Bill Title: Amends the Innovations for Transportation Infrastructure Act. Provides that the Department of Transportation or the Illinois State Toll Highway Authority may use the design-build project delivery method for transportation facilities if the capital costs for transportation facilities delivered utilizing the design-build project delivery method or Construction Manager/General Contractor project delivery method or Alternative Technical Concepts in a design-bid-build project delivery method do not for transportation facilities delivered by the Department, exceed the value of 20% of the projects annually programmed in (rather than $400 million of contracts awarded during) the Department's multi-year highway improvement program on an annual basis (rather than for any 5-year period). Removes language that provides that notwithstanding any other law, and as authority supplemental to its existing powers, the Department may use the Construction Manager/General Contractor project delivery method for up to 2 transportation facilities per year. Effective immediately.
Spectrum: Partisan Bill (Democrat 8-0)
Status: (Introduced) 2025-02-18 - Referred to Rules Committee [HB3177 Detail]
Download: Illinois-2025-HB3177-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning transportation.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Innovations for Transportation | |||||||||||||||||||
5 | Infrastructure Act is amended by changing Section 15 as | |||||||||||||||||||
6 | follows:
| |||||||||||||||||||
7 | (630 ILCS 10/15) | |||||||||||||||||||
8 | (Section scheduled to be repealed on July 1, 2032) | |||||||||||||||||||
9 | Sec. 15. Authorization of project delivery methods. | |||||||||||||||||||
10 | (a) Notwithstanding any other law, and as authority | |||||||||||||||||||
11 | supplemental to its existing powers, except as otherwise | |||||||||||||||||||
12 | provided for in this Act, the Transportation Agency, in | |||||||||||||||||||
13 | accordance with this Act, may use the design-build project | |||||||||||||||||||
14 | delivery method for transportation facilities if the capital | |||||||||||||||||||
15 | costs for transportation facilities delivered utilizing the | |||||||||||||||||||
16 | design-build project delivery method or Construction | |||||||||||||||||||
17 | Manager/General Contractor project delivery method or | |||||||||||||||||||
18 | Alternative Technical Concepts in a design-bid-build project | |||||||||||||||||||
19 | delivery method do not: (i) for transportation facilities | |||||||||||||||||||
20 | delivered by the Department, exceed the value of 20% $400 | |||||||||||||||||||
21 | million of the projects annually programmed in contracts | |||||||||||||||||||
22 | awarded during the Department's multi-year highway improvement | |||||||||||||||||||
23 | program on an annual basis for any 5-year period ; or (ii) for |
| |||||||
| |||||||
1 | transportation facilities delivered by the Authority, exceed | ||||||
2 | 20% of the Authority's annual improvement program. The | ||||||
3 | Transportation Agency shall make this calculation before | ||||||
4 | commencing the procurement. Notwithstanding any other law, and | ||||||
5 | as authority supplemental to its existing powers, the | ||||||
6 | Department, in accordance with this Act, may use the | ||||||
7 | Construction Manager/General Contractor project delivery | ||||||
8 | method for up to 2 transportation facilities per year. Before | ||||||
9 | commencing a procurement under this Act for either a | ||||||
10 | design-build contract or a Construction Manager/General | ||||||
11 | Contractor contract, the Transportation Agency shall first | ||||||
12 | undertake an analysis and make a written determination that it | ||||||
13 | is in the best interests of this State to use the selected | ||||||
14 | delivery method for that transportation facility. The analysis | ||||||
15 | and determination shall discuss the design-build project | ||||||
16 | delivery method or Construction Manager/General Contractor | ||||||
17 | project delivery method's impact on the anticipated schedule, | ||||||
18 | completion date, and project costs. The best interests of the | ||||||
19 | State analysis shall be made available to the public. | ||||||
20 | (b) The Transportation Agency shall report to the General | ||||||
21 | Assembly annually for the first 5 years after June 15, 2022 | ||||||
22 | (the effective date of this Act) on the progress of | ||||||
23 | procurements and transportation facilities procured under this | ||||||
24 | Act. | ||||||
25 | (c) A contract entered into pursuant to the provisions of | ||||||
26 | this Act is excepted from the Public Contract Fraud Act. |
| |||||||
| |||||||
1 | (Source: P.A. 102-1094, eff. 6-15-22; 103-154, eff. 6-30-23.)
| ||||||
2 | Section 99. Effective date. This Act takes effect upon | ||||||
3 | becoming law. |