Bill Text: AZ HB2463 | 2022 | Fifty-fifth Legislature 2nd Regular | Introduced


Bill Title: Well drilling; groundwater basins.

Spectrum: Partisan Bill (Democrat 6-0)

Status: (Introduced - Dead) 2022-01-25 - House read second time [HB2463 Detail]

Download: Arizona-2022-HB2463-Introduced.html

 

 

 

REFERENCE TITLE: well drilling; groundwater basins.

 

 

 

 

State of Arizona

House of Representatives

Fifty-fifth Legislature

Second Regular Session

2022

 

 

 

HB 2463

 

Introduced by

Representatives Cano: Dalessandro, Hernandez M, Mathis, Quiñonez, Solorio

 

 

AN ACT

 

amending Title 45, chapter 2, article 10, Arizona Revised Statutes, by adding section 45-596.02; relating to wells.

 

(TEXT OF BILL BEGINS ON NEXT PAGE)

 


Be it enacted by the Legislature of the State of Arizona:

Section 1. Title 45, chapter 2, article 10, Arizona Revised Statutes, is amended by adding section 45-596.02, to read:

START_STATUTE45-596.02. Well drilling moratorium; upper San Pedro, Verde Valley groundwater basins; exemptions

Beginning on the effective date of this section, a person may not construct and the department may not issue a permit or drilling card for a new well in the upper San Pedro groundwater basin or the Verde Valley groundwater subbasin, except for:

1. A replacement well as prescribed in rules adopted by the director.

2. A well that the director determines will not pump the subflow of a river system or source.

3. A well that is constructed after the conclusion of the general adjudication of water rights in the Gila River. END_STATUTE

feedback