| | 104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026
HB3177 Introduced , by Rep. Kevin John Olickal SYNOPSIS AS INTRODUCED:
| | | Amends the Innovations for Transportation Infrastructure Act. Provides that the Department of Transportation or the Illinois State Toll Highway Authority may use the design-build project delivery method for transportation facilities if the capital costs for transportation facilities delivered utilizing the design-build project delivery method or Construction Manager/General Contractor project delivery method or Alternative Technical Concepts in a design-bid-build project delivery method do not for transportation facilities delivered by the Department, exceed the value of 20% of the projects annually programmed in (rather than $400 million of contracts awarded during) the Department's multi-year highway improvement program on an annual basis (rather than for any 5-year period). Removes language that provides that notwithstanding any other law, and as authority supplemental to its existing powers, the Department may use the Construction Manager/General Contractor project delivery method for up to 2 transportation facilities per year. Effective immediately. |
| |
| | A BILL FOR |
|
|
| | HB3177 | | LRB104 10935 LNS 21017 b |
|
|
1 | | AN ACT concerning transportation.
|
2 | | Be it enacted by the People of the State of Illinois, |
3 | | represented in the General Assembly:
|
4 | | Section 5. The Innovations for Transportation |
5 | | Infrastructure Act is amended by changing Section 15 as |
6 | | follows:
|
7 | | (630 ILCS 10/15) |
8 | | (Section scheduled to be repealed on July 1, 2032) |
9 | | Sec. 15. Authorization of project delivery methods. |
10 | | (a) Notwithstanding any other law, and as authority |
11 | | supplemental to its existing powers, except as otherwise |
12 | | provided for in this Act, the Transportation Agency, in |
13 | | accordance with this Act, may use the design-build project |
14 | | delivery method for transportation facilities if the capital |
15 | | costs for transportation facilities delivered utilizing the |
16 | | design-build project delivery method or Construction |
17 | | Manager/General Contractor project delivery method or |
18 | | Alternative Technical Concepts in a design-bid-build project |
19 | | delivery method do not: (i) for transportation facilities |
20 | | delivered by the Department, exceed the value of 20% $400 |
21 | | million of the projects annually programmed in contracts |
22 | | awarded during the Department's multi-year highway improvement |