Bill Text: IL HB1613 | 2025-2026 | 104th General Assembly | Introduced
Bill Title: Amends the Public Utilities Act. Removes the recovery of costs associated with an investment in a qualifying infrastructure plant from reasons the Commission may authorize a water or sewer utility to file a surcharge. Makes a conforming change.
Sponsorship: Partisan Bill (Democrat 5)
Status: (Introduced - Dead) 2025-03-21 - Rule 19(a) / Re-referred to Rules Committee [HB1613 Detail]
Download: Illinois-2025-HB1613-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning regulation.
| |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
| 3 | represented in the General Assembly:
| |||||||||||||||||||
| 4 | Section 5. The Public Utilities Act is amended by changing | |||||||||||||||||||
| 5 | Section 9-220.2 as follows:
| |||||||||||||||||||
| 6 | (220 ILCS 5/9-220.2) | |||||||||||||||||||
| 7 | Sec. 9-220.2. Water and sewer surcharges authorized. | |||||||||||||||||||
| 8 | (a) The Commission may authorize a water or sewer utility | |||||||||||||||||||
| 9 | to file a surcharge which adjusts rates and charges to provide | |||||||||||||||||||
| 10 | for recovery of (i) the cost of purchased water, (ii) the cost | |||||||||||||||||||
| 11 | of purchased sewage treatment service, or (iii) other costs | |||||||||||||||||||
| 12 | which fluctuate for reasons beyond the utility's control or | |||||||||||||||||||
| 13 | are difficult to predict, or (iv) costs associated with an | |||||||||||||||||||
| 14 | investment in qualifying infrastructure plant, independent of | |||||||||||||||||||
| 15 | any other matters related to the utility's revenue | |||||||||||||||||||
| 16 | requirement. A surcharge approved under this Section can | |||||||||||||||||||
| 17 | operate on an historical or a prospective basis. | |||||||||||||||||||
| 18 | (b) (Blank). For purposes of this Section, "costs | |||||||||||||||||||
| 19 | associated with an investment in qualifying infrastructure | |||||||||||||||||||
| 20 | plant" include a return on the investment in and depreciation | |||||||||||||||||||
| 21 | expense related to plant items or facilities (including, but | |||||||||||||||||||
| 22 | not limited to, replacement mains, meters, services, and | |||||||||||||||||||
| 23 | hydrants) which (i) are not reflected in the rate base used to | |||||||||||||||||||
| |||||||
| |||||||
| 1 | establish the utility's base rates and (ii) are non-revenue | ||||||
| 2 | producing. For purposes of this Section, a "non-revenue | ||||||
| 3 | producing facility" is one that is not constructed or | ||||||
| 4 | installed for the purpose of serving a new customer. | ||||||
| 5 | (c) On a periodic basis, the Commission shall initiate | ||||||
| 6 | hearings to reconcile amounts collected under each surcharge | ||||||
| 7 | authorized pursuant to this Section with the actual prudently | ||||||
| 8 | incurred costs recoverable for each annual period during which | ||||||
| 9 | the surcharge was in effect. | ||||||
| 10 | (Source: P.A. 91-638, eff. 1-1-00.) | ||||||
