Bill Text: TX SB75 | 2025-2026 | 89th Legislature | Enrolled
Bill Title: Relating to the resilience of the electric grid and certain municipalities.
Sponsorship: Broadly Bipartisan Bill
Status: (Passed) 2025-06-20 - Effective immediately [SB75 Detail]
Download: Texas-2025-SB75-Enrolled.html
| S.B. No. 75 | ||
|
|
||
| relating to the resilience of the electric grid and certain | ||
| municipalities. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. The legislature finds that: | ||
| (1) electric grid outages threaten the lives of the | ||
| citizens of this state and pose a disproportionately large risk to: | ||
| (A) the elderly, vulnerable, and underprivileged | ||
| within this state; and | ||
| (B) communities facing disproportionate | ||
| environmental health burdens and population vulnerabilities | ||
| relating to facilities such as chemical plants and refineries that | ||
| can become environmental disaster areas when taken off-line due to | ||
| loss of electricity; | ||
| (2) the 16 critical infrastructure sectors identified | ||
| in President Barack Obama's Presidential Policy Directive | ||
| "Critical Infrastructure Security and Resilience" (PPD-21) | ||
| (chemical, commercial facilities, communications, critical | ||
| manufacturing, dams, defense industrial base, emergency services, | ||
| energy, financial services, food and agriculture, government | ||
| facilities, health care and public health, information technology, | ||
| nuclear reactors, materials, and waste, transportation systems, | ||
| water and wastewater systems) depend on the electric grid in this | ||
| state and make the grid's protection vital to the economy of this | ||
| nation and homeland security; | ||
| (3) the power outage that occurred in this state in | ||
| February 2021 caused: | ||
| (A) death and suffering in this state; | ||
| (B) economic loss to this state's economy; | ||
| (C) impacts to all critical infrastructures in | ||
| this state; | ||
| (D) the dispatch of generation units that likely | ||
| exceeded limits established by the Environmental Protection Agency | ||
| for sulfur dioxide, nitrogen oxide, mercury, and carbon monoxide | ||
| emissions and wastewater release limits; | ||
| (E) radically increased pricing of electricity | ||
| and made electric power bills unaffordable to many customers across | ||
| this state; and | ||
| (F) exacerbation of COVID-19 pandemic risk by | ||
| forcing many of the state's citizens to consolidate at warming | ||
| centers and in other small spaces where warmth for survival | ||
| superseded social distancing protocols; | ||
| (4) a previous large-scale power outage occurred in | ||
| this state in February 2011 during which 4.4 million customers were | ||
| affected; | ||
| (5) this state is uniquely positioned to prevent power | ||
| outages because this state is a net exporter of energy and is the | ||
| only state with an electric grid almost exclusively within its | ||
| territorial boundaries; | ||
| (6) the 2011 and 2021 power outages call into | ||
| question: | ||
| (A) whether too much risk has been accepted | ||
| regarding weatherization of electric generation infrastructure; | ||
| (B) whether this state lacks the internal | ||
| distribution structure and control systems to manage rolling | ||
| outages; and | ||
| (C) whether sufficient resources have been | ||
| allocated toward overall grid resilience; | ||
| (7) public confidence in the resilience of the | ||
| electric grid in this state is essential to ensuring economic | ||
| prosperity, domestic tranquility, continuity of government, and | ||
| life-sustaining systems; | ||
| (8) a resilient electric grid that offers businesses | ||
| in this state continuity of operations in the event of a natural or | ||
| man-made disaster will be an unrivaled attraction for businesses to | ||
| expand or move their operations to this state; | ||
| (9) a resilient electric grid that can operate in the | ||
| event of a natural or man-made disaster will protect important | ||
| facets of this state, including its military installations and | ||
| environment; | ||
| (10) current market incentives and regulations are not | ||
| sufficient for electric utilities to: | ||
| (A) prioritize grid security and resilience; and | ||
| (B) protect the grid against hazards; | ||
| (11) protection of the electric grid in this state | ||
| against hazards would assure businesses and the citizens of this | ||
| state that the "lights will be back on first in Texas" in the event | ||
| of a nationwide catastrophe affecting electric infrastructure, | ||
| sparing this state from catastrophic societal and environmental | ||
| consequences; and | ||
| (12) when this state begins implementation of the plan | ||
| for all hazards resilience described by Section 44.007, Utilities | ||
| Code, as added by this Act, to protect the electric grid in this | ||
| state, short-term and long-term economic benefits will far exceed | ||
| even the most optimistic estimates of the conventional economic | ||
| incentives provided by tax abatements to attract businesses to this | ||
| state. | ||
| SECTION 2. Section 38.077, Utilities Code, is amended to | ||
| read as follows: | ||
| Sec. 38.077. RELIABILITY [ |
||
| In this section, "critical facility" means a transmission | ||
| substation and any associated control centers that, if rendered | ||
| inoperable or damaged because of a physical attack, could cause | ||
| widespread instability, uncontrolled separation, or cascading | ||
| outages within an interconnection. | ||
| (b) The commission and the independent organization | ||
| certified for the ERCOT power region under Section 39.151 shall | ||
| conduct simulated or tabletop load shedding exercises with | ||
| providers of electric generation service and transmission and | ||
| distribution service in the ERCOT power region. | ||
| [ |
||
| one simulated or tabletop load shedding exercise is conducted | ||
| during a summer month and one simulated or tabletop load shedding | ||
| exercise is conducted during a winter month. | ||
| (c) The commission and the independent organization | ||
| certified for the ERCOT power region under Section 39.151 shall | ||
| conduct simulated or tabletop exercises with providers of electric | ||
| generation service and transmission and distribution service in the | ||
| ERCOT power region to mitigate and prepare for a threat of an attack | ||
| or an actual physical attack on a critical facility. The exercises | ||
| required by this subsection are in addition to the exercises | ||
| required by Subsection (b) and any requirements of the North | ||
| American Electric Reliability Corporation Critical Infrastructure | ||
| Protection plan standards. The commission and the independent | ||
| organization shall conduct the exercises under this subsection at | ||
| least once every two years. | ||
| (d) A simulated or tabletop exercise conducted under | ||
| Subsection (c) must identify the roles and responsibilities of the | ||
| following in the event of a threat of an attack or an actual | ||
| physical attack on a critical facility: | ||
| (1) transmission and distribution service providers; | ||
| (2) providers of electric generation service; | ||
| (3) law enforcement; | ||
| (4) the independent organization certified for the | ||
| ERCOT power region under Section 39.151; and | ||
| (5) the commission. | ||
| (e) A transmission and distribution service provider is not | ||
| required to disclose the specific location of the provider's | ||
| critical substations to the commission or the independent | ||
| organization certified for the ERCOT power region under Section | ||
| 39.151 for the purposes of a simulated or tabletop exercise | ||
| conducted under Subsection (c). | ||
| (f) Each provider of electric generation service and of | ||
| transmission and distribution service that participates in a | ||
| simulated or tabletop exercise conducted under Subsection (c) shall | ||
| provide to the independent organization certified for the ERCOT | ||
| power region under Section 39.151 a written attestation that the | ||
| provider has coordinated with law enforcement when identifying | ||
| roles and responsibilities under Subsection (d). | ||
| SECTION 3. Subtitle B, Title 2, Utilities Code, is amended | ||
| by adding Chapter 44 to read as follows: | ||
| CHAPTER 44. GRID RESILIENCE | ||
| Sec. 44.001. DEFINITIONS. In this chapter: | ||
| (1) "All hazards" means: | ||
| (A) terrestrial weather, including wind, | ||
| hurricanes, tornadoes, flooding, ice storms, extended cold weather | ||
| events, heat waves, and wildfires; | ||
| (B) seismic events, including earthquakes and | ||
| tsunamis; | ||
| (C) physical threats, including terrorist | ||
| attacks with direct fire, drones, explosives, and other methods of | ||
| physical sabotage; | ||
| (D) cyber attacks, including malware attacks and | ||
| hacking of unprotected or compromised information technology | ||
| networks; | ||
| (E) manipulation of operational technology | ||
| devices, including sensors, actuators, and drives; | ||
| (F) electromagnetic threats through man-made | ||
| radio frequency weapons, high-altitude nuclear electromagnetic | ||
| pulses, and naturally occurring geomagnetic disturbances; | ||
| (G) electric generation supply chain | ||
| vulnerabilities, including insecure or inadequate fuel | ||
| transportation or storage; and | ||
| (H) insider threats caused by compromised or | ||
| hostile personnel working within government or the utility | ||
| industry. | ||
| (2) "Micro-grid" means a group of interconnected loads | ||
| and distributed energy resources inside clearly defined electrical | ||
| boundaries. | ||
| (3) "Public utility" means an entity that generates, | ||
| transmits, or distributes electric energy to the public, including | ||
| an electric utility, an electric cooperative, a municipally owned | ||
| utility, and a river authority. | ||
| (4) "Security commission" means the Texas Grid | ||
| Security Commission. | ||
| Sec. 44.002. TEXAS GRID SECURITY COMMISSION. (a) The Texas | ||
| Grid Security Commission is composed of the following members: | ||
| (1) a representative of the Texas Division of | ||
| Emergency Management appointed by the chief of that division; | ||
| (2) a representative of the commission appointed by | ||
| that commission; | ||
| (3) a representative of the Railroad Commission of | ||
| Texas appointed by that commission; | ||
| (4) a representative of the independent organization | ||
| certified under Section 39.151 for the ERCOT power region appointed | ||
| by the chief executive officer of that organization; | ||
| (5) a representative of power generation companies | ||
| appointed by the chief of the Texas Division of Emergency | ||
| Management; | ||
| (6) a representative of transmission and distribution | ||
| utilities, electric cooperatives, municipally owned utilities, and | ||
| river authorities appointed by the chief of the Texas Division of | ||
| Emergency Management; and | ||
| (7) at the discretion of the security commission's | ||
| presiding officer, any other representative of a state agency, | ||
| board, commission, or organized volunteer group designated by the | ||
| head of that entity. | ||
| (b) The Texas Division of Emergency Management shall | ||
| designate a member of the security commission to serve as presiding | ||
| officer. | ||
| (c) The security commission shall convene at the call of the | ||
| presiding officer. | ||
| (d) The security commission shall report to the chief of the | ||
| Texas Division of Emergency Management. | ||
| (e) A vacancy on the security commission is filled by | ||
| appointment for the unexpired term in the same manner as the | ||
| original appointment. | ||
| (f) To the extent possible, individuals appointed to the | ||
| security commission must be residents of this state. | ||
| (g) The chief of the Texas Division of Emergency Management | ||
| may invite officials or former officials of the United States | ||
| Department of Defense or Department of Homeland Security with | ||
| expertise on electromagnetic pulse defense to advise the security | ||
| commission. | ||
| (h) The presiding officer of the security commission or the | ||
| chief of the Texas Division of Emergency Management may invite to | ||
| advise the security commission any person whose expertise the | ||
| security commission considers necessary to carry out the purposes | ||
| of this chapter, including individuals recognized as experts in the | ||
| fields of law enforcement, emergency services, communications, | ||
| water and sewer services, health care, financial services, | ||
| agriculture, transportation, electricity markets, cybersecurity of | ||
| grid control systems, electromagnetic pulse mitigation, | ||
| terrestrial and solar weather, and micro-grids. | ||
| Sec. 44.003. GRID RESILIENCE INFORMATION. (a) Each of the | ||
| following members of the security commission shall apply for a | ||
| secret security clearance or an interim secret security clearance | ||
| to be granted by the federal government: | ||
| (1) the representative of the independent | ||
| organization certified under Section 39.151 for the ERCOT power | ||
| region; | ||
| (2) the representative of the Texas Division of | ||
| Emergency Management; and | ||
| (3) the representative of the commission. | ||
| (b) A member of the security commission listed under | ||
| Subsection (a) who is granted an applicable security clearance | ||
| under that subsection is a member of the information security | ||
| working group. | ||
| (c) The information security working group shall determine: | ||
| (1) which information created or obtained by the | ||
| security commission is confidential; | ||
| (2) which members of the security commission may | ||
| access which types of information received by the security | ||
| commission; and | ||
| (3) which members, other than members of the working | ||
| group, should apply for a secret security clearance or interim | ||
| clearance granted by the federal government. | ||
| (d) Information that the information security working group | ||
| determines is confidential under Subsection (c) shall be stored and | ||
| maintained by the independent organization certified under Section | ||
| 39.151 for the ERCOT power region. | ||
| (e) The security commission must maintain a reasonable | ||
| balance between public transparency and security for information | ||
| determined to be confidential under Subsection (c). | ||
| (f) Confidential information created or obtained by the | ||
| security commission is not subject to disclosure under Chapter 552, | ||
| Government Code. | ||
| (g) A meeting of the security commission that involves the | ||
| discussion of confidential information is not subject to Chapter | ||
| 551, Government Code. | ||
| Sec. 44.004. GRID RESILIENCE EVALUATION. (a) The security | ||
| commission shall evaluate, using available information on past | ||
| power outages in ERCOT, all hazards to the critical infrastructure | ||
| of the ERCOT electric grid, including threats that can cause future | ||
| outages. The security commission shall evaluate the resilience of | ||
| municipalities in this state in the following essential areas: | ||
| (1) emergency services; | ||
| (2) communications systems; | ||
| (3) water and sewer services; | ||
| (4) health care systems; | ||
| (5) financial services; | ||
| (6) energy systems, including whether energy, | ||
| electric power, and fuel supplies are protected and available for | ||
| recovery in the event of a catastrophic power outage; and | ||
| (7) transportation systems. | ||
| (b) The security commission may create groups to identify | ||
| and address each hazard as necessary. The security commission must | ||
| assess each hazard both on the likelihood of occurrence of the | ||
| hazard and the potential consequences of the hazard. | ||
| (c) The security commission shall identify methods by which | ||
| this state can support an overall national deterrence policy as | ||
| proposed by the United States Cyberspace Solarium Commission, | ||
| including by: | ||
| (1) identifying means to ensure that measures taken to | ||
| increase resilience of critical infrastructure against all hazards | ||
| support critical national security functions in this state; and | ||
| (2) engaging the Texas National Guard to be trained as | ||
| first responders to cybersecurity threats to the ERCOT electric | ||
| grid and other critical infrastructure. | ||
| (d) The security commission shall evaluate nuclear | ||
| generation sites in this state, the resilience of each nuclear | ||
| reactor to all hazards, and the resilience to all hazards of | ||
| off-site power for critical safety systems that support the reactor | ||
| and spent fuel. The security commission may communicate with the | ||
| United States Nuclear Regulatory Commission to accomplish the | ||
| evaluation. | ||
| (e) The security commission shall evaluate current Critical | ||
| Infrastructure Protection standards established by the North | ||
| American Electric Reliability Corporation and standards set by the | ||
| National Institute of Standards and Technology to inform the | ||
| security commission's recommended standards for protecting | ||
| critical infrastructure in this state. | ||
| (f) The security commission shall investigate the steps | ||
| that local communities and other states have taken to address grid | ||
| resilience. The security commission may request funding from the | ||
| Texas Division of Emergency Management to conduct site visits to | ||
| these locations as required. | ||
| (g) The security commission shall identify universities | ||
| based in this state that have expertise in cybersecurity and other | ||
| matters that can contribute to the security commission's goal of | ||
| mitigating all hazards to critical infrastructure in this state. | ||
| (h) In carrying out the security commission's duties under | ||
| this section, the security commission may solicit information from: | ||
| (1) defense contractors with experience protecting | ||
| defense systems from electromagnetic pulses; | ||
| (2) public utilities that have developed | ||
| electromagnetic pulse protections for the utilities' grid assets; | ||
| (3) the United States Department of Homeland Security; | ||
| and | ||
| (4) the Commission to Assess the Threat to the United | ||
| States from Electromagnetic Pulse (EMP) Attack. | ||
| Sec. 44.005. RESILIENCE STANDARDS. (a) Based on the | ||
| findings of the evaluations and investigations conducted under | ||
| Section 44.004, the security commission shall consider and | ||
| recommend resilience standards for municipalities and critical | ||
| infrastructure of the ERCOT electric grid. | ||
| (b) Standards considered and recommended for energy systems | ||
| of municipalities should include provisions to ensure that energy, | ||
| electric power, and fuel supplies are protected and available for | ||
| recovery in the event of a catastrophic power outage. | ||
| (c) Not later than December 1, 2026, the security commission | ||
| shall prepare and deliver a report to the legislature on the | ||
| security commission's recommended resilience standards, the | ||
| estimated costs associated with implementing the recommended | ||
| standards, the potential effects if the recommended standards are | ||
| not implemented, and the anticipated timeline for implementation of | ||
| the recommended standards. | ||
| Sec. 44.006. MICRO-GRIDS. The security commission shall | ||
| recommend resilience standards for micro-grids. The standards must | ||
| be developed for both alternating current and direct current. | ||
| Sec. 44.007. PLAN FOR ALL HAZARDS RESILIENCE. (a) Not | ||
| later than December 1, 2026, the security commission shall prepare | ||
| and deliver to the legislature a plan for protecting critical | ||
| infrastructure from all hazards, including a catastrophic loss of | ||
| power in the state. | ||
| (b) The plan must include: | ||
| (1) any weatherization recommendations in addition to | ||
| requirements established under Section 35.0021 necessary to | ||
| prevent outages of critical infrastructure from extreme cold | ||
| weather events, an analysis of whether these recommendations would | ||
| induce cyber vulnerabilities, and an analysis of the associated | ||
| costs for these recommendations; | ||
| (2) recommendations for installing, replacing, or | ||
| upgrading industrial control systems and associated networks, or | ||
| the use of compensating controls or procedures, in critical | ||
| facilities to address cyber vulnerabilities; | ||
| (3) recommendations for installing, replacing, or | ||
| upgrading extra high-voltage power transformers and supervisory | ||
| control and data acquisition systems to withstand 100 | ||
| kilovolts/meter E1 electromagnetic pulses and 85 volts/kilometer | ||
| E3 electromagnetic pulses; | ||
| (4) a timeline for making improvements to critical | ||
| infrastructure to meet resilience standards recommended by the | ||
| security commission under Section 44.005; | ||
| (5) long-term resilience recommendations for | ||
| supporting industries, including: | ||
| (A) communications; | ||
| (B) food supply; | ||
| (C) fuel supply; | ||
| (D) health care; | ||
| (E) nuclear reactors, materials, and waste; | ||
| (F) transportation; and | ||
| (G) water and sewer services; and | ||
| (6) any additional recommendations considered | ||
| necessary by the security commission. | ||
| (c) The security commission may consult with the Private | ||
| Sector Advisory Council in developing the plan. | ||
| Sec. 44.008. CRITICAL INFRASTRUCTURE RESILIENCE REPORT. | ||
| (a) Not later than January 1 of each year, the security commission | ||
| shall prepare and deliver a nonclassified report to the | ||
| legislature, the governor, and the commission assessing natural and | ||
| man-made threats to critical infrastructure and efforts to mitigate | ||
| the threats. | ||
| (b) The security commission shall make the report available | ||
| to the public. | ||
| (c) In preparing the report, the security commission may | ||
| hold confidential or classified briefings with federal, state, and | ||
| local officials as necessary. | ||
| SECTION 4. Not later than December 31, 2026, the Public | ||
| Utility Commission of Texas and the independent organization | ||
| certified under Section 39.151, Utilities Code, for the ERCOT power | ||
| region shall conduct a simulated or tabletop exercise with each | ||
| provider of electric generation service and of transmission and | ||
| distribution service as required by Section 38.077(c), Utilities | ||
| Code, as added by this Act. | ||
| SECTION 5. This Act takes effect immediately if it receives | ||
| a vote of two-thirds of all the members elected to each house, as | ||
| provided by Section 39, Article III, Texas Constitution. If this | ||
| Act does not receive the vote necessary for immediate effect, this | ||
| Act takes effect September 1, 2025. | ||
| ______________________________ | ______________________________ | |
| President of the Senate | Speaker of the House | |
| I hereby certify that S.B. No. 75 passed the Senate on | ||
| April 16, 2025, by the following vote: Yeas 31, Nays 0; and that | ||
| the Senate concurred in House amendments on May 26, 2025, by the | ||
| following vote: Yeas 31, Nays 0. | ||
| ______________________________ | ||
| Secretary of the Senate | ||
| I hereby certify that S.B. No. 75 passed the House, with | ||
| amendments, on May 21, 2025, by the following vote: Yeas 144, | ||
| Nays 0, two present not voting. | ||
| ______________________________ | ||
| Chief Clerk of the House | ||
| Approved: | ||
| ______________________________ | ||
| Date | ||
| ______________________________ | ||
| Governor | ||