Bill Text: US HB8113 | 2025-2026 | 119th Congress | Introduced
Bill Title: To direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes.
Sponsorship: Partisan Bill (Republican 3)
Status: (Introduced) 2026-03-26 - Referred to the House Committee on Natural Resources. [HB8113 Detail]
Download: US_Congress-2025-HB8113-Introduced.pdf
