Bill Text: AZ SB1849 | 2026 | Fifty-seventh Legislature 2nd Regular | Engrossed
Bill Title: Capital outlay; appropriations; 2026-2027.
Sponsorship: Partisan Bill (Republican 1)
Status: (Introduced) 2026-06-11 - Senate Committee of the Whole action: Do Pass [SB1849 Detail]
Download: Arizona-2026-SB1849-Engrossed.html
|
Senate Engrossed
capital outlay; appropriations; 2026-2027. |
|
State of Arizona Senate Fifty-seventh Legislature Second Regular Session 2026
|
|
SENATE BILL 1849 |
|
|
|
|
AN ACT
amending laws 2021, chapter 406, section 33, as amended by laws 2022, chapter 33, section 1 and Laws 2023, chapter 135, section 1; amending laws 2022, chapter 309, section 8, as amended by Laws 2023, chapter 135, section 3 and Laws 2025, chapter 235, section 1; Amending laws 2023, chapter 135, section 8; Amending Laws 2023, chapter 135, section 10, as amended by Laws 2024, chapter 211, section 1 and Laws 2025, Chapter 235, section 2; amending laws 2024, chapter 211, section 6; Amending laws 2024, Chapter 211, section 9, as amended by laws 2025, chapter 235, section 3; Amending Laws 2024, chapter 211, section 22; Amending laws 2024, chapter 211, section 29; amending laws 2025, chapter 235, sections 8 and 9; Making capital outlay appropriations for the different departments of the state and for state institutions; providing for review of capital outlay projects.
(TEXT OF BILL BEGINS ON NEXT PAGE)
Be it enacted by the Legislature of the State of Arizona:
Section 1. Laws 2021, chapter 406, section 33, as amended by Laws 2022, chapter 33, section 1 and Laws 2023, chapter 135, section 1, is amended to read:
Sec. 33. Appropriations; department of transportation; highway construction; fiscal year 2020-2021; exemption; lapsing; report
A. The following amounts are appropriated from the state general fund in fiscal year 2020-2021 to the department of transportation for the following highway projects:
1. Repave State Route 69 in
Prescott Valley���������������� � $ 4,700,000 $ 4,583,800
2. Repave State Route 95 in
Mohave county������������������ � $46,700,000 $44,965,700
3. Study options for expanding the on and
off ramps at the intersection of
Grand Avenue and State Route 303����������� $ 150,000
4. Construct an overpass at Riggs Road
and State Route 347������������������������ $25,000,000
5. Study an overpass at Riggs Road and
Design, right-of-way acquisition,
utility RELOCATION, natural resource
recovery and construction for an
Overpass at RigGs Road and
to improve State Route 347����������������� $ 2,500,000
6. Final design plan, right-of-way and
easements for an overpass at
Riggs Road and Design, right-of-way
acquisition, utility RELOCATION,
natural resource recovery and
construction for an
Overpass at RiGgs Road and
to improve State Route 347����������������� $ 7,500,000
7. Study the north/south corridor in����������������������
Pinal county������������������������������� $ 4,000,000
8. Improve drainage on 67th Avenue
in Peoria���������������������������������� $ 8,500,000
9. Widen Camelback Road between State
Route 303 and Litchfield Road
in Goodyear�������������������������������� $ 8,000,000
10. Study and design concept report for
the repair of State Route 88��������������� $ 700,000
11. Repair and maintain 20th Avenue in
Safford������������������������������������ $ 1,032,100
12. Improve Tangerine Road near
Interstate 10 in Marana�������������������� $ 5,000,000
13. Construct a bridge and extend
� Ocotillo Road in Gilbert����������� $ 7,900,000
14. Repair State Route 186 and State
Business Route 10 in Wilcox�� $ 3,500,000 $3,406,900
15. Replace Butte Avenue bridge in
Florence��������������������������������� $ 1,000,000
16. Improve Center Avenue in Jerome����������������� $ 560,000
17. Rehabilitate pavement along
State Route 77 near Oro Valley����������� $15,807,500
18. Improve State Route 90 near
Fort Huachuca���������������������������� $10,600,000
19. Improve State Route 87 � local match����������������� $ 750,000
20. Study guardrail � shoulder of
State Route 377 from Holbrook to Heber��� $ 140,000
21. Improve Hill Street Corridor in Globe����������� $ 1,169,400
B. Notwithstanding section 41-1252, Arizona Revised Statutes, the appropriations made in subsection A of this section are not subject to review by the joint committee on capital review.
C. The appropriations made in subsection A of this section do not lapse until the purpose for which the appropriations were made has been accomplished or abandoned, or the appropriations stand for a full fiscal year without an expenditure or encumbrance.
D. Before transferring monies between the projects described in subsection A of this section, the department shall submit a report for review by the joint committee on capital review.
Sec. 2. Laws 2022, chapter 309, section 8, as amended by Laws 2023, chapter 135, section 3 and Laws 2025, chapter 235, section 1, is amended to read:
Sec. 8. Appropriations; department of transportation; highway construction; intent; reports; exemption; lapsing
A. The following amounts are appropriated from the state highway fund established by section 28-6991, Arizona Revised Statutes, in fiscal year 2022-2023 to the department of transportation for the following highway projects:
1. Design and construct additional vehicle
lanes, separated by a lighted median,
on Interstate 10 between State Route 85
and Citrus Road��������������������������� $60,910,000
The legislature intends that:
(a) Not more than one hundred twenty days after the effective date of this section, the city of Buckeye contribute $3,000,000 to the project described in this paragraph.
(b) The Maricopa association of governments collect and contribute at least $10,000,000 from sources other than this state for the project described in this paragraph.
(c) The department use any federal discretionary monies awarded for the project described in this paragraph before spending the monies appropriated in this paragraph.
2. Improve Jackrabbit Trail between
Thomas Road and McDowell Road������������������ $20,080,000
The legislature intends that the city of Buckeye contribute $5,020,000 to the project described in this paragraph.
3. Acquire right-of-way to extend State
Route 24��������������������������������������� $15,000,000
4. Rehabilitate pavement along United States
Route 60 between Loop 101
and Loop 202����������������������������������� $38,482,000
5. Study the construction of an emergency
evacuation bridge in Lake Havasu City���������� $ 200,000
6. Construct roundabout at intersection of
State Route 69 and State Route 169������������� $ 8,022,500
7. Study and design traffic interchange on
State Route 74 at Lake Pleasant Parkway�������� $ 5,000,000
8. Assess intersection of State Route 79 and
Hunt Highway����������������������������������� $ 100,000
9. Assess intersection of State Route 87
and Skousen Road������������������������������� $ 100,000
10. Design traffic interchange on State
Route 89 at State Route 89A������������������� $ 600,000
11. Rehabilitate pavement along State Route 90
between Campus Drive and the U.S. Border
Patrol Station in Huachuca City��������������� $38,620,000
12. Rehabilitate pavement along United States
Route 191 between Mile Post 163 and
Mile Post 173��������������������� $22,152,000 $16,239,900
13. Design and construct a screen wall along
Loop 101 between 51st Avenue and
59th Avenue����������������������������������� $ 9,514,000
14. Rehabilitate pavement along United States
Route 191 between Armory Road and
East Safford���������������������� $16,481,000 $14,865,500
15. Design to improve State Route 238 between
State Route 347 and Green Road���������������� $ 800,000
16. Design work for State Route 303
Improvements from Interstate 17
to Lake Pleasant Parkway���������������������� $ 4,000,000
17. Design work for the interchange at
State Route 303 and Interstate 17���������� $19,000,000
18. Design, to widen lanes along right-of-way
acquisition, utility relation, natural
resource recovery and construction to
improve State Route 347, including
improving the intersection on state route
347 at casa blanca road and cement
plant access, and to construct an
overpass at Riggs Road and State
Route 347 between Interstate 10
and city of Maricopa����������������������� $19,000,000
19. Assess intersection on State
Route 389 at Arizona Avenue���������������� $ 100,000
20. Distribute to the northern Arizona
intergovernmental public
transportation authority for
capital costs of the Flagstaff
downtown connection center����������������� $ 6,000,000
21. Install lighting on the Sentinel exit
in Gila Bend���������������������� $ 1,085,000 $762,500
22. Conduct a tier 2 study for the
North-South Corridor in Pinal county������� $15,000,000
23. Conduct a tier 2 study for the Sonoran
Corridor in Pima county�������������������� $14,000,000
24. Conduct a tier 2 study for Interstate 11
in Maricopa county������������������������� $25,000,000
25. Design and construct a screen wall
along the east side of Loop 101
near 16th Street�������������� $ 7,250,000 $ 6,365,000
B. Within thirty days after the last day of each calendar quarter, the department shall report to the joint legislative budget committee staff the projected cost and status of the projects for the appropriations made in subsection A of this section. The report shall include any impacts to the projects due to the increase in the cost of concrete.
C. Before transferring monies between the projects described in subsection A of this section, the department shall submit a report for review by the joint committee on capital review.
D. Notwithstanding section 41-1252, Arizona Revised Statutes, the appropriations made in subsection A of this section are not subject to review by the joint committee on capital review.
E. The appropriations made in subsection A of this section do not lapse until the purpose for which the appropriations were made has been accomplished or abandoned, or the appropriations stand for a full fiscal year without an expenditure or encumbrance.
Sec. 3. Laws 2023, chapter 135, section 8 is amended to read:
Sec. 8. Appropriations; state agency and administrative board capital projects
A. The amounts appropriated in this section are appropriated for fiscal year 2023-2024 to be used by the applicable agency or board for individual capital projects.
B. DEPARTMENT OF ADMINISTRATION
Electric vehicle charging and advance
����� fuel infrastructure���������������������������� $ 5,000,000
Fund source:
State general fund����������������������������� $ 5,000,000
C. STATE DEPARTMENT OF CORRECTIONS
1. Replace evaporative cooling statewide
with HVAC�������������������������������������� $ 66,783,600
2. Statewide door, lock and fire systems
replacement������������������������������������ $ 48,650,600
Fund source:
State general fund����������������������������� $115,434,200
D. DEPARTMENT OF EMERGENCY AND MILITARY AFFAIRS
Additional construction monies for
Surprise readiness center���������������������� $ 1,125,000
Fund source:
State general fund����������������������������� $ 1,125,000
E. ARIZONA EXPOSITION AND STATE FAIR BOARD
Capital improvements��������������������������� $ 3,802,100
Fund source:
Arizona exposition and state fair fund��������� $ 3,802,100
F. ARIZONA GAME AND FISH DEPARTMENT
1. Dam maintenance���������������������������������� $ 150,000
2. Hatchery maintenance����������������������������� $ 400,000
3. Property maintenance����������������������������� $ 300,000
4. Water conservation projects���������������������� $ 500,000
Fund sources:
Capital improvement fund����������������������� $ 850,000
Game and fish fund����������������������������� $ 500,000
G. DEPARTMENT OF HEALTH SERVICES
1. State hospital water pump replacements ���������� $ 209,000
2. State hospital water isolation valves������������ $ 200,000
Fund source:
Arizona state hospital fund�������������������� $ 409,000
H. ARIZONA STATE PARKS BOARD
1. Capital improvements����������������������������� $ 3,034,400
2. Verde River state park��������������������������� $ 7,000,000
Fund sources:
State general fund����������������������������� $ 7,000,000
State parks revenue fund����������������������� $ 3,034,400
The Arizona state parks board shall establish a state park at the headwaters of the Verde River.
The Arizona state parks board shall report to the joint committee on capital review and the governor's office of strategic planning and budgeting if the board revises the plan for any project for which monies are appropriated by this subsection because the board receives land and water conservation grant funding.
I. ARIZONA PIONEERS' HOME
1. Capital improvements����������������������������� $ 468,700
2. Cemetery columbarium����������������������������� $ 75,000
3. Cemetery parking��������������������������������� $ 250,000
Fund source:
Miners' hospital for miners with
disabilities land fund����������������������� $ 793,700
J. DEPARTMENT OF PUBLIC SAFETY
Renovate Flagstaff aviation hangar������������������� $ 320,000
Fund source:
State general fund����������������������������� $ 320,000
K. DEPARTMENT OF TRANSPORTATION
1. Construct new maintenance facility in
����� Keams Canyon����������������������������������� $ 3,400,000
2. Replace vehicle fueling facilities in
����� Springerville, Holbrook and Chambers����������� $ 2,600,000
3. Electric vehicle charging and advance
����� fuel infrastructure at department
����� facilities open and accessible to the
����� public, excluding rest areas������������������� $ 2,500,000
4. Electric vehicle charging and advance
����� fuel infrastructure at department
����� fleet facilities������������������������������� $ 5,000,000
5. 4. Renovate motor vehicle division in
����� north Tucson������������������������������� $� 4,100,000
6. 5. Water conservation projects������������������ $� 2,500,000
7. 6. Planning of passenger rail
����� service from Phoenix to
����� Tucson������������������������������������� $� 3,500,000
Fund sources:
State general fund����������������������������� $ 3,500,000
State highway fund����������������������������� $ 20,100,000
Sec. 4. Laws 2023, chapter 135, section 10, as amended by Laws 2024, chapter 211, section 1 and Laws 2025, chapter 235, section 2, is amended to read:
Sec. 10. Appropriations; department of transportation; highway projects; exemption
A. The following amounts are appropriated from the state general fund in fiscal year 2023-2024 to the department of transportation for the following highway projects:
1. Improve the interchange at State Route
����� 303 and U.S. Route 60������������������������� $ 4,500,000
2. Distribute to the town of Clarkdale to
����� replace the current bridge over
����� Bitter Creek wash����������������������������� $ 6,321,400
3. Improve intersection on State Route 347
����� at Casa Blanca Road and Cement
����� Plant access
Design, right-of-way acquisition,
����� utility relocation, natural resource
����� recovery and construction to improve
����� state route 347, including improving the
����� intersection on state route 347 at casa
����� blanca road and cement plant access,
����� and to construct an overpass at riggs road
����� and state route 347 �������������������������� $18,000,000
4. Distribute to the city of Phoenix for
����� improvements on Happy Valley Road
����� between 35th Avenue and 67th Avenue������������ $12,500,000
The legislature intends that the city of Phoenix contribute $14,800,000 to the project described in this paragraph.
5. Distribute to the town of Prescott Valley
����� to improve Glassford Hill Road���������������� $ 9,900,000
The department of transportation may distribute the monies appropriated in this paragraph only if the town of Prescott Valley demonstrates to the department that the town has a commitment for at least $1,100,000 in matching monies of gifts, grants and donations for improvements to Glassford Hill Road from sources other than this state.
6. Distribute to the city of Coolidge for
����� Coolidge Avenue reconstruction between
����� Christensen Road and Clemans Road������������� $ 5,300,000
7. Distribute to the city of Eloy for Sunland
����� Gin Road Interstate 10 overpass and road
����� improvements between Interstate 10 and
����� Arica Road������������������������������������ $ 5,000,000
8. Distribute to the town of Marana for�������������
����� design costs for traffic interchange
����� between Interstate 10 and Cortaro Road�������� $10,000,000
9. Distribute to the city of Douglas for road
����� development and construction connecting
the Douglas international commercial
����� port of entry and State Route 80�������������� $ 8,170,000
10. Distribute to the town of Patagonia for
������� McKeown Avenue reconstruction between
������� Fourth Avenue West and State Route 82��������� $ 1,500,000
11. Distribute to the city of Sierra Vista for �����������������
������� Theater Drive corridor improvements
������� between 7th Street and Carmichael
������� Avenue���������������������������������������� $ 1,800,000
12. Distribute to Graham county for
������� intersection reconstruction at Norton
������� Road and Reay Lane���������������������������� $ 500,000
13. Distribute to Cochise county for
������� Moson Road drainage and safety
������� improvements between State Route 90
������� and Hereford Road����������������������������� $ 6,100,000
14. Improve U.S. Route 95 between Wellton
������� Mohawk Canal Road and Aberdeen Road����������� $33,300,000
15. Distribute to Yuma county for
������� U.S. Route 95 pavement
������� rehabilitation between County
������� 22nd Street and County 11th Street������������ $ 5,910,400
16. Design work and engineer improvements on
������� State Route 85 between mile post 123
������� and Maricopa Road����������������������������� $ 6,500,000
17. Construct turn lanes along State Route 95
������� near Bullhead City���������������������������� $ 8,000,000
18. Construct an emergency evacuation bridge
������� in Lake Havasu City��������������������������� $35,500,000
19. Distribute to the town of Queen Creek
������� to extend State Route 24 including a
������� traffic interchange at State Route 24
������� and Ironwood Road����������������������������� $59,800,000
Monies distributed to the town of Queen Creek for the project in this paragraph are eligible to be used for all necessary expenses from the current project status until completion. The town of Queen Creek must collaborate with Pinal county before spending the monies distributed for the project pursuant to this paragraph.
20. Improve State Route 83 within
������� Santa Cruz county����������������������������� $ 9,000,000
21. Distribute to the town of Cave Creek to
������� study the construction of expanding
������� lanes along Cave Creek Road between
������� Loop 101 and Carefree Highway����������������� $ 250,000
22. Design a freeway interchange on
������� Interstate 10 at Jackrabbit Trail������������� $ 5,000,000
23. Distribute to the city of Phoenix to
������� extend 43rd Avenue between Dove
������� Valley Road and State Route 74���������������� $ 6,500,000
24. Design of State Route 87 intersection
������� improvements at Arica Road and
������� Shedd Road������������������������������������ $ 700,000
25. Distribute to the town of Huachuca City
������� for Skyline Drive reconstruction
������� between State Route 90 and
������� Huachuca City Landfill������������������������ $ 1,565,200
26. Distribute to the town of Huachuca City
������� for Skyline Pathway development along
������� Skyline Drive between Gila Avenue
������� and Edgewood Street �������������������������� $ 506,000
27. Distribute to the town of Pinetop-Lakeside
������� for Porter Mountain Road improvements
������� in the vicinity of Blue Ridge
������� elementary school����������������������������� $ 2,242,200
28. Distribute to the city of Globe for
������� sidewalk construction along Jesse Hayes
������� Road and Six Shooter Canyon Road�������������� $ 3,501,100
29. Distribute to the city of Globe for
������� Jesse Hayes Road bridge replacement
������� and improvements at Pinal Creek��������������� $ 643,200
30. Distribute to the city of Globe for
������� Cottonwood Street bridge replacement
������� and improvements at Pinal Creek��������������� $ 632,500
31. Distribute to Gila county for
������� Houston Mesa Road improvements
������� between State Route 260 and .4 miles
������� south of Forest Road 198���������������������� $ 243,600
32. Distribute to the Canyon Water improvement
������� district to make improvements to
������� infrastructure, including fire hydrants
������� and other related water needs����������������� $ 610,000
33. Distribute to Graham county for
������� Safford Bryce Road improvements in
������� the vicinity of Talley Wash Crossing���������� $ 1,781,500
34. Distribute to the town of Thatcher for
������� 8th Street improvements between
������� 1st Avenue and 20th Avenue�������������������� $ 4,526,400
35. Repave U.S. Route 60 between Morristown
������� and Wickenburg�������������������������������� $10,500,000
36. Distribute to the town of Winkelman for
������� improvements to Golf Course Road and
������� Quarelli Street������������������������������� $ 1,560,900
37. Distribute to the town of Superior for
������� Panther Drive bridge design and
������� construction at Queen Creek������������������� $ 2,486,700
38. Improve State Route 260 within
������� Navajo county��������������������������������� $ 4,250,000
39. Distribute to the Navajo Nation for
������� Improvements to N9402 Road near
������� Lupton and Houck������������������������������ $10,000,000
40. Distribute to Apache county for
������� State Route 264 turn lane construction
������� into the Ganado senior citizens center
������� and veterans building development area�������� $ 538,700
41. Distribute to the city of Tucson for
������� improvements to the Drexel Road
������� bridge���������������������������������������� $15,000,000
42. Distribute to Santa Cruz county for
������� improvements to traffic interchange
������� at Interstate 19 and Rio Rico Drive
������� and traffic interchange at
������� Interstate 19 and Ruby Road������������������� $ 8,600,000
B. Within thirty days after the last day of each calendar quarter, the department of transportation shall report to the joint legislative budget committee staff the projected cost and status of the projects for the appropriations made in subsection A of this section.
C. Before transferring monies between the projects described in subsection A of this section, the department of transportation shall submit a report for review by the joint committee on capital review.
D. Notwithstanding section 41-1252, Arizona Revised Statutes, the appropriations made in subsection A of this section are not subject to review by the joint committee on capital review.
Sec. 5. Laws 2024, chapter 211, section 6 is amended to read:
Sec. 6. Appropriation reduction; fiscal year 2021-2022; appropriation; fiscal year 2028-2029; department of veterans' services; veterans' home facility; site selection; review; exemption
A. Notwithstanding any other law, the following amounts are reduced from appropriations made to the following state agency in fiscal year 2021-2022 by Laws 2021, chapter 406, section 29 for the following project:
B. DEPARTMENT OF VETERANS' SERVICES
Veterans' home facility ����������������������� $(25,000,000)
Fund source:
State general fund����������������������������� $(25,000,000)
C. The sum of $25,000,000 is appropriated from the state general fund in fiscal year 2027-2028 2028-2029 to the department of veterans' services to construct and establish a veterans' home facility in the northwestern portion of this state.
D. The appropriation made in subsection C of this section is intended to be this state's share of the costs and is not subject to expenditure for any purpose unless the department of veterans' services has irrevocable commitments from the United States government to fund at least sixty-five percent of the total costs.
E. The department shall submit the proposed site location in the northwestern portion of this state to the Arizona veterans' service advisory commission established by section 41-602, Arizona Revised Statutes, for approval. The department shall provide the commission a feasibility analysis of suitable sites to consider when approving the site location.
F. Before spending the appropriation made in subsection C of this section, the department of veterans' services shall submit the scope, purpose and estimated cost of the capital improvements to the joint committee on capital review for its review pursuant to section 41-1252, Arizona Revised Statutes.
G. The appropriation made in subsection C of this section is exempt from the provisions of section 35-190, Arizona Revised Statutes, relating to lapsing of appropriations.
Sec. 6. Laws 2024, chapter 211, section 9, as amended by Laws 2025, chapter 235, section 3, is amended to read:
Sec. 9. Appropriation reductions; appropriation; department of transportation; Riggs Road overpass; fiscal years 2020-2021, 2022-2023 and 2027-2028; fund balance transfer; intent
A. Notwithstanding any other law, the following amounts are reduced from appropriations made to the following state agency in fiscal year 2020-2021 by Laws 2021, chapter 406, section 33, as amended by Laws 2022, chapter 33, section 1 and Laws 2023, chapter 135, section 1, for the following project:
B. DEPARTMENT OF TRANSPORTATION
Construct an overpass at Riggs Road������������
and State Route 347�������������������� $(25,000,000)
Fund sources:
State general fund����������������������� $(25,000,000)
C. Notwithstanding any other law, the following amounts are reduced from appropriations made to the following state agency in fiscal year 2022-2023 by Laws 2022, chapter 309, section 12, as amended by Laws 2023, chapter 135, section 5, for the following project:
D. DEPARTMENT OF TRANSPORTATION
Construct an overpass at Riggs Road������������
and State Route 347�������������������� $(24,000,000)
Fund sources:
State highway fund����������������������� $(24,000,000)
E. Notwithstanding any other law, on or before June 30, 2024, $24,000,000 from the state highway fund established by section 28-6991, Arizona Revised Statutes, is transferred to the state general fund for the purposes of providing adequate support and maintenance for agencies of this state. This amount reflects a portion of the revenues derived from the tax levied by title 42, chapter 5, articles 1 and 5, Arizona Revised Statutes, that were transferred to the state highway fund by Laws 2022, chapter 321, section 20, subsection A, paragraph 2.
F. The sum of $41,400,000 is appropriated from the state general fund in fiscal year 2025-2026 to the department of transportation for design, right-of-way acquisition, utility relocation, natural resource recovery and construction of an overpass at riggs road and State Route 347.
G. The sum of $49,000,000 is appropriated from the state general fund in fiscal year 2027-2028 to the department of transportation to construct for design, right-of-way acquisition, utility relocation, natural resource recovery and construction of an overpass at Riggs Road and State Route 347. Consistent with this advance appropriation, the legislature intends that the overpass at Riggs Road and State Route 347 the appropriation made in this subsection be funded in fiscal year 2027-2028.
Sec. 7. Laws 2024, chapter 211, section 22 is amended to read:
Sec. 22. Supplemental appropriation; department of transportation; Riggs Road overpass; fiscal year 2023-2024
A. In addition to the appropriation made by Laws 2021, chapter 406, section 33, the following amounts are appropriated to the following state agency in fiscal year 2023-2024 for the following project:
B. DEPARTMENT OF TRANSPORTATION
Final design plan, right-of-way and
easements for an overpass at�
Riggs Road and State Route 347
Design, right-of-way ACQUISITION, utility
relocation, natural resource recovery
and construction for an overpass at
Riggs road and state route 347����������� ����� $ 1,500,000
Fund sources:
State highway fund����������������������������� $ 1,500,000
Sec. 8. Laws 2024, chapter 211, section 29 is amended to read:
Sec. 29. Supplemental appropriation; department of transportation; State Route 347; fiscal year 2023-2024
A. In addition to the appropriation made by Laws 2023, chapter 135, section 10, the following amounts are appropriated to the following state agency in fiscal year 2023-2024 for the following project:
B. DEPARTMENT OF TRANSPORTATION
Improve intersection on State Route 347
at Casa Blanca Road and Cement
Plant access
Design, right-of-way acquisition, utility
relocation, natural resource recovery
And construction to improve state route 347,
including improving the intersection on
state route 347 at casa blanca road and
cement plant access, and to construct
an overpass at riggs road
and state route 347���������������������������� $ 1,901,000
Fund sources:
State general fund����������������������������� $ 1,901,000
Sec. 9. Laws 2025, chapter 235, section 8 is amended to read:
Sec. 8. Appropriations; state agencies and boards; capital projects
A. The amounts appropriated in this section are appropriated for fiscal year 2025-2026 to be used by the applicable agency or board for individual capital projects.
B. STATE DEPARTMENT OF CORRECTIONS
Replace fire, life alarm and suppression
system at the Yuma state prison������������������� $ 8,500,000
Fund source:
State general fund����������������������������� $ 8,500,000
C. ARIZONA EXPOSITION AND STATE FAIR BOARD
Capital improvements��������������������������� $ 3,815,100
Fund source:
Arizona exposition and state fair fund��������� $ 3,815,100
D. ARIZONA GAME AND FISH DEPARTMENT
1. Dam maintenance���������������������������������� $ 150,000
2. Hatchery maintenance����������������������������� $ 400,000
3. Property maintenance����������������������������� $ 300,000
4. Dam repairs at Black Canyon Lake
and Fool Hollow Lake�������������������������� $ 6,850,000
5. Hatchery repairs��������������������������������� $ 4,700,000
Fund sources:
Capital improvement fund����������������������� $ 850,000
Game and fish fund����������������������������� $ 11,550,000
E. DEPARTMENT OF HEALTH SERVICES
1. State hospital isolation valve installation������ $ 160,000
2. State hospital anti-ligature renovations��������� $ 695,000
3. State hospital perimeter detection
system replacement���������������������������� $ 83,000
Fund source:
Arizona state hospital land fund��������������� $ 938,000
F. DEPARTMENT OF JUVENILE CORRECTIONS
1. Fire line booster pumps replacement�������������� $ 536,600
2. School door and lock replacements at
Adobe Mountain school������������������������� $ 303,000
3. School kitchen air unit replacements at
Adobe Mountain school������������������������� $ 641,000
Fund sources:
Criminal justice enhancement fund�������������� $ 1,361,900
Department of juvenile corrections
local cost sharing fund����������������������� $ 118,700
G. ARIZONA STATE PARKS BOARD
1. Capital improvements����������������������������� $ 3,633,300
2. Verde River state park construction�������������� $ 500,000
Fund sources:
State general fund����������������������������� $ 500,000
State parks revenue fund����������������������� $ 3,633,300
H. ARIZONA PIONEERS' HOME
1. Capital improvements����������������������������� $ 470,400
2. Facility window and door replacements������������ $ 1,515,000
Fund source:
Miners' hospital for miners with
disabilities land fund����������������������� $ 1,985,400
I. DEPARTMENT OF PUBLIC SAFETY
1. Replace office buildings in
Payson and Sanders���������������������������� $ 2,000,000
2. Upgrade electrical system at the department
headquarters in Phoenix����������������������� $ 11,227,100
Fund source:
State general fund����������������������������� $ 13,227,100
J. DEPARTMENT OF TRANSPORTATION
1. Improvements to vehicle repair shop
in Avondale����������������������������������� $ 6,951,000
2. Construct new maintenance offices in
Little Antelope and Gray Mountain������������� $ 6,861,000
3. Renovate Grand Canyon airport terminal����������� $ 850,300
Fund sources:
State highway fund����������������������������� $ 13,812,000
State aviation fund���������������������������� $ 850,300
The monies appropriated to the department of transportation to renovate the Grand Canyon airport terminal revert to the state aviation fund established by section 28-8202, Arizona Revised Statutes, on June 30, 2026 2028 if the department does not receive a federal aviation administration grant for the project.
K. DEPARTMENT OF VETERANS' SERVICES
Replace HVAC at the Tucson veterans' home������������ $ 2,400,000
Fund source:
State general fund����������������������������� $ 2,400,000
The monies appropriated to the department of veterans' services to replace the HVAC at the Tucson veterans' home revert to the state general fund on June 30, 2026 2027 if the department is not awarded a federal grant for the project. The department may apply for federal grant monies for the HVAC replacement project prior to review by the joint committee on capital review.
Sec. 10. Laws 2025, chapter 235, section 9 is amended to read:
Sec. 9. Appropriations; department of transportation; highway projects
A. The following amounts are appropriated from the state general fund in fiscal year 2025-2026 to the department of transportation for the following highway projects:
1. Improve intersection on State Route 347
at Casa Blanca Road and Cement
Plant Access Road
Design, right-of-way acquisition,
utility relocation, natural resource
recovery and construction to
improve state route 347, including
improving the intersection on state route
347 at casa Blanca road and cement plant
access, and to construct an overpass at
riggs road and state route 347������������������� $ 10,839,000
2. Design to widen lanes along State
Route 347 between Interstate 10
and the city of Maricopa
Design, right-of-way acquisition,
utility relocation, natural resource
recovery and construction to
improve state route 347, including
improving the intersection on state route
347 at casa Blanca road and cement plant
access, and to construct an overpass at
riggs road and state route 347����������������� $ 1,500,000
3. Design an additional right-hand
turn lane on northbound State Route
87 and State Route 260 near Payson������������� $ 2,129,800
4. Distribute to the city of Flagstaff to
design and construct a traffic light
signal at the intersection of Woody
Mountain Road and US Route 66������������������ $ 1,900,000
The department of transportation shall submit an intergovernmental agreement to the city of Flagstaff to design and construct a traffic light signal at the intersection of Woody Mountain Road and US Route 66 on or before September 15, 2025. If the city of Flagstaff agrees to the intergovernmental agreement, the monies appropriated in this paragraph to design and construct a traffic light signal at the intersection of Woody Mountain Road and US Route 66 shall be distributed to the city of Flagstaff on or before November 1, 2025.
5. Construct safety improvements along
State Route 70 from mile post 255 to
mile post 301 near San Carlos Apache
reservation������������������������������������ $ 1,400,000
6. Distribute to the city of Bullhead City for
Hancock Road improvements���������������������� $ 1,500,000
The department of transportation shall submit an intergovernmental agreement to the city of Bullhead City for Hancock Road improvements on or before September 15, 2025. If the city of Bullhead City agrees to the intergovernmental agreement, the monies appropriated in this paragraph for Hancock Road improvements shall be distributed to the city of Bullhead City on or before November 1, 2025.
7. Distribute to Mohave county for Mountain
View Road improvements������������������������� $ 1,000,000
The department of transportation shall submit an intergovernmental agreement to Mohave county for Mountain View Road improvements on or before September 15, 2025. If Mohave county agrees to the intergovernmental agreement, the monies appropriated in this paragraph for Mountain View Road improvements shall be distributed to Mohave county on or before November 1, 2025.
8. Distribute to the Prescott regional airport
for infrastructure supporting firefighting
aircraft��������������������������������������� $ 3,500,000
The department of transportation shall submit an intergovernmental agreement to the Prescott regional airport for infrastructure supporting firefighting aircraft on or before September 15, 2025. If the Prescott regional airport agrees to the intergovernmental agreement, the monies appropriated in this paragraph for infrastructure supporting firefighting aircraft shall be distributed to the Prescott regional airport on or before November 1, 2025.
9. Distribute to the Prescott regional airport
for maintenance and operations����������������� $ 500,000
The department of transportation shall submit an intergovernmental agreement to the Prescott regional airport for maintenance and operations on or before September 15, 2025. If the Prescott regional airport agrees to the intergovernmental agreement, the monies appropriated in this paragraph for maintenance and operations shall be distributed to the Prescott regional airport on or before November 1, 2025.
10. Distribute to Yuma county for bridge
replacement project on Somerton Avenue
between West County 10th Street and
West County 11th Street����������������������� $ 1,300,000
The department of transportation shall submit an intergovernmental agreement to Yuma county for the bridge replacement project on Somerton Avenue between West County 10th Street and West County 11th Street on or before September 15, 2025. If Yuma county agrees to the intergovernmental agreement, the monies appropriated in this paragraph for the bridge replacement project on Somerton Avenue between West County 10th Street and West County 11th Street shall be distributed to Yuma county on or before November 1, 2025.
11. Install traffic control systems along
State Route 389 near Colorado City������������ $ 1,500,000
12. Distribute to the city of Kingman for
Eastern Street infrastructure improvements���� $ 1,500,000
The department of transportation shall submit an intergovernmental agreement to the city of Kingman for the Eastern Street infrastructure improvements project on or before September 15, 2025. If the city of Kingman agrees to the intergovernmental agreement, the monies appropriated in this paragraph for the Eastern Street infrastructure improvements project shall be distributed to the city of Kingman on or before November 1, 2025.
13. Distribute to the city of Nogales for
improvements to Frank Reed Road���������������� $ 1,500,000
The department of transportation shall submit an intergovernmental agreement to the city of Nogales for improvements to Frank Reed Road on or before September 15, 2025. If the city of Nogales agrees to the intergovernmental agreement, the monies appropriated in this paragraph for improvements to Frank Reed Road shall be distributed to the city of Nogales on or before November 1, 2025.
14. Distribute to the city of Nogales for
improvements to Industrial Park Road����������� $ 2,900,000
The department of transportation shall submit an intergovernmental agreement to the city of Nogales for improvements to Industrial Park Road on or before September 15, 2025. If the city of Nogales agrees to the intergovernmental agreement, the monies appropriated in this paragraph for improvements to Industrial Park Road shall be distributed to the city of Nogales on or before November 1, 2025.
15. Distribute to the city of Nogales for
Improvements to La Quinta Road����������������� $ 1,800,000
The department of transportation shall submit an intergovernmental agreement to the city of Nogales for improvements to La Quinta Road on or before September 15, 2025. If the city of Nogales agrees to the intergovernmental agreement, the monies appropriated in this paragraph for improvements to La Quinta Road shall be distributed to the city of Nogales on or before November 1, 2025.
16. Distribute to the city of Cottonwood for
Main Street preservation and sidewalk
Improvements����������������������������������� $ 1,000,000
The department of transportation shall submit an intergovernmental agreement to the city of Cottonwood for Main Street preservation and sidewalk improvements on or before September 15, 2025. If the city of Cottonwood agrees to the intergovernmental agreement, the monies appropriated in this paragraph shall be distributed to the city of Cottonwood on or before November 1, 2025.
17. Distribute to the city of Glendale for
the 75th Avenue reconstruction project��������� $ 3,000,000
The department of transportation shall submit an intergovernmental agreement to the city of Glendale for the 75th Avenue reconstruction project on or before September 15, 2025. If the city of Glendale agrees to the intergovernmental agreement, the monies appropriated in this paragraph shall be distributed to the city of Glendale on or before November 1, 2025.
18. Design traffic interchange and connecting
arterial roadways at State Route 303
and 155th Avenue������������������������������� $ 3,500,000
The legislature intends that a local government or council of government entity contribute $900,000 in matching monies to the project described in this paragraph. The department may not expend any monies appropriated in this paragraph until the department can confirm the matching commitment to the project.
19. Design the repaving of Olga Frontage Road
between mile post 366 and mile post 379�������� $ 850,000
Building Renewal
Sec. 11. Capital outlay appropriations; major maintenance and repair of state buildings
A. Notwithstanding section 41-793.01, Arizona Revised Statutes, the amounts appropriated in this section are appropriated for fiscal year 2026-2027 to be used by the applicable agency for major maintenance and repair activities for state buildings in accordance with title 41, chapter 4, article 7, Arizona Revised Statutes.
B. DEPARTMENT OF ADMINISTRATION��������������������� $15,154,000
Fund sources:
State general fund����������������������������� $10,000,000
Capital outlay stabilization fund�������������� $ 4,600,000
Arizona state hospital land fund��������������� $ 554,000
The department of administration shall allocate the monies to state agencies for necessary building renewal. If monies in the capital outlay stabilization fund established by section 41-792.01, Arizona Revised Statutes, are insufficient to fund the appropriation to the department of administration for building renewal, the appropriation to the department of administration is reduced by the difference between the amount appropriated to the department of administration from the capital outlay stabilization fund and the balance in the capital outlay stabilization fund.� Notwithstanding title 41, chapter 4, article 7, Arizona Revised Statutes, the department of administration may use monies appropriated for building renewal in fiscal year 2026-2027 for building projects related to retrofitting facilities for space consolidation initiatives.
C. STATE DEPARTMENT OF CORRECTIONS������������������ $ 15,652,200
Fund source:
Department of corrections building
renewal fund�������������������������������� $ 15,652,200
The state department of corrections may not spend any of this appropriation on personal services or overhead expenses related to managing the funded projects.
Notwithstanding section 41-797, Arizona Revised Statutes, the state department of corrections may spend not more than $4,570,000 of the appropriation made in this subsection to construct new facilities to address capital needs as required by the court in the Jensen v. Thornell inmate health care litigation.
D. ARIZONA GAME AND FISH DEPARTMENT����������������� $ 1,932,900
Fund source:
Game and fish fund����������������������������� $ 1,932,900
E. ARIZONA STATE LOTTERY COMMISSION����������������� $ 100,000
Fund source:
State lottery fund����������������������������� $ 100,000
F. DEPARTMENT OF TRANSPORTATION��������������������� $ 24,574,100
Fund sources:
State highway fund����������������������������� $ 24,158,500
State aviation fund���������������������������� $ 415,600
Individual Projects
Sec. 12. Appropriations; state agencies and boards; capital projects
A. The amounts appropriated in this section are appropriated for fiscal year 2026-2027 to be used by the applicable agency or board for individual capital projects.
B. ARIZONA EXPOSITION AND STATE FAIR BOARD
Capital improvements��������������������������������� $ 3,905,900
Fund source:
Arizona exposition and state fair fund��������� $ 3,905,900
C. ARIZONA GAME AND FISH DEPARTMENT
1. Dam maintenance���������������������������������� $ 150,000
2. Hatchery maintenance����������������������������� $ 400,000
3. Hatchery repairs��������������������������������� $ 11,000,000
Fund sources:
Capital improvement fund����������������������� $ 550,000
Game and fish fund����������������������������� $ 11,000,000
D. ARIZONA STATE PARKS BOARD
1. Capital improvements����������������������������� $ 3,552,200
2. Develop monitoring plan and install markers
at Tonto Natural Bridge state park������������� $ 200,000
Fund source:
State parks revenue fund����������������������� $ 3,752,200
E. ARIZONA PIONEERS' HOME
Capital improvements��������������������������������� $ 482,000
Fund source:
Miners' hospital for miners with
disabilities land fund���������������������� $ 482,000
F. DEPARTMENT OF TRANSPORTATION
1. Construct new materials lab in Kingman����������� $ 5,038,000
2. Replace vehicle fueling facilities in
Payson, Phoenix and Mesa���������������������� $ 4,944,000
3. Design the renovation of the traffic signal
and lighting warehouse in Phoenix�������������� $ 611,000
Fund source:
State highway fund����������������������������� $ 10,593,000
Department of Transportation Statewide Highway Construction
Sec. 13. Appropriation; department of transportation; statewide highway construction; reports; exemption
A. The amount appropriated in this section is appropriated for fiscal year 2026-2027 to plan and construct state highways, including the national system of interstate highways within this state, the state primary or secondary system, the county primary or secondary system and urban rural routes, to acquire rights-of-way and to provide for the costs of contracted field administration and field engineering on construction projects and debt service payments on bonds issued for highway construction.
B. DEPARTMENT OF TRANSPORTATION��������������������� $432,663,000
Fund source:
State highway fund����������������������������� $432,663,000
Any balances and collections in the state highway fund established by section 28-6991, Arizona Revised Statutes, that exceed the specific amounts appropriated in the general appropriations act and in this act are appropriated to the department of transportation for the purposes provided in this section.
C. On or before November 1, 2026, the department of transportation shall report to the directors of the joint legislative budget committee and the governor's office of strategic planning and budgeting on its actual prior year, estimated current year and upcoming budget year highway construction expenses from all fund sources, including appropriated monies, federal monies, local agency monies, state highway monies, bond proceeds and regional area road monies. The report shall be in the same format as in the prior year unless the directors of the joint legislative budget committee and the governor's office of strategic planning and budgeting have approved modifications to the format.
D. On or before November 1, 2026, the department of transportation shall report capital outlay information for fiscal years 2025-2026, 2026-2027 and 2027-2028 to the directors of the joint legislative budget committee and the governor's office of strategic planning and budgeting. This information must appear in the same format as tables two, three and seven, as found in the fiscal year 2025-2026 appropriations report.
E. On or before November 1, 2026, the department of transportation shall report the department's estimated outstanding debt principal balance at the end of fiscal year 2027-2028 and the estimated debt service payment amount for each of fiscal years 2027-2028, 2028-2029, 2029-2030 and 2030-2031 to the directors of the joint legislative budget committee and the governor's office of strategic planning and budgeting. This report must include state highway fund statewide construction bonds, Arizona highway user revenue fund bonds, Maricopa association of governments and Pima association of governments controlled access bonds, Maricopa regional area road fund bonds and grant anticipation notes and is intended to be comparable to the information in the fiscal year 2025-2026 appropriations report.
F. Notwithstanding section 41-1252, Arizona Revised Statutes, the appropriation made in this section is not subject to review by the joint committee on capital review.
Department of Transportation Airport Planning and Development
Sec. 14. Appropriation; department of transportation; airport planning and development; report; exemption
A. The amount appropriated in this section is appropriated in fiscal year 2026-2027 to plan, construct, develop and improve state, county, city or town airports as determined by the state transportation board.
B. DEPARTMENT OF TRANSPORTATION��������������������� $ 29,048,900
Fund source:
State aviation fund���������������������������� $ 29,048,900
Any balances and collections in the state aviation fund established by section 28-8202, Arizona Revised Statutes, that exceed the specific amounts appropriated in the general appropriations act and in this act are appropriated to the department of transportation in fiscal year 2026-2027 for the purposes provided in this section.
C. On or before December 31, 2026, the department of transportation shall report to the joint legislative budget committee staff on the status of all aviation grant awards and aviation grant distributions.� The report must delineate projects by individual airport and fiscal year, including any future year commitments.
D. Notwithstanding section 41-1252, Arizona Revised Statutes, the appropriation made in this section is not subject to review by the joint committee on capital review.
Department of Transportation Appropriation Reductions
Sec. 15. Appropriation reduction; department of transportation; fiscal year 2022-2023
Notwithstanding any other law, $(1,052,600) is reduced from appropriations made from the state general fund to the department of transportation for U.S. Route 89 in fiscal year 2022-2023 by Laws 2022, chapter 309, section 9, as amended by Laws 2023, chapter 135, section 4.
Sec. 16. Appropriation reduction; department of transportation; fiscal year 2022-2023
Notwithstanding any other law, the following amounts are reduced from appropriations made from the state highway fund to the department of transportation in fiscal year 2022-2023 by Laws 2022, chapter 309, section 12, as amended by Laws 2023, chapter 135, section 5:
1. Repave State Route 69 in Prescott Valley��������� $ (1,819,000)
2. Repave State Route 95 in Mohave county����������� $ (6,052,200)
3. Repair State Route 186 and State Business
Route 10 in Willcox���������������������������� $ (765,600)
Sec. 17. Fund balance transfer; state highway fund; fiscal year 2026-2027
A. Notwithstanding any other law, from and after July 1, 2026 and on or before June 30, 2027, $17,371,900 from the state highway fund established by section 28-6991, Arizona Revised Statutes, is transferred to the state general fund for the purposes of providing adequate support and maintenance for the agencies of this state. This amount reflects a portion of the revenues derived from the tax levied by title 42, chapter 5, articles 1 and 5, Arizona Revised Statutes, that were transferred to the state highway fund by Laws 2022, chapter 321, section 20, subsection A, paragraph 2.
B. The amount transferred in subsection A of this section consists of appropriation reductions made in sections 2 and 16 of this act.
Sec. 18. Department of transportation; U.S. Route 191 pavement rehabilitation; transfer
A. On or before June 30, 2026, $2,500,000 is transferred from the state highway fund established by section 28-6991, Arizona Revised Statutes, to the state general fund for the support and maintenance of agencies of this state. This amount reflects a portion of the revenues derived from the tax levied by title 42, chapter 5, articles 1 and 5, Arizona Revised Statutes, that were transferred to the state highway fund by Laws 2022, chapter 321, section 20, subsection A, paragraph 2.
B. The amount transferred in subsection A of this section reflects the reduction of $2,500,000 made by Laws 2022, chapter 309, section 8, as amended by Laws 2023, chapter 135, section 3 and Laws 2025, chapter 235, section 1, from the state highway project to rehabilitate pavement along U.S. Route 191 between Armory Road and East Safford
Sec. 19. Department of transportation; Interstate 10; exemption
The appropriations made in Laws 2025, chapter 235, section 4 to the department of transportation for design and construction of additional vehicle lanes, separated by a lighted median, on Interstate 10 between State Route 85 and Citrus Road is exempt from the provisions of section 35-190, Arizona Revised Statutes, relating to lapsing of appropriations.
Sec. 20. Use of appropriations
A. The department of administration may spend up to five percent of the amounts appropriated to the department in this act, excluding amounts to be distributed to nonstate agencies, for expenditures for project management of building renewal and capital projects. All other monies appropriated to the department in this act may not be spent for personal services or employee-related expenditures or for maintenance contracts on building components and equipment without review by the joint committee on capital review.
B. Except as provided in subsection A of this section, the monies appropriated in this act may not be spent for personal services or employee-related expenditures of state employees, excluding any services provided as part of the inmate construction program for correctional facilities.
