Bill Text: HI SB2999 | 2012 | Regular Session | Introduced


Bill Title: CIP; 16th Senatorial District

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2012-01-27 - (S) Referred to WAM. [SB2999 Detail]

Download: Hawaii-2012-SB2999-Introduced.html

THE SENATE

S.B. NO.

2999

TWENTY-SIXTH LEGISLATURE, 2012

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE SIXTEENTH SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $63,960,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2012-2013 for the purpose of capital improvement projects for the sixteenth senatorial district, as follows:

1.   To be expended by the department of education:

     A.   Aiea Elementary School, Oahu

          Additional design and construction for air conditioning of buildings A and B, ground and site improvements, and equipment and appurtenances.

          Design                        $300,000

          Construction                $1,200,000

          Total funding                              $1,500,000

     B.   Aiea Elementary School, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                         $75,000

          Construction                  $500,000

          Total funding                                $575,000

     C.   Aiea Intermediate School, Oahu

          Design and construction for a retaining wall, perimeter fence and gate, ground and site improvements, and equipment and appurtenances.

          Design                        $150,000

          Construction                  $800,000

          Total funding                                $950,000

     D.   Aiea Intermediate School, Oahu

          Additional design and construction for campus-wide electrical upgrades, ground and site improvements, and equipment and appurtenances.

          Design                        $200,000

          Construction                $1,000,000

          Total funding                              $1,200,000

     E.   Aiea Intermediate School, Oahu

          Design, construction, and equipment for electrical upgrades and heat abatement improvements or air conditioning, including appurtenances.

          Design                         $99,000

          Construction                  $400,000

          Equipment                       $1,000

          Total funding                                $500,000

     F.   Aiea High School, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $240,000

          Construction                $2,000,000

          Total funding                              $2,240,000

     G.   Aiea High School, Oahu

          Design, construction, and equipment for improvements to athletic facilities, including a new building or an addition to existing buildings for two classrooms, a weight training room, permanent restrooms, and a concession for the athletic field.

          Design                        $600,000

          Construction                $6,340,000

          Equipment                      $60,000

          Total funding                              $7,000,000

     H.   Aiea High School, Oahu

          Design and construction for an amphitheater, sidewalk safety improvements, campus-wide erosion control, retaining walls, ground and site improvements, and equipment and appurtenances.

          Design                        $300,000

          Construction                $2,500,000

          Total funding                              $2,800,000

     I.   Aiea Public Library, Oahu

          Construction of a photovoltaic system, program meeting room, and related improvements for the new Aiea Public Library.

          Construction                $1,525,000

          Equipment                     $225,000

          Total funding                              $1,750,000

     J.   Alvah Scott Elementary School, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $150,000

          Construction                $1,000,000

          Total funding                              $1,150,000

     K.   Alvah Scott Elementary School, Oahu

          Design and construction for air conditioning for building E, ground and site improvements, and equipment and appurtenances.

          Design                        $150,000

          Construction                  $600,000

          Total funding                                $750,000

     L.   Alvah Scott Elementary School, Oahu

          Design and construction for traffic safety improvements and parking expansion, ground and site improvements, and equipment and appurtenances.

          Design                         $75,000

          Construction                  $650,000

          Total funding                                $725,000

     M.   Gustav H. Webling Elementary School, Oahu

          Design, construction, and equipment for campus-wide electrical upgrades, ground and site improvements, and equipment and appurtenances.

          Design                        $200,000

          Construction                $1,499,000

          Equipment                        1,000

          Total funding                              $1,700,000

     N.   Gustav H. Webling Elementary School, Oahu

          Plans, design, and construction to redesign the administration building to improve the health room, and to provide air conditioning and doorways.

          Plans                           $1,000

          Design                          $1,000

          Construction                  $223,000

          Total funding                                $225,000

     O.   Gustav H. Webling Elementary School, Oahu

          Design, construction, and equipment for a multipurpose room above the administration building including restrooms, walkway connecting to building A, air conditioning, furniture, and appurtenances.

          Design                         $15,000

          Construction                   $80,000

          Equipment                       $5,000

          Total funding                                $100,000

     P.   Highlands Intermediate School, Oahu

          Design and construction of a fence fronting Highlands Intermediate School.

          Design                         $20,000

          Construction                  $160,000

          Total funding                                $180,000

     Q.   Lehua Elementary School, Oahu

          Plans, design, and construction for a new six-classroom building.

          Plans                           $1,000

          Design                          $1,000

          Construction                $5,998,000

          Total funding                              $6,000,000

     R.   Lehua Elementary School, Oahu

          Construction to improve the structural integrity of building B.

          Construction                $1,000,000

          Total funding                              $1,000,000

     S.   Lehua Elementary School, Oahu

          Construction for campus-wide electrical upgrades.

          Construction                $1,114,000

          Total funding                              $1,114,000

     T.   Manana Elementary School, Oahu

          Construction to provide ramps, elevators, and other measures to improve access to school facilities.

          Construction                   $85,000

          Total funding                                 $85,000

     U.   Manana Elementary School, Oahu

          Construction to provide disabled accessibility for science laboratory in building K and classrooms in building J.

          Construction                  $120,000

          Total funding                                $120,000

     V.   Manana Elementary School, Oahu

          Design to improve school campus drainage.

          Design                        $400,000

          Total funding                                $400,000

     W.   Manana Elementary School, Oahu

          Design and construction to complete renovations to the library.

          Design                         $60,000

          Construction                  $300,000

          Total funding                                $360,000

     X.   Manana Elementary School, Oahu

          Design and construction of retaining walls and for drainage improvements for buildings H, F, G, and J.

          Design                         $50,000

          Construction                  $400,000

          Total funding                                $450,000

     Y.   Momilani Elementary School, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $100,000

          Construction                  $500,000

          Total funding                                $600,000

     Z.   Palisades Elementary School, Oahu

          Design and construction to improve the slope of the front parking lot.

          Design                        $180,000

          Construction                  $900,000

          Total funding                              $1,080,000

     AA.  Palisades Elementary School, Oahu

          Construction of ten-stall parking lot, driveway, and retaining wall to be added to existing parking lot.

          Construction                  $600,000

          Total funding                                $600,000

     BB.  Pearl City Elementary School, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $225,000

          Construction                $1,775,000

          Total funding                              $2,000,000

     CC.  Pearl City High School, Oahu

          Design and construction for air conditioning for building R.

          Design                      $1,000,000

          Construction                $5,000,000

          Total funding                              $6,000,000

     DD.  Pearl City High School, Oahu

          Design, construction, and equipment to install a synthetic track and field at the Bino Neves Stadium at Pearl City High School.

          Design                      $1,000,000

          Construction                $4,000,000

          Equipment                     $500,000

          Total funding                              $5,500,000

     EE.  Pearl City Library, Oahu

          Design and construction to renovate the library's parking lot.

          Design                         $75,000

          Construction                  $705,000

          Total funding                                $780,000

     FF.  Pearl Ridge Elementary School, Oahu

          Design, construction, and equipment to improve the administration building and courtyard, including air conditioning and heat abatement.

          Design                          $1,000

          Construction                $3,598,000

          Equipment                       $1,000

          Total funding                              $3,600,000

     GG.  Pearl Ridge Elementary School, Oahu

          Design and construction for a covered walkway to the cafeteria from buildings F and J, ground and site improvements, and equipment and appurtenances.

          Design                        $150,000

          Construction                  $500,000

          Total funding                                $650,000

     HH.  Red Hill Elementary School, Oahu

          Construction to install ceiling fans in various campus buildings.

          Construction                  $126,000

          Total funding                                $126,000

     II.  Red Hill Elementary School, Oahu

          Design and construction to upgrade cafeteria restrooms and faculty restrooms.

          Design                          $5,000

          Construction                   $45,000

          Total funding                                 $50,000

     JJ.  Waimalu Elementary School, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $150,000

          Construction                $1,000,000

          Total funding                              $1,150,000

     KK.  Waimalu Elementary School, Oahu

          Design and construction for electrical upgrades and installation of air conditioning systems for various classrooms, ground and site improvements, and equipment and appurtenances.

          Design                        $500,000

          Construction                $3,000,000

          Total funding                              $3,500,000

     LL.  Waimalu Elementary School, Oahu

          Design and construction for electrical upgrades and installation of air conditioning systems for various classrooms.

          Design                        $500,000

          Construction                $3,000,000

          Total funding                              $3,500,000

2.   To be expended by the department of transportation:

     A.   Kamehameha Highway, Oahu

          Construction to equip all crosswalks along Kamehameha Highway with in-roadway lighted warning systems.

          Construction                $1,000,000

          Total funding                              $1,000,000

3.   To be expended by the city and county of Honolulu:

     A.   Halawa Heights Road, Oahu

          Design and construction for a retaining wall to prevent erosion of hillside along Halawa Heights Road adjacent to 99-614 Kaakau Place.

          Design                          $1,000

          Construction                  $949,000

          Total funding                                $950,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2014, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 4.  This Act shall take effect on July 1, 2012.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 16th Senatorial District

 

Description:

Appropriates funds for capital improvement projects in the 16th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback