| 1 | AMENDMENT TO HOUSE BILL 3042
| ||||||
| 2 | AMENDMENT NO. ______. Amend House Bill 3042 by replacing | ||||||
| 3 | everything after the enacting clause with the following:
| ||||||
| 4 | "ARTICLE 1. SHORT TITLE. | ||||||
| 5 | Section 1. Short title. This Act may be cited as the Energy | ||||||
| 6 | and Environmental Security Act.
| ||||||
| 7 | ARTICLE 5. AMENDATORY PROVISIONS | ||||||
| 8 | Section 5. The Energy Conservation and Coal Development Act | ||||||
| 9 | is amended by changing Section 1 and by adding Sections 17 and | ||||||
| 10 | 20 as follows:
| ||||||
| 11 | (20 ILCS 1105/1) (from Ch. 96 1/2, par. 7401)
| ||||||
| 12 | Sec. 1. Definitions; transfer of duties.
| ||||||
| 13 | (a) For the purposes of this Act, unless the context | ||||||
| |||||||
| |||||||
| 1 | otherwise requires:
| ||||||
| 2 | "Department" means the Department of Commerce and | ||||||
| 3 | Economic Opportunity.
| ||||||
| 4 | "Director" means the Director of Commerce and Economic | ||||||
| 5 | Opportunity.
| ||||||
| 6 | "Qualified Clean Coal Facility" means an electric | ||||||
| 7 | generating facility which uses United States high volatile | ||||||
| 8 | rank bituminous coal with an emissions factor of less than | ||||||
| 9 | 210 pounds of carbon dioxide per million BTU as its primary | ||||||
| 10 | fuel source. | ||||||
| 11 | (b) As provided in Section 80-20 of the Department of | ||||||
| 12 | Natural Resources
Act, the Department of Commerce and Community | ||||||
| 13 | Affairs (now Department of Commerce and Economic Opportunity)
| ||||||
| 14 | shall assume the rights,
powers, and duties of the former | ||||||
| 15 | Department of Energy and Natural Resources
under this Act, | ||||||
| 16 | except as those rights, powers, and duties are otherwise
| ||||||
| 17 | allocated or transferred by law.
| ||||||
| 18 | (Source: P.A. 94-793, eff. 5-19-06.)
| ||||||
| 19 | (20 ILCS 1105/17 new) | ||||||
| 20 | Sec. 17. Illinois Qualified Clean Coal Technology Grant | ||||||
| 21 | Program. | ||||||
| 22 | (a) Subject to appropriation, the Department shall provide | ||||||
| 23 | grants for the purpose of funding or financing capital | ||||||
| 24 | projects, operating activities, contractual expenses and fees, | ||||||
| 25 | and other expenses that will allow the grant recipient to (i) | ||||||
| |||||||
| |||||||
| 1 | meet the qualifications of a qualified clean coal facility, as | ||||||
| 2 | defined in this Act, (ii) operate the electric generating unit | ||||||
| 3 | as a qualified clean coal facility while complying with State | ||||||
| 4 | and federal emissions requirements applicable to the grant | ||||||
| 5 | recipient's entire electric generating fleet, and (iii) | ||||||
| 6 | mitigate the environmental impacts of the operation of | ||||||
| 7 | coal-fueled electric generation units in this State. For | ||||||
| 8 | purposes of this Section, "contractual expenses and fees" shall | ||||||
| 9 | include, without limitation, (i) contractual termination fees | ||||||
| 10 | paid by the owner of a coal-fueled electric generation facility | ||||||
| 11 | to terminate one or more contracts for the purchase or delivery | ||||||
| 12 | of coal that is to be replaced by United States high volatile | ||||||
| 13 | rank bituminous coal with an emissions factor of less than 210 | ||||||
| 14 | pounds of carbon dioxide per million btu and (ii) payments made | ||||||
| 15 | by the owner of a coal-fueled electric generation facility, | ||||||
| 16 | pursuant to contract, to the owner or operator of transmission | ||||||
| 17 | facilities as the consideration for implementing transmission | ||||||
| 18 | system efficiency improvements that will reduce congestion and | ||||||
| 19 | increase capacity of generating units converted to burn coal | ||||||
| 20 | meeting specified criteria. All grants shall be provided | ||||||
| 21 | pursuant to contracts between the Department and an eligible | ||||||
| 22 | recipient in accordance with this Section. Each grant must be | ||||||
| 23 | provided for one or more specific capital projects, operating | ||||||
| 24 | activities, contractual expenses and fees, or other expenses | ||||||
| 25 | that have the specific objective or purpose of increasing the | ||||||
| 26 | use of, maintaining the use of, or conversion to, high volatile | ||||||
| |||||||
| |||||||
| 1 | rank bituminous coal with an emissions factor of less than 210 | ||||||
| 2 | pounds of carbon dioxide per million btu and mitigating the | ||||||
| 3 | environmental impacts of operating the electric generating | ||||||
| 4 | unit or units. Grants may be provided for capital projects, | ||||||
| 5 | operating activities, contractual expenses and fees, and other | ||||||
| 6 | expenses incurred or to be incurred for the purpose of | ||||||
| 7 | increasing the use of, maintaining the use of, or conversion | ||||||
| 8 | to, high volatile rank bituminous coal with an emissions factor | ||||||
| 9 | of less than 210 pounds of carbon dioxide per million btu and | ||||||
| 10 | having the following purposes or any other purpose that is | ||||||
| 11 | consistent with the objectives of this Act: | ||||||
| 12 | (1) installation or modification of emissions controls | ||||||
| 13 | or other necessary equipment and materials on one or more | ||||||
| 14 | coal-fueled electric generating units; | ||||||
| 15 | (2) efficiency improvements such as reductions in heat | ||||||
| 16 | rate at one or more coal-fueled electric generating units | ||||||
| 17 | that reduce the amount of coal that must be burned to | ||||||
| 18 | produce a megawatthour of electricity; | ||||||
| 19 | (3) modifications or conversion of an existing | ||||||
| 20 | coal-fueled electric generating unit to a coal-fueled | ||||||
| 21 | electric generating unit capable of using high volatile | ||||||
| 22 | rank bituminous coal with an emissions factor of less than | ||||||
| 23 | 210 pounds of carbon dioxide per million btu while meeting | ||||||
| 24 | applicable environmental requirements; | ||||||
| 25 | (4) installation of or modifications to equipment at | ||||||
| 26 | other electric generating units in the grant recipient's | ||||||
| |||||||
| |||||||
| 1 | generating fleet that are necessary to enable the grant | ||||||
| 2 | recipient to use high volatile rank bituminous coal with an | ||||||
| 3 | emissions factor of less than 210 pounds of carbon dioxide | ||||||
| 4 | per million btu at one or more electric generating units | ||||||
| 5 | while complying with applicable State and federal | ||||||
| 6 | emissions requirements on a fleet-wide basis; | ||||||
| 7 | (5) transmission system efficiency improvements to | ||||||
| 8 | reduce congestion and increase the capacity of units that | ||||||
| 9 | burn coal meeting specified criteria; and | ||||||
| 10 | (6) funding the costs of operating activities, | ||||||
| 11 | contractual expenses and fees, and other expenses incurred | ||||||
| 12 | to enable the increased use of, maintained use of, or | ||||||
| 13 | conversion to, high volatile rank bituminous coal with an | ||||||
| 14 | emissions factor of less than 210 pounds of carbon dioxide | ||||||
| 15 | per million btu. | ||||||
| 16 | (b) Grant funds awarded may be paid to the recipient on a | ||||||
| 17 | one-time basis or over a period of up to 5 years in accordance | ||||||
| 18 | with the terms of the contract between the Department and the | ||||||
| 19 | recipient. No grant amount shall exceed $500,000,000 in total | ||||||
| 20 | over the term of the grant. | ||||||
| 21 | (c) The Department may provide grants based on the amount | ||||||
| 22 | of funds available in the Clean Coal Technology Development and | ||||||
| 23 | Utilization Fund; provided that at no time may payments be made | ||||||
| 24 | to any recipient in excess of the total amount of funds | ||||||
| 25 | available in the Clean Coal Technology Development and | ||||||
| 26 | Utilization Fund. | ||||||
| |||||||
| |||||||
| 1 | (d) The grant contract between the Department and the | ||||||
| 2 | recipient shall include, at a minimum, the following terms: | ||||||
| 3 | (1) the name and location of the coal-fueled electric | ||||||
| 4 | generating unit or units at or for which the capital | ||||||
| 5 | project, operating activity, or expense for which the grant | ||||||
| 6 | is being provided will be implemented or incurred; | ||||||
| 7 | (2) the total amount of the grant and the timing of the | ||||||
| 8 | release of the grant funds to the recipient, such as in a | ||||||
| 9 | single payment or in a series of periodic payments over a | ||||||
| 10 | period of up to 5 years; | ||||||
| 11 | (3) a detailed description of the capital project, | ||||||
| 12 | operating activity, contractual expense or fee, or other | ||||||
| 13 | expense for which the grant is being provided, including a | ||||||
| 14 | description of the manner in which the capital project, | ||||||
| 15 | operating activity, or expense will enable or facilitate an | ||||||
| 16 | increase in the use of, maintained use of, or conversion | ||||||
| 17 | to, high volatile rank bituminous coal with an emissions | ||||||
| 18 | factor of less than 210 pounds of carbon dioxide per | ||||||
| 19 | million btu and mitigate environmental impacts of the | ||||||
| 20 | operation of the coal-fueled electric generating unit; | ||||||
| 21 | (4) a detailed schedule for execution, implementation, | ||||||
| 22 | and completion of the capital project or operating | ||||||
| 23 | activity; | ||||||
| 24 | (5) quantifiable performance objectives or outcomes of | ||||||
| 25 | the capital project, operating activity, contractual | ||||||
| 26 | expense or fee, or other expense with respect to the | ||||||
| |||||||
| |||||||
| 1 | increased use of, maintained use of, or conversion to, high | ||||||
| 2 | volatile rank bituminous coal with an emissions factor of | ||||||
| 3 | less than 210 pounds of carbon dioxide per million btu and | ||||||
| 4 | mitigation of environmental impacts of operation of the | ||||||
| 5 | generating unit or units, including a description of the | ||||||
| 6 | manner in which achievement of the performance objectives | ||||||
| 7 | or outcomes will be measured and will be reported by the | ||||||
| 8 | recipient to the Department; | ||||||
| 9 | (6) a description of procedures by which the recipient | ||||||
| 10 | will (i) maintain accounts and records of expenditures of | ||||||
| 11 | grant funds, which accounts and records shall be made | ||||||
| 12 | available for inspection and audit by the Department on | ||||||
| 13 | reasonable notice, and (ii) provide periodic reports to the | ||||||
| 14 | Department on the expenditure of grant funds and on | ||||||
| 15 | progress in implementing or completing the capital project | ||||||
| 16 | or operating activity; | ||||||
| 17 | (7) a provision specifying that the grant amount will | ||||||
| 18 | not be increased if the cost of the capital project or | ||||||
| 19 | operating activity or the amount of the contractual | ||||||
| 20 | expenses and fees or other expenses exceeds the estimated | ||||||
| 21 | cost stated in the contract; | ||||||
| 22 | (8) provisions specifying that if the performance | ||||||
| 23 | objectives or outcomes for the capital project, operating | ||||||
| 24 | activity, contractual expenses and fees or other expenses | ||||||
| 25 | as specified in the contract are not achieved based on the | ||||||
| 26 | measurement methods specified in the contract, a portion of | ||||||
| |||||||
| |||||||
| 1 | the grant amount will be repaid by the recipient to the | ||||||
| 2 | Department in accordance with measures and procedures | ||||||
| 3 | specified in the contract; and | ||||||
| 4 | (9) such other usual and customary provisions for the | ||||||
| 5 | administration and monitoring of grants and grant | ||||||
| 6 | recipients as the Department may by rule adopt.
| ||||||
| 7 | (20 ILCS 1105/20 new) | ||||||
| 8 | Sec. 20. Clean Coal Technology Development and Utilization | ||||||
| 9 | Fund. | ||||||
| 10 | (a) The Clean Coal Technology Development and Utilization | ||||||
| 11 | Fund is created as a special fund in the State treasury. | ||||||
| 12 | (b) The Clean Coal Technology Development and Utilization | ||||||
| 13 | Fund shall be administered by the Department to provide grants | ||||||
| 14 | under Section 17 of this Act.
| ||||||
| 15 | Section 10. The State Finance Act is amended by adding | ||||||
| 16 | Section 5.878 as follows:
| ||||||
| 17 | (30 ILCS 105/5.878 new) | ||||||
| 18 | Sec. 5.878. The Clean Coal Technology Development and | ||||||
| 19 | Utilization Fund.
| ||||||
| 20 | ARTICLE 99. EFFECTIVE DATE. | ||||||
| 21 | Section 99. Effective date. This Act takes effect upon | ||||||
| |||||||
| |||||||
| 1 | becoming law.".
| ||||||