Bill Title: Amends the Township Code. Provides that no township may increase or create water main, sewer, or water main and sewer connection charges without first conducting a cost study, the results of which justify the charge. Provides that a township shall not be required to conduct more than one cost study in a 60 month period and specified units or persons requesting a cost study after the first cost study will be required to pay for the cost study. Further provides that if the connection charge that the township charges is greater than is justified by the cost study, the township must reduce its connection charge.
Sponsorship: Partisan Bill (Democrat 1)
Status: (Introduced - Dead) 2015-09-24 - Referred to Rules Committee
[HB4298 Detail]
Bill Drafts
| Revision | Date | Format | Source | View |
| Introduced | 2015-09-24 | HTML/Text | Link | View |
Amendments
| Amendment | Date | Disposition | Format | Source | View |
| No bill amendments currently on file for Illinois HB4298 |
Supplemental Documents
| Title | Description | Date | Format | Source | View |
| No supplemental documents for Illinois HB4298 currently on file. |