Bill Text: CA AB678 | 2017-2018 | Regular Session | Amended
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Housing Accountability Act.
Spectrum: Partisan Bill (Democrat 4-0)
Status: (Passed) 2017-09-29 - Chaptered by Secretary of State - Chapter 373, Statutes of 2017. [AB678 Detail]
Download: California-2017-AB678-Amended.html
Bill Title: Housing Accountability Act.
Spectrum: Partisan Bill (Democrat 4-0)
Status: (Passed) 2017-09-29 - Chaptered by Secretary of State - Chapter 373, Statutes of 2017. [AB678 Detail]
Download: California-2017-AB678-Amended.html
Amended
IN
Senate
July 03, 2017 |
Amended
IN
Senate
June 26, 2017 |
Amended
IN
Senate
June 12, 2017 |
Amended
IN
Assembly
May 26, 2017 |
Amended
IN
Assembly
May 15, 2017 |
Amended
IN
Assembly
May 01, 2017 |
Amended
IN
Assembly
March 21, 2017 |
CALIFORNIA LEGISLATURE—
2017–2018 REGULAR SESSION
Assembly Bill | No. 678 |
Introduced by Assembly Member Bocanegra (Principal coauthor: Senator Skinner) (Coauthors: Senators Beall and Wiener) |
February 15, 2017 |
An act to amend Section 65589.5 of the Government Code, relating to housing.
LEGISLATIVE COUNSEL'S DIGEST
AB 678, as amended, Bocanegra.
Housing Accountability Act.
(1) The Housing Accountability Act, among other things, prohibits a local agency from disapproving, or conditioning approval in a manner than renders infeasible, a housing development project for very low, low-, or moderate-income households or an emergency shelter unless the local agency makes specified written findings based upon substantial evidence in the record.
This bill would require the findings of the local agency to instead be based on a preponderance of the evidence in the record.
(2) The act authorizes a local agency to disapprove or condition approval of a housing development or emergency shelter, as described above, if, among other reasons, the housing development project or emergency shelter is inconsistent with both the jurisdiction’s zoning
ordinance and general plan land use designation as specified in any element of the general plan as it existed on the date the application was deemed complete, and the jurisdiction has adopted a revised housing element in accordance with specified law.
This bill would specify that a change to the zoning ordinance or general plan land use designation subsequent to the date the application was deemed complete does not constitute a valid basis to disapprove or condition approval of the housing development project or emergency shelter.
(3) The act authorizes the project applicant, a person who would be eligible to apply for residency in the development or emergency shelter, or a housing organization, as defined, to bring an action to enforce its provisions.
This bill would entitle a housing organization to reasonable attorney’s fees and costs if it is the
prevailing party in an action to enforce the act.
(4) If a court finds that the local agency disapproved, or conditioned approval in a manner that renders infeasible the project or emergency shelter or housing for very low, low-, or moderate-income households without making the required findings or without making sufficient findings, the act requires the court to issue an order or judgment compelling compliance with its provisions within 60 days, including an order that the local agency take action on the development project or emergency shelter and awarding attorney’s fees and costs.
This bill would additionally require the court to issue an order compelling compliance with the act, as described above, if it finds that the local agency disapproved a housing development project complying with applicable, objective general plan and zoning standards and criteria, or approved it upon the condition that
the project be developed at a lower density, without making the required findings or without making findings supported by substantial evidence. The bill would authorize the court to issue an order or judgment directing the local agency to approve the housing development project or emergency shelter if the court finds that the local agency acted in bad faith when it disapproved or conditionally approved the housing development project or emergency shelter in violation of the act.
(5) The act authorizes the court to impose fines if it finds that a local agency acted in bad faith when it disapproved or conditionally approved the housing development or emergency shelter and failed to carry out the court’s order or judgment compelling compliance within 60 days of the court’s judgment. The act requires that the fines be deposited into a housing trust fund and committed for the sole purpose of financing newly constructed housing units affordable to
extremely low, very low, or low-income households.
This bill, upon a determination that the local agency has failed to comply with the order or judgment compelling compliance with these provisions within 60 days, would instead authorize the court to impose fines, as described above, in every instance in which the court determines that the local agency disapproved, or conditioned approval in a manner than renders infeasible, the housing development project or emergency shelter without making the required findings or without making sufficient findings. The bill would require that the fine be in a minimum amount of $10,000 per housing unit in the housing development project on the date the application was deemed complete. In determining the amount of fine to impose, the bill would require the court to consider the local agency’s progress in attaining its target allocation of the regional housing need and
need, any prior violations of the act. act, the budget of the local jurisdiction, whether the jurisdiction has complied with a specified published analysis requirement imposed by this bill and the ratio of median home price to median household income in the jurisdiction. If the local agency has acted in bad faith and failed to carry out the court’s order, as described above, the bill would authorize require the court to award punitive damages.
multiply the fine by a factor of 5.
This bill would also require the local agency that proposes to deny or reduce the density of a housing development project or emergency shelter or impose restrictions or conditions, including design review standards, that render the housing development project infeasible for very low, low-, or moderate-income housing or for an emergency
shelter to publish an analysis of the requirements of the act as part of its review of
the application for a housing development project, as provided, and specify that failure to do so constitutes “bad faith” for purposes of a punitive damages award.
This bill would also require that a petition to enforce the act be filed and served no later than 90 days from the later of (a) the withdrawal of the application by the applicant or the effective date of a decision of the local agency imposing conditions on, disapproving, or taking any other final action on a housing development project or (b) the expiration of certain time periods specified in the Permit Streamlining Act.
(6) This bill would make various technical and conforming changes to the Housing Accountability Act.
Digest Key
Vote: MAJORITY Appropriation: NO Fiscal Committee: NO Local Program: NOBill Text
The people of the State of California do enact as follows:
SECTION 1.
Section 65589.5 of the Government Code is amended to read:65589.5.
(a) The Legislature finds and declares all of the following:(1) The lack of housing, including emergency shelters, is a critical problem that threatens the economic, environmental, and social quality of life in California.
(2) California housing has become the most expensive in the nation. The excessive cost of the state’s housing supply is partially caused by activities and policies of many local governments that limit the approval of housing, increase the cost of land for housing, and require that high fees and exactions be paid by producers of housing.
(3) Among the consequences of those actions are discrimination against low-income and minority households, lack of housing to support employment growth, imbalance in jobs and housing, reduced mobility, urban sprawl, excessive commuting, and air quality deterioration.
(4) Many local governments do not give adequate attention to the economic, environmental, and social costs of decisions that result in disapproval of housing development projects, reduction in density of housing projects, and excessive standards for housing development projects.
(b) It is the policy of the state that a local government not reject or make infeasible housing development projects, including emergency shelters, that contribute to meeting the need determined pursuant to this article without
a thorough analysis of the economic, social, and environmental effects of the action and without complying with subdivision (d).
(c) The Legislature also recognizes that premature and unnecessary development of agricultural lands for urban uses continues to have adverse effects on the availability of those lands for food and fiber production and on the economy of the state. Furthermore, it is the policy of the state that development should be guided away from prime agricultural lands; therefore, in implementing this section, local jurisdictions should encourage, to the maximum extent practicable, in filling existing urban areas.
(d) A local agency shall not disapprove a housing development project, including farmworker housing as defined in subdivision (h) of Section 50199.7 of
the Health and Safety Code, for very low, low-, or moderate-income households, or an emergency shelter, or condition approval in a manner that renders the housing development project infeasible for development for the use of very low, low-, or moderate-income households, or an emergency shelter, including through the use of design review standards, unless it makes written findings, based upon a preponderance of the evidence in the record, as to one of the following:
(1) The jurisdiction has adopted a housing element pursuant to this article that has been revised in accordance with Section 65588, is in substantial compliance with this article, and the jurisdiction has met or exceeded its share of the regional housing need allocation pursuant to Section 65584 for the planning period for the income category proposed for the housing development
project, provided that any disapproval or conditional approval shall not be based on any of the reasons prohibited by Section 65008. If the housing development project includes a mix of income categories, and the jurisdiction has not met or exceeded its share of the regional housing need for one or more of those categories, then this paragraph shall not be used to disapprove or conditionally approve the housing development project. The share of the regional housing need met by the jurisdiction shall be calculated consistently with the forms and definitions that may be adopted by the Department of Housing and Community Development pursuant to Section 65400. In the case of an emergency shelter, the jurisdiction shall have met or exceeded the need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. Any disapproval or conditional approval pursuant to this
paragraph shall be in accordance with applicable law, rule, or standards.
(2) The housing development project or emergency shelter as proposed would have a specific, adverse impact upon the public health or safety, and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible. As used in this paragraph, a “specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. Inconsistency with the zoning ordinance or general plan land use designation shall not
constitute a specific, adverse impact upon the public health or safety.
(3) The denial of the housing development project or imposition of conditions is required in order to comply with specific state or federal law, and there is no feasible method to comply without rendering the development unaffordable to low- and moderate-income households or rendering the development of the emergency shelter financially infeasible.
(4) The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project.
(5) The housing development project or emergency shelter is inconsistent with both the jurisdiction’s zoning ordinance and general plan land use designation as specified in any element of the general plan as it existed on the date the application was deemed complete, and the jurisdiction has adopted a revised housing element in accordance with Section 65588 that is in substantial compliance with this article. For purposes of this section, a change to the zoning ordinance or general plan land use designation subsequent to the date the application was deemed complete shall not constitute a valid basis to disapprove or condition approval of the housing development project or emergency shelter.
(A) This paragraph cannot be utilized to disapprove or conditionally approve a housing development project if the housing development
project is proposed on a site that is identified as suitable or available for very low, low-, or moderate-income households in the jurisdiction’s housing element, and consistent with the density specified in the housing element, even though it is inconsistent with both the jurisdiction’s zoning ordinance and general plan land use designation.
(B) If the local agency has failed to identify in the inventory of land in its housing element sites that can be developed for housing
within the planning period and are sufficient to provide for the jurisdiction’s share of the regional housing need for all income levels pursuant to Section 65584, then this paragraph shall not be utilized to disapprove or conditionally approve a housing development project proposed for a site designated in any element of the general plan for residential uses or designated in any element of the general plan for commercial uses if residential uses are permitted or conditionally permitted within commercial designations. In any action in court, the burden of proof shall be on the local agency to show that its housing element does identify adequate sites with appropriate zoning and development standards and with services and facilities to accommodate the local agency’s share of the regional housing need for the very low, low-, and moderate-income categories.
(C) If the local agency has failed to identify a zone or zones where emergency shelters are allowed as a permitted use without a conditional use or other discretionary permit, has failed to demonstrate that the identified zone or zones include sufficient capacity to accommodate the need for emergency shelter identified in paragraph (7) of subdivision (a) of Section 65583, or has failed to demonstrate that the identified zone or zones can accommodate at least one emergency shelter, as required by paragraph (4) of subdivision (a) of Section 65583, then this paragraph shall not be utilized to disapprove or conditionally approve an emergency shelter proposed for a site designated in any element of the general plan for industrial, commercial, or multifamily residential uses. In any action in court, the burden of proof shall be on the local agency to
show that its housing element does satisfy the requirements of paragraph (4) of subdivision (a) of Section 65583.
(e) Nothing in this section shall be construed to relieve the local agency from complying with the congestion management program required by Chapter 2.6 (commencing with Section 65088) of Division 1 of Title 7 or the California Coastal Act of 1976 (Division 20 (commencing with Section 30000) of the Public Resources Code). Neither shall anything in this section be construed to relieve the local agency from making one or more of the findings required pursuant to Section 21081 of the Public Resources Code or otherwise complying with the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(f) (1) Nothing in this section shall be construed to prohibit a local agency from requiring the housing development project to comply with objective, quantifiable, written development standards, conditions, and policies appropriate to, and consistent with, meeting the jurisdiction’s share of the regional housing need pursuant to Section 65584. However, the development standards, conditions, and policies shall be applied to facilitate and accommodate development at the density permitted on the site and proposed by the development.
(2) Nothing in this section shall be construed to prohibit a local agency from requiring an emergency shelter project to comply with objective, quantifiable, written development standards, conditions, and policies that are consistent with paragraph (4) of subdivision (a) of Section 65583
and appropriate to, and consistent with, meeting the jurisdiction’s need for emergency shelter, as identified pursuant to paragraph (7) of subdivision (a) of Section 65583. However, the development standards, conditions, and policies shall be applied by the local agency to facilitate and accommodate the development of the emergency shelter project.
(3) This section does not prohibit a local agency from imposing fees and other exactions otherwise authorized by law that are essential to provide necessary public services and facilities to the housing development project or emergency shelter.
(g) This section shall be applicable to charter cities because the Legislature finds that the lack of housing, including emergency shelter, is a critical statewide problem.
(h) The following definitions apply for the purposes of this section:
(1) “Feasible” means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors.
(2) “Housing development project” means a use consisting of any of the following:
(A) Residential units only.
(B) Mixed-use developments consisting of residential and nonresidential uses in which nonresidential uses are limited to neighborhood commercial uses and to the first floor of buildings that are two or more stories. As used in this
paragraph, “neighborhood commercial” means small-scale general or specialty stores that furnish goods and services primarily to residents of the neighborhood.
(C) Transitional housing or supportive housing.
(3) “Housing for very low, low-, or moderate-income households” means that either (A) at least 20 percent of the total units shall be sold or rented to lower income households, as defined in Section 50079.5 of the Health and Safety Code, or (B) 100 percent of the units shall be sold or rented to persons and families of moderate income as defined in Section 50093 of the Health and Safety Code, or persons and families of middle income, as defined in Section 65008 of this code. Housing units targeted for lower income households shall be made available at a monthly housing cost
that does not exceed 30 percent of 60 percent of area median income with adjustments for household size made in accordance with the adjustment factors on which the lower income eligibility limits are based. Housing units targeted for persons and families of moderate income shall be made available at a monthly housing cost that does not exceed 30 percent of 100 percent of area median income with adjustments for household size made in accordance with the adjustment factors on which the moderate-income eligibility limits are based.
(4) “Area median income” means area median income as periodically established by the Department of Housing and Community Development pursuant to Section 50093 of the Health and Safety Code. The developer shall provide sufficient legal commitments to ensure continued availability of units for very low or
low-income households in accordance with the provisions of this subdivision for 30 years.
(5) “Disapprove the housing development project” includes any instance in which a local agency does either of the following:
(A) Votes on a proposed housing development project application and the application is disapproved.
(B) Fails to comply with the time periods specified in subdivision (a) of Section 65950. An extension of time pursuant to Article 5 (commencing with Section 65950) shall be deemed to be an extension of time pursuant to this paragraph.
(i) If any city, county, or city and county denies approval or imposes restrictions, including design changes, or a reduction
of allowable densities or the percentage of a lot that may be occupied by a building or structure under the applicable planning and zoning in force at the time the application is deemed complete pursuant to Section 65943, that have a substantial adverse effect on the viability or affordability of a housing development for very low, low-, or moderate-income households, and the denial of the development or the imposition of restrictions on the development is the subject of a court action which challenges the denial, then the burden of proof shall be on the local legislative body to show that its decision is consistent with the findings as described in subdivision (d) and that the findings are supported by a preponderance of the evidence in the record.
(j) When a proposed housing development project complies with applicable, objective
general plan and zoning standards and criteria, including design review standards, in effect at the time that the housing development project’s application is determined to be complete, but the local agency proposes to disapprove the project or to approve it upon the condition that the project be developed at a lower density, the local agency shall base its decision regarding the proposed housing development project upon written findings supported by a preponderance of the evidence on the record that both of the following conditions exist:
(1) The housing development project would have a specific, adverse impact upon the public health or safety unless the project is disapproved or approved upon the condition that the project be developed at a lower density. As used in this paragraph, a “specific, adverse impact” means a significant,
quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.
(2) There is no feasible method to satisfactorily mitigate or avoid the adverse impact identified pursuant to paragraph (1), other than the disapproval of the housing development project or the approval of the project upon the condition that it be developed at a lower density.
(k) (1) (A) The applicant, a person who would be eligible to apply for residency in the development or emergency shelter, or a housing organization may bring an action to enforce this section. If, in any action brought to enforce this section, a court finds that
either (i) the local agency, in violation of subdivision (d), disapproved a housing development project or conditioned its approval in a manner rendering it infeasible for the development of an emergency shelter, or housing for very low, low-, or moderate-income households, including farmworker housing, without making the findings required by this section or without making findings supported by a preponderance of the evidence, or (ii) the local agency, in violation of subdivision (j), disapproved a housing development project complying with applicable, objective general plan and zoning standards and criteria, or approved it upon the condition that the project be developed at a lower density, without making the findings required by this section or without making findings supported by a preponderance of the evidence, the court shall issue an order or judgment compelling compliance
with this section within 60 days, including, but not limited to, an order that the local agency take action on the housing development project or emergency shelter. The court may issue an order or judgment directing the local agency to approve the housing development project or emergency shelter if the court finds that the local agency acted in bad faith when it disapproved or conditionally approved the housing development or emergency shelter in violation of this section. The court shall retain jurisdiction to ensure that its order or judgment is carried out and shall award reasonable attorney’s fees and costs of suit to the plaintiff or petitioner, except under extraordinary circumstances in which the court finds that awarding fees would not further the purposes of this section.
(B) Upon a determination that the local agency has failed to comply
with the order or judgment compelling compliance with this section within 60 days issued pursuant to subparagraph (A), the court may shall impose fines on a local agency that has violated this section and require the local agency to deposit any fine levied pursuant to this subdivision into a housing trust fund. The fine shall be in a minimum amount of ten thousand dollars ($10,000) per housing unit in the housing development project on the date the application was deemed complete pursuant to Section 65943. In determining the amount of fine to impose, the court shall consider the local agency’s progress in attaining its target allocation of the regional housing need pursuant to Section 65584 and
65584, any prior violations of this section. section, the budget of the local jurisdiction, whether the jurisdiction complied fully with subdivision (o), and the ratio of median home price to median household income within the jurisdiction. Fines shall not be paid out of funds already dedicated to affordable housing, including, but not limited to, redevelopment, funds dedicated to housing for very low, low-, and moderate-income households, and federal HOME Investment Partnerships Program and Community Development Block Grant Program funds. The local agency shall commit the money in the housing trust fund within five years for the sole purpose of financing newly constructed housing units affordable to extremely low,
very low, or low-income households.
(C) If the court determines that its order or judgment has not been carried out within 60 days, the court may issue further orders as provided by law to ensure that the purposes and policies of this section are fulfilled, including, but not limited to, an order to vacate the decision of the local agency, in which case the application for the project, as constituted at the time the local agency took the initial action determined to be in violation of this section, along with any standard conditions determined by the court to be generally imposed by the local agency on similar projects, shall be deemed approved unless the applicant consents to a different decision or action by the local agency.
(2) For purposes of this subdivision, “housing organization” means
a trade or industry group whose local members are primarily engaged in the construction or management of housing units or a nonprofit organization whose mission includes providing or advocating for increased access to housing for low-income households and have filed written or oral comments with the local agency prior to action on the housing development project. A housing organization may only file an action pursuant to this section to challenge the disapproval of a housing development by a local agency. A housing organization shall be entitled to reasonable attorney’s fees and costs if it is the prevailing party in an action to enforce this section.
(l) If the court finds that the local agency (1) acted in bad faith when it disapproved or conditionally approved the housing development or emergency shelter in violation of this section and (2)
failed to carry out the court’s order or judgment within 60 days as described in subdivision (k), the court, in addition to any other remedies provided by this section, may award punitive damages to the petitioner. shall multiply the fine determined pursuant to subparagraph (B) of paragraph (1) of subdivision (k) by a factor of five. For purposes of this section, “bad faith” includes, but is not limited to, the failure to comply with subdivision (o) or an action that is frivolous or otherwise entirely without merit.
(m) Any action brought to enforce the provisions of this section shall be brought pursuant to
Section 1094.5 of the Code of Civil Procedure, and the local agency shall prepare and certify the record of proceedings in accordance with subdivision (c) of Section 1094.6 of the Code of Civil Procedure no later than 30 days after the petition is served, provided that the cost of preparation of the record shall be borne by the local agency. A petition to enforce the provisions of this section shall be filed and served no later than 90 days from the later of (1) the withdrawal of the application by the applicant or the effective date of a decision of the local agency imposing conditions on, disapproving, or any other final action on a housing development project or (2) the expiration of the time periods specified in subparagraph (B) of paragraph (5) of subdivision (h). Upon entry of the trial court’s order, a party shall, in order to obtain appellate review of the order, file a petition within 20
days after service upon it of a written notice of the entry of the order, or within such further time not exceeding an additional 20 days as the trial court may for good cause allow. If the local agency appeals the judgment of the trial court, the local agency shall post a bond, in an amount to be determined by the court, to the benefit of the plaintiff if the plaintiff is the project applicant.
(n) In any action, the record of the proceedings before the local agency shall be filed as expeditiously as possible and, notwithstanding Section 1094.6 of the Code of Civil Procedure or subdivision (m) of this section, all or part of the record may be prepared (1) by the petitioner with the petition or petitioner’s points and authorities, (2) by the respondent with respondent’s points and authorities, (3) after payment of costs by the petitioner, or (4) as otherwise
directed by the court. If the expense of preparing the record has been borne by the petitioner and the petitioner is the prevailing party, the expense shall be taxable as costs.
(o) If a local agency proposes to deny or reduce the density of a housing development project or emergency shelter or impose restrictions or conditions, including design review standards, that render the housing development project infeasible for very low, low-, or moderate-income housing or for an emergency shelter, the local agency shall publish an analysis of the requirements of this section as part of its review of the application for the housing development project. The analysis shall include a finding whether this section does or does not apply to the project, and, if applicable, the local agency shall make the findings that apply to the project pursuant to
subdivision (j) of Section 65589 and, if it is a housing development project for very low, low-, or moderate-income households, subdivision (d) of this section.
(p) This section shall be known, and may be cited, as the Housing Accountability Act.