Bill Text: HI SB2953 | 2010 | Regular Session | Introduced


Bill Title: CIP; 24th Senatorial District

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2010-01-29 - (S) Referred to WAM. [SB2953 Detail]

Download: Hawaii-2010-SB2953-Introduced.html

THE SENATE

S.B. NO.

2953

TWENTY-FIFTH LEGISLATURE, 2010

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE twenty-fourth SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $15,939,000 or so much thereof as may be necessary, and the same sum, or so much thereof as may be necessary, is appropriated for fiscal year 2010-2011, for the purpose of capital improvement projects for the twenty-fourth senatorial district, as follows:

1.   Aikahi elementary school, Oahu

     A.   Upgrade telephone system, repair the roof of building D, and renovate cafeteria and bathrooms.

          Design and construction       $125,000

          Total funding                                $125,000

2.   Benjamin Parker elementary, Oahu

     A.   Repair cafeteria ceiling.

          Design and construction       $100,000

          Total funding                                $100,000


3.   Castle high school, Oahu

     A.   Upgrade to LED lighting fixtures, digital sound system for auditorium.

          Design and construction       $500,000

          Total funding                                $500,000

     B.   Electrical replacement and upgrade for building BB (auditorium).

          Plans                          $10,000

          Construction                   $25,000

          Equipment                     $250,000

          Total funding                                $285,000

4.   Enchanted Lake elementary school, Oahu

     A.   Electrical upgrade for the entire campus.

          Plans                                $1,000

          Design                               $1,000

          Construction                        $98,000

             Total funding                            $100,000

     B.   Covered walkway for administration building (K-1).

          Plans                                $1,000

          Design                               $1,000

          Construction                        $98,000

             Total funding                            $100,000

     C.   Covered walkway from building F (library) to the main corridor.

          Plans                                $1,000

          Design                               $1,000

          Construction                        $98,000

             Total funding                            $100,000

5.   Kaelepulu elementary school, Oahu

     A.   Replace walkway steps from parking lot to building C that have shifted due to erosion.

          Design                              $25,000

          Construction                       $150,000

             Total funding                            $175,000

     B.   Upgrade telecommunications network.

          Design                              $35,000

          Construction                       $145,000

             Total funding                            $180,000

     C.   Covered walkway improvements.

          Design                              $40,000

          Construction                       $140,000

             Total funding                            $180,000

     D.   Classroom renovations for the entire campus.

          Design                             $100,000

          Construction                     $1,500,000

             Total funding                          $1,600,000

6.   Kailua intermediate school, Oahu

     A.   Electrical upgrade for the entire campus.

          Design                         $91,600

          Construction                  $824,400

          Total funding                                $916,000

7.   Kainalu elementary school, Oahu

     A.   Covered walkway repair between buildings D and E and extending to the cafeteria.

          Design                         $35,000

          Construction                  $200,000

          Total funding                                $235,000


8.   Kalaheo high school, Oahu

     A.   Plan, design, construction, and equipment for a regulation football/soccer field, lengthen the physical education field and install field lights and bleachers.

          Plans                          $75,000

          Design                         $75,000

          Construction                  $350,000

          Equipment                     $250,000

          Total funding                                $750,000

9.   Kaneohe elementary school, Oahu

     A.   Expand the school library, grading for an access road to the library, and construction of a parking area near the library that complies with the Americans with Disabilities Act.

          Design                             $100,000

          Construction                     $1,100,000

             Total funding                          $1,200,000

10.  King intermediate school, Oahu

     A.   Expand the cafeteria to serve as a theater/performance center and construct an adjoining restroom facility, remodel kitchen area in gymnasium.

          Plans                               $50,000

          Construction                       $400,000

          Equipment                           $80,000

             Total funding                            $530,000

11.  Mokapu elementary school, Oahu

     A.   Electrical upgrade for the entire campus.

          Design                             $120,000

          Construction                     $1,080,000

             Total funding                          $1,200,000

12.  Olomana school, Oahu

     A.   Plans, design, and construction for an extension of the physical education portable room.

          Plans                                $5,000

          Design                               $8,000

          Construction                        $75,000

             Total funding                             $88,000

13.  Olomana youth center, Oahu

     A.   Construct an open-air field house for indoor sports (basketball, volleyball, etc.).

          Construction                     $1,500,000

          Equipment                          $100,000

             Total funding                          $1,600,000

14.  Puohala elementary school, Oahu

     A.   Structural assessment to address the separation of walls in buildings on entire campus.

             Total funding                            $250,000

15.  Boys and girls club, Oahu

     A.   Provide a grant pursuant to chapter 42F, Hawaii Revised Statutes, to renovate the boys' locker facility in the athletic department wing at Kailua intermediate school to create separate boys' and girls' locker facilities and staff offices that can be used by the boys and girls club after school program.

             Total funding                          $1,500,000

16.  Hawaii state hospital, Oahu

     A.   Commission of a study for the demolition of the Goddard building.

             Total funding                            $250,000

     B.   Plans and design for a Joint Forensic Facility.

             Total funding                            $250,000

17.  Department of land and natural resources

     A.   Plans and design for an engineering study and environmental assessment to restore water flow from Kawai Nui marsh to Kawai Nui stream.

             Total funding                            $425,000

     B.   Update the master plan for Kawainui marsh for the planning, design, and construction of project features that include parks, trails, education, visitor and maintenance facilities, wildlife habitat restoration areas, and other wildlife sanctuary and park features; completion of an environmental assessment on the impact to the Kailua waterways and Kawainui marsh, if necessary; obtaining work permits for the project features.

          Plans                              $400,000

          Design                             $150,000

          Construction                       $250,000

             Total funding                            $800,000

     C.   Plans, design, and construction to mitigate damage to the habitat and improve waterways at Kaelepulu pond.

          Plans                              $100,000

          Design                             $100,000

          Construction                       $800,000

             Total funding                          $1,000,000

18.  Department of transportation

     A.   Sidewalk and pedestrian improvements for Lilipuna road, Waikalua road, and William Henry road.

          Plans                               $50,000

          Design                              $75,000

          Construction                     $1,000,000

             Total funding                          $1,125,000

     B.   Traffic study for ingress and egress to Olomana and Pohakupu subdivisions.

          Plans                                $1,000

          Design                               $1,000

          Construction                        $23,000

             Total funding                             $25,000

     C.   Plans and construction for a parking lot behind the Olomana fire station at Maunawili elementary school.

          Plans                               $10,000

          Construction                       $240,000

             Total funding                            $250,000

     D.   Installation of storm drains in Kaneohe and Kailua.

          Plans                               $10,000

          Design                              $10,000

          Construction                        $20,000

          Equipment                           $60,000

             Total funding                            $100,000

     SECTION 2.  The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2012, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act as follows:

     (1)  For items 1 through 14, the expending agency shall be the department of education;

     (2)  For item 15, the expending agency shall be the department of human services;

     (3)  For item 16, the expending agency shall be the department of health;

     (4)  For item 17, the expending agency shall be the department of land and natural resources; and

     (5)  For item 18, the expending agency shall be the department of transportation.

     SECTION 4.  This Act shall take effect on July 1, 2010.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 24th Senatorial District

 

Description:

Appropriates funds for capital improvement projects in the 24th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback