter the 25% value shall
5 apply to each delivery year.
6 For each delivery year, the total amount of
7 renewable energy credits supplied by all alternative
8 retail electric suppliers under this subparagraph (H)
9 shall not exceed 9% of the Illinois target renewable
10 energy credit quantity. The Illinois target renewable
11 energy credit quantity for the delivery year beginning
12 June 1, 2018 is 14.5% multiplied by the total amount of
13 metered electricity (megawatt-hours) delivered in the
14 delivery year immediately preceding that delivery
15 year, provided that the 14.5% shall increase by 1.5%
16 each delivery year thereafter to 25% by the delivery
17 year beginning June 1, 2025, and thereafter the 25%
18 value shall apply to each delivery year.
19 If the requirements set forth in items (i) through
20 (iii) of this subparagraph (H) are met, the charges
21 that would otherwise be applicable to the retail
22 customers of the alternative retail electric supplier
23 under paragraph (6) of this subsection (c) for the
24 applicable delivery year shall be reduced by the ratio
25 of the quantity of renewable energy credits supplied
26 by the alternative retail electric supplier compared

HB4731- 41 -LRB102 24633 AMQ 33871 b
1 to that supplier's target renewable energy credit
2 quantity. The supplier's target renewable energy
3 credit quantity for the delivery year beginning June
4 1, 2018 is 14.5% multiplied by the total amount of
5 metered electricity (megawatt-hours) delivered by the
6 alternative retail supplier in that delivery year,
7 provided that the 14.5% shall increase by 1.5% each
8 delivery year thereafter to 25% by the delivery year
9 beginning June 1, 2025, and thereafter the 25% value
10 shall apply to each delivery year.
11 On or before April 1 of each year, the Agency shall
12 annually publish a report on its website that
13 identifies the aggregate amount of renewable energy
14 credits supplied by alternative retail electric
15 suppliers under this subparagraph (H).
16 (I) The Agency shall design its long-term renewable
17 energy procurement plan to maximize the State's interest
18 in the health, safety, and welfare of its residents,
19 including but not limited to minimizing sulfur dioxide,
20 nitrogen oxide, particulate matter and other pollution
21 that adversely affects public health in this State,
22 increasing fuel and resource diversity in this State,
23 enhancing the reliability and resiliency of the
24 electricity distribution system in this State, meeting
25 goals to limit carbon dioxide emissions under federal or
26 State law, and contributing to a cleaner and healthier

HB4731- 42 -LRB102 24633 AMQ 33871 b
1 environment for the citizens of this State. In order to
2 further these legislative purposes, renewable energy
3 credits shall be eligible to be counted toward the
4 renewable energy requirements of this subsection (c) if
5 they are generated from facilities located in this State.
6 The Agency may qualify renewable energy credits from
7 facilities located in states adjacent to Illinois or
8 renewable energy credits associated with the electricity
9 generated by a utility-scale wind energy facility or
10 utility-scale photovoltaic facility and transmitted by a
11 qualifying direct current project described in subsection
12 (b-5) of Section 8-406 of the Public Utilities Act to a
13 delivery point on the electric transmission grid located
14 in this State or a state adjacent to Illinois, if the
15 generator demonstrates and the Agency determines that the
16 operation of such facility or facilities will help promote
17 the State's interest in the health, safety, and welfare of
18 its residents based on the public interest criteria
19 described above. For the purposes of this Section,
20 renewable resources that are delivered via a high voltage
21 direct current converter station located in Illinois shall
22 be deemed generated in Illinois at the time and location
23 the energy is converted to alternating current by the high
24 voltage direct current converter station if the high
25 voltage direct current transmission line: (i) after the
26 effective date of this amendatory Act of the 102nd General

HB4731- 43 -LRB102 24633 AMQ 33871 b
1 Assembly, was constructed with a project labor agreement;
2 (ii) is capable of transmitting electricity at 525kv;
3 (iii) has an Illinois converter station located and
4 interconnected in the region of the PJM Interconnection,
5 LLC; (iv) does not operate as a public utility; and (v) if
6 the high voltage direct current transmission line was
7 energized after June 1, 2023. To ensure that the public
8 interest criteria are applied to the procurement and given
9 full effect, the Agency's long-term procurement plan shall
10 describe in detail how each public interest factor shall
11 be considered and weighted for facilities located in
12 states adjacent to Illinois.
13 (J) In order to promote the competitive development of
14 renewable energy resources in furtherance of the State's
15 interest in the health, safety, and welfare of its
16 residents, renewable energy credits shall not be eligible
17 to be counted toward the renewable energy requirements of
18 this subsection (c) if they are sourced from a generating
19 unit whose costs were being recovered through rates
20 regulated by this State or any other state or states on or
21 after January 1, 2017. Each contract executed to purchase
22 renewable energy credits under this subsection (c) shall
23 provide for the contract's termination if the costs of the
24 generating unit supplying the renewable energy credits
25 subsequently begin to be recovered through rates regulated
26 by this State or any other state or states; and each

HB4731- 44 -LRB102 24633 AMQ 33871 b
1 contract shall further provide that, in that event, the
2 supplier of the credits must return 110% of all payments
3 received under the contract. Amounts returned under the
4 requirements of this subparagraph (J) shall be retained by
5 the utility and all of these amounts shall be used for the
6 procurement of additional renewable energy credits from
7 new wind or new photovoltaic resources as defined in this
8 subsection (c). The long-term plan shall provide that
9 these renewable energy credits shall be procured in the
10 next procurement event.
11 Notwithstanding the limitations of this subparagraph
12 (J), renewable energy credits sourced from generating
13 units that are constructed, purchased, owned, or leased by
14 an electric utility as part of an approved project,
15 program, or pilot under Section 1-56 of this Act shall be
16 eligible to be counted toward the renewable energy
17 requirements of this subsection (c), regardless of how the
18 costs of these units are recovered. As long as a
19 generating unit or an identifiable portion of a generating
20 unit has not had and does not have its costs recovered
21 through rates regulated by this State or any other state,
22 HVDC renewable energy credits associated with that
23 generating unit or identifiable portion thereof shall be
24 eligible to be counted toward the renewable energy
25 requirements of this subsection (c).
26 (K) The long-term renewable resources procurement plan

HB4731- 45 -LRB102 24633 AMQ 33871 b
1 developed by the Agency in accordance with subparagraph
2 (A) of this paragraph (1) shall include an Adjustable
3 Block program for the procurement of renewable energy
4 credits from new photovoltaic projects that are
5 distributed renewable energy generation devices or new
6 photovoltaic community renewable generation projects. The
7 Adjustable Block program shall be generally designed to
8 provide for the steady, predictable, and sustainable
9 growth of new solar photovoltaic development in Illinois.
10 To this end, the Adjustable Block program shall provide a
11 transparent annual schedule of prices and quantities to
12 enable the photovoltaic market to scale up and for
13 renewable energy credit prices to adjust at a predictable
14 rate over time. The prices set by the Adjustable Block
15 program can be reflected as a set value or as the product
16 of a formula.
17 The Adjustable Block program shall include for each
18 category of eligible projects for each delivery year: a
19 single block of nameplate capacity, a price for renewable
20 energy credits within that block, and the terms and
21 conditions for securing a spot on a waitlist once the
22 block is fully committed or reserved. Except as outlined
23 below, the waitlist of projects in a given year will carry
24 over to apply to the subsequent year when another block is
25 opened. Only projects energized on or after June 1, 2017
26 shall be eligible for the Adjustable Block program. For

HB4731- 46 -LRB102 24633 AMQ 33871 b
1 each category for each delivery year the Agency shall
2 determine the amount of generation capacity in each block,
3 and the purchase price for each block, provided that the
4 purchase price provided and the total amount of generation
5 in all blocks for all categories shall be sufficient to
6 meet the goals in this subsection (c). The Agency shall
7 strive to issue a single block sized to provide for
8 stability and market growth. The Agency shall establish
9 program eligibility requirements that ensure that projects
10 that enter the program are sufficiently mature to indicate
11 a demonstrable path to completion. The Agency may
12 periodically review its prior decisions establishing the
13 amount of generation capacity in each block, and the
14 purchase price for each block, and may propose, on an
15 expedited basis, changes to these previously set values,
16 including but not limited to redistributing these amounts
17 and the available funds as necessary and appropriate,
18 subject to Commission approval as part of the periodic
19 plan revision process described in Section 16-111.5 of the
20 Public Utilities Act. The Agency may define different
21 block sizes, purchase prices, or other distinct terms and
22 conditions for projects located in different utility
23 service territories if the Agency deems it necessary to
24 meet the goals in this subsection (c).
25 The Adjustable Block program shall include the
26 following categories in at least the following amounts:

HB4731- 47 -LRB102 24633 AMQ 33871 b
1 (i) At least 20% from distributed renewable energy
2 generation devices with a nameplate capacity of no
3 more than 25 kilowatts.
4 (ii) At least 20% from distributed renewable
5 energy generation devices with a nameplate capacity of
6 more than 25 kilowatts and no more than 5,000
7 kilowatts. The Agency may create sub-categories within
8 this category to account for the differences between
9 projects for small commercial customers, large
10 commercial customers, and public or non-profit
11 customers.
12 (iii) At least 30% from photovoltaic community
13 renewable generation projects. Capacity for this
14 category for the first 2 delivery years after the
15 effective date of this amendatory Act of the 102nd
16 General Assembly shall be allocated to waitlist
17 projects as provided in paragraph (3) of item (iv) of
18 subparagraph (G). Starting in the third delivery year
19 after the effective date of this amendatory Act of the
20 102nd General Assembly or earlier if the Agency
21 determines there is additional capacity needed for to
22 meet previous delivery year requirements, the
23 following shall apply:
24 (1) the Agency shall select projects on a
25 first-come, first-serve basis, however the Agency
26 may suggest additional methods to prioritize

HB4731- 48 -LRB102 24633 AMQ 33871 b
1 projects that are submitted at the same time;
2 (2) projects shall have subscriptions of 25 kW
3 or less for at least 50% of the facility's
4 nameplate capacity and the Agency shall price the
5 renewable energy credits with that as a factor;
6 (3) projects shall not be colocated with one
7 or more other community renewable generation
8 projects, as defined in the Agency's first revised
9 long-term renewable resources procurement plan
10 approved by the Commission on February 18, 2020,
11 such that the aggregate nameplate capacity exceeds
12 5,000 kilowatts; and
13 (4) projects greater than 2 MW may not apply
14 until after the approval of the Agency's revised
15 Long-Term Renewable Resources Procurement Plan
16 after the effective date of this amendatory Act of
17 the 102nd General Assembly.
18 (iv) At least 15% from distributed renewable
19 generation devices or photovoltaic community renewable
20 generation projects installed at public schools. The
21 Agency may create subcategories within this category
22 to account for the differences between project size or
23 location. Projects located within environmental
24 justice communities or within Organizational Units
25 that fall within Tier 1 or Tier 2 shall be given
26 priority. Each of the Agency's periodic updates to its

HB4731- 49 -LRB102 24633 AMQ 33871 b
1 long-term renewable resources procurement plan to
2 incorporate the procurement described in this
3 subparagraph (iv) shall also include the proposed
4 quantities or blocks, pricing, and contract terms
5 applicable to the procurement as indicated herein. In
6 each such update and procurement, the Agency shall set
7 the renewable energy credit price and establish
8 payment terms for the renewable energy credits
9 procured pursuant to this subparagraph (iv) that make
10 it feasible and affordable for public schools to
11 install photovoltaic distributed renewable energy
12 devices on their premises, including, but not limited
13 to, those public schools subject to the prioritization
14 provisions of this subparagraph. For the purposes of
15 this item (iv):
16 "Environmental Justice Community" shall have the
17 same meaning set forth in the Agency's long-term
18 renewable resources procurement plan;
19 "Organization Unit", "Tier 1" and "Tier 2" shall
20 have the meanings set for in Section 18-8.15 of the
21 School Code;
22 "Public schools" shall have the meaning set forth
23 in Section 1-3 of the School Code.
24 (v) At least 5% from community-driven community
25 solar projects intended to provide more direct and
26 tangible connection and benefits to the communities

HB4731- 50 -LRB102 24633 AMQ 33871 b
1 which they serve or in which they operate and,
2 additionally, to increase the variety of community
3 solar locations, models, and options in Illinois. As
4 part of its long-term renewable resources procurement
5 plan, the Agency shall develop selection criteria for
6 projects participating in this category. Nothing in
7 this Section shall preclude the Agency from creating a
8 selection process that maximizes community ownership
9 and community benefits in selecting projects to
10 receive renewable energy credits. Selection criteria
11 shall include:
12 (1) community ownership or community
13 wealth-building;
14 (2) additional direct and indirect community
15 benefit, beyond project participation as a
16 subscriber, including, but not limited to,
17 economic, environmental, social, cultural, and
18 physical benefits;
19 (3) meaningful involvement in project
20 organization and development by community members
21 or nonprofit organizations or public entities
22 located in or serving the community;
23 (4) engagement in project operations and
24 management by nonprofit organizations, public
25 entities, or community members; and
26 (5) whether a project is developed in response

HB4731- 51 -LRB102 24633 AMQ 33871 b
1 to a site-specific RFP developed by community
2 members or a nonprofit organization or public
3 entity located in or serving the community.
4 Selection criteria may also prioritize projects
5 that:
6 (1) are developed in collaboration with or to
7 provide complementary opportunities for the Clean
8 Jobs Workforce Network Program, the Illinois
9 Climate Works Preapprenticeship Program, the
10 Returning Residents Clean Jobs Training Program,
11 the Clean Energy Contractor Incubator Program, or
12 the Clean Energy Primes Contractor Accelerator
13 Program;
14 (2) increase the diversity of locations of
15 community solar projects in Illinois, including by
16 locating in urban areas and population centers;
17 (3) are located in Equity Investment Eligible
18 Communities;
19 (4) are not greenfield projects;
20 (5) serve only local subscribers;
21 (6) have a nameplate capacity that does not
22 exceed 500 kW;
23 (7) are developed by an equity eligible
24 contractor; or
25 (8) otherwise meaningfully advance the goals
26 of providing more direct and tangible connection

HB4731- 52 -LRB102 24633 AMQ 33871 b
1 and benefits to the communities which they serve
2 or in which they operate and increasing the
3 variety of community solar locations, models, and
4 options in Illinois.
5 For the purposes of this item (v):
6 "Community" means a social unit in which people
7 come together regularly to effect change; a social
8 unit in which participants are marked by a cooperative
9 spirit, a common purpose, or shared interests or
10 characteristics; or a space understood by its
11 residents to be delineated through geographic
12 boundaries or landmarks.
13 "Community benefit" means a range of services and
14 activities that provide affirmative, economic,
15 environmental, social, cultural, or physical value to
16 a community; or a mechanism that enables economic
17 development, high-quality employment, and education
18 opportunities for local workers and residents, or
19 formal monitoring and oversight structures such that
20 community members may ensure that those services and
21 activities respond to local knowledge and needs.
22 "Community ownership" means an arrangement in
23 which an electric generating facility is, or over time
24 will be, in significant part, owned collectively by
25 members of the community to which an electric
26 generating facility provides benefits; members of that

HB4731- 53 -LRB102 24633 AMQ 33871 b
1 community participate in decisions regarding the
2 governance, operation, maintenance, and upgrades of
3 and to that facility; and members of that community
4 benefit from regular use of that facility.
5 Terms and guidance within these criteria that are
6 not defined in this item (v) shall be defined by the
7 Agency, with stakeholder input, during the development
8 of the Agency's long-term renewable resources
9 procurement plan. The Agency shall develop regular
10 opportunities for projects to submit applications for
11 projects under this category, and develop selection
12 criteria that gives preference to projects that better
13 meet individual criteria as well as projects that
14 address a higher number of criteria.
15 (vi) At least 10% from distributed renewable
16 energy generation devices, which includes distributed
17 renewable energy devices with a nameplate capacity
18 under 5,000 kilowatts or photovoltaic community
19 renewable generation projects, from applicants that
20 are equity eligible contractors. The Agency may create
21 subcategories within this category to account for the
22 differences between project size and type. The Agency
23 shall propose to increase the percentage in this item
24 (vi) over time to 40% based on factors, including, but
25 not limited to, the number of equity eligible
26 contractors and capacity used in this item (vi) in

HB4731- 54 -LRB102 24633 AMQ 33871 b
1 previous delivery years.
2 The Agency shall propose a payment structure for
3 contracts executed pursuant to this paragraph under
4 which, upon a demonstration of qualification or need,
5 applicant firms are advanced capital disbursed after
6 contract execution but before the contracted project's
7 energization. The amount or percentage of capital
8 advanced prior to project energization shall be
9 sufficient to both cover any increase in development
10 costs resulting from prevailing wage requirements or
11 project-labor agreements, and designed to overcome
12 barriers in access to capital faced by equity eligible
13 contractors. The amount or percentage of advanced
14 capital may vary by subcategory within this category
15 and by an applicant's demonstration of need, with such
16 levels to be established through the Long-Term
17 Renewable Resources Procurement Plan authorized under
18 subparagraph (A) of paragraph (1) of subsection (c) of
19 this Section.
20 Contracts developed featuring capital advanced
21 prior to a project's energization shall feature
22 provisions to ensure both the successful development
23 of applicant projects and the delivery of the
24 renewable energy credits for the full term of the
25 contract, including ongoing collateral requirements
26 and other provisions deemed necessary by the Agency,

HB4731- 55 -LRB102 24633 AMQ 33871 b
1 and may include energization timelines longer than for
2 comparable project types. The percentage or amount of
3 capital advanced prior to project energization shall
4 not operate to increase the overall contract value,
5 however contracts executed under this subparagraph may
6 feature renewable energy credit prices higher than
7 those offered to similar projects participating in
8 other categories. Capital advanced prior to
9 energization shall serve to reduce the ratable
10 payments made after energization under items (ii) and
11 (iii) of subparagraph (L) or payments made for each
12 renewable energy credit delivery under item (iv) of
13 subparagraph (L).
14 (vii) The remaining capacity shall be allocated by
15 the Agency in order to respond to market demand. The
16 Agency shall allocate any discretionary capacity prior
17 to the beginning of each delivery year.
18 To the extent there is uncontracted capacity from any
19 block in any of categories (i) through (vi) at the end of a
20 delivery year, the Agency shall redistribute that capacity
21 to one or more other categories giving priority to
22 categories with projects on a waitlist. The redistributed
23 capacity shall be added to the annual capacity in the
24 subsequent delivery year, and the price for renewable
25 energy credits shall be the price for the new delivery
26 year. Redistributed capacity shall not be considered

HB4731- 56 -LRB102 24633 AMQ 33871 b
1 redistributed when determining whether the goals in this
2 subsection (K) have been met.
3 Notwithstanding anything to the contrary, as the
4 Agency increases the capacity in item (vi) to 40% over
5 time, the Agency may reduce the capacity of items (i)
6 through (v) proportionate to the capacity of the
7 categories of projects in item (vi), to achieve a balance
8 of project types.
9 The Adjustable Block program shall be designed to
10 ensure that renewable energy credits are procured from
11 projects in diverse locations and are not concentrated in
12 a few regional areas.
13 (L) Notwithstanding provisions for advancing capital
14 prior to project energization found in item (vi) of
15 subparagraph (K), the procurement of photovoltaic
16 renewable energy credits under items (i) through (vi) of
17 subparagraph (K) of this paragraph (1) shall otherwise be
18 subject to the following contract and payment terms:
19 (i) (Blank).
20 (ii) For those renewable energy credits that
21 qualify and are procured under item (i) of
22 subparagraph (K) of this paragraph (1), and any
23 similar category projects that are procured under item
24 (vi) of subparagraph (K) of this paragraph (1) that
25 qualify and are procured under item (vi), the contract
26 length shall be 15 years. The renewable energy credit

HB4731- 57 -LRB102 24633 AMQ 33871 b
1 delivery contract value shall be paid in full, based
2 on the estimated generation during the first 15 years
3 of operation, by the contracting utilities at the time
4 that the facility producing the renewable energy
5 credits is interconnected at the distribution system
6 level of the utility and verified as energized and
7 compliant by the Program Administrator. The electric
8 utility shall receive and retire all renewable energy
9 credits generated by the project for the first 15
10 years of operation. Renewable energy credits generated
11 by the project thereafter shall not be transferred
12 under the renewable energy credit delivery contract
13 with the counterparty electric utility.
14 (iii) For those renewable energy credits that
15 qualify and are procured under item (ii) and (v) of
16 subparagraph (K) of this paragraph (1) and any like
17 projects similar category that qualify and are
18 procured under item (vi), the contract length shall be
19 15 years. 15% of the renewable energy credit delivery
20 contract value, based on the estimated generation
21 during the first 15 years of operation, shall be paid
22 by the contracting utilities at the time that the
23 facility producing the renewable energy credits is
24 interconnected at the distribution system level of the
25 utility and verified as energized and compliant by the
26 Program Administrator. The remaining portion shall be

HB4731- 58 -LRB102 24633 AMQ 33871 b
1 paid ratably over the subsequent 6-year period. The
2 electric utility shall receive and retire all
3 renewable energy credits generated by the project for
4 the first 15 years of operation. Renewable energy
5 credits generated by the project thereafter shall not
6 be transferred under the renewable energy credit
7 delivery contract with the counterparty electric
8 utility.
9 (iv) For those renewable energy credits that
10 qualify and are procured under items (iii) and (iv) of
11 subparagraph (K) of this paragraph (1), and any like
12 projects that qualify and are procured under item
13 (vi), the renewable energy credit delivery contract
14 length shall be 20 years and shall be paid over the
15 delivery term, not to exceed during each delivery year
16 the contract price multiplied by the estimated annual
17 renewable energy credit generation amount. If
18 generation of renewable energy credits during a
19 delivery year exceeds the estimated annual generation
20 amount, the excess renewable energy credits shall be
21 carried forward to future delivery years and shall not
22 expire during the delivery term. If generation of
23 renewable energy credits during a delivery year,
24 including carried forward excess renewable energy
25 credits, if any, is less than the estimated annual
26 generation amount, payments during such delivery year

HB4731- 59 -LRB102 24633 AMQ 33871 b
1 will not exceed the quantity generated plus the
2 quantity carried forward multiplied by the contract
3 price. The electric utility shall receive all
4 renewable energy credits generated by the project
5 during the first 20 years of operation and retire all
6 renewable energy credits paid for under this item (iv)
7 and return at the end of the delivery term all
8 renewable energy credits that were not paid for.
9 Renewable energy credits generated by the project
10 thereafter shall not be transferred under the
11 renewable energy credit delivery contract with the
12 counterparty electric utility. Notwithstanding the
13 preceding, for those projects participating under item
14 (iii) of subparagraph (K), the contract price for a
15 delivery year shall be based on subscription levels as
16 measured on the higher of the first business day of the
17 delivery year or the first business day 6 months after
18 the first business day of the delivery year.
19 Subscription of 90% of nameplate capacity or greater
20 shall be deemed to be fully subscribed for the
21 purposes of this item (iv). For projects receiving a
22 20-year delivery contract, REC prices shall be
23 adjusted downward for consistency with the incentive
24 levels previously determined to be necessary to
25 support projects under 15-year delivery contracts,
26 taking into consideration any additional new

HB4731- 60 -LRB102 24633 AMQ 33871 b
1 requirements placed on the projects, including, but
2 not limited to, labor standards.
3 (v) Each contract shall include provisions to
4 ensure the delivery of the estimated quantity of
5 renewable energy credits and ongoing collateral
6 requirements and other provisions deemed appropriate
7 by the Agency.
8 (vi) The utility shall be the counterparty to the
9 contracts executed under this subparagraph (L) that
10 are approved by the Commission under the process
11 described in Section 16-111.5 of the Public Utilities
12 Act. No contract shall be executed for an amount that
13 is less than one renewable energy credit per year.
14 (vii) If, at any time, approved applications for
15 the Adjustable Block program exceed funds collected by
16 the electric utility or would cause the Agency to
17 exceed the limitation described in subparagraph (E) of
18 this paragraph (1) on the amount of renewable energy
19 resources that may be procured, then the Agency may
20 consider future uncommitted funds to be reserved for
21 these contracts on a first-come, first-served basis.
22 (viii) Nothing in this Section shall require the
23 utility to advance any payment or pay any amounts that
24 exceed the actual amount of revenues anticipated to be
25 collected by the utility under paragraph (6) of this
26 subsection (c) and subsection (k) of Section 16-108 of

HB4731- 61 -LRB102 24633 AMQ 33871 b
1 the Public Utilities Act inclusive of eligible funds
2 collected in prior years and alternative compliance
3 payments for use by the utility, and contracts
4 executed under this Section shall expressly
5 incorporate this limitation.
6 (ix) Notwithstanding other requirements of this
7 subparagraph (L), no modification shall be required to
8 Adjustable Block program contracts if they were
9 already executed prior to the establishment, approval,
10 and implementation of new contract forms as a result
11 of this amendatory Act of the 102nd General Assembly.
12 (x) Contracts may be assignable, but only to
13 entities first deemed by the Agency to have met
14 program terms and requirements applicable to direct
15 program participation. In developing contracts for the
16 delivery of renewable energy credits, the Agency shall
17 be permitted to establish fees applicable to each
18 contract assignment.
19 (M) The Agency shall be authorized to retain one or
20 more experts or expert consulting firms to develop,
21 administer, implement, operate, and evaluate the
22 Adjustable Block program described in subparagraph (K) of
23 this paragraph (1), and the Agency shall retain the
24 consultant or consultants in the same manner, to the
25 extent practicable, as the Agency retains others to
26 administer provisions of this Act, including, but not

HB4731- 62 -LRB102 24633 AMQ 33871 b
1 limited to, the procurement administrator. The selection
2 of experts and expert consulting firms and the procurement
3 process described in this subparagraph (M) are exempt from
4 the requirements of Section 20-10 of the Illinois
5 Procurement Code, under Section 20-10 of that Code. The
6 Agency shall strive to minimize administrative expenses in
7 the implementation of the Adjustable Block program.
8 The Program Administrator may charge application fees
9 to participating firms to cover the cost of program
10 administration. Any application fee amounts shall
11 initially be determined through the long-term renewable
12 resources procurement plan, and modifications to any
13 application fee that deviate more than 25% from the
14 Commission's approved value must be approved by the
15 Commission as a long-term plan revision under Section
16 16-111.5 of the Public Utilities Act. The Agency shall
17 consider stakeholder feedback when making adjustments to
18 application fees and shall notify stakeholders in advance
19 of any planned changes.
20 In addition to covering the costs of program
21 administration, the Agency, in conjunction with its
22 Program Administrator, may also use the proceeds of such
23 fees charged to participating firms to support public
24 education and ongoing regional and national coordination
25 with nonprofit organizations, public bodies, and others
26 engaged in the implementation of renewable energy

HB4731- 63 -LRB102 24633 AMQ 33871 b
1 incentive programs or similar initiatives. This work may
2 include developing papers and reports, hosting regional
3 and national conferences, and other work deemed necessary
4 by the Agency to position the State of Illinois as a
5 national leader in renewable energy incentive program
6 development and administration.
7 The Agency and its consultant or consultants shall
8 monitor block activity, share program activity with
9 stakeholders and conduct quarterly meetings to discuss
10 program activity and market conditions. If necessary, the
11 Agency may make prospective administrative adjustments to
12 the Adjustable Block program design, such as making
13 adjustments to purchase prices as necessary to achieve the
14 goals of this subsection (c). Program modifications to any
15 block price that do not deviate from the Commission's
16 approved value by more than 10% shall take effect
17 immediately and are not subject to Commission review and
18 approval. Program modifications to any block price that
19 deviate more than 10% from the Commission's approved value
20 must be approved by the Commission as a long-term plan
21 amendment under Section 16-111.5 of the Public Utilities
22 Act. The Agency shall consider stakeholder feedback when
23 making adjustments to the Adjustable Block design and
24 shall notify stakeholders in advance of any planned
25 changes.
26 The Agency and its program administrators for both the

HB4731- 64 -LRB102 24633 AMQ 33871 b
1 Adjustable Block program and the Illinois Solar for All
2 Program, consistent with the requirements of this
3 subsection (c) and subsection (b) of Section 1-56 of this
4 Act, shall propose the Adjustable Block program terms,
5 conditions, and requirements, including the prices to be
6 paid for renewable energy credits, where applicable, and
7 requirements applicable to participating entities and
8 project applications, through the development, review, and
9 approval of the Agency's long-term renewable resources
10 procurement plan described in this subsection (c) and
11 paragraph (5) of subsection (b) of Section 16-111.5 of the
12 Public Utilities Act. Terms, conditions, and requirements
13 for program participation shall include the following:
14 (i) The Agency shall establish a registration
15 process for entities seeking to qualify for
16 program-administered incentive funding and establish
17 baseline qualifications for vendor approval. The
18 Agency must maintain a list of approved entities on
19 each program's website, and may revoke a vendor's
20 ability to receive program-administered incentive
21 funding status upon a determination that the vendor
22 failed to comply with contract terms, the law, or
23 other program requirements.
24 (ii) The Agency shall establish program
25 requirements and minimum contract terms to ensure
26 projects are properly installed and produce their

HB4731- 65 -LRB102 24633 AMQ 33871 b
1 expected amounts of energy. Program requirements may
2 include on-site inspections and photo documentation of
3 projects under construction. The Agency may require
4 repairs, alterations, or additions to remedy any
5 material deficiencies discovered. Vendors who have a
6 disproportionately high number of deficient systems
7 may lose their eligibility to continue to receive
8 State-administered incentive funding through Agency
9 programs and procurements.
10 (iii) To discourage deceptive marketing or other
11 bad faith business practices, the Agency may require
12 direct program participants, including agents
13 operating on their behalf, to provide standardized
14 disclosures to a customer prior to that customer's
15 execution of a contract for the development of a
16 distributed generation system or a subscription to a
17 community solar project.
18 (iv) The Agency shall establish one or multiple
19 Consumer Complaints Centers to accept complaints
20 regarding businesses that participate in, or otherwise
21 benefit from, State-administered incentive funding
22 through Agency-administered programs. The Agency shall
23 maintain a public database of complaints with any
24 confidential or particularly sensitive information
25 redacted from public entries.
26 (v) Through a filing in the proceeding for the

HB4731- 66 -LRB102 24633 AMQ 33871 b
1 approval of its long-term renewable energy resources
2 procurement plan, the Agency shall provide an annual
3 written report to the Illinois Commerce Commission
4 documenting the frequency and nature of complaints and
5 any enforcement actions taken in response to those
6 complaints.
7 (vi) The Agency shall schedule regular meetings
8 with representatives of the Office of the Attorney
9 General, the Illinois Commerce Commission, consumer
10 protection groups, and other interested stakeholders
11 to share relevant information about consumer
12 protection, project compliance, and complaints
13 received.
14 (vii) To the extent that complaints received
15 implicate the jurisdiction of the Office of the
16 Attorney General, the Illinois Commerce Commission, or
17 local, State, or federal law enforcement, the Agency
18 shall also refer complaints to those entities as
19 appropriate.
20 (N) The Agency shall establish the terms, conditions,
21 and program requirements for photovoltaic community
22 renewable generation projects with a goal to expand access
23 to a broader group of energy consumers, to ensure robust
24 participation opportunities for residential and small
25 commercial customers and those who cannot install
26 renewable energy on their own properties. Subject to

HB4731- 67 -LRB102 24633 AMQ 33871 b
1 reasonable limitations, any plan approved by the
2 Commission shall allow subscriptions to community
3 renewable generation projects to be portable and
4 transferable. For purposes of this subparagraph (N),
5 "portable" means that subscriptions may be retained by the
6 subscriber even if the subscriber relocates or changes its
7 address within the same utility service territory; and
8 "transferable" means that a subscriber may assign or sell
9 subscriptions to another person within the same utility
10 service territory.
11 Through the development of its long-term renewable
12 resources procurement plan, the Agency may consider
13 whether community renewable generation projects utilizing
14 technologies other than photovoltaics should be supported
15 through State-administered incentive funding, and may
16 issue requests for information to gauge market demand.
17 Electric utilities shall provide a monetary credit to
18 a subscriber's subsequent bill for service for the
19 proportional output of a community renewable generation
20 project attributable to that subscriber as specified in
21 Section 16-107.5 of the Public Utilities Act.
22 The Agency shall purchase renewable energy credits
23 from subscribed shares of photovoltaic community renewable
24 generation projects through the Adjustable Block program
25 described in subparagraph (K) of this paragraph (1) or
26 through the Illinois Solar for All Program described in

HB4731- 68 -LRB102 24633 AMQ 33871 b
1 Section 1-56 of this Act. The electric utility shall
2 purchase any unsubscribed energy from community renewable
3 generation projects that are Qualifying Facilities ("QF")
4 under the electric utility's tariff for purchasing the
5 output from QFs under Public Utilities Regulatory Policies
6 Act of 1978.
7 The owners of and any subscribers to a community
8 renewable generation project shall not be considered
9 public utilities or alternative retail electricity
10 suppliers under the Public Utilities Act solely as a
11 result of their interest in or subscription to a community
12 renewable generation project and shall not be required to
13 become an alternative retail electric supplier by
14 participating in a community renewable generation project
15 with a public utility.
16 (O) For the delivery year beginning June 1, 2018, the
17 long-term renewable resources procurement plan required by
18 this subsection (c) shall provide for the Agency to
19 procure contracts to continue offering the Illinois Solar
20 for All Program described in subsection (b) of Section
21 1-56 of this Act, and the contracts approved by the
22 Commission shall be executed by the utilities that are
23 subject to this subsection (c). The long-term renewable
24 resources procurement plan shall allocate up to
25 $50,000,000 per delivery year to fund the programs, and
26 the plan shall determine the amount of funding to be

HB4731- 69 -LRB102 24633 AMQ 33871 b
1 apportioned to the programs identified in subsection (b)
2 of Section 1-56 of this Act; provided that for the
3 delivery years beginning June 1, 2021, June 1, 2022, and
4 June 1, 2023, the long-term renewable resources
5 procurement plan may average the annual budgets over a
6 3-year period to account for program ramp-up. For the
7 delivery years beginning June 1, 2021, June 1, 2024, June
8 1, 2027, and June 1, 2030 and additional $10,000,000 shall
9 be provided to the Department of Commerce and Economic
10 Opportunity to implement the workforce development
11 programs and reporting as outlined in Section 16-108.12 of
12 the Public Utilities Act. In making the determinations
13 required under this subparagraph (O), the Commission shall
14 consider the experience and performance under the programs
15 and any evaluation reports. The Commission shall also
16 provide for an independent evaluation of those programs on
17 a periodic basis that are funded under this subparagraph
18 (O).
19 (P) All programs and procurements under this
20 subsection (c) shall be designed to encourage
21 participating projects to use a diverse and equitable
22 workforce and a diverse set of contractors, including
23 minority-owned businesses, disadvantaged businesses,
24 trade unions, graduates of any workforce training programs
25 administered under this Act, and small businesses.
26 The Agency shall develop a method to optimize

HB4731- 70 -LRB102 24633 AMQ 33871 b
1 procurement of renewable energy credits from proposed
2 utility-scale projects that are located in communities
3 eligible to receive Energy Transition Community Grants
4 pursuant to Section 10-20 of the Energy Community
5 Reinvestment Act. If this requirement conflicts with other
6 provisions of law or the Agency determines that full
7 compliance with the requirements of this subparagraph (P)
8 would be unreasonably costly or administratively
9 impractical, the Agency is to propose alternative
10 approaches to achieve development of renewable energy
11 resources in communities eligible to receive Energy
12 Transition Community Grants pursuant to Section 10-20 of
13 the Energy Community Reinvestment Act or seek an exemption
14 from this requirement from the Commission.
15 (Q) Each facility listed in subitems (i) through
16 (viii) of item (1) of this subparagraph (Q) for which a
17 renewable energy credit delivery contract is signed after
18 the effective date of this amendatory Act of the 102nd
19 General Assembly is subject to the following requirements
20 through the Agency's long-term renewable resources
21 procurement plan:
22 (1) Each facility shall be subject to the
23 prevailing wage requirements included in the
24 Prevailing Wage Act. The Agency shall require
25 verification that all construction performed on the
26 facility by the renewable energy credit delivery

HB4731- 71 -LRB102 24633 AMQ 33871 b
1 contract holder, its contractors, or its
2 subcontractors relating to construction of the
3 facility is performed by construction employees
4 receiving an amount for that work equal to or greater
5 than the general prevailing rate, as that term is
6 defined in Section 3 of the Prevailing Wage Act. For
7 purposes of this item (1), "house of worship" means
8 property that is both (1) used exclusively by a
9 religious society or body of persons as a place for
10 religious exercise or religious worship and (2)
11 recognized as exempt from taxation pursuant to Section
12 15-40 of the Property Tax Code. This item (1) shall
13 apply to any the following:
14 (i) all new utility-scale wind projects;
15 (ii) all new utility-scale photovoltaic
16 projects;
17 (iii) all new brownfield photovoltaic
18 projects;
19 (iv) all new photovoltaic community renewable
20 energy facilities that qualify for item (iii) of
21 subparagraph (K) of this paragraph (1);
22 (v) all new community driven community
23 photovoltaic projects that qualify for item (v) of
24 subparagraph (K) of this paragraph (1);
25 (vi) all new photovoltaic distributed
26 renewable energy generation devices on schools

HB4731- 72 -LRB102 24633 AMQ 33871 b
1 that qualify for item (iv) of subparagraph (K) of
2 this paragraph (1);
3 (vii) all new photovoltaic distributed
4 renewable energy generation devices that (1)
5 qualify for item (i) of subparagraph (K) of this
6 paragraph (1); (2) are not projects that serve
7 single-family or multi-family residential
8 buildings; and (3) are not houses of worship where
9 the aggregate capacity including collocated
10 projects would not exceed 100 kilowatts;
11 (viii) all new photovoltaic distributed
12 renewable energy generation devices that (1)
13 qualify for item (ii) of subparagraph (K) of this
14 paragraph (1); (2) are not projects that serve
15 single-family or multi-family residential
16 buildings; and (3) are not houses of worship where
17 the aggregate capacity including collocated
18 projects would not exceed 100 kilowatts.
19 (2) Renewable energy credits procured from new
20 utility-scale wind projects, new utility-scale solar
21 projects, and new brownfield solar projects pursuant
22 to Agency procurement events occurring after the
23 effective date of this amendatory Act of the 102nd
24 General Assembly must be from facilities built by
25 general contractors that must enter into a project
26 labor agreement, as defined by this Act, prior to

HB4731- 73 -LRB102 24633 AMQ 33871 b
1 construction. The project labor agreement shall be
2 filed with the Director in accordance with procedures
3 established by the Agency through its long-term
4 renewable resources procurement plan. Any information
5 submitted to the Agency in this item (2) shall be
6 considered commercially sensitive information. At a
7 minimum, the project labor agreement must provide the
8 names, addresses, and occupations of the owner of the
9 plant and the individuals representing the labor
10 organization employees participating in the project
11 labor agreement consistent with the Project Labor
12 Agreements Act. The agreement must also specify the
13 terms and conditions as defined by this Act.
14 (3) It is the intent of this Section to ensure that
15 economic development occurs across Illinois
16 communities, that emerging businesses may grow, and
17 that there is improved access to the clean energy
18 economy by persons who have greater economic burdens
19 to success. The Agency shall take into consideration
20 the unique cost of compliance of this subparagraph (Q)
21 that might be borne by equity eligible contractors,
22 shall include such costs when determining the price of
23 renewable energy credits in the Adjustable Block
24 program, and shall take such costs into consideration
25 in a nondiscriminatory manner when comparing bids for
26 competitive procurements. The Agency shall consider

HB4731- 74 -LRB102 24633 AMQ 33871 b
1 costs associated with compliance whether in the
2 development, financing, or construction of projects.
3 The Agency shall periodically review the assumptions
4 in these costs and may adjust prices, in compliance
5 with subparagraph (M) of this paragraph (1).
6 (R) In its long-term renewable resources procurement
7 plan, the Agency shall establish a self-direct renewable
8 portfolio standard compliance program for eligible
9 self-direct customers that purchase renewable energy
10 credits from utility-scale wind and solar projects through
11 long-term agreements for purchase of renewable energy
12 credits as described in this Section. Such long-term
13 agreements may include the purchase of energy or other
14 products on a physical or financial basis and may involve
15 an alternative retail electric supplier as defined in
16 Section 16-102 of the Public Utilities Act. This program
17 shall take effect in the delivery year commencing June 1,
18 2023.
19 (1) For the purposes of this subparagraph:
20 "Eligible self-direct customer" means any retail
21 customers of an electric utility that serves 3,000,000
22 or more retail customers in the State and whose total
23 highest 30-minute demand was more than 10,000
24 kilowatts, or any retail customers of an electric
25 utility that serves less than 3,000,000 retail
26 customers but more than 500,000 retail customers in

HB4731- 75 -LRB102 24633 AMQ 33871 b
1 the State and whose total highest 15-minute demand was
2 more than 10,000 kilowatts.
3 "Retail customer" has the meaning set forth in
4 Section 16-102 of the Public Utilities Act and
5 multiple retail customer accounts under the same
6 corporate parent may aggregate their account demands
7 to meet the 10,000 kilowatt threshold. The criteria
8 for determining whether this subparagraph is
9 applicable to a retail customer shall be based on the
10 12 consecutive billing periods prior to the start of
11 the year in which the application is filed.
12 (2) For renewable energy credits to count toward
13 the self-direct renewable portfolio standard
14 compliance program, they must:
15 (i) qualify as renewable energy credits as
16 defined in Section 1-10 of this Act;
17 (ii) be sourced from one or more renewable
18 energy generating facilities that comply with the
19 geographic requirements as set forth in
20 subparagraph (I) of paragraph (1) of subsection
21 (c) as interpreted through the Agency's long-term
22 renewable resources procurement plan, or, where
23 applicable, the geographic requirements that
24 governed utility-scale renewable energy credits at
25 the time the eligible self-direct customer entered
26 into the applicable renewable energy credit

HB4731- 76 -LRB102 24633 AMQ 33871 b
1 purchase agreement;
2 (iii) be procured through long-term contracts
3 with term lengths of at least 10 years either
4 directly with the renewable energy generating
5 facility or through a bundled power purchase
6 agreement, a virtual power purchase agreement, an
7 agreement between the renewable generating
8 facility, an alternative retail electric supplier,
9 and the customer, or such other structure as is
10 permissible under this subparagraph (R);
11 (iv) be equivalent in volume to at least 40%
12 of the eligible self-direct customer's usage,
13 determined annually by the eligible self-direct
14 customer's usage during the previous delivery
15 year, measured to the nearest megawatt-hour;
16 (v) be retired by or on behalf of the large
17 energy customer;
18 (vi) be sourced from new utility-scale wind
19 projects or new utility-scale solar projects; and
20 (vii) if the contracts for renewable energy
21 credits are entered into after the effective date
22 of this amendatory Act of the 102nd General
23 Assembly, the new utility-scale wind projects or
24 new utility-scale solar projects must comply with
25 the requirements established in subparagraphs (P)
26 and (Q) of paragraph (1) of this subsection (c)

HB4731- 77 -LRB102 24633 AMQ 33871 b
1 and subsection (c-10).
2 (3) The self-direct renewable portfolio standard
3 compliance program shall be designed to allow eligible
4 self-direct customers to procure new renewable energy
5 credits from new utility-scale wind projects or new
6 utility-scale photovoltaic projects. The Agency shall
7 annually determine the amount of utility-scale
8 renewable energy credits it will include each year
9 from the self-direct renewable portfolio standard
10 compliance program, subject to receiving qualifying
11 applications. In making this determination, the Agency
12 shall evaluate publicly available analyses and studies
13 of the potential market size for utility-scale
14 renewable energy long-term purchase agreements by
15 commercial and industrial energy customers and make
16 that report publicly available. If demand for
17 participation in the self-direct renewable portfolio
18 standard compliance program exceeds availability, the
19 Agency shall ensure participation is evenly split
20 between commercial and industrial users to the extent
21 there is sufficient demand from both customer classes.
22 Each renewable energy credit procured pursuant to this
23 subparagraph (R) by a self-direct customer shall
24 reduce the total volume of renewable energy credits
25 the Agency is otherwise required to procure from new
26 utility-scale projects pursuant to subparagraph (C) of

HB4731- 78 -LRB102 24633 AMQ 33871 b
1 paragraph (1) of this subsection (c) on behalf of
2 contracting utilities where the eligible self-direct
3 customer is located. The self-direct customer shall
4 file an annual compliance report with the Agency
5 pursuant to terms established by the Agency through
6 its long-term renewable resources procurement plan to
7 be eligible for participation in this program.
8 Customers must provide the Agency with their most
9 recent electricity billing statements or other
10 information deemed necessary by the Agency to
11 demonstrate they are an eligible self-direct customer.
12 (4) The Commission shall approve a reduction in
13 the volumetric charges collected pursuant to Section
14 16-108 of the Public Utilities Act for approved
15 eligible self-direct customers equivalent to the
16 anticipated cost of renewable energy credit deliveries
17 under contracts for new utility-scale wind and new
18 utility-scale solar entered for each delivery year
19 after the large energy customer begins retiring
20 eligible new utility scale renewable energy credits
21 for self-compliance. The self-direct credit amount
22 shall be determined annually and is equal to the
23 estimated portion of the cost authorized by
24 subparagraph (E) of paragraph (1) of this subsection
25 (c) that supported the annual procurement of
26 utility-scale renewable energy credits in the prior

HB4731- 79 -LRB102 24633 AMQ 33871 b
1 delivery year using a methodology described in the
2 long-term renewable resources procurement plan,
3 expressed on a per kilowatthour basis, and does not
4 include (i) costs associated with any contracts
5 entered into before the delivery year in which the
6 customer files the initial compliance report to be
7 eligible for participation in the self-direct program,
8 and (ii) costs associated with procuring renewable
9 energy credits through existing and future contracts
10 through the Adjustable Block Program, subsection (c-5)
11 of this Section 1-75, and the Solar for All Program.
12 The Agency shall assist the Commission in determining
13 the current and future costs. The Agency must
14 determine the self-direct credit amount for new and
15 existing eligible self-direct customers and submit
16 this to the Commission in an annual compliance filing.
17 The Commission must approve the self-direct credit
18 amount by June 1, 2023 and June 1 of each delivery year
19 thereafter.
20 (5) Customers described in this subparagraph (R)
21 shall apply, on a form developed by the Agency, to the
22 Agency to be designated as a self-direct eligible
23 customer. Once the Agency determines that a
24 self-direct customer is eligible for participation in
25 the program, the self-direct customer will remain
26 eligible until the end of the term of the contract.

HB4731- 80 -LRB102 24633 AMQ 33871 b
1 Thereafter, application may be made not less than 12
2 months before the filing date of the long-term
3 renewable resources procurement plan described in this
4 Act. At a minimum, such application shall contain the
5 following:
6 (i) the customer's certification that, at the
7 time of the customer's application, the customer
8 qualifies to be a self-direct eligible customer,
9 including documents demonstrating that
10 qualification;
11 (ii) the customer's certification that the
12 customer has entered into or will enter into by
13 the beginning of the applicable procurement year,
14 one or more bilateral contracts for new wind
15 projects or new photovoltaic projects, including
16 supporting documentation;
17 (iii) certification that the contract or
18 contracts for new renewable energy resources are
19 long-term contracts with term lengths of at least
20 10 years, including supporting documentation;
21 (iv) certification of the quantities of
22 renewable energy credits that the customer will
23 purchase each year under such contract or
24 contracts, including supporting documentation;
25 (v) proof that the contract is sufficient to
26 produce renewable energy credits to be equivalent

HB4731- 81 -LRB102 24633 AMQ 33871 b
1 in volume to at least 40% of the large energy
2 customer's usage from the previous delivery year,
3 measured to the nearest megawatt-hour; and
4 (vi) certification that the customer intends
5 to maintain the contract for the duration of the
6 length of the contract.
7 (6) If a customer receives the self-direct credit
8 but fails to properly procure and retire renewable
9 energy credits as required under this subparagraph
10 (R), the Commission, on petition from the Agency and
11 after notice and hearing, may direct such customer's
12 utility to recover the cost of the wrongfully received
13 self-direct credits plus interest through an adder to
14 charges assessed pursuant to Section 16-108 of the
15 Public Utilities Act. Self-direct customers who
16 knowingly fail to properly procure and retire
17 renewable energy credits and do not notify the Agency
18 are ineligible for continued participation in the
19 self-direct renewable portfolio standard compliance
20 program.
21 (2) (Blank).
22 (3) (Blank).
23 (4) The electric utility shall retire all renewable
24 energy credits used to comply with the standard.
25 (5) Beginning with the 2010 delivery year and ending
26 June 1, 2017, an electric utility subject to this

HB4731- 82 -LRB102 24633 AMQ 33871 b
1 subsection (c) shall apply the lesser of the maximum
2 alternative compliance payment rate or the most recent
3 estimated alternative compliance payment rate for its
4 service territory for the corresponding compliance period,
5 established pursuant to subsection (d) of Section 16-115D
6 of the Public Utilities Act to its retail customers that
7 take service pursuant to the electric utility's hourly
8 pricing tariff or tariffs. The electric utility shall
9 retain all amounts collected as a result of the
10 application of the alternative compliance payment rate or
11 rates to such customers, and, beginning in 2011, the
12 utility shall include in the information provided under
13 item (1) of subsection (d) of Section 16-111.5 of the
14 Public Utilities Act the amounts collected under the
15 alternative compliance payment rate or rates for the prior
16 year ending May 31. Notwithstanding any limitation on the
17 procurement of renewable energy resources imposed by item
18 (2) of this subsection (c), the Agency shall increase its
19 spending on the purchase of renewable energy resources to
20 be procured by the electric utility for the next plan year
21 by an amount equal to the amounts collected by the utility
22 under the alternative compliance payment rate or rates in
23 the prior year ending May 31.
24 (6) The electric utility shall be entitled to recover
25 all of its costs associated with the procurement of
26 renewable energy credits under plans approved under this

HB4731- 83 -LRB102 24633 AMQ 33871 b
1 Section and Section 16-111.5 of the Public Utilities Act.
2 These costs shall include associated reasonable expenses
3 for implementing the procurement programs, including, but
4 not limited to, the costs of administering and evaluating
5 the Adjustable Block program, through an automatic
6 adjustment clause tariff in accordance with subsection (k)
7 of Section 16-108 of the Public Utilities Act.
8 (7) Renewable energy credits procured from new
9 photovoltaic projects or new distributed renewable energy
10 generation devices under this Section after June 1, 2017
11 (the effective date of Public Act 99-906) must be procured
12 from devices installed by a qualified person in compliance
13 with the requirements of Section 16-128A of the Public
14 Utilities Act and any rules or regulations adopted
15 thereunder.
16 In meeting the renewable energy requirements of this
17 subsection (c), to the extent feasible and consistent with
18 State and federal law, the renewable energy credit
19 procurements, Adjustable Block solar program, and
20 community renewable generation program shall provide
21 employment opportunities for all segments of the
22 population and workforce, including minority-owned and
23 female-owned business enterprises, and shall not,
24 consistent with State and federal law, discriminate based
25 on race or socioeconomic status.
26 (c-5) Procurement of renewable energy credits from new

HB4731- 84 -LRB102 24633 AMQ 33871 b
1renewable energy facilities installed at or adjacent to the
2sites of electric generating facilities that burn or burned
3coal as their primary fuel source.
4 (1) In addition to the procurement of renewable energy
5 credits pursuant to long-term renewable resources
6 procurement plans in accordance with subsection (c) of
7 this Section and Section 16-111.5 of the Public Utilities
8 Act, the Agency shall conduct procurement events in
9 accordance with this subsection (c-5) for the procurement
10 by electric utilities that served more than 300,000 retail
11 customers in this State as of January 1, 2019 of renewable
12 energy credits from new renewable energy facilities to be
13 installed at or adjacent to the sites of electric
14 generating facilities that, as of January 1, 2016, burned
15 coal as their primary fuel source and meet the other
16 criteria specified in this subsection (c-5). For purposes
17 of this subsection (c-5), "new renewable energy facility"
18 means a new utility-scale solar project as defined in this
19 Section 1-75. The renewable energy credits procured
20 pursuant to this subsection (c-5) may be included or
21 counted for purposes of compliance with the amounts of
22 renewable energy credits required to be procured pursuant
23 to subsection (c) of this Section to the extent that there
24 are otherwise shortfalls in compliance with such
25 requirements. The procurement of renewable energy credits
26 by electric utilities pursuant to this subsection (c-5)

HB4731- 85 -LRB102 24633 AMQ 33871 b
1 shall be funded solely by revenues collected from the Coal
2 to Solar and Energy Storage Initiative Charge provided for
3 in this subsection (c-5) and subsection (i-5) of Section
4 16-108 of the Public Utilities Act, shall not be funded by
5 revenues collected through any of the other funding
6 mechanisms provided for in subsection (c) of this Section,
7 and shall not be subject to the limitation imposed by
8 subsection (c) on charges to retail customers for costs to
9 procure renewable energy resources pursuant to subsection
10 (c), and shall not be subject to any other requirements or
11 limitations of subsection (c).
12 (2) The Agency shall conduct 2 procurement events to
13 select owners of electric generating facilities meeting
14 the eligibility criteria specified in this subsection
15 (c-5) to enter into long-term contracts to sell renewable
16 energy credits to electric utilities serving more than
17 300,000 retail customers in this State as of January 1,
18 2019. The first procurement event shall be conducted no
19 later than March 31, 2022, unless the Agency elects to
20 delay it, until no later than May 1, 2022, due to its
21 overall volume of work, and shall be to select owners of
22 electric generating facilities located in this State and
23 south of federal Interstate Highway 80 that meet the
24 eligibility criteria specified in this subsection (c-5).
25 The second procurement event shall be conducted no sooner
26 than September 30, 2022 and no later than October 31, 2022

HB4731- 86 -LRB102 24633 AMQ 33871 b
1 and shall be to select owners of electric generating
2 facilities located anywhere in this State that meet the
3 eligibility criteria specified in this subsection (c-5).
4 The Agency shall establish and announce a time period,
5 which shall begin no later than 30 days prior to the
6 scheduled date for the procurement event, during which
7 applicants may submit applications to be selected as
8 suppliers of renewable energy credits pursuant to this
9 subsection (c-5). The eligibility criteria for selection
10 as a supplier of renewable energy credits pursuant to this
11 subsection (c-5) shall be as follows:
12 (A) The applicant owns an electric generating
13 facility located in this State that: (i) as of January
14 1, 2016, burned coal as its primary fuel to generate
15 electricity; and (ii) has, or had prior to retirement,
16 an electric generating capacity of at least 150
17 megawatts. The electric generating facility can be
18 either: (i) retired as of the date of the procurement
19 event; or (ii) still operating as of the date of the
20 procurement event.
21 (B) The applicant is not (i) an electric
22 cooperative as defined in Section 3-119 of the Public
23 Utilities Act, or (ii) an entity described in
24 subsection (b)(1) of Section 3-105 of the Public
25 Utilities Act, or an association or consortium of or
26 an entity owned by entities described in (i) or (ii);

HB4731- 87 -LRB102 24633 AMQ 33871 b
1 and the coal-fueled electric generating facility was
2 at one time owned, in whole or in part, by a public
3 utility as defined in Section 3-105 of the Public
4 Utilities Act.
5 (C) If participating in the first procurement
6 event, the applicant proposes and commits to construct
7 and operate, at the site, and if necessary for
8 sufficient space on property adjacent to the existing
9 property, at which the electric generating facility
10 identified in paragraph (A) is located: (i) a new
11 renewable energy facility of at least 20 megawatts but
12 no more than 100 megawatts of electric generating
13 capacity, and (ii) an energy storage facility having a
14 storage capacity equal to at least 2 megawatts and at
15 most 10 megawatts. If participating in the second
16 procurement event, the applicant proposes and commits
17 to construct and operate, at the site, and if
18 necessary for sufficient space on property adjacent to
19 the existing property, at which the electric
20 generating facility identified in paragraph (A) is
21 located: (i) a new renewable energy facility of at
22 least 5 megawatts but no more than 20 megawatts of
23 electric generating capacity, and (ii) an energy
24 storage facility having a storage capacity equal to at
25 least 0.5 megawatts and at most one megawatt.
26 (D) The applicant agrees that the new renewable

HB4731- 88 -LRB102 24633 AMQ 33871 b
1 energy facility and the energy storage facility will
2 be constructed or installed by a qualified entity or
3 entities in compliance with the requirements of
4 subsection (g) of Section 16-128A of the Public
5 Utilities Act and any rules adopted thereunder.
6 (E) The applicant agrees that personnel operating
7 the new renewable energy facility and the energy
8 storage facility will have the requisite skills,
9 knowledge, training, experience, and competence, which
10 may be demonstrated by completion or current
11 participation and ultimate completion by employees of
12 an accredited or otherwise recognized apprenticeship
13 program for the employee's particular craft, trade, or
14 skill, including through training and education
15 courses and opportunities offered by the owner to
16 employees of the coal-fueled electric generating
17 facility or by previous employment experience
18 performing the employee's particular work skill or
19 function.
20 (F) The applicant commits that not less than the
21 prevailing wage, as determined pursuant to the
22 Prevailing Wage Act, will be paid to the applicant's
23 employees engaged in construction activities
24 associated with the new renewable energy facility and
25 the new energy storage facility and to the employees
26 of applicant's contractors engaged in construction

HB4731- 89 -LRB102 24633 AMQ 33871 b
1 activities associated with the new renewable energy
2 facility and the new energy storage facility, and
3 that, on or before the commercial operation date of
4 the new renewable energy facility, the applicant shall
5 file a report with the Agency certifying that the
6 requirements of this subparagraph (F) have been met.
7 (G) The applicant commits that if selected, it
8 will negotiate a project labor agreement for the
9 construction of the new renewable energy facility and
10 associated energy storage facility that includes
11 provisions requiring the parties to the agreement to
12 work together to establish diversity threshold
13 requirements and to ensure best efforts to meet
14 diversity targets, improve diversity at the applicable
15 job site, create diverse apprenticeship opportunities,
16 and create opportunities to employ former coal-fired
17 power plant workers.
18 (H) The applicant commits to enter into a contract
19 or contracts for the applicable duration to provide
20 specified numbers of renewable energy credits each
21 year from the new renewable energy facility to
22 electric utilities that served more than 300,000
23 retail customers in this State as of January 1, 2019,
24 at a price of $30 per renewable energy credit. The
25 price per renewable energy credit shall be fixed at
26 $30 for the applicable duration and the renewable

HB4731- 90 -LRB102 24633 AMQ 33871 b
1 energy credits shall not be indexed renewable energy
2 credits as provided for in item (v) of subparagraph
3 (G) of paragraph (1) of subsection (c) of Section 1-75
4 of this Act. The applicable duration of each contract
5 shall be 20 years, unless the applicant is physically
6 interconnected to the PJM Interconnection, LLC
7 transmission grid and had a generating capacity of at
8 least 1,200 megawatts as of January 1, 2021, in which
9 case the applicable duration of the contract shall be
10 15 years.
11 (I) The applicant's application is certified by an
12 officer of the applicant and by an officer of the
13 applicant's ultimate parent company, if any.
14 (3) An applicant may submit applications to contract
15 to supply renewable energy credits from more than one new
16 renewable energy facility to be constructed at or adjacent
17 to one or more qualifying electric generating facilities
18 owned by the applicant. The Agency may select new
19 renewable energy facilities to be located at or adjacent
20 to the sites of more than one qualifying electric
21 generation facility owned by an applicant to contract with
22 electric utilities to supply renewable energy credits from
23 such facilities.
24 (4) The Agency shall assess fees to each applicant to
25 recover the Agency's costs incurred in receiving and
26 evaluating applications, conducting the procurement event,

HB4731- 91 -LRB102 24633 AMQ 33871 b
1 developing contracts for sale, delivery and purchase of
2 renewable energy credits, and monitoring the
3 administration of such contracts, as provided for in this
4 subsection (c-5), including fees paid to a procurement
5 administrator retained by the Agency for one or more of
6 these purposes.
7 (5) The Agency shall select the applicants and the new
8 renewable energy facilities to contract with electric
9 utilities to supply renewable energy credits in accordance
10 with this subsection (c-5). In the first procurement
11 event, the Agency shall select applicants and new
12 renewable energy facilities to supply renewable energy
13 credits, at a price of $30 per renewable energy credit,
14 aggregating to no less than 400,000 renewable energy
15 credits per year for the applicable duration, assuming
16 sufficient qualifying applications to supply, in the
17 aggregate, at least that amount of renewable energy
18 credits per year; and not more than 580,000 renewable
19 energy credits per year for the applicable duration. In
20 the second procurement event, the Agency shall select
21 applicants and new renewable energy facilities to supply
22 renewable energy credits, at a price of $30 per renewable
23 energy credit, aggregating to no more than 625,000
24 renewable energy credits per year less the amount of
25 renewable energy credits each year contracted for as a
26 result of the first procurement event, for the applicable

HB4731- 92 -LRB102 24633 AMQ 33871 b
1 durations. The number of renewable energy credits to be
2 procured as specified in this paragraph (5) shall not be
3 reduced based on renewable energy credits procured in the
4 self-direct renewable energy credit compliance program
5 established pursuant to subparagraph (R) of paragraph (1)
6 of subsection (c) of Section 1-75.
7 (6) The obligation to purchase renewable energy
8 credits from the applicants and their new renewable energy
9 facilities selected by the Agency shall be allocated to
10 the electric utilities based on their respective
11 percentages of kilowatthours delivered to delivery
12 services customers to the aggregate kilowatthour
13 deliveries by the electric utilities to delivery services
14 customers for the year ended December 31, 2021. In order
15 to achieve these allocation percentages between or among
16 the electric utilities, the Agency shall require each
17 applicant that is selected in the procurement event to
18 enter into a contract with each electric utility for the
19 sale and purchase of renewable energy credits from each
20 new renewable energy facility to be constructed and
21 operated by the applicant, with the sale and purchase
22 obligations under the contracts to aggregate to the total
23 number of renewable energy credits per year to be supplied
24 by the applicant from the new renewable energy facility.
25 (7) The Agency shall submit its proposed selection of
26 applicants, new renewable energy facilities to be

HB4731- 93 -LRB102 24633 AMQ 33871 b
1 constructed, and renewable energy credit amounts for each
2 procurement event to the Commission for approval. The
3 Commission shall, within 2 business days after receipt of
4 the Agency's proposed selections, approve the proposed
5 selections if it determines that the applicants and the
6 new renewable energy facilities to be constructed meet the
7 selection criteria set forth in this subsection (c-5) and
8 that the Agency seeks approval for contracts of applicable
9 durations aggregating to no more than the maximum amount
10 of renewable energy credits per year authorized by this
11 subsection (c-5) for the procurement event, at a price of
12 $30 per renewable energy credit.
13 (8) The Agency, in conjunction with its procurement
14 administrator if one is retained, the electric utilities,
15 and potential applicants for contracts to produce and
16 supply renewable energy credits pursuant to this
17 subsection (c-5), shall develop a standard form contract
18 for the sale, delivery and purchase of renewable energy
19 credits pursuant to this subsection (c-5). Each contract
20 resulting from the first procurement event shall allow for
21 a commercial operation date for the new renewable energy
22 facility of either June 1, 2023 or June 1, 2024, with such
23 dates subject to adjustment as provided in this paragraph.
24 Each contract resulting from the second procurement event
25 shall provide for a commercial operation date on June 1
26 next occurring up to 48 months after execution of the

HB4731- 94 -LRB102 24633 AMQ 33871 b
1 contract. Each contract shall provide that the owner shall
2 receive payments for renewable energy credits for the
3 applicable durations beginning with the commercial
4 operation date of the new renewable energy facility. The
5 form contract shall provide for adjustments to the
6 commercial operation and payment start dates as needed due
7 to any delays in completing the procurement and
8 contracting processes, in finalizing interconnection
9 agreements and installing interconnection facilities, and
10 in obtaining other necessary governmental permits and
11 approvals. The form contract shall be, to the maximum
12 extent possible, consistent with standard electric
13 industry contracts for sale, delivery, and purchase of
14 renewable energy credits while taking into account the
15 specific requirements of this subsection (c-5). The form
16 contract shall provide for over-delivery and
17 under-delivery of renewable energy credits within
18 reasonable ranges during each 12-month period and penalty,
19 default, and enforcement provisions for failure of the
20 selling party to deliver renewable energy credits as
21 specified in the contract and to comply with the
22 requirements of this subsection (c-5). The standard form
23 contract shall specify that all renewable energy credits
24 delivered to the electric utility pursuant to the contract
25 shall be retired. The Agency shall make the proposed
26 contracts available for a reasonable period for comment by

HB4731- 95 -LRB102 24633 AMQ 33871 b
1 potential applicants, and shall publish the final form
2 contract at least 30 days before the date of the first
3 procurement event.
4 (9) Coal to Solar and Energy Storage Initiative
5 Charge.
6 (A) By no later than July 1, 2022, each electric
7 utility that served more than 300,000 retail customers
8 in this State as of January 1, 2019 shall file a tariff
9 with the Commission for the billing and collection of
10 a Coal to Solar and Energy Storage Initiative Charge
11 in accordance with subsection (i-5) of Section 16-108
12 of the Public Utilities Act, with such tariff to be
13 effective, following review and approval or
14 modification by the Commission, beginning January 1,
15 2023. The tariff shall provide for the calculation and
16 setting of the electric utility's Coal to Solar and
17 Energy Storage Initiative Charge to collect revenues
18 estimated to be sufficient, in the aggregate, (i) to
19 enable the electric utility to pay for the renewable
20 energy credits it has contracted to purchase in the
21 delivery year beginning June 1, 2023 and each delivery
22 year thereafter from new renewable energy facilities
23 located at the sites of qualifying electric generating
24 facilities, and (ii) to fund the grant payments to be
25 made in each delivery year by the Department of
26 Commerce and Economic Opportunity, or any successor

HB4731- 96 -LRB102 24633 AMQ 33871 b
1 department or agency, which shall be referred to in
2 this subsection (c-5) as the Department, pursuant to
3 paragraph (10) of this subsection (c-5). The electric
4 utility's tariff shall provide for the billing and
5 collection of the Coal to Solar and Energy Storage
6 Initiative Charge on each kilowatthour of electricity
7 delivered to its delivery services customers within
8 its service territory and shall provide for an annual
9 reconciliation of revenues collected with actual
10 costs, in accordance with subsection (i-5) of Section
11 16-108 of the Public Utilities Act.
12 (B) Each electric utility shall remit on a monthly
13 basis to the State Treasurer, for deposit in the Coal
14 to Solar and Energy Storage Initiative Fund provided
15 for in this subsection (c-5), the electric utility's
16 collections of the Coal to Solar and Energy Storage
17 Initiative Charge in the amount estimated to be needed
18 by the Department for grant payments pursuant to grant
19 contracts entered into by the Department pursuant to
20 paragraph (10) of this subsection (c-5).
21 (10) Coal to Solar and Energy Storage Initiative Fund.
22 (A) The Coal to Solar and Energy Storage
23 Initiative Fund is established as a special fund in
24 the State treasury. The Coal to Solar and Energy
25 Storage Initiative Fund is authorized to receive, by
26 statutory deposit, that portion specified in item (B)

HB4731- 97 -LRB102 24633 AMQ 33871 b
1 of paragraph (9) of this subsection (c-5) of moneys
2 collected by electric utilities through imposition of
3 the Coal to Solar and Energy Storage Initiative Charge
4 required by this subsection (c-5). The Coal to Solar
5 and Energy Storage Initiative Fund shall be
6 administered by the Department to provide grants to
7 support the installation and operation of energy
8 storage facilities at the sites of qualifying electric
9 generating facilities meeting the criteria specified
10 in this paragraph (10).
11 (B) The Coal to Solar and Energy Storage
12 Initiative Fund shall not be subject to sweeps,
13 administrative charges, or chargebacks, including, but
14 not limited to, those authorized under Section 8h of
15 the State Finance Act, that would in any way result in
16 the transfer of those funds from the Coal to Solar and
17 Energy Storage Initiative Fund to any other fund of
18 this State or in having any such funds utilized for any
19 purpose other than the express purposes set forth in
20 this paragraph (10).
21 (C) The Department shall utilize up to
22 $280,500,000 in the Coal to Solar and Energy Storage
23 Initiative Fund for grants, assuming sufficient
24 qualifying applicants, to support installation of
25 energy storage facilities at the sites of up to 3
26 qualifying electric generating facilities located in

HB4731- 98 -LRB102 24633 AMQ 33871 b
1 the Midcontinent Independent System Operator, Inc.,
2 region in Illinois and the sites of up to 2 qualifying
3 electric generating facilities located in the PJM
4 Interconnection, LLC region in Illinois that meet the
5 criteria set forth in this subparagraph (C). The
6 criteria for receipt of a grant pursuant to this
7 subparagraph (C) are as follows:
8 (1) the electric generating facility at the
9 site has, or had prior to retirement, an electric
10 generating capacity of at least 150 megawatts;
11 (2) the electric generating facility burns (or
12 burned prior to retirement) coal as its primary
13 source of fuel;
14 (3) if the electric generating facility is
15 retired, it was retired subsequent to January 1,
16 2016;
17 (4) the owner of the electric generating
18 facility has not been selected by the Agency
19 pursuant to this subsection (c-5) of this Section
20 to enter into a contract to sell renewable energy
21 credits to one or more electric utilities from a
22 new renewable energy facility located or to be
23 located at or adjacent to the site at which the
24 electric generating facility is located;
25 (5) the electric generating facility located
26 at the site was at one time owned, in whole or in

HB4731- 99 -LRB102 24633 AMQ 33871 b
1 part, by a public utility as defined in Section
2 3-105 of the Public Utilities Act;
3 (6) the electric generating facility at the
4 site is not owned by (i) an electric cooperative
5 as defined in Section 3-119 of the Public
6 Utilities Act, or (ii) an entity described in
7 subsection (b)(1) of Section 3-105 of the Public
8 Utilities Act, or an association or consortium of
9 or an entity owned by entities described in items
10 (i) or (ii);
11 (7) the proposed energy storage facility at
12 the site will have energy storage capacity of at
13 least 37 megawatts;
14 (8) the owner commits to place the energy
15 storage facility into commercial operation on
16 either June 1, 2023, June 1, 2024, or June 1, 2025,
17 with such date subject to adjustment as needed due
18 to any delays in completing the grant contracting
19 process, in finalizing interconnection agreements
20 and in installing interconnection facilities, and
21 in obtaining necessary governmental permits and
22 approvals;
23 (9) the owner agrees that the new energy
24 storage facility will be constructed or installed
25 by a qualified entity or entities consistent with
26 the requirements of subsection (g) of Section

HB4731- 100 -LRB102 24633 AMQ 33871 b
1 16-128A of the Public Utilities Act and any rules
2 adopted under that Section;
3 (10) the owner agrees that personnel operating
4 the energy storage facility will have the
5 requisite skills, knowledge, training, experience,
6 and competence, which may be demonstrated by
7 completion or current participation and ultimate
8 completion by employees of an accredited or
9 otherwise recognized apprenticeship program for
10 the employee's particular craft, trade, or skill,
11 including through training and education courses
12 and opportunities offered by the owner to
13 employees of the coal-fueled electric generating
14 facility or by previous employment experience
15 performing the employee's particular work skill or
16 function;
17 (11) the owner commits that not less than the
18 prevailing wage, as determined pursuant to the
19 Prevailing Wage Act, will be paid to the owner's
20 employees engaged in construction activities
21 associated with the new energy storage facility
22 and to the employees of the owner's contractors
23 engaged in construction activities associated with
24 the new energy storage facility, and that, on or
25 before the commercial operation date of the new
26 energy storage facility, the owner shall file a

HB4731- 101 -LRB102 24633 AMQ 33871 b
1 report with the Department certifying that the
2 requirements of this subparagraph (11) have been
3 met; and
4 (12) the owner commits that if selected to
5 receive a grant, it will negotiate a project labor
6 agreement for the construction of the new energy
7 storage facility that includes provisions
8 requiring the parties to the agreement to work
9 together to establish diversity threshold
10 requirements and to ensure best efforts to meet
11 diversity targets, improve diversity at the
12 applicable job site, create diverse apprenticeship
13 opportunities, and create opportunities to employ
14 former coal-fired power plant workers.
15 The Department shall accept applications for this
16 grant program until March 31, 2022 and shall announce
17 the award of grants no later than June 1, 2022. The
18 Department shall make the grant payments to a
19 recipient in equal annual amounts for 10 years
20 following the date the energy storage facility is
21 placed into commercial operation. The annual grant
22 payments to a qualifying energy storage facility shall
23 be $110,000 per megawatt of energy storage capacity,
24 with total annual grant payments pursuant to this
25 subparagraph (C) for qualifying energy storage
26 facilities not to exceed $28,050,000 in any year.

HB4731- 102 -LRB102 24633 AMQ 33871 b
1 (D) Grants of funding for energy storage
2 facilities pursuant to subparagraph (C) of this
3 paragraph (10), from the Coal to Solar and Energy
4 Storage Initiative Fund, shall be memorialized in
5 grant contracts between the Department and the
6 recipient. The grant contracts shall specify the date
7 or dates in each year on which the annual grant
8 payments shall be paid.
9 (E) All disbursements from the Coal to Solar and
10 Energy Storage Initiative Fund shall be made only upon
11 warrants of the Comptroller drawn upon the Treasurer
12 as custodian of the Fund upon vouchers signed by the
13 Director of the Department or by the person or persons
14 designated by the Director of the Department for that
15 purpose. The Comptroller is authorized to draw the
16 warrants upon vouchers so signed. The Treasurer shall
17 accept all written warrants so signed and shall be
18 released from liability for all payments made on those
19 warrants.
20 (11) Diversity, equity, and inclusion plans.
21 (A) Each applicant selected in a procurement event
22 to contract to supply renewable energy credits in
23 accordance with this subsection (c-5) and each owner
24 selected by the Department to receive a grant or
25 grants to support the construction and operation of a
26 new energy storage facility or facilities in

HB4731- 103 -LRB102 24633 AMQ 33871 b
1 accordance with this subsection (c-5) shall, within 60
2 days following the Commission's approval of the
3 applicant to contract to supply renewable energy
4 credits or within 60 days following execution of a
5 grant contract with the Department, as applicable,
6 submit to the Commission a diversity, equity, and
7 inclusion plan setting forth the applicant's or
8 owner's numeric goals for the diversity composition of
9 its supplier entities for the new renewable energy
10 facility or new energy storage facility, as
11 applicable, which shall be referred to for purposes of
12 this paragraph (11) as the project, and the
13 applicant's or owner's action plan and schedule for
14 achieving those goals.
15 (B) For purposes of this paragraph (11), diversity
16 composition shall be based on the percentage, which
17 shall be a minimum of 25%, of eligible expenditures
18 for contract awards for materials and services (which
19 shall be defined in the plan) to business enterprises
20 owned by minority persons, women, or persons with
21 disabilities as defined in Section 2 of the Business
22 Enterprise for Minorities, Women, and Persons with
23 Disabilities Act, to LGBTQ business enterprises, to
24 veteran-owned business enterprises, and to business
25 enterprises located in environmental justice
26 communities. The diversity composition goals of the

HB4731- 104 -LRB102 24633 AMQ 33871 b
1 plan may include eligible expenditures in areas for
2 vendor or supplier opportunities in addition to
3 development and construction of the project, and may
4 exclude from eligible expenditures materials and
5 services with limited market availability, limited
6 production and availability from suppliers in the
7 United States, such as solar panels and storage
8 batteries, and material and services that are subject
9 to critical energy infrastructure or cybersecurity
10 requirements or restrictions. The plan may provide
11 that the diversity composition goals may be met
12 through Tier 1 Direct or Tier 2 subcontracting
13 expenditures or a combination thereof for the project.
14 (C) The plan shall provide for, but not be limited
15 to: (i) internal initiatives, including multi-tier
16 initiatives, by the applicant or owner, or by its
17 engineering, procurement and construction contractor
18 if one is used for the project, which for purposes of
19 this paragraph (11) shall be referred to as the EPC
20 contractor, to enable diverse businesses to be
21 considered fairly for selection to provide materials
22 and services; (ii) requirements for the applicant or
23 owner or its EPC contractor to proactively solicit and
24 utilize diverse businesses to provide materials and
25 services; and (iii) requirements for the applicant or
26 owner or its EPC contractor to hire a diverse

HB4731- 105 -LRB102 24633 AMQ 33871 b
1 workforce for the project. The plan shall include a
2 description of the applicant's or owner's diversity
3 recruiting efforts both for the project and for other
4 areas of the applicant's or owner's business
5 operations. The plan shall provide for the imposition
6 of financial penalties on the applicant's or owner's
7 EPC contractor for failure to exercise best efforts to
8 comply with and execute the EPC contractor's diversity
9 obligations under the plan. The plan may provide for
10 the applicant or owner to set aside a portion of the
11 work on the project to serve as an incubation program
12 for qualified businesses, as specified in the plan,
13 owned by minority persons, women, persons with
14 disabilities, LGBTQ persons, and veterans, and
15 businesses located in environmental justice
16 communities, seeking to enter the renewable energy
17 industry.
18 (D) The applicant or owner may submit a revised or
19 updated plan to the Commission from time to time as
20 circumstances warrant. The applicant or owner shall
21 file annual reports with the Commission detailing the
22 applicant's or owner's progress in implementing its
23 plan and achieving its goals and any modifications the
24 applicant or owner has made to its plan to better
25 achieve its diversity, equity and inclusion goals. The
26 applicant or owner shall file a final report on the

HB4731- 106 -LRB102 24633 AMQ 33871 b
1 fifth June 1 following the commercial operation date
2 of the new renewable energy resource or new energy
3 storage facility, but the applicant or owner shall
4 thereafter continue to be subject to applicable
5 reporting requirements of Section 5-117 of the Public
6 Utilities Act.
7 (c-10) Equity accountability system. It is the purpose of
8this subsection (c-10) to create an equity accountability
9system, which includes the minimum equity standards for all
10renewable energy procurements, the equity category of the
11Adjustable Block Program, and the equity prioritization for
12noncompetitive procurements, that is successful in advancing
13priority access to the clean energy economy for businesses and
14workers from communities that have been excluded from economic
15opportunities in the energy sector, have been subject to
16disproportionate levels of pollution, and have
17disproportionately experienced negative public health
18outcomes. Further, it is the purpose of this subsection to
19ensure that this equity accountability system is successful in
20advancing equity across Illinois by providing access to the
21clean energy economy for businesses and workers from
22communities that have been historically excluded from economic
23opportunities in the energy sector, have been subject to
24disproportionate levels of pollution, and have
25disproportionately experienced negative public health
26outcomes.

HB4731- 107 -LRB102 24633 AMQ 33871 b
1 (1) Minimum equity standards. The Agency shall create
2 programs with the purpose of increasing access to and
3 development of equity eligible contractors, who are prime
4 contractors and subcontractors, across all of the programs
5 it manages. All applications for renewable energy credit
6 procurements shall comply with specific minimum equity
7 commitments. Starting in the delivery year immediately
8 following the next long-term renewable resources
9 procurement plan, at least 10% of the project workforce
10 for each entity participating in a procurement program
11 outlined in this subsection (c-10) must be done by equity
12 eligible persons or equity eligible contractors. The
13 Agency shall increase the minimum percentage each delivery
14 year thereafter by increments that ensure a statewide
15 average of 30% of the project workforce for each entity
16 participating in a procurement program is done by equity
17 eligible persons or equity eligible contractors by 2030.
18 The Agency shall propose a schedule of percentage
19 increases to the minimum equity standards in its draft
20 revised renewable energy resources procurement plan
21 submitted to the Commission for approval pursuant to
22 paragraph (5) of subsection (b) of Section 16-111.5 of the
23 Public Utilities Act. In determining these annual
24 increases, the Agency shall have the discretion to
25 establish different minimum equity standards for different
26 types of procurements and different regions of the State

HB4731- 108 -LRB102 24633 AMQ 33871 b
1 if the Agency finds that doing so will further the
2 purposes of this subsection (c-10). The proposed schedule
3 of annual increases shall be revisited and updated on an
4 annual basis. Revisions shall be developed with
5 stakeholder input, including from equity eligible persons,
6 equity eligible contractors, clean energy industry
7 representatives, and community-based organizations that
8 work with such persons and contractors.
9 (A) At the start of each delivery year, the Agency
10 shall require a compliance plan from each entity
11 participating in a procurement program of subsection
12 (c) of this Section that demonstrates how they will
13 achieve compliance with the minimum equity standard
14 percentage for work completed in that delivery year.
15 If an entity applies for its approved vendor or
16 designee status between delivery years, the Agency
17 shall require a compliance plan at the time of
18 application.
19 (B) Halfway through each delivery year, the Agency
20 shall require each entity participating in a
21 procurement program to confirm that it will achieve
22 compliance in that delivery year, when applicable. The
23 Agency may offer corrective action plans to entities
24 that are not on track to achieve compliance.
25 (C) At the end of each delivery year, each entity
26 participating and completing work in that delivery

HB4731- 109 -LRB102 24633 AMQ 33871 b
1 year in a procurement program of subsection (c) shall
2 submit a report to the Agency that demonstrates how it
3 achieved compliance with the minimum equity standards
4 percentage for that delivery year.
5 (D) The Agency shall prohibit participation in
6 procurement programs by an approved vendor or
7 designee, as applicable, or entities with which an
8 approved vendor or designee, as applicable, shares a
9 common parent company if an approved vendor or
10 designee, as applicable, failed to meet the minimum
11 equity standards for the prior delivery year. Waivers
12 approved for lack of equity eligible persons or equity
13 eligible contractors in a geographic area of a project
14 shall not count against the approved vendor or
15 designee. The Agency shall offer a corrective action
16 plan for any such entities to assist them in obtaining
17 compliance and shall allow continued access to
18 procurement programs upon an approved vendor or
19 designee demonstrating compliance.
20 (E) The Agency shall pursue efficiencies achieved
21 by combining with other approved vendor or designee
22 reporting.
23 (2) Equity accountability system within the Adjustable
24 Block program. The equity category described in item (vi)
25 of subparagraph (K) of subsection (c) is only available to
26 applicants that are equity eligible contractors.

HB4731- 110 -LRB102 24633 AMQ 33871 b
1 (3) Equity accountability system within competitive
2 procurements. Through its long-term renewable resources
3 procurement plan, the Agency shall develop requirements
4 for ensuring that competitive procurement processes,
5 including utility-scale solar, utility-scale wind, and
6 brownfield site photovoltaic projects, advance the equity
7 goals of this subsection (c-10). Subject to Commission
8 approval, the Agency shall develop bid application
9 requirements and a bid evaluation methodology for ensuring
10 that utilization of equity eligible contractors, whether
11 as bidders or as participants on project development, is
12 optimized, including requiring that winning or successful
13 applicants for utility-scale projects are or will partner
14 with equity eligible contractors and giving preference to
15 bids through which a higher portion of contract value
16 flows to equity eligible contractors. To the extent
17 practicable, entities participating in competitive
18 procurements shall also be required to meet all the equity
19 accountability requirements for approved vendors and their
20 designees under this subsection (c-10). In developing
21 these requirements, the Agency shall also consider whether
22 equity goals can be further advanced through additional
23 measures.
24 (4) In the first revision to the long-term renewable
25 energy resources procurement plan and each revision
26 thereafter, the Agency shall include the following:

HB4731- 111 -LRB102 24633 AMQ 33871 b
1 (A) The current status and number of equity
2 eligible contractors listed in the Energy Workforce
3 Equity Database designed in subsection (c-25),
4 including the number of equity eligible contractors
5 with current certifications as issued by the Agency.
6 (B) A mechanism for measuring, tracking, and
7 reporting project workforce at the approved vendor or
8 designee level, as applicable, which shall include a
9 measurement methodology and records to be made
10 available for audit by the Agency or the Program
11 Administrator.
12 (C) A program for approved vendors, designees,
13 eligible persons, and equity eligible contractors to
14 receive trainings, guidance, and other support from
15 the Agency or its designee regarding the equity
16 category outlined in item (vi) of subparagraph (K) of
17 paragraph (1) of subsection (c) and in meeting the
18 minimum equity standards of this subsection (c-10).
19 (D) A process for certifying equity eligible
20 contractors and equity eligible persons. The
21 certification process shall coordinate with the Energy
22 Workforce Equity Database set forth in subsection
23 (c-25).
24 (E) An application for waiver of the minimum
25 equity standards of this subsection, which the Agency
26 shall have the discretion to grant in rare

HB4731- 112 -LRB102 24633 AMQ 33871 b
1 circumstances. The Agency may grant such a waiver
2 where the applicant provides evidence of significant
3 efforts toward meeting the minimum equity commitment,
4 including: use of the Energy Workforce Equity
5 Database; efforts to hire or contract with entities
6 that hire eligible persons; and efforts to establish
7 contracting relationships with eligible contractors.
8 The Agency shall support applicants in understanding
9 the Energy Workforce Equity Database and other
10 resources for pursuing compliance of the minimum
11 equity standards. Waivers shall be project-specific,
12 unless the Agency deems it necessary to grant a waiver
13 across a portfolio of projects, and in effect for no
14 longer than one year. Any waiver extension or
15 subsequent waiver request from an applicant shall be
16 subject to the requirements of this Section and shall
17 specify efforts made to reach compliance. When
18 considering whether to grant a waiver, and to what
19 extent, the Agency shall consider the degree to which
20 similarly situated applicants have been able to meet
21 these minimum equity commitments. For repeated waiver
22 requests for specific lack of eligible persons or
23 eligible contractors available, the Agency shall make
24 recommendations to target recruitment to add such
25 eligible persons or eligible contractors to the
26 database.

HB4731- 113 -LRB102 24633 AMQ 33871 b
1 (5) The Agency shall collect information about work on
2 projects or portfolios of projects subject to these
3 minimum equity standards to ensure compliance with this
4 subsection (c-10). Reporting in furtherance of this
5 requirement may be combined with other annual reporting
6 requirements. Such reporting shall include proof of
7 certification of each equity eligible contractor or equity
8 eligible person during the applicable time period.
9 (6) The Agency shall keep confidential all information
10 and communication that provides private or personal
11 information.
12 (7) Modifications to the equity accountability system.
13 As part of the update of the long-term renewable resources
14 procurement plan to be initiated in 2023, or sooner if the
15 Agency deems necessary, the Agency shall determine the
16 extent to which the equity accountability system described
17 in this subsection (c-10) has advanced the goals of this
18 amendatory Act of the 102nd General Assembly, including
19 through the inclusion of equity eligible persons and
20 equity eligible contractors in renewable energy credit
21 projects. If the Agency finds that the equity
22 accountability system has failed to meet those goals to
23 its fullest potential, the Agency may revise the following
24 criteria for future Agency procurements: (A) the
25 percentage of project workforce, or other appropriate
26 workforce measure, certified as equity eligible persons or

HB4731- 114 -LRB102 24633 AMQ 33871 b
1 equity eligible contractors; (B) definitions for equity
2 investment eligible persons and equity investment eligible
3 community; and (C) such other modifications necessary to
4 advance the goals of this amendatory Act of the 102nd
5 General Assembly effectively. Such revised criteria may
6 also establish distinct equity accountability systems for
7 different types of procurements or different regions of
8 the State if the Agency finds that doing so will further
9 the purposes of such programs. Revisions shall be
10 developed with stakeholder input, including from equity
11 eligible persons, equity eligible contractors, and
12 community-based organizations that work with such persons
13 and contractors.
14 (c-15) Racial discrimination elimination powers and
15process.
16 (1) Purpose. It is the purpose of this subsection to
17 empower the Agency and other State actors to remedy racial
18 discrimination in Illinois' clean energy economy as
19 effectively and expediently as possible, including through
20 the use of race-conscious remedies, such as race-conscious
21 contracting and hiring goals, as consistent with State and
22 federal law.
23 (2) Racial disparity and discrimination review
24 process.
25 (A) Within one year after awarding contracts using
26 the equity actions processes established in this

HB4731- 115 -LRB102 24633 AMQ 33871 b
1 Section, the Agency shall publish a report evaluating
2 the effectiveness of the equity actions point criteria
3 of this Section in increasing participation of equity
4 eligible persons and equity eligible contractors. The
5 report shall disaggregate participating workers and
6 contractors by race and ethnicity. The report shall be
7 forwarded to the Governor, the General Assembly, and
8 the Illinois Commerce Commission and be made available
9 to the public.
10 (B) As soon as is practicable thereafter, the
11 Agency, in consultation with the Department of
12 Commerce and Economic Opportunity, Department of
13 Labor, and other agencies that may be relevant, shall
14 commission and publish a disparity and availability
15 study that measures the presence and impact of
16 discrimination on minority businesses and workers in
17 Illinois' clean energy economy. The Agency may hire
18 consultants and experts to conduct the disparity and
19 availability study, with the retention of those
20 consultants and experts exempt from the requirements
21 of Section 20-10 of the Illinois Procurement Code. The
22 Illinois Power Agency shall forward a copy of its
23 findings and recommendations to the Governor, the
24 General Assembly, and the Illinois Commerce
25 Commission. If the disparity and availability study
26 establishes a strong basis in evidence that there is

HB4731- 116 -LRB102 24633 AMQ 33871 b
1 discrimination in Illinois' clean energy economy, the
2 Agency, Department of Commerce and Economic
3 Opportunity, Department of Labor, Department of
4 Corrections, and other appropriate agencies shall take
5 appropriate remedial actions, including race-conscious
6 remedial actions as consistent with State and federal
7 law, to effectively remedy this discrimination. Such
8 remedies may include modification of the equity
9 accountability system as described in subsection
10 (c-10).
11 (c-20) Program data collection.
12 (1) Purpose. Data collection, data analysis, and
13 reporting are critical to ensure that the benefits of the
14 clean energy economy provided to Illinois residents and
15 businesses are equitably distributed across the State. The
16 Agency shall collect data from program applicants in order
17 to track and improve equitable distribution of benefits
18 across Illinois communities for all procurements the
19 Agency conducts. The Agency shall use this data to, among
20 other things, measure any potential impact of racial
21 discrimination on the distribution of benefits and provide
22 information necessary to correct any discrimination
23 through methods consistent with State and federal law.
24 (2) Agency collection of program data. The Agency
25 shall collect demographic and geographic data for each
26 entity awarded contracts under any Agency-administered

HB4731- 117 -LRB102 24633 AMQ 33871 b
1 program.
2 (3) Required information to be collected. The Agency
3 shall collect the following information from applicants
4 and program participants where applicable:
5 (A) demographic information, including racial or
6 ethnic identity for real persons employed, contracted,
7 or subcontracted through the program and owners of
8 businesses or entities that apply to receive renewable
9 energy credits from the Agency;
10 (B) geographic location of the residency of real
11 persons employed, contracted, or subcontracted through
12 the program and geographic location of the
13 headquarters of the business or entity that applies to
14 receive renewable energy credits from the Agency; and
15 (C) any other information the Agency determines is
16 necessary for the purpose of achieving the purpose of
17 this subsection.
18 (4) Publication of collected information. The Agency
19 shall publish, at least annually, information on the
20 demographics of program participants on an aggregate
21 basis.
22 (5) Nothing in this subsection shall be interpreted to
23 limit the authority of the Agency, or other agency or
24 department of the State, to require or collect demographic
25 information from applicants of other State programs.
26 (c-25) Energy Workforce Equity Database.

HB4731- 118 -LRB102 24633 AMQ 33871 b
1 (1) The Agency, in consultation with the Department of
2 Commerce and Economic Opportunity, shall create an Energy
3 Workforce Equity Database, and may contract with a third
4 party to do so ("database program administrator"). If the
5 Department decides to contract with a third party, that
6 third party shall be exempt from the requirements of
7 Section 20-10 of the Illinois Procurement Code. The Energy
8 Workforce Equity Database shall be a searchable database
9 of suppliers, vendors, and subcontractors for clean energy
10 industries that is:
11 (A) publicly accessible;
12 (B) easy for people to find and use;
13 (C) organized by company specialty or field;
14 (D) region-specific; and
15 (E) populated with information including, but not
16 limited to, contacts for suppliers, vendors, or
17 subcontractors who are minority and women-owned
18 business enterprise certified or who participate or
19 have participated in any of the programs described in
20 this Act.
21 (2) The Agency shall create an easily accessible,
22 public facing online tool using the database information
23 that includes, at a minimum, the following:
24 (A) a map of environmental justice and equity
25 investment eligible communities;
26 (B) job postings and recruiting opportunities;

HB4731- 119 -LRB102 24633 AMQ 33871 b
1 (C) a means by which recruiting clean energy
2 companies can find and interact with current or former
3 participants of clean energy workforce training
4 programs;
5 (D) information on workforce training service
6 providers and training opportunities available to
7 prospective workers;
8 (E) renewable energy company diversity reporting;
9 (F) a list of equity eligible contractors with
10 their contact information, types of work performed,
11 and locations worked in;
12 (G) reporting on outcomes of the programs
13 described in the workforce programs of the Energy
14 Transition Act, including information such as, but not
15 limited to, retention rate, graduation rate, and
16 placement rates of trainees; and
17 (H) information about the Jobs and Environmental
18 Justice Grant Program, the Clean Energy Jobs and
19 Justice Fund, and other sources of capital.
20 (3) The Agency shall ensure the database is regularly
21 updated to ensure information is current and shall
22 coordinate with the Department of Commerce and Economic
23 Opportunity to ensure that it includes information on
24 individuals and entities that are or have participated in
25 the Clean Jobs Workforce Network Program, Clean Energy
26 Contractor Incubator Program, Returning Residents Clean

HB4731- 120 -LRB102 24633 AMQ 33871 b
1 Jobs Training Program, or Clean Energy Primes Contractor
2 Accelerator Program.
3 (c-30) Enforcement of minimum equity standards. All
4entities seeking renewable energy credits must submit an
5annual report to demonstrate compliance with each of the
6equity commitments required under subsection (c-10). If the
7Agency concludes the entity has not met or maintained its
8minimum equity standards required under the applicable
9subparagraphs under subsection (c-10), the Agency shall deny
10the entity's ability to participate in procurement programs in
11subsection (c), including by withholding approved vendor or
12designee status. The Agency may require the entity to enter
13into a corrective action plan. An entity that is not
14recertified for failing to meet required equity actions in
15subparagraph (c-10) may reapply once they have a corrective
16action plan and achieve compliance with the minimum equity
17standards.
18 (d) Clean coal portfolio standard.
19 (1) The procurement plans shall include electricity
20 generated using clean coal. Each utility shall enter into
21 one or more sourcing agreements with the initial clean
22 coal facility, as provided in paragraph (3) of this
23 subsection (d), covering electricity generated by the
24 initial clean coal facility representing at least 5% of
25 each utility's total supply to serve the load of eligible
26 retail customers in 2015 and each year thereafter, as

HB4731- 121 -LRB102 24633 AMQ 33871 b
1 described in paragraph (3) of this subsection (d), subject
2 to the limits specified in paragraph (2) of this
3 subsection (d). It is the goal of the State that by January
4 1, 2025, 25% of the electricity used in the State shall be
5 generated by cost-effective clean coal facilities. For
6 purposes of this subsection (d), "cost-effective" means
7 that the expenditures pursuant to such sourcing agreements
8 do not cause the limit stated in paragraph (2) of this
9 subsection (d) to be exceeded and do not exceed cost-based
10 benchmarks, which shall be developed to assess all
11 expenditures pursuant to such sourcing agreements covering
12 electricity generated by clean coal facilities, other than
13 the initial clean coal facility, by the procurement
14 administrator, in consultation with the Commission staff,
15 Agency staff, and the procurement monitor and shall be
16 subject to Commission review and approval.
17 A utility party to a sourcing agreement shall
18 immediately retire any emission credits that it receives
19 in connection with the electricity covered by such
20 agreement.
21 Utilities shall maintain adequate records documenting
22 the purchases under the sourcing agreement to comply with
23 this subsection (d) and shall file an accounting with the
24 load forecast that must be filed with the Agency by July 15
25 of each year, in accordance with subsection (d) of Section
26 16-111.5 of the Public Utilities Act.

HB4731- 122 -LRB102 24633 AMQ 33871 b
1 A utility shall be deemed to have complied with the
2 clean coal portfolio standard specified in this subsection
3 (d) if the utility enters into a sourcing agreement as
4 required by this subsection (d).
5 (2) For purposes of this subsection (d), the required
6 execution of sourcing agreements with the initial clean
7 coal facility for a particular year shall be measured as a
8 percentage of the actual amount of electricity
9 (megawatt-hours) supplied by the electric utility to
10 eligible retail customers in the planning year ending
11 immediately prior to the agreement's execution. For
12 purposes of this subsection (d), the amount paid per
13 kilowatthour means the total amount paid for electric
14 service expressed on a per kilowatthour basis. For
15 purposes of this subsection (d), the total amount paid for
16 electric service includes without limitation amounts paid
17 for supply, transmission, distribution, surcharges and
18 add-on taxes.
19 Notwithstanding the requirements of this subsection
20 (d), the total amount paid under sourcing agreements with
21 clean coal facilities pursuant to the procurement plan for
22 any given year shall be reduced by an amount necessary to
23 limit the annual estimated average net increase due to the
24 costs of these resources included in the amounts paid by
25 eligible retail customers in connection with electric
26 service to:

HB4731- 123 -LRB102 24633 AMQ 33871 b
1 (A) in 2010, no more than 0.5% of the amount paid
2 per kilowatthour by those customers during the year
3 ending May 31, 2009;
4 (B) in 2011, the greater of an additional 0.5% of
5 the amount paid per kilowatthour by those customers
6 during the year ending May 31, 2010 or 1% of the amount
7 paid per kilowatthour by those customers during the
8 year ending May 31, 2009;
9 (C) in 2012, the greater of an additional 0.5% of
10 the amount paid per kilowatthour by those customers
11 during the year ending May 31, 2011 or 1.5% of the
12 amount paid per kilowatthour by those customers during
13 the year ending May 31, 2009;
14 (D) in 2013, the greater of an additional 0.5% of
15 the amount paid per kilowatthour by those customers
16 during the year ending May 31, 2012 or 2% of the amount
17 paid per kilowatthour by those customers during the
18 year ending May 31, 2009; and
19 (E) thereafter, the total amount paid under
20 sourcing agreements with clean coal facilities
21 pursuant to the procurement plan for any single year
22 shall be reduced by an amount necessary to limit the
23 estimated average net increase due to the cost of
24 these resources included in the amounts paid by
25 eligible retail customers in connection with electric
26 service to no more than the greater of (i) 2.015% of

HB4731- 124 -LRB102 24633 AMQ 33871 b
1 the amount paid per kilowatthour by those customers
2 during the year ending May 31, 2009 or (ii) the
3 incremental amount per kilowatthour paid for these
4 resources in 2013. These requirements may be altered
5 only as provided by statute.
6 No later than June 30, 2015, the Commission shall
7 review the limitation on the total amount paid under
8 sourcing agreements, if any, with clean coal facilities
9 pursuant to this subsection (d) and report to the General
10 Assembly its findings as to whether that limitation unduly
11 constrains the amount of electricity generated by
12 cost-effective clean coal facilities that is covered by
13 sourcing agreements.
14 (3) Initial clean coal facility. In order to promote
15 development of clean coal facilities in Illinois, each
16 electric utility subject to this Section shall execute a
17 sourcing agreement to source electricity from a proposed
18 clean coal facility in Illinois (the "initial clean coal
19 facility") that will have a nameplate capacity of at least
20 500 MW when commercial operation commences, that has a
21 final Clean Air Act permit on June 1, 2009 (the effective
22 date of Public Act 95-1027), and that will meet the
23 definition of clean coal facility in Section 1-10 of this
24 Act when commercial operation commences. The sourcing
25 agreements with this initial clean coal facility shall be
26 subject to both approval of the initial clean coal

HB4731- 125 -LRB102 24633 AMQ 33871 b
1 facility by the General Assembly and satisfaction of the
2 requirements of paragraph (4) of this subsection (d) and
3 shall be executed within 90 days after any such approval
4 by the General Assembly. The Agency and the Commission
5 shall have authority to inspect all books and records
6 associated with the initial clean coal facility during the
7 term of such a sourcing agreement. A utility's sourcing
8 agreement for electricity produced by the initial clean
9 coal facility shall include:
10 (A) a formula contractual price (the "contract
11 price") approved pursuant to paragraph (4) of this
12 subsection (d), which shall:
13 (i) be determined using a cost of service
14 methodology employing either a level or deferred
15 capital recovery component, based on a capital
16 structure consisting of 45% equity and 55% debt,
17 and a return on equity as may be approved by the
18 Federal Energy Regulatory Commission, which in any
19 case may not exceed the lower of 11.5% or the rate
20 of return approved by the General Assembly
21 pursuant to paragraph (4) of this subsection (d);
22 and
23 (ii) provide that all miscellaneous net
24 revenue, including but not limited to net revenue
25 from the sale of emission allowances, if any,
26 substitute natural gas, if any, grants or other

HB4731- 126 -LRB102 24633 AMQ 33871 b
1 support provided by the State of Illinois or the
2 United States Government, firm transmission
3 rights, if any, by-products produced by the
4 facility, energy or capacity derived from the
5 facility and not covered by a sourcing agreement
6 pursuant to paragraph (3) of this subsection (d)
7 or item (5) of subsection (d) of Section 16-115 of
8 the Public Utilities Act, whether generated from
9 the synthesis gas derived from coal, from SNG, or
10 from natural gas, shall be credited against the
11 revenue requirement for this initial clean coal
12 facility;
13 (B) power purchase provisions, which shall:
14 (i) provide that the utility party to such
15 sourcing agreement shall pay the contract price
16 for electricity delivered under such sourcing
17 agreement;
18 (ii) require delivery of electricity to the
19 regional transmission organization market of the
20 utility that is party to such sourcing agreement;
21 (iii) require the utility party to such
22 sourcing agreement to buy from the initial clean
23 coal facility in each hour an amount of energy
24 equal to all clean coal energy made available from
25 the initial clean coal facility during such hour
26 times a fraction, the numerator of which is such

HB4731- 127 -LRB102 24633 AMQ 33871 b
1 utility's retail market sales of electricity
2 (expressed in kilowatthours sold) in the State
3 during the prior calendar month and the
4 denominator of which is the total retail market
5 sales of electricity (expressed in kilowatthours
6 sold) in the State by utilities during such prior
7 month and the sales of electricity (expressed in
8 kilowatthours sold) in the State by alternative
9 retail electric suppliers during such prior month
10 that are subject to the requirements of this
11 subsection (d) and paragraph (5) of subsection (d)
12 of Section 16-115 of the Public Utilities Act,
13 provided that the amount purchased by the utility
14 in any year will be limited by paragraph (2) of
15 this subsection (d); and
16 (iv) be considered pre-existing contracts in
17 such utility's procurement plans for eligible
18 retail customers;
19 (C) contract for differences provisions, which
20 shall:
21 (i) require the utility party to such sourcing
22 agreement to contract with the initial clean coal
23 facility in each hour with respect to an amount of
24 energy equal to all clean coal energy made
25 available from the initial clean coal facility
26 during such hour times a fraction, the numerator

HB4731- 128 -LRB102 24633 AMQ 33871 b
1 of which is such utility's retail market sales of
2 electricity (expressed in kilowatthours sold) in
3 the utility's service territory in the State
4 during the prior calendar month and the
5 denominator of which is the total retail market
6 sales of electricity (expressed in kilowatthours
7 sold) in the State by utilities during such prior
8 month and the sales of electricity (expressed in
9 kilowatthours sold) in the State by alternative
10 retail electric suppliers during such prior month
11 that are subject to the requirements of this
12 subsection (d) and paragraph (5) of subsection (d)
13 of Section 16-115 of the Public Utilities Act,
14 provided that the amount paid by the utility in
15 any year will be limited by paragraph (2) of this
16 subsection (d);
17 (ii) provide that the utility's payment
18 obligation in respect of the quantity of
19 electricity determined pursuant to the preceding
20 clause (i) shall be limited to an amount equal to
21 (1) the difference between the contract price
22 determined pursuant to subparagraph (A) of
23 paragraph (3) of this subsection (d) and the
24 day-ahead price for electricity delivered to the
25 regional transmission organization market of the
26 utility that is party to such sourcing agreement

HB4731- 129 -LRB102 24633 AMQ 33871 b
1 (or any successor delivery point at which such
2 utility's supply obligations are financially
3 settled on an hourly basis) (the "reference
4 price") on the day preceding the day on which the
5 electricity is delivered to the initial clean coal
6 facility busbar, multiplied by (2) the quantity of
7 electricity determined pursuant to the preceding
8 clause (i); and
9 (iii) not require the utility to take physical
10 delivery of the electricity produced by the
11 facility;
12 (D) general provisions, which shall:
13 (i) specify a term of no more than 30 years,
14 commencing on the commercial operation date of the
15 facility;
16 (ii) provide that utilities shall maintain
17 adequate records documenting purchases under the
18 sourcing agreements entered into to comply with
19 this subsection (d) and shall file an accounting
20 with the load forecast that must be filed with the
21 Agency by July 15 of each year, in accordance with
22 subsection (d) of Section 16-111.5 of the Public
23 Utilities Act;
24 (iii) provide that all costs associated with
25 the initial clean coal facility will be
26 periodically reported to the Federal Energy

HB4731- 130 -LRB102 24633 AMQ 33871 b
1 Regulatory Commission and to purchasers in
2 accordance with applicable laws governing
3 cost-based wholesale power contracts;
4 (iv) permit the Illinois Power Agency to
5 assume ownership of the initial clean coal
6 facility, without monetary consideration and
7 otherwise on reasonable terms acceptable to the
8 Agency, if the Agency so requests no less than 3
9 years prior to the end of the stated contract
10 term;
11 (v) require the owner of the initial clean
12 coal facility to provide documentation to the
13 Commission each year, starting in the facility's
14 first year of commercial operation, accurately
15 reporting the quantity of carbon emissions from
16 the facility that have been captured and
17 sequestered and report any quantities of carbon
18 released from the site or sites at which carbon
19 emissions were sequestered in prior years, based
20 on continuous monitoring of such sites. If, in any
21 year after the first year of commercial operation,
22 the owner of the facility fails to demonstrate
23 that the initial clean coal facility captured and
24 sequestered at least 50% of the total carbon
25 emissions that the facility would otherwise emit
26 or that sequestration of emissions from prior

HB4731- 131 -LRB102 24633 AMQ 33871 b
1 years has failed, resulting in the release of
2 carbon dioxide into the atmosphere, the owner of
3 the facility must offset excess emissions. Any
4 such carbon offsets must be permanent, additional,
5 verifiable, real, located within the State of
6 Illinois, and legally and practicably enforceable.
7 The cost of such offsets for the facility that are
8 not recoverable shall not exceed $15 million in
9 any given year. No costs of any such purchases of
10 carbon offsets may be recovered from a utility or
11 its customers. All carbon offsets purchased for
12 this purpose and any carbon emission credits
13 associated with sequestration of carbon from the
14 facility must be permanently retired. The initial
15 clean coal facility shall not forfeit its
16 designation as a clean coal facility if the
17 facility fails to fully comply with the applicable
18 carbon sequestration requirements in any given
19 year, provided the requisite offsets are
20 purchased. However, the Attorney General, on
21 behalf of the People of the State of Illinois, may
22 specifically enforce the facility's sequestration
23 requirement and the other terms of this contract
24 provision. Compliance with the sequestration
25 requirements and offset purchase requirements
26 specified in paragraph (3) of this subsection (d)

HB4731- 132 -LRB102 24633 AMQ 33871 b
1 shall be reviewed annually by an independent
2 expert retained by the owner of the initial clean
3 coal facility, with the advance written approval
4 of the Attorney General. The Commission may, in
5 the course of the review specified in item (vii),
6 reduce the allowable return on equity for the
7 facility if the facility willfully fails to comply
8 with the carbon capture and sequestration
9 requirements set forth in this item (v);
10 (vi) include limits on, and accordingly
11 provide for modification of, the amount the
12 utility is required to source under the sourcing
13 agreement consistent with paragraph (2) of this
14 subsection (d);
15 (vii) require Commission review: (1) to
16 determine the justness, reasonableness, and
17 prudence of the inputs to the formula referenced
18 in subparagraphs (A)(i) through (A)(iii) of
19 paragraph (3) of this subsection (d), prior to an
20 adjustment in those inputs including, without
21 limitation, the capital structure and return on
22 equity, fuel costs, and other operations and
23 maintenance costs and (2) to approve the costs to
24 be passed through to customers under the sourcing
25 agreement by which the utility satisfies its
26 statutory obligations. Commission review shall

HB4731- 133 -LRB102 24633 AMQ 33871 b
1 occur no less than every 3 years, regardless of
2 whether any adjustments have been proposed, and
3 shall be completed within 9 months;
4 (viii) limit the utility's obligation to such
5 amount as the utility is allowed to recover
6 through tariffs filed with the Commission,
7 provided that neither the clean coal facility nor
8 the utility waives any right to assert federal
9 pre-emption or any other argument in response to a
10 purported disallowance of recovery costs;
11 (ix) limit the utility's or alternative retail
12 electric supplier's obligation to incur any
13 liability until such time as the facility is in
14 commercial operation and generating power and
15 energy and such power and energy is being
16 delivered to the facility busbar;
17 (x) provide that the owner or owners of the
18 initial clean coal facility, which is the
19 counterparty to such sourcing agreement, shall
20 have the right from time to time to elect whether
21 the obligations of the utility party thereto shall
22 be governed by the power purchase provisions or
23 the contract for differences provisions;
24 (xi) append documentation showing that the
25 formula rate and contract, insofar as they relate
26 to the power purchase provisions, have been

HB4731- 134 -LRB102 24633 AMQ 33871 b
1 approved by the Federal Energy Regulatory
2 Commission pursuant to Section 205 of the Federal
3 Power Act;
4 (xii) provide that any changes to the terms of
5 the contract, insofar as such changes relate to
6 the power purchase provisions, are subject to
7 review under the public interest standard applied
8 by the Federal Energy Regulatory Commission
9 pursuant to Sections 205 and 206 of the Federal
10 Power Act; and
11 (xiii) conform with customary lender
12 requirements in power purchase agreements used as
13 the basis for financing non-utility generators.
14 (4) Effective date of sourcing agreements with the
15 initial clean coal facility. Any proposed sourcing
16 agreement with the initial clean coal facility shall not
17 become effective unless the following reports are prepared
18 and submitted and authorizations and approvals obtained:
19 (i) Facility cost report. The owner of the initial
20 clean coal facility shall submit to the Commission,
21 the Agency, and the General Assembly a front-end
22 engineering and design study, a facility cost report,
23 method of financing (including but not limited to
24 structure and associated costs), and an operating and
25 maintenance cost quote for the facility (collectively
26 "facility cost report"), which shall be prepared in

HB4731- 135 -LRB102 24633 AMQ 33871 b
1 accordance with the requirements of this paragraph (4)
2 of subsection (d) of this Section, and shall provide
3 the Commission and the Agency access to the work
4 papers, relied upon documents, and any other backup
5 documentation related to the facility cost report.
6 (ii) Commission report. Within 6 months following
7 receipt of the facility cost report, the Commission,
8 in consultation with the Agency, shall submit a report
9 to the General Assembly setting forth its analysis of
10 the facility cost report. Such report shall include,
11 but not be limited to, a comparison of the costs
12 associated with electricity generated by the initial
13 clean coal facility to the costs associated with
14 electricity generated by other types of generation
15 facilities, an analysis of the rate impacts on
16 residential and small business customers over the life
17 of the sourcing agreements, and an analysis of the
18 likelihood that the initial clean coal facility will
19 commence commercial operation by and be delivering
20 power to the facility's busbar by 2016. To assist in
21 the preparation of its report, the Commission, in
22 consultation with the Agency, may hire one or more
23 experts or consultants, the costs of which shall be
24 paid for by the owner of the initial clean coal
25 facility. The Commission and Agency may begin the
26 process of selecting such experts or consultants prior

HB4731- 136 -LRB102 24633 AMQ 33871 b
1 to receipt of the facility cost report.
2 (iii) General Assembly approval. The proposed
3 sourcing agreements shall not take effect unless,
4 based on the facility cost report and the Commission's
5 report, the General Assembly enacts authorizing
6 legislation approving (A) the projected price, stated
7 in cents per kilowatthour, to be charged for
8 electricity generated by the initial clean coal
9 facility, (B) the projected impact on residential and
10 small business customers' bills over the life of the
11 sourcing agreements, and (C) the maximum allowable
12 return on equity for the project; and
13 (iv) Commission review. If the General Assembly
14 enacts authorizing legislation pursuant to
15 subparagraph (iii) approving a sourcing agreement, the
16 Commission shall, within 90 days of such enactment,
17 complete a review of such sourcing agreement. During
18 such time period, the Commission shall implement any
19 directive of the General Assembly, resolve any
20 disputes between the parties to the sourcing agreement
21 concerning the terms of such agreement, approve the
22 form of such agreement, and issue an order finding
23 that the sourcing agreement is prudent and reasonable.
24 The facility cost report shall be prepared as follows:
25 (A) The facility cost report shall be prepared by
26 duly licensed engineering and construction firms

HB4731- 137 -LRB102 24633 AMQ 33871 b
1 detailing the estimated capital costs payable to one
2 or more contractors or suppliers for the engineering,
3 procurement and construction of the components
4 comprising the initial clean coal facility and the
5 estimated costs of operation and maintenance of the
6 facility. The facility cost report shall include:
7 (i) an estimate of the capital cost of the
8 core plant based on one or more front end
9 engineering and design studies for the
10 gasification island and related facilities. The
11 core plant shall include all civil, structural,
12 mechanical, electrical, control, and safety
13 systems.
14 (ii) an estimate of the capital cost of the
15 balance of the plant, including any capital costs
16 associated with sequestration of carbon dioxide
17 emissions and all interconnects and interfaces
18 required to operate the facility, such as
19 transmission of electricity, construction or
20 backfeed power supply, pipelines to transport
21 substitute natural gas or carbon dioxide, potable
22 water supply, natural gas supply, water supply,
23 water discharge, landfill, access roads, and coal
24 delivery.
25 The quoted construction costs shall be expressed
26 in nominal dollars as of the date that the quote is

HB4731- 138 -LRB102 24633 AMQ 33871 b
1 prepared and shall include capitalized financing costs
2 during construction, taxes, insurance, and other
3 owner's costs, and an assumed escalation in materials
4 and labor beyond the date as of which the construction
5 cost quote is expressed.
6 (B) The front end engineering and design study for
7 the gasification island and the cost study for the
8 balance of plant shall include sufficient design work
9 to permit quantification of major categories of
10 materials, commodities and labor hours, and receipt of
11 quotes from vendors of major equipment required to
12 construct and operate the clean coal facility.
13 (C) The facility cost report shall also include an
14 operating and maintenance cost quote that will provide
15 the estimated cost of delivered fuel, personnel,
16 maintenance contracts, chemicals, catalysts,
17 consumables, spares, and other fixed and variable
18 operations and maintenance costs. The delivered fuel
19 cost estimate will be provided by a recognized third
20 party expert or experts in the fuel and transportation
21 industries. The balance of the operating and
22 maintenance cost quote, excluding delivered fuel
23 costs, will be developed based on the inputs provided
24 by duly licensed engineering and construction firms
25 performing the construction cost quote, potential
26 vendors under long-term service agreements and plant

HB4731- 139 -LRB102 24633 AMQ 33871 b
1 operating agreements, or recognized third party plant
2 operator or operators.
3 The operating and maintenance cost quote
4 (including the cost of the front end engineering and
5 design study) shall be expressed in nominal dollars as
6 of the date that the quote is prepared and shall
7 include taxes, insurance, and other owner's costs, and
8 an assumed escalation in materials and labor beyond
9 the date as of which the operating and maintenance
10 cost quote is expressed.
11 (D) The facility cost report shall also include an
12 analysis of the initial clean coal facility's ability
13 to deliver power and energy into the applicable
14 regional transmission organization markets and an
15 analysis of the expected capacity factor for the
16 initial clean coal facility.
17 (E) Amounts paid to third parties unrelated to the
18 owner or owners of the initial clean coal facility to
19 prepare the core plant construction cost quote,
20 including the front end engineering and design study,
21 and the operating and maintenance cost quote will be
22 reimbursed through Coal Development Bonds.
23 (5) Re-powering and retrofitting coal-fired power
24 plants previously owned by Illinois utilities to qualify
25 as clean coal facilities. During the 2009 procurement
26 planning process and thereafter, the Agency and the

HB4731- 140 -LRB102 24633 AMQ 33871 b
1 Commission shall consider sourcing agreements covering
2 electricity generated by power plants that were previously
3 owned by Illinois utilities and that have been or will be
4 converted into clean coal facilities, as defined by
5 Section 1-10 of this Act. Pursuant to such procurement
6 planning process, the owners of such facilities may
7 propose to the Agency sourcing agreements with utilities
8 and alternative retail electric suppliers required to
9 comply with subsection (d) of this Section and item (5) of
10 subsection (d) of Section 16-115 of the Public Utilities
11 Act, covering electricity generated by such facilities. In
12 the case of sourcing agreements that are power purchase
13 agreements, the contract price for electricity sales shall
14 be established on a cost of service basis. In the case of
15 sourcing agreements that are contracts for differences,
16 the contract price from which the reference price is
17 subtracted shall be established on a cost of service
18 basis. The Agency and the Commission may approve any such
19 utility sourcing agreements that do not exceed cost-based
20 benchmarks developed by the procurement administrator, in
21 consultation with the Commission staff, Agency staff and
22 the procurement monitor, subject to Commission review and
23 approval. The Commission shall have authority to inspect
24 all books and records associated with these clean coal
25 facilities during the term of any such contract.
26 (6) Costs incurred under this subsection (d) or

HB4731- 141 -LRB102 24633 AMQ 33871 b
1 pursuant to a contract entered into under this subsection
2 (d) shall be deemed prudently incurred and reasonable in
3 amount and the electric utility shall be entitled to full
4 cost recovery pursuant to the tariffs filed with the
5 Commission.
6 (d-5) Zero emission standard.
7 (1) Beginning with the delivery year commencing on
8 June 1, 2017, the Agency shall, for electric utilities
9 that serve at least 100,000 retail customers in this
10 State, procure contracts with zero emission facilities
11 that are reasonably capable of generating cost-effective
12 zero emission credits in an amount approximately equal to
13 16% of the actual amount of electricity delivered by each
14 electric utility to retail customers in the State during
15 calendar year 2014. For an electric utility serving fewer
16 than 100,000 retail customers in this State that
17 requested, under Section 16-111.5 of the Public Utilities
18 Act, that the Agency procure power and energy for all or a
19 portion of the utility's Illinois load for the delivery
20 year commencing June 1, 2016, the Agency shall procure
21 contracts with zero emission facilities that are
22 reasonably capable of generating cost-effective zero
23 emission credits in an amount approximately equal to 16%
24 of the portion of power and energy to be procured by the
25 Agency for the utility. The duration of the contracts
26 procured under this subsection (d-5) shall be for a term

HB4731- 142 -LRB102 24633 AMQ 33871 b
1 of 10 years ending May 31, 2027. The quantity of zero
2 emission credits to be procured under the contracts shall
3 be all of the zero emission credits generated by the zero
4 emission facility in each delivery year; however, if the
5 zero emission facility is owned by more than one entity,
6 then the quantity of zero emission credits to be procured
7 under the contracts shall be the amount of zero emission
8 credits that are generated from the portion of the zero
9 emission facility that is owned by the winning supplier.
10 The 16% value identified in this paragraph (1) is the
11 average of the percentage targets in subparagraph (B) of
12 paragraph (1) of subsection (c) of this Section for the 5
13 delivery years beginning June 1, 2017.
14 The procurement process shall be subject to the
15 following provisions:
16 (A) Those zero emission facilities that intend to
17 participate in the procurement shall submit to the
18 Agency the following eligibility information for each
19 zero emission facility on or before the date
20 established by the Agency:
21 (i) the in-service date and remaining useful
22 life of the zero emission facility;
23 (ii) the amount of power generated annually
24 for each of the years 2005 through 2015, and the
25 projected zero emission credits to be generated
26 over the remaining useful life of the zero

HB4731- 143 -LRB102 24633 AMQ 33871 b
1 emission facility, which shall be used to
2 determine the capability of each facility;
3 (iii) the annual zero emission facility cost
4 projections, expressed on a per megawatthour
5 basis, over the next 6 delivery years, which shall
6 include the following: operation and maintenance
7 expenses; fully allocated overhead costs, which
8 shall be allocated using the methodology developed
9 by the Institute for Nuclear Power Operations;
10 fuel expenditures; non-fuel capital expenditures;
11 spent fuel expenditures; a return on working
12 capital; the cost of operational and market risks
13 that could be avoided by ceasing operation; and
14 any other costs necessary for continued
15 operations, provided that "necessary" means, for
16 purposes of this item (iii), that the costs could
17 reasonably be avoided only by ceasing operations
18 of the zero emission facility; and
19 (iv) a commitment to continue operating, for
20 the duration of the contract or contracts executed
21 under the procurement held under this subsection
22 (d-5), the zero emission facility that produces
23 the zero emission credits to be procured in the
24 procurement.
25 The information described in item (iii) of this
26 subparagraph (A) may be submitted on a confidential

HB4731- 144 -LRB102 24633 AMQ 33871 b
1 basis and shall be treated and maintained by the
2 Agency, the procurement administrator, and the
3 Commission as confidential and proprietary and exempt
4 from disclosure under subparagraphs (a) and (g) of
5 paragraph (1) of Section 7 of the Freedom of
6 Information Act. The Office of Attorney General shall
7 have access to, and maintain the confidentiality of,
8 such information pursuant to Section 6.5 of the
9 Attorney General Act.
10 (B) The price for each zero emission credit
11 procured under this subsection (d-5) for each delivery
12 year shall be in an amount that equals the Social Cost
13 of Carbon, expressed on a price per megawatthour
14 basis. However, to ensure that the procurement remains
15 affordable to retail customers in this State if
16 electricity prices increase, the price in an
17 applicable delivery year shall be reduced below the
18 Social Cost of Carbon by the amount ("Price
19 Adjustment") by which the market price index for the
20 applicable delivery year exceeds the baseline market
21 price index for the consecutive 12-month period ending
22 May 31, 2016. If the Price Adjustment is greater than
23 or equal to the Social Cost of Carbon in an applicable
24 delivery year, then no payments shall be due in that
25 delivery year. The components of this calculation are
26 defined as follows:

HB4731- 145 -LRB102 24633 AMQ 33871 b
1 (i) Social Cost of Carbon: The Social Cost of
2 Carbon is $16.50 per megawatthour, which is based
3 on the U.S. Interagency Working Group on Social
4 Cost of Carbon's price in the August 2016
5 Technical Update using a 3% discount rate,
6 adjusted for inflation for each year of the
7 program. Beginning with the delivery year
8 commencing June 1, 2023, the price per
9 megawatthour shall increase by $1 per
10 megawatthour, and continue to increase by an
11 additional $1 per megawatthour each delivery year
12 thereafter.
13 (ii) Baseline market price index: The baseline
14 market price index for the consecutive 12-month
15 period ending May 31, 2016 is $31.40 per
16 megawatthour, which is based on the sum of (aa)
17 the average day-ahead energy price across all
18 hours of such 12-month period at the PJM
19 Interconnection LLC Northern Illinois Hub, (bb)
20 50% multiplied by the Base Residual Auction, or
21 its successor, capacity price for the rest of the
22 RTO zone group determined by PJM Interconnection
23 LLC, divided by 24 hours per day, and (cc) 50%
24 multiplied by the Planning Resource Auction, or
25 its successor, capacity price for Zone 4
26 determined by the Midcontinent Independent System

HB4731- 146 -LRB102 24633 AMQ 33871 b
1 Operator, Inc., divided by 24 hours per day.
2 (iii) Market price index: The market price
3 index for a delivery year shall be the sum of
4 projected energy prices and projected capacity
5 prices determined as follows:
6 (aa) Projected energy prices: the
7 projected energy prices for the applicable
8 delivery year shall be calculated once for the
9 year using the forward market price for the
10 PJM Interconnection, LLC Northern Illinois
11 Hub. The forward market price shall be
12 calculated as follows: the energy forward
13 prices for each month of the applicable
14 delivery year averaged for each trade date
15 during the calendar year immediately preceding
16 that delivery year to produce a single energy
17 forward price for the delivery year. The
18 forward market price calculation shall use
19 data published by the Intercontinental
20 Exchange, or its successor.
21 (bb) Projected capacity prices:
22 (I) For the delivery years commencing
23 June 1, 2017, June 1, 2018, and June 1,
24 2019, the projected capacity price shall
25 be equal to the sum of (1) 50% multiplied
26 by the Base Residual Auction, or its

HB4731- 147 -LRB102 24633 AMQ 33871 b
1 successor, price for the rest of the RTO
2 zone group as determined by PJM
3 Interconnection LLC, divided by 24 hours
4 per day and, (2) 50% multiplied by the
5 resource auction price determined in the
6 resource auction administered by the
7 Midcontinent Independent System Operator,
8 Inc., in which the largest percentage of
9 load cleared for Local Resource Zone 4,
10 divided by 24 hours per day, and where
11 such price is determined by the
12 Midcontinent Independent System Operator,
13 Inc.
14 (II) For the delivery year commencing
15 June 1, 2020, and each year thereafter,
16 the projected capacity price shall be
17 equal to the sum of (1) 50% multiplied by
18 the Base Residual Auction, or its
19 successor, price for the ComEd zone as
20 determined by PJM Interconnection LLC,
21 divided by 24 hours per day, and (2) 50%
22 multiplied by the resource auction price
23 determined in the resource auction
24 administered by the Midcontinent
25 Independent System Operator, Inc., in
26 which the largest percentage of load

HB4731- 148 -LRB102 24633 AMQ 33871 b
1 cleared for Local Resource Zone 4, divided
2 by 24 hours per day, and where such price
3 is determined by the Midcontinent
4 Independent System Operator, Inc.
5 For purposes of this subsection (d-5):
6 "Rest of the RTO" and "ComEd Zone" shall have
7 the meaning ascribed to them by PJM
8 Interconnection, LLC.
9 "RTO" means regional transmission
10 organization.
11 (C) No later than 45 days after June 1, 2017 (the
12 effective date of Public Act 99-906), the Agency shall
13 publish its proposed zero emission standard
14 procurement plan. The plan shall be consistent with
15 the provisions of this paragraph (1) and shall provide
16 that winning bids shall be selected based on public
17 interest criteria that include, but are not limited
18 to, minimizing carbon dioxide emissions that result
19 from electricity consumed in Illinois and minimizing
20 sulfur dioxide, nitrogen oxide, and particulate matter
21 emissions that adversely affect the citizens of this
22 State. In particular, the selection of winning bids
23 shall take into account the incremental environmental
24 benefits resulting from the procurement, such as any
25 existing environmental benefits that are preserved by
26 the procurements held under Public Act 99-906 and

HB4731- 149 -LRB102 24633 AMQ 33871 b
1 would cease to exist if the procurements were not
2 held, including the preservation of zero emission
3 facilities. The plan shall also describe in detail how
4 each public interest factor shall be considered and
5 weighted in the bid selection process to ensure that
6 the public interest criteria are applied to the
7 procurement and given full effect.
8 For purposes of developing the plan, the Agency
9 shall consider any reports issued by a State agency,
10 board, or commission under House Resolution 1146 of
11 the 98th General Assembly and paragraph (4) of
12 subsection (d) of this Section, as well as publicly
13 available analyses and studies performed by or for
14 regional transmission organizations that serve the
15 State and their independent market monitors.
16 Upon publishing of the zero emission standard
17 procurement plan, copies of the plan shall be posted
18 and made publicly available on the Agency's website.
19 All interested parties shall have 10 days following
20 the date of posting to provide comment to the Agency on
21 the plan. All comments shall be posted to the Agency's
22 website. Following the end of the comment period, but
23 no more than 60 days later than June 1, 2017 (the
24 effective date of Public Act 99-906), the Agency shall
25 revise the plan as necessary based on the comments
26 received and file its zero emission standard

HB4731- 150 -LRB102 24633 AMQ 33871 b
1 procurement plan with the Commission.
2 If the Commission determines that the plan will
3 result in the procurement of cost-effective zero
4 emission credits, then the Commission shall, after
5 notice and hearing, but no later than 45 days after the
6 Agency filed the plan, approve the plan or approve
7 with modification. For purposes of this subsection
8 (d-5), "cost effective" means the projected costs of
9 procuring zero emission credits from zero emission
10 facilities do not cause the limit stated in paragraph
11 (2) of this subsection to be exceeded.
12 (C-5) As part of the Commission's review and
13 acceptance or rejection of the procurement results,
14 the Commission shall, in its public notice of
15 successful bidders:
16 (i) identify how the winning bids satisfy the
17 public interest criteria described in subparagraph
18 (C) of this paragraph (1) of minimizing carbon
19 dioxide emissions that result from electricity
20 consumed in Illinois and minimizing sulfur
21 dioxide, nitrogen oxide, and particulate matter
22 emissions that adversely affect the citizens of
23 this State;
24 (ii) specifically address how the selection of
25 winning bids takes into account the incremental
26 environmental benefits resulting from the

HB4731- 151 -LRB102 24633 AMQ 33871 b
1 procurement, including any existing environmental
2 benefits that are preserved by the procurements
3 held under Public Act 99-906 and would have ceased
4 to exist if the procurements had not been held,
5 such as the preservation of zero emission
6 facilities;
7 (iii) quantify the environmental benefit of
8 preserving the resources identified in item (ii)
9 of this subparagraph (C-5), including the
10 following:
11 (aa) the value of avoided greenhouse gas
12 emissions measured as the product of the zero
13 emission facilities' output over the contract
14 term multiplied by the U.S. Environmental
15 Protection Agency eGrid subregion carbon
16 dioxide emission rate and the U.S. Interagency
17 Working Group on Social Cost of Carbon's price
18 in the August 2016 Technical Update using a 3%
19 discount rate, adjusted for inflation for each
20 delivery year; and
21 (bb) the costs of replacement with other
22 zero carbon dioxide resources, including wind
23 and photovoltaic, based upon the simple
24 average of the following:
25 (I) the price, or if there is more
26 than one price, the average of the prices,

HB4731- 152 -LRB102 24633 AMQ 33871 b
1 paid for renewable energy credits from new
2 utility-scale wind projects in the
3 procurement events specified in item (i)
4 of subparagraph (G) of paragraph (1) of
5 subsection (c) of this Section; and
6 (II) the price, or if there is more
7 than one price, the average of the prices,
8 paid for renewable energy credits from new
9 utility-scale solar projects and
10 brownfield site photovoltaic projects in
11 the procurement events specified in item
12 (ii) of subparagraph (G) of paragraph (1)
13 of subsection (c) of this Section and,
14 after January 1, 2015, renewable energy
15 credits from photovoltaic distributed
16 generation projects in procurement events
17 held under subsection (c) of this Section.
18 Each utility shall enter into binding contractual
19 arrangements with the winning suppliers.
20 The procurement described in this subsection
21 (d-5), including, but not limited to, the execution of
22 all contracts procured, shall be completed no later
23 than May 10, 2017. Based on the effective date of
24 Public Act 99-906, the Agency and Commission may, as
25 appropriate, modify the various dates and timelines
26 under this subparagraph and subparagraphs (C) and (D)

HB4731- 153 -LRB102 24633 AMQ 33871 b
1 of this paragraph (1). The procurement and plan
2 approval processes required by this subsection (d-5)
3 shall be conducted in conjunction with the procurement
4 and plan approval processes required by subsection (c)
5 of this Section and Section 16-111.5 of the Public
6 Utilities Act, to the extent practicable.
7 Notwithstanding whether a procurement event is
8 conducted under Section 16-111.5 of the Public
9 Utilities Act, the Agency shall immediately initiate a
10 procurement process on June 1, 2017 (the effective
11 date of Public Act 99-906).
12 (D) Following the procurement event described in
13 this paragraph (1) and consistent with subparagraph
14 (B) of this paragraph (1), the Agency shall calculate
15 the payments to be made under each contract for the
16 next delivery year based on the market price index for
17 that delivery year. The Agency shall publish the
18 payment calculations no later than May 25, 2017 and
19 every May 25 thereafter.
20 (E) Notwithstanding the requirements of this
21 subsection (d-5), the contracts executed under this
22 subsection (d-5) shall provide that the zero emission
23 facility may, as applicable, suspend or terminate
24 performance under the contracts in the following
25 instances:
26 (i) A zero emission facility shall be excused

HB4731- 154 -LRB102 24633 AMQ 33871 b
1 from its performance under the contract for any
2 cause beyond the control of the resource,
3 including, but not restricted to, acts of God,
4 flood, drought, earthquake, storm, fire,
5 lightning, epidemic, war, riot, civil disturbance
6 or disobedience, labor dispute, labor or material
7 shortage, sabotage, acts of public enemy,
8 explosions, orders, regulations or restrictions
9 imposed by governmental, military, or lawfully
10 established civilian authorities, which, in any of
11 the foregoing cases, by exercise of commercially
12 reasonable efforts the zero emission facility
13 could not reasonably have been expected to avoid,
14 and which, by the exercise of commercially
15 reasonable efforts, it has been unable to
16 overcome. In such event, the zero emission
17 facility shall be excused from performance for the
18 duration of the event, including, but not limited
19 to, delivery of zero emission credits, and no
20 payment shall be due to the zero emission facility
21 during the duration of the event.
22 (ii) A zero emission facility shall be
23 permitted to terminate the contract if legislation
24 is enacted into law by the General Assembly that
25 imposes or authorizes a new tax, special
26 assessment, or fee on the generation of

HB4731- 155 -LRB102 24633 AMQ 33871 b
1 electricity, the ownership or leasehold of a
2 generating unit, or the privilege or occupation of
3 such generation, ownership, or leasehold of
4 generation units by a zero emission facility.
5 However, the provisions of this item (ii) do not
6 apply to any generally applicable tax, special
7 assessment or fee, or requirements imposed by
8 federal law.
9 (iii) A zero emission facility shall be
10 permitted to terminate the contract in the event
11 that the resource requires capital expenditures in
12 excess of $40,000,000 that were neither known nor
13 reasonably foreseeable at the time it executed the
14 contract and that a prudent owner or operator of
15 such resource would not undertake.
16 (iv) A zero emission facility shall be
17 permitted to terminate the contract in the event
18 the Nuclear Regulatory Commission terminates the
19 resource's license.
20 (F) If the zero emission facility elects to
21 terminate a contract under subparagraph (E) of this
22 paragraph (1), then the Commission shall reopen the
23 docket in which the Commission approved the zero
24 emission standard procurement plan under subparagraph
25 (C) of this paragraph (1) and, after notice and
26 hearing, enter an order acknowledging the contract

HB4731- 156 -LRB102 24633 AMQ 33871 b
1 termination election if such termination is consistent
2 with the provisions of this subsection (d-5).
3 (2) For purposes of this subsection (d-5), the amount
4 paid per kilowatthour means the total amount paid for
5 electric service expressed on a per kilowatthour basis.
6 For purposes of this subsection (d-5), the total amount
7 paid for electric service includes, without limitation,
8 amounts paid for supply, transmission, distribution,
9 surcharges, and add-on taxes.
10 Notwithstanding the requirements of this subsection
11 (d-5), the contracts executed under this subsection (d-5)
12 shall provide that the total of zero emission credits
13 procured under a procurement plan shall be subject to the
14 limitations of this paragraph (2). For each delivery year,
15 the contractual volume receiving payments in such year
16 shall be reduced for all retail customers based on the
17 amount necessary to limit the net increase that delivery
18 year to the costs of those credits included in the amounts
19 paid by eligible retail customers in connection with
20 electric service to no more than 1.65% of the amount paid
21 per kilowatthour by eligible retail customers during the
22 year ending May 31, 2009. The result of this computation
23 shall apply to and reduce the procurement for all retail
24 customers, and all those customers shall pay the same
25 single, uniform cents per kilowatthour charge under
26 subsection (k) of Section 16-108 of the Public Utilities

HB4731- 157 -LRB102 24633 AMQ 33871 b
1 Act. To arrive at a maximum dollar amount of zero emission
2 credits to be paid for the particular delivery year, the
3 resulting per kilowatthour amount shall be applied to the
4 actual amount of kilowatthours of electricity delivered by
5 the electric utility in the delivery year immediately
6 prior to the procurement, to all retail customers in its
7 service territory. Unpaid contractual volume for any
8 delivery year shall be paid in any subsequent delivery
9 year in which such payments can be made without exceeding
10 the amount specified in this paragraph (2). The
11 calculations required by this paragraph (2) shall be made
12 only once for each procurement plan year. Once the
13 determination as to the amount of zero emission credits to
14 be paid is made based on the calculations set forth in this
15 paragraph (2), no subsequent rate impact determinations
16 shall be made and no adjustments to those contract amounts
17 shall be allowed. All costs incurred under those contracts
18 and in implementing this subsection (d-5) shall be
19 recovered by the electric utility as provided in this
20 Section.
21 No later than June 30, 2019, the Commission shall
22 review the limitation on the amount of zero emission
23 credits procured under this subsection (d-5) and report to
24 the General Assembly its findings as to whether that
25 limitation unduly constrains the procurement of
26 cost-effective zero emission credits.

HB4731- 158 -LRB102 24633 AMQ 33871 b
1 (3) Six years after the execution of a contract under
2 this subsection (d-5), the Agency shall determine whether
3 the actual zero emission credit payments received by the
4 supplier over the 6-year period exceed the Average ZEC
5 Payment. In addition, at the end of the term of a contract
6 executed under this subsection (d-5), or at the time, if
7 any, a zero emission facility's contract is terminated
8 under subparagraph (E) of paragraph (1) of this subsection
9 (d-5), then the Agency shall determine whether the actual
10 zero emission credit payments received by the supplier
11 over the term of the contract exceed the Average ZEC
12 Payment, after taking into account any amounts previously
13 credited back to the utility under this paragraph (3). If
14 the Agency determines that the actual zero emission credit
15 payments received by the supplier over the relevant period
16 exceed the Average ZEC Payment, then the supplier shall
17 credit the difference back to the utility. The amount of
18 the credit shall be remitted to the applicable electric
19 utility no later than 120 days after the Agency's
20 determination, which the utility shall reflect as a credit
21 on its retail customer bills as soon as practicable;
22 however, the credit remitted to the utility shall not
23 exceed the total amount of payments received by the
24 facility under its contract.
25 For purposes of this Section, the Average ZEC Payment
26 shall be calculated by multiplying the quantity of zero

HB4731- 159 -LRB102 24633 AMQ 33871 b
1 emission credits delivered under the contract times the
2 average contract price. The average contract price shall
3 be determined by subtracting the amount calculated under
4 subparagraph (B) of this paragraph (3) from the amount
5 calculated under subparagraph (A) of this paragraph (3),
6 as follows:
7 (A) The average of the Social Cost of Carbon, as
8 defined in subparagraph (B) of paragraph (1) of this
9 subsection (d-5), during the term of the contract.
10 (B) The average of the market price indices, as
11 defined in subparagraph (B) of paragraph (1) of this
12 subsection (d-5), during the term of the contract,
13 minus the baseline market price index, as defined in
14 subparagraph (B) of paragraph (1) of this subsection
15 (d-5).
16 If the subtraction yields a negative number, then the
17 Average ZEC Payment shall be zero.
18 (4) Cost-effective zero emission credits procured from
19 zero emission facilities shall satisfy the applicable
20 definitions set forth in Section 1-10 of this Act.
21 (5) The electric utility shall retire all zero
22 emission credits used to comply with the requirements of
23 this subsection (d-5).
24 (6) Electric utilities shall be entitled to recover
25 all of the costs associated with the procurement of zero
26 emission credits through an automatic adjustment clause

HB4731- 160 -LRB102 24633 AMQ 33871 b
1 tariff in accordance with subsection (k) and (m) of
2 Section 16-108 of the Public Utilities Act, and the
3 contracts executed under this subsection (d-5) shall
4 provide that the utilities' payment obligations under such
5 contracts shall be reduced if an adjustment is required
6 under subsection (m) of Section 16-108 of the Public
7 Utilities Act.
8 (7) This subsection (d-5) shall become inoperative on
9 January 1, 2028.
10 (d-10) Nuclear Plant Assistance; carbon mitigation
11credits.
12 (1) The General Assembly finds:
13 (A) The health, welfare, and prosperity of all
14 Illinois citizens require that the State of Illinois act
15 to avoid and not increase carbon emissions from electric
16 generation sources while continuing to ensure affordable,
17 stable, and reliable electricity to all citizens.
18 (B) Absent immediate action by the State to preserve
19 existing carbon-free energy resources, those resources may
20 retire, and the electric generation needs of Illinois'
21 retail customers may be met instead by facilities that
22 emit significant amounts of carbon pollution and other
23 harmful air pollutants at a high social and economic cost
24 until Illinois is able to develop other forms of clean
25 energy.
26 (C) The General Assembly finds that nuclear power

HB4731- 161 -LRB102 24633 AMQ 33871 b
1 generation is necessary for the State's transition to 100%
2 clean energy, and ensuring continued operation of nuclear
3 plants advances environmental and public health interests
4 through providing carbon-free electricity while reducing
5 the air pollution profile of the Illinois energy
6 generation fleet.
7 (D) The clean energy attributes of nuclear generation
8 facilities support the State in its efforts to achieve
9 100% clean energy.
10 (E) The State currently invests in various forms of
11 clean energy, including, but not limited to, renewable
12 energy, energy efficiency, and low-emission vehicles,
13 among others.
14 (F) The Environmental Protection Agency commissioned
15 an independent audit which provided a detailed assessment
16 of the financial condition of the Illinois nuclear fleet
17 to evaluate its financial viability and whether the
18 environmental benefits of such resources were at risk. The
19 report identified the risk of losing the environmental
20 benefits of several specific nuclear units. The report
21 also identified that the LaSalle County Generating Station
22 will continue to operate through 2026 and therefore is not
23 eligible to participate in the carbon mitigation credit
24 program.
25 (G) Nuclear plants provide carbon-free energy, which
26 helps to avoid many health-related negative impacts for

HB4731- 162 -LRB102 24633 AMQ 33871 b
1 Illinois residents.
2 (H) The procurement of carbon mitigation credits
3 representing the environmental benefits of carbon-free
4 generation will further the State's efforts at achieving
5 100% clean energy and decarbonizing the electricity sector
6 in a safe, reliable, and affordable manner. Further, the
7 procurement of carbon emission credits will enhance the
8 health and welfare of Illinois residents through decreased
9 reliance on more highly polluting generation.
10 (I) The General Assembly therefore finds it necessary
11 to establish carbon mitigation credits to ensure decreased
12 reliance on more carbon-intensive energy resources, for
13 transitioning to a fully decarbonized electricity sector,
14 and to help ensure health and welfare of the State's
15 residents.
16 (2) As used in this subsection:
17 "Baseline costs" means costs used to establish a customer
18protection cap that have been evaluated through an independent
19audit of a carbon-free energy resource conducted by the
20Environmental Protection Agency that evaluated projected
21annual costs for operation and maintenance expenses; fully
22allocated overhead costs, which shall be allocated using the
23methodology developed by the Institute for Nuclear Power
24Operations; fuel expenditures; nonfuel capital expenditures;
25spent fuel expenditures; a return on working capital; the cost
26of operational and market risks that could be avoided by

HB4731- 163 -LRB102 24633 AMQ 33871 b
1ceasing operation; and any other costs necessary for continued
2operations, provided that "necessary" means, for purposes of
3this definition, that the costs could reasonably be avoided
4only by ceasing operations of the carbon-free energy resource.
5 "Carbon mitigation credit" means a tradable credit that
6represents the carbon emission reduction attributes of one
7megawatt-hour of energy produced from a carbon-free energy
8resource.
9 "Carbon-free energy resource" means a generation facility
10that: (1) is fueled by nuclear power; and (2) is
11interconnected to PJM Interconnection, LLC.
12 (3) Procurement.
13 (A) Beginning with the delivery year commencing on
14 June 1, 2022, the Agency shall, for electric utilities
15 serving at least 3,000,000 retail customers in the State,
16 seek to procure contracts for no more than approximately
17 54,500,000 cost-effective carbon mitigation credits from
18 carbon-free energy resources because such credits are
19 necessary to support current levels of carbon-free energy
20 generation and ensure the State meets its carbon dioxide
21 emissions reduction goals. The Agency shall not make a
22 partial award of a contract for carbon mitigation credits
23 covering a fractional amount of a carbon-free energy
24 resource's projected output.
25 (B) Each carbon-free energy resource that intends to
26 participate in a procurement shall be required to submit

HB4731- 164 -LRB102 24633 AMQ 33871 b
1 to the Agency the following information for the resource
2 on or before the date established by the Agency:
3 (i) the in-service date and remaining useful life
4 of the carbon-free energy resource;
5 (ii) the amount of power generated annually for
6 each of the past 10 years, which shall be used to
7 determine the capability of each facility;
8 (iii) a commitment to be reflected in any contract
9 entered into pursuant to this subsection (d-10) to
10 continue operating the carbon-free energy resource at
11 a capacity factor of at least 88% annually on average
12 for the duration of the contract or contracts executed
13 under the procurement held under this subsection
14 (d-10), except in an instance described in
15 subparagraph (E) of paragraph (1) of subsection (d-5)
16 of this Section or made impracticable as a result of
17 compliance with law or regulation;
18 (iv) financial need and the risk of loss of the
19 environmental benefits of such resource, which shall
20 include the following information:
21 (I) the carbon-free energy resource's cost
22 projections, expressed on a per megawatt-hour
23 basis, over the next 5 delivery years, which shall
24 include the following: operation and maintenance
25 expenses; fully allocated overhead costs, which
26 shall be allocated using the methodology developed

HB4731- 165 -LRB102 24633 AMQ 33871 b
1 by the Institute for Nuclear Power Operations;
2 fuel expenditures; nonfuel capital expenditures;
3 spent fuel expenditures; a return on working
4 capital; the cost of operational and market risks
5 that could be avoided by ceasing operation; and
6 any other costs necessary for continued
7 operations, provided that "necessary" means, for
8 purposes of this subitem (I), that the costs could
9 reasonably be avoided only by ceasing operations
10 of the carbon-free energy resource; and
11 (II) the carbon-free energy resource's revenue
12 projections, including energy, capacity, ancillary
13 services, any other direct State support, known or
14 anticipated federal attribute credits, known or
15 anticipated tax credits, and any other direct
16 federal support.
17 The information described in this subparagraph (B) may
18 be submitted on a confidential basis and shall be treated
19 and maintained by the Agency, the procurement
20 administrator, and the Commission as confidential and
21 proprietary and exempt from disclosure under subparagraphs
22 (a) and (g) of paragraph (1) of Section 7 of the Freedom of
23 Information Act. The Office of the Attorney General shall
24 have access to, and maintain the confidentiality of, such
25 information pursuant to Section 6.5 of the Attorney
26 General Act.

HB4731- 166 -LRB102 24633 AMQ 33871 b
1 (C) The Agency shall solicit bids for the contracts
2 described in this subsection (d-10) from carbon-free
3 energy resources that have satisfied the requirements of
4 subparagraph (B) of this paragraph (3). The contracts
5 procured pursuant to a procurement event shall reflect,
6 and be subject to, the following terms, requirements, and
7 limitations:
8 (i) Contracts are for delivery of carbon
9 mitigation credits, and are not energy or capacity
10 sales contracts requiring physical delivery. Pursuant
11 to item (iii), contract payments shall fully deduct
12 the value of any monetized federal production tax
13 credits, credits issued pursuant to a federal clean
14 energy standard, and other federal credits if
15 applicable.
16 (ii) Contracts for carbon mitigation credits shall
17 commence with the delivery year beginning on June 1,
18 2022 and shall be for a term of 5 delivery years
19 concluding on May 31, 2027.
20 (iii) The price per carbon mitigation credit to be
21 paid under a contract for a given delivery year shall
22 be equal to an accepted bid price less the sum of:
23 (I) one of the following energy price indices,
24 selected by the bidder at the time of the bid for
25 the term of the contract:
26 (aa) the weighted-average hourly day-ahead

HB4731- 167 -LRB102 24633 AMQ 33871 b
1 price for the applicable delivery year at the
2 busbar of all resources procured pursuant to
3 this subsection (d-10), weighted by actual
4 production from the resources; or
5 (bb) the projected energy price for the
6 PJM Interconnection, LLC Northern Illinois Hub
7 for the applicable delivery year determined
8 according to subitem (aa) of item (iii) of
9 subparagraph (B) of paragraph (1) of
10 subsection (d-5).
11 (II) the Base Residual Auction Capacity Price
12 for the ComEd zone as determined by PJM
13 Interconnection, LLC, divided by 24 hours per day,
14 for the applicable delivery year for the first 3
15 delivery years, and then any subsequent delivery
16 years unless the PJM Interconnection, LLC applies
17 the Minimum Offer Price Rule to participating
18 carbon-free energy resources because they supply
19 carbon mitigation credits pursuant to this Section
20 at which time, upon notice by the carbon-free
21 energy resource to the Commission and subject to
22 the Commission's confirmation, the value under
23 this subitem shall be zero, as further described
24 in the carbon mitigation credit procurement plan;
25 and
26 (III) any value of monetized federal tax

HB4731- 168 -LRB102 24633 AMQ 33871 b
1 credits, direct payments, or similar subsidy
2 provided to the carbon-free energy resource from
3 any unit of government that is not already
4 reflected in energy prices.
5 If the price-per-megawatt-hour calculation
6 performed under item (iii) of this subparagraph (C)
7 for a given delivery year results in a net positive
8 value, then the electric utility counterparty to the
9 contract shall multiply such net value by the
10 applicable contract quantity and remit the amount to
11 the supplier.
12 To protect retail customers from retail rate
13 impacts that may arise upon the initiation of carbon
14 policy changes, if the price-per-megawatt-hour
15 calculation performed under item (iii) of this
16 subparagraph (C) for a given delivery year results in
17 a net negative value, then the supplier counterparty
18 to the contract shall multiply such net value by the
19 applicable contract quantity and remit such amount to
20 the electric utility counterparty. The electric
21 utility shall reflect such amounts remitted by
22 suppliers as a credit on its retail customer bills as
23 soon as practicable.
24 (iv) To ensure that retail customers in Northern
25 Illinois do not pay more for carbon mitigation credits
26 than the value such credits provide, and

HB4731- 169 -LRB102 24633 AMQ 33871 b
1 notwithstanding the provisions of this subsection
2 (d-10), the Agency shall not accept bids for contracts
3 that exceed a customer protection cap equal to the
4 baseline costs of carbon-free energy resources.
5 The baseline costs for the applicable year shall
6 be the following:
7 (I) For the delivery year beginning June 1,
8 2022, the baseline costs shall be an amount equal
9 to $30.30 per megawatt-hour.
10 (II) For the delivery year beginning June 1,
11 2023, the baseline costs shall be an amount equal
12 to $32.50 per megawatt-hour.
13 (III) For the delivery year beginning June 1,
14 2024, the baseline costs shall be an amount equal
15 to $33.43 per megawatt-hour.
16 (IV) For the delivery year beginning June 1,
17 2025, the baseline costs shall be an amount equal
18 to $33.50 per megawatt-hour.
19 (V) For the delivery year beginning June 1,
20 2026, the baseline costs shall be an amount equal
21 to $34.50 per megawatt-hour.
22 An Environmental Protection Agency consultant
23 forecast, included in a report issued April 14, 2021,
24 projects that a carbon-free energy resource has the
25 opportunity to earn on average approximately $30.28
26 per megawatt-hour, for the sale of energy and capacity

HB4731- 170 -LRB102 24633 AMQ 33871 b
1 during the time period between 2022 and 2027.
2 Therefore, the sale of carbon mitigation credits
3 provides the opportunity to receive an additional
4 amount per megawatt-hour in addition to the projected
5 prices for energy and capacity.
6 Although actual energy and capacity prices may
7 vary from year-to-year, the General Assembly finds
8 that this customer protection cap will help ensure
9 that the cost of carbon mitigation credits will be
10 less than its value, based upon the social cost of
11 carbon identified in the Technical Support Document
12 issued in February 2021 by the U.S. Interagency
13 Working Group on Social Cost of Greenhouse Gases and
14 the PJM Interconnection, LLC carbon dioxide marginal
15 emission rate for 2020, and that a carbon-free energy
16 resource receiving payment for carbon mitigation
17 credits receives no more than necessary to keep those
18 units in operation.
19 (D) No later than 7 days after the effective date of
20 this amendatory Act of the 102nd General Assembly, the
21 Agency shall publish its proposed carbon mitigation credit
22 procurement plan. The Plan shall provide that winning bids
23 shall be selected by taking into consideration which
24 resources best match public interest criteria that
25 include, but are not limited to, minimizing carbon dioxide
26 emissions that result from electricity consumed in

HB4731- 171 -LRB102 24633 AMQ 33871 b
1 Illinois and minimizing sulfur dioxide, nitrogen oxide,
2 and particulate matter emissions that adversely affect the
3 citizens of this State. The selection of winning bids
4 shall also take into account the incremental environmental
5 benefits resulting from the procurement or procurements,
6 such as any existing environmental benefits that are
7 preserved by a procurement held under this subsection
8 (d-10) and would cease to exist if the procurement were
9 not held, including the preservation of carbon-free energy
10 resources. For those bidders having the same public
11 interest criteria score, the relative ranking of such
12 bidders shall be determined by price. The Plan shall
13 describe in detail how each public interest factor shall
14 be considered and weighted in the bid selection process to
15 ensure that the public interest criteria are applied to
16 the procurement. The Plan shall, to the extent practical
17 and permissible by federal law, ensure that successful
18 bidders make commercially reasonable efforts to apply for
19 federal tax credits, direct payments, or similar subsidy
20 programs that support carbon-free generation and for which
21 the successful bidder is eligible. Upon publishing of the
22 carbon mitigation credit procurement plan, copies of the
23 plan shall be posted and made publicly available on the
24 Agency's website. All interested parties shall have 7 days
25 following the date of posting to provide comment to the
26 Agency on the plan. All comments shall be posted to the

HB4731- 172 -LRB102 24633 AMQ 33871 b
1 Agency's website. Following the end of the comment period,
2 but no more than 19 days later than the effective date of
3 this amendatory Act of the 102nd General Assembly, the
4 Agency shall revise the plan as necessary based on the
5 comments received and file its carbon mitigation credit
6 procurement plan with the Commission.
7 (E) If the Commission determines that the plan is
8 likely to result in the procurement of cost-effective
9 carbon mitigation credits, then the Commission shall,
10 after notice and hearing and opportunity for comment, but
11 no later than 42 days after the Agency filed the plan,
12 approve the plan or approve it with modification. For
13 purposes of this subsection (d-10), "cost-effective" means
14 carbon mitigation credits that are procured from
15 carbon-free energy resources at prices that are within the
16 limits specified in this paragraph (3). As part of the
17 Commission's review and acceptance or rejection of the
18 procurement results, the Commission shall, in its public
19 notice of successful bidders:
20 (i) identify how the selected carbon-free energy
21 resources satisfy the public interest criteria
22 described in this paragraph (3) of minimizing carbon
23 dioxide emissions that result from electricity
24 consumed in Illinois and minimizing sulfur dioxide,
25 nitrogen oxide, and particulate matter emissions that
26 adversely affect the citizens of this State;

HB4731- 173 -LRB102 24633 AMQ 33871 b
1 (ii) specifically address how the selection of
2 carbon-free energy resources takes into account the
3 incremental environmental benefits resulting from the
4 procurement, including any existing environmental
5 benefits that are preserved by the procurements held
6 under this amendatory Act of the 102nd General
7 Assembly and would have ceased to exist if the
8 procurements had not been held, such as the
9 preservation of carbon-free energy resources;
10 (iii) quantify the environmental benefit of
11 preserving the carbon-free energy resources procured
12 pursuant to this subsection (d-10), including the
13 following:
14 (I) an assessment value of avoided greenhouse
15 gas emissions measured as the product of the
16 carbon-free energy resources' output over the
17 contract term, using generally accepted
18 methodologies for the valuation of avoided
19 emissions; and
20 (II) an assessment of costs of replacement
21 with other carbon-free energy resources and
22 renewable energy resources, including wind and
23 photovoltaic generation, based upon an assessment
24 of the prices paid for renewable energy credits
25 through programs and procurements conducted
26 pursuant to subsection (c) of Section 1-75 of this

HB4731- 174 -LRB102 24633 AMQ 33871 b
1 Act, and the additional storage necessary to
2 produce the same or similar capability of matching
3 customer usage patterns.
4 (F) The procurements described in this paragraph (3),
5 including, but not limited to, the execution of all
6 contracts procured, shall be completed no later than
7 December 3, 2021. The procurement and plan approval
8 processes required by this paragraph (3) shall be
9 conducted in conjunction with the procurement and plan
10 approval processes required by Section 16-111.5 of the
11 Public Utilities Act, to the extent practicable. However,
12 the Agency and Commission may, as appropriate, modify the
13 various dates and timelines under this subparagraph and
14 subparagraphs (D) and (E) of this paragraph (3) to meet
15 the December 3, 2021 contract execution deadline.
16 Following the completion of such procurements, and
17 consistent with this paragraph (3), the Agency shall
18 calculate the payments to be made under each contract in a
19 timely fashion.
20 (F-1) Costs incurred by the electric utility pursuant
21 to a contract authorized by this subsection (d-10) shall
22 be deemed prudently incurred and reasonable in amount, and
23 the electric utility shall be entitled to full cost
24 recovery pursuant to a tariff or tariffs filed with the
25 Commission.
26 (G) The counterparty electric utility shall retire all

HB4731- 175 -LRB102 24633 AMQ 33871 b
1 carbon mitigation credits used to comply with the
2 requirements of this subsection (d-10).
3 (H) If a carbon-free energy resource is sold to
4 another owner, the rights, obligations, and commitments
5 under this subsection (d-10) shall continue to the
6 subsequent owner.
7 (I) This subsection (d-10) shall become inoperative on
8 January 1, 2028.
9 (e) The draft procurement plans are subject to public
10comment, as required by Section 16-111.5 of the Public
11Utilities Act.
12 (f) The Agency shall submit the final procurement plan to
13the Commission. The Agency shall revise a procurement plan if
14the Commission determines that it does not meet the standards
15set forth in Section 16-111.5 of the Public Utilities Act.
16 (g) The Agency shall assess fees to each affected utility
17to recover the costs incurred in preparation of the annual
18procurement plan for the utility.
19 (h) The Agency shall assess fees to each bidder to recover
20the costs incurred in connection with a competitive
21procurement process.
22 (i) A renewable energy credit, carbon emission credit,
23zero emission credit, or carbon mitigation credit can only be
24used once to comply with a single portfolio or other standard
25as set forth in subsection (c), subsection (d), or subsection
26(d-5) of this Section, respectively. A renewable energy

HB4731- 176 -LRB102 24633 AMQ 33871 b
1credit, carbon emission credit, zero emission credit, or
2carbon mitigation credit cannot be used to satisfy the
3requirements of more than one standard. If more than one type
4of credit is issued for the same megawatt hour of energy, only
5one credit can be used to satisfy the requirements of a single
6standard. After such use, the credit must be retired together
7with any other credits issued for the same megawatt hour of
8energy.
9(Source: P.A. 101-81, eff. 7-12-19; 101-113, eff. 1-1-20;
10102-662, eff. 9-15-21.)