Bill Text: TX SB492 | 2011-2012 | 82nd Legislature | Introduced
Bill Title: Relating to the creation of a distributed solar generation incentive program.
Sponsorship: Bipartisan Bill
Status: (Introduced - Dead) 2011-03-17 - Referred to Natural Resources [SB492 Detail]
Download: Texas-2011-SB492-Introduced.html
| 82R3928 RWG-F | ||
| By: Fraser | S.B. No. 492 | |
|
|
||
|
|
||
| relating to the creation of a distributed solar generation | ||
| incentive program. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Section 31.002(6), Utilities Code, is amended to | ||
| read as follows: | ||
| (6) "Electric utility" means a person or river | ||
| authority that owns or operates for compensation in this state | ||
| equipment or facilities to produce, generate, transmit, | ||
| distribute, sell, or furnish electricity in this state. The term | ||
| includes a lessee, trustee, or receiver of an electric utility and a | ||
| recreational vehicle park owner who does not comply with Subchapter | ||
| C, Chapter 184, with regard to the metered sale of electricity at | ||
| the recreational vehicle park. The term does not include: | ||
| (A) a municipal corporation; | ||
| (B) a qualifying facility; | ||
| (C) a power generation company; | ||
| (D) an exempt wholesale generator; | ||
| (E) a power marketer; | ||
| (F) a corporation described by Section 32.053 to | ||
| the extent the corporation sells electricity exclusively at | ||
| wholesale and not to the ultimate consumer; | ||
| (G) an electric cooperative; | ||
| (H) a retail electric provider; | ||
| (I) this state or an agency of this state; [ |
||
| (J) a person not otherwise an electric utility | ||
| who: | ||
| (i) furnishes an electric service or | ||
| commodity only to itself, its employees, or its tenants as an | ||
| incident of employment or tenancy, if that service or commodity is | ||
| not resold to or used by others; | ||
| (ii) owns or operates in this state | ||
| equipment or facilities to produce, generate, transmit, | ||
| distribute, sell, or furnish electric energy to an electric | ||
| utility, if the equipment or facilities are used primarily to | ||
| produce and generate electric energy for consumption by that | ||
| person; or | ||
| (iii) owns or operates in this state a | ||
| recreational vehicle park that provides metered electric service in | ||
| accordance with Subchapter C, Chapter 184; or | ||
| (K) a distributed renewable generation owner, as | ||
| defined by Section 39.916. | ||
| SECTION 2. Section 39.002, Utilities Code, is amended to | ||
| read as follows: | ||
| Sec. 39.002. APPLICABILITY. Except as provided by this | ||
| section, this [ |
||
| 39.157(e), 39.203, 39.903, 39.904, 39.9051, 39.9052, [ |
||
| 39.914(e), and 39.9156, does not apply to a municipally owned | ||
| utility or to an electric cooperative. Sections 39.157(e), 39.203, | ||
| and 39.904[ |
||
| an electric cooperative that is offering customer choice. Section | ||
| 39.916 applies to an electric cooperative. Section 39.9161 applies | ||
| to a municipally owned utility. If there is a conflict between the | ||
| specific provisions of this chapter and any other provisions of | ||
| this title, except for Chapters 40 and 41, the provisions of this | ||
| chapter control. | ||
| SECTION 3. Subchapter Z, Chapter 39, Utilities Code, is | ||
| amended by adding Sections 39.9155 and 39.9156 to read as follows: | ||
| Sec. 39.9155. SOLAR GENERATION INCENTIVE PROGRAM. (a) In | ||
| this section: | ||
| (1) "Distributed solar generation" means distributed | ||
| renewable generation, as defined by Section 39.9161, using solar | ||
| energy technology. | ||
| (2) "Owner of distributed solar generation" includes a | ||
| retail electric customer who contracts with another person to | ||
| install or maintain distributed solar generation on the customer's | ||
| side of the meter, regardless of whether the customer takes | ||
| ownership of the installed distributed solar generation. | ||
| (3) "Surplus electricity" means electricity generated | ||
| by distributed solar generation that is not consumed at the place | ||
| the distributed solar generation is installed but flows onto the | ||
| electric distribution system. | ||
| (b) It is the goal of the legislature that electric | ||
| utilities administer incentive programs for residential and | ||
| commercial customers to increase the amount of distributed solar | ||
| generation, utility scale solar generation capacity, and energy | ||
| storage capacity installed in this state in a cost-effective, | ||
| market-neutral, and nondiscriminatory manner. | ||
| (c) The commission by rule shall: | ||
| (1) establish a solar generation incentive program, to | ||
| be implemented by electric utilities; | ||
| (2) oversee the implementation of the program required | ||
| by Subdivision (1); and | ||
| (3) establish procedures to achieve the goal described | ||
| by Subsection (b). | ||
| (d) The rules adopted under Subsection (c) must include | ||
| provisions: | ||
| (1) for recovery of the cost of electric utility | ||
| programs authorized by this section through nonbypassable fees, | ||
| which may not exceed: | ||
| (A) 20 cents per month for residential customers; | ||
| (B) $2 per month for commercial customers; and | ||
| (C) $20 per month for industrial customers; | ||
| (2) for rebates to customers to defray the cost of | ||
| installing distributed solar generation as provided by Subsection | ||
| (f); | ||
| (3) to require that customers in the Electric | ||
| Reliability Council of Texas who install distributed solar | ||
| generation will have the option to be equipped with an advanced | ||
| meter and appropriate procedures to give the customers an option to | ||
| settle on the basis of their real-time energy usage instead of on | ||
| the basis of a load profile and to receive the real-time energy | ||
| price for surplus electricity exported to the grid by the customer; | ||
| (4) to require: | ||
| (A) a retail electric provider to offer service | ||
| to a retail electric service customer who has installed distributed | ||
| solar generation; and | ||
| (B) a retail electric provider that provides | ||
| service to a retail electric service customer who has installed | ||
| distributed solar generation to: | ||
| (i) purchase the customer's surplus | ||
| electricity at a price equal to or greater than a fair market price | ||
| determined in accordance with this section; or | ||
| (ii) credit the customer's bill for the | ||
| billing cycle in which the customer's surplus electricity is | ||
| generated at a price equal to or greater than the equivalent of a | ||
| fair market price determined in accordance with this section and | ||
| allow any unused credit on the customer's bill to be carried forward | ||
| to subsequent billing cycles for the customer; | ||
| (5) for appropriate net metering policies and retail | ||
| rate options for customers served by electric utilities outside the | ||
| Electric Reliability Council of Texas; and | ||
| (6) for the utility scale solar and energy storage | ||
| capacity program provided by Subsection (g). | ||
| (e) Electric utilities may not assess the fees authorized by | ||
| this section after the fifth anniversary of the date the program | ||
| required by this section is established by commission rule, except | ||
| as provided by Subsection (l). The commission shall ensure that all | ||
| fees collected under this section are used for the programs | ||
| authorized by this section, except that utilities may not use more | ||
| than 2.5 percent of the funds collected for administrative expenses | ||
| related to this section, as approved by the commission. | ||
| (f) The commission shall set a rebate amount for the | ||
| installation of distributed solar generation capacity. The | ||
| commission shall periodically adjust the rebate amount such that | ||
| the quantity of solar generation capacity installed under this | ||
| section is maximized, but shall reduce rebate amounts by not less | ||
| than five percent per year. The commission may set a higher rebate | ||
| amount for solar generation capacity using equipment manufactured | ||
| wholly or substantially in this state, provided that the higher | ||
| amount is not more than 20 percent higher than the rebate applicable | ||
| to all other solar generation capacity. The commission may provide | ||
| for rebates to be provided directly to customers or to qualified | ||
| installers of solar generation equipment. Unless adjusted by the | ||
| commission, the initial rebates shall be: | ||
| (1) $2.40 per watt for installations on residential | ||
| buildings; | ||
| (2) $1.50 per watt for installations on commercial | ||
| buildings; and | ||
| (3) $1 per watt for installations at industrial | ||
| facilities. | ||
| (g) The commission may direct not more than 70 percent of | ||
| the money collected from the fees authorized by this section to | ||
| utility scale solar generation capacity if the commission | ||
| determines such projects are more cost-effective per megawatt of | ||
| installed capacity than distributed solar generation or will | ||
| provide a greater benefit to the reliability of the electric grid. | ||
| The commission may establish rebate amounts not to exceed $1 per | ||
| watt for utility scale solar generation projects or may consider a | ||
| competitive bidding process, a reverse auction, or other methods to | ||
| award money in order to maximize the quantity of generation | ||
| capacity installed under this section. If the demand for money | ||
| under this section exceeds the money available, the commission | ||
| shall consider the following in determining which projects receive | ||
| subsidies: | ||
| (1) projects that, to be commercially viable, require | ||
| the lowest amount of subsidy per megawatt of installed capacity; | ||
| (2) projects that use the transmission capacity built | ||
| under Section 39.904(g) and that require minimal additional | ||
| transmission facilities; | ||
| (3) projects that enhance the reliability of the | ||
| transmission and distribution grid or defer the need for additional | ||
| transmission and distribution infrastructure; | ||
| (4) projects in development that can use rebates to | ||
| secure additional financing; | ||
| (5) projects that provide maximum output during | ||
| periods when electricity demand is highest in this state; and | ||
| (6) projects that can provide ancillary services to | ||
| the electric grid. | ||
| (h) The commission shall develop a "Made in Texas" | ||
| certification program for energy products useful for distributed | ||
| solar generation. The commission shall post a list of energy | ||
| products that are wholly or substantially produced in this state | ||
| and shall conduct education efforts to inform customers of the | ||
| availability of those energy products. The commission may partner | ||
| or contract with third parties or nonprofit organizations to | ||
| achieve the goals of this subsection. | ||
| (i) Notwithstanding any other provision of this title, a | ||
| retail electric provider or any other person may own distributed | ||
| solar generation and enter into a contract with the retail customer | ||
| on whose property the solar generation capacity is located to lease | ||
| the solar generation equipment or sell the generated output to the | ||
| retail customer or to that customer's retail electric provider. An | ||
| owner of the distributed solar generation is not an electric | ||
| utility and is not required to register with the commission as a | ||
| power generation company or self-generator unless the commission | ||
| determines that a registration system of that type is necessary to | ||
| maintain the reliability of the distribution grid. The commission | ||
| may establish appropriate reporting and other requirements for an | ||
| owner of distributed solar generation to be eligible to earn | ||
| renewable energy credits. | ||
| (j) The commission, in consultation with the Electric | ||
| Reliability Council of Texas, shall conduct and make available the | ||
| results of a study indicating geographic areas where utility scale, | ||
| non-wind, renewable energy generation capacity can be located with | ||
| minimal need for additional transmission facilities. | ||
| (k) The commission is not required to conduct its selection | ||
| of projects under Subsection (g) by contested case proceedings. | ||
| The commission may appoint an advisory committee to assist the | ||
| commission in evaluating proposals made under Subsection (g). | ||
| Members of an advisory committee appointed under this subsection | ||
| may not have a financial interest in any of the proposals. After | ||
| the conclusion of a process authorized by Subsection (g), the | ||
| commission shall release a complete record of the proposals and of | ||
| the evaluation of the factors required to be considered under | ||
| Subsection (g). | ||
| (l) The commission may extend the fees and program | ||
| authorized by this section for an additional five years if the | ||
| commission finds that: | ||
| (1) a substantial amount of manufacturing of solar | ||
| generation products has begun in Texas during the initial five-year | ||
| program; and | ||
| (2) the extension of the program's fees does not | ||
| present an undue burden to customers. | ||
| (m) The commission by rule shall provide a methodology for | ||
| determining a fair market value price for surplus electricity. The | ||
| fair market value price may not be less than an amount equal to 80 | ||
| percent of the customer's applicable retail rate less any | ||
| nonbypassable charges. The commission shall post on the | ||
| commission's Internet website the fair market value prices derived | ||
| from the methodology provided under this subsection. | ||
| (n) In an area in which customer choice has been introduced, | ||
| a retail electric provider shall pay an owner of distributed solar | ||
| generation for surplus electricity: | ||
| (1) the local market clearing price for energy at the | ||
| time of day the surplus electricity is made available to the grid; | ||
| or | ||
| (2) a price that is not less than the fair market value | ||
| price determined in accordance with the methodology provided under | ||
| Subsection (m). | ||
| (o) An owner of distributed solar generation is qualified to | ||
| be paid for surplus electricity under Subsection (n) only if the | ||
| owner's distributed solar generation: | ||
| (1) is installed on a residential retail electric | ||
| customer's side of the meter; | ||
| (2) has a generating capacity of not greater than 50 | ||
| kilowatts; and | ||
| (3) is rated to produce an amount of electricity less | ||
| than or equal to the amount of electricity the residential retail | ||
| electric customer for whom the distributed solar generation is | ||
| installed is reasonably expected to consume. | ||
| (p) The commission by rule shall require a retail electric | ||
| provider that purchases a customer's surplus electricity to include | ||
| on each bill of the customer line items to inform the owner of: | ||
| (1) the amount of surplus electricity, in terms of | ||
| kilowatt hours; | ||
| (2) the price credited to the owner for each kilowatt | ||
| hour; and | ||
| (3) the amount of any credit for surplus electricity | ||
| applied or carried forward from the previous billing period. | ||
| (q) Until the commission provides the methodology under | ||
| Subsection (m) for determining a fair market value price, a retail | ||
| electric provider shall pay a price for surplus electricity that is | ||
| not less than five cents per kilowatt hour. | ||
| (r) If, at the time distributed solar generation is | ||
| installed on a retail electric customer's side of the meter, the | ||
| estimated annual amount of electric energy to be generated by the | ||
| distributed solar generation is less than or equal to the | ||
| customer's estimated annual electric energy consumption, the | ||
| commission may not consider the owner of distributed solar | ||
| generation to be a power generation company or require the owner of | ||
| distributed solar generation to register as a power generation | ||
| company. | ||
| Sec. 39.9156. SOLAR GENERATION INCENTIVE PROGRAMS. (a) It | ||
| is the goal of the legislature that: | ||
| (1) electric cooperatives and municipally owned | ||
| utilities administer incentive programs that increase the amount of | ||
| solar generation capacity installed in this state in a | ||
| cost-effective, market-neutral, and nondiscriminatory manner; | ||
| (2) customers of electric cooperatives and | ||
| municipally owned utilities will have access to incentives for the | ||
| installation of distributed solar generation as defined by Section | ||
| 39.9155(a); and | ||
| (3) electric cooperatives and municipally owned | ||
| utilities expend funds to increase the amount of solar generation | ||
| capacity at a total funding level consistent with the requirements | ||
| for electric utilities in this state under Sections 39.9155(d)(1) | ||
| and (e). | ||
| (b) Beginning not later than September 1, 2014, an electric | ||
| cooperative or municipally owned utility must report annually to | ||
| the state energy conservation office, in a form and manner | ||
| determined by the office, information regarding the efforts of the | ||
| municipally owned utility or electric cooperative related to this | ||
| section. | ||
| (c) This section does not prevent the governing body of an | ||
| electric cooperative or municipally owned utility from adopting | ||
| rules, programs, or incentives to encourage or provide for the | ||
| installation of more solar generation capacity than the goals | ||
| established by Section 39.9155 or rules adopted under that section. | ||
| (d) An electric cooperative or municipally owned utility | ||
| may recover the costs required by this section through a | ||
| nonbypassable fee consistent with that authorized by the commission | ||
| for electric utilities under Section 39.9155(d)(1) or another cost | ||
| recovery mechanism as determined by the governing body of the | ||
| electric cooperative or municipally owned utility. | ||
| (e) An electric cooperative or municipally owned utility is | ||
| entitled to have funding for solar generation capacity provided by | ||
| an electric cooperative or municipally owned utility after May 1, | ||
| 2007, counted toward its compliance with this section. | ||
| (f) This section applies only to an electric cooperative or | ||
| municipally owned utility with retail sales of more than 500,000 | ||
| megawatt hours in 2007. | ||
| SECTION 4. The heading to Section 39.916, Utilities Code, | ||
| is amended to read as follows: | ||
| Sec. 39.916. [ |
||
| GENERATION. | ||
| SECTION 5. Section 39.916, Utilities Code, is amended by | ||
| amending Subsections (a), (b), (c), (e), (f), (h), and (j) and | ||
| adding Subsections (d-1), (k), (l), (m), (n), (o), (p), (q), and (r) | ||
| to read as follows: | ||
| (a) In this section: | ||
| (1) "Distributed renewable generation" means electric | ||
| generation with a capacity of not more than 2,000 kilowatts | ||
| provided by a renewable energy technology, as defined by Section | ||
| 39.904, that is installed on a retail electric customer's side of | ||
| the meter. | ||
| (2) "Distributed renewable generation owner" means: | ||
| (A) the owner of distributed renewable | ||
| generation; | ||
| (B) a retail electric customer who contracts with | ||
| another person to finance, install, or maintain distributed | ||
| renewable generation on the customer's side of the meter, | ||
| regardless of whether the customer takes ownership of the installed | ||
| distributed renewable generation; or | ||
| (C) a person who by contract is assigned | ||
| ownership rights to distributed renewable generation located at the | ||
| premises of a customer on the customer's side of the meter. | ||
| (3) "Interconnection" means the right of a distributed | ||
| renewable generation owner to physically connect distributed | ||
| renewable generation to an electricity distribution system, and the | ||
| technical requirements, rules, or processes for the connection. | ||
| (b) A transmission and distribution utility, electric | ||
| cooperative, or electric utility shall allow interconnection if: | ||
| (1) the distributed renewable generation to be | ||
| interconnected has a five-year warranty against breakdown or undue | ||
| degradation; and | ||
| (2) the rated capacity of the distributed renewable | ||
| generation does not exceed the transmission and distribution | ||
| utility, electric cooperative, or electric utility service | ||
| capacity. | ||
| (c) A customer may request interconnection by filing an | ||
| application for interconnection with the transmission and | ||
| distribution utility, electric cooperative, or electric | ||
| utility. Procedures of a transmission and distribution utility, | ||
| electric cooperative, or electric utility for the submission and | ||
| processing of a customer's application for interconnection shall be | ||
| consistent with rules adopted by the commission regarding | ||
| interconnection. | ||
| (d-1) If, at the time distributed renewable generation is | ||
| installed on a retail electric customer's side of the meter, the | ||
| estimated annual amount of electric energy to be produced by the | ||
| distributed renewable generation is less than or equal to the | ||
| customer's estimated annual electric energy consumption, the | ||
| commission may not consider the distributed renewable generation | ||
| owner to be a power generation company or require the distributed | ||
| renewable generation owner to register as a power generation | ||
| company. | ||
| (e) A transmission and distribution utility, electric | ||
| cooperative, electric utility, or retail electric provider may not | ||
| require a distributed renewable generation owner whose distributed | ||
| renewable generation meets the standards established by rule under | ||
| Subsection (d) to purchase an amount, type, or classification of | ||
| liability insurance the distributed renewable generation owner | ||
| would not have in the absence of the distributed renewable | ||
| generation. | ||
| (f) A transmission and distribution utility, electric | ||
| cooperative, or electric utility shall make available to a | ||
| distributed renewable generation owner for purposes of this section | ||
| metering required for services provided under this section, | ||
| including separate meters that measure the load and generator | ||
| output or a single meter capable of measuring in-flow and out-flow | ||
| at the point of common coupling meter point. The distributed | ||
| renewable generation owner must pay the differential cost of the | ||
| metering unless the meters are provided at no additional cost. | ||
| Except as provided by this section, Section 39.107 applies to | ||
| metering under this section. | ||
| (h) On the request of a distributed renewable generation | ||
| owner and in accordance with this section, an [ |
||
| utility, electric cooperative, or retail electric provider shall | ||
| [ |
||
| that: | ||
| (1) surplus electricity produced by distributed | ||
| renewable generation is made available for sale to the transmission | ||
| grid and distribution system; and | ||
| (2) the fair market [ |
||
| electricity is credited to the distributed renewable generation | ||
| owner. | ||
| (j) For a distributed renewable generation owner who | ||
| chooses to sell the owner's surplus electricity in an area [ |
||
|
|
||
| distributed renewable generation owner must sell the owner's | ||
| surplus electricity produced to the retail electric provider that | ||
| serves the [ |
||
| distributed renewable generation owner who chooses to sell the | ||
| owner's surplus electricity in an area in which customer choice has | ||
| not been introduced, the owner must sell the owner's surplus | ||
| electricity to the electric utility or electric cooperative that | ||
| serves the owner's load at a value that is greater than or equal to | ||
| the avoided cost of the electric utility or electric cooperative, | ||
| as determined in accordance with commission rules, and, for an | ||
| electric cooperative, that is at least 4.5 cents per kilowatt hour | ||
| regardless of the electric cooperative's avoided cost. A | ||
| distributed generation owner who chooses to sell the owner's | ||
| surplus electricity in an area in which customer choice has been | ||
| introduced must sell the owner's surplus electricity at a fair | ||
| market value, determined in accordance with this section, [ |
||
|
|
||
|
|
||
|
|
||
|
|
||
| or the owner's surplus electricity may be exchanged for [ |
||
| a credit applied at a fair market value, determined in accordance | ||
| with this section, to an account during a billing period that may be | ||
| carried over to subsequent billing periods until the credit has | ||
| been redeemed. The independent organization identified in Section | ||
| 39.151 shall develop procedures so that the amount of electricity | ||
| purchased from a distributed renewable generation owner under this | ||
| section is accounted for in settling the total load served by the | ||
| provider that serves that owner's load [ |
||
| distributed renewable generation owner requesting [ |
||
| services for purposes of this section must have metering devices | ||
| capable of providing measurements consistent with the independent | ||
| organization's settlement requirements. | ||
| (k) In areas in which customer choice has been introduced, | ||
| the commission by rule shall provide a methodology for determining | ||
| a fair market value price for surplus electricity generated by | ||
| distributed renewable generation that provides a monthly or longer | ||
| periodic proxy for the market clearing price. The methodology must | ||
| not allow the aggregate fair market value of surplus electricity in | ||
| any billing period to be less than zero. The commission shall | ||
| review the methodology periodically. The commission shall post on | ||
| its Internet website the fair market value prices derived from the | ||
| methodology provided under this subsection. | ||
| (l) In an area in which customer choice has been introduced, | ||
| a retail electric provider shall pay a distributed renewable | ||
| generation owner for surplus electricity generated by the owner's | ||
| distributed renewable generation the local market clearing price | ||
| for energy at the time of day the surplus electricity is made | ||
| available to the grid or a price that is not less than the fair | ||
| market value price determined in accordance with the methodology | ||
| provided under Subsection (k). | ||
| (m) In areas in which customer choice has been introduced, a | ||
| distributed renewable generation owner is qualified to be paid for | ||
| surplus electricity under Subsection (h), (j), (k), or (l) only if: | ||
| (1) the owner's distributed renewable generation is: | ||
| (A) rated to produce an amount of electricity | ||
| that is less than or equal to the amount of electricity the retail | ||
| electric customer for whom the distributed renewable generation is | ||
| installed is reasonably expected to consume; and | ||
| (B) installed on the customer's side of the meter | ||
| for a residential retail electric customer or a retail electric | ||
| customer who is a public school or a church; and | ||
| (2) the generating capacity of the distributed | ||
| renewable generation does not exceed: | ||
| (A) 10 kilowatts for a residential retail | ||
| electric customer; | ||
| (B) 150 kilowatts for a church retail electric | ||
| customer; or | ||
| (C) 250 kilowatts for a public school retail | ||
| electric customer. | ||
| (n) A distributed renewable generation owner who does not | ||
| meet the qualifications prescribed by Subsection (m) will be paid | ||
| for the owner's surplus electricity or will have the owner's surplus | ||
| electricity exchanged for a credit to the owner's electric service | ||
| account at a value to which the owner and the provider that serves | ||
| the owner's load agree. | ||
| (o) The commission by rule may establish standards | ||
| distributed renewable generation must meet to be eligible for | ||
| compensation under this section, including interconnection | ||
| standards and standards for the generating equipment. The | ||
| standards must be designed so that small-scale distributed | ||
| renewable generation at residential addresses is eligible for | ||
| compensation. | ||
| (p) The commission by rule shall require an electric | ||
| utility, retail electric provider, or electric cooperative that | ||
| purchases surplus electricity from distributed renewable | ||
| generation to include on each bill or separate statement to the | ||
| distributed renewable generation owner line items to inform the | ||
| owner of: | ||
| (1) the amount of surplus electricity from the | ||
| distributed renewable generation, in terms of kilowatt hours; | ||
| (2) the price credited to or the payment made to the | ||
| owner for each kilowatt hour; and | ||
| (3) the amount of any credit for surplus electricity | ||
| applied or carried forward from the previous billing period. | ||
| (q) Until the commission provides the methodology under | ||
| Subsection (k) for determining a fair market value price in an area | ||
| open to competition, a retail electric provider shall pay a price | ||
| for surplus electricity that is not less than five cents per | ||
| kilowatt hour for electricity generated by a solar energy | ||
| technology or not less than four cents per kilowatt hour for | ||
| electricity generated by another renewable energy technology. | ||
| (r) This section expires September 2, 2016. | ||
| SECTION 6. Subchapter Z, Chapter 39, Utilities Code, is | ||
| amended by adding Sections 39.9161, 39.917, and 39.918 to read as | ||
| follows: | ||
| Sec. 39.9161. DISTRIBUTED RENEWABLE GENERATION WITHIN | ||
| MUNICIPALLY OWNED UTILITIES. (a) In this section: | ||
| (1) "Distributed renewable generation" means electric | ||
| generation with a capacity of not more than 2,000 kilowatts | ||
| provided by a renewable energy technology, as defined by Section | ||
| 39.904, that is installed on a retail electric customer's side of | ||
| the meter. | ||
| (2) "Distributed renewable generation owner" means: | ||
| (A) the owner of distributed renewable | ||
| generation; | ||
| (B) a retail electric customer who contracts with | ||
| another person to finance, install, or maintain distributed | ||
| renewable generation on the customer's side of the meter, | ||
| regardless of whether the customer takes ownership of the installed | ||
| distributed renewable generation; or | ||
| (C) a person who by contract is assigned | ||
| ownership rights to distributed renewable generation located at the | ||
| premises of a customer on the customer's side of the meter. | ||
| (3) "Interconnection" means the right of a distributed | ||
| renewable generation owner to physically connect distributed | ||
| renewable generation to an electricity distribution system, and the | ||
| technical requirements, rules, or processes for the connection. | ||
| (b) It is the goal of the legislature that municipally owned | ||
| utilities shall allow interconnection and net metering by | ||
| distributed renewable generation owners. | ||
| (c) A municipally owned utility shall provide its customers | ||
| access to the interconnection and net metering of distributed | ||
| renewable generation. | ||
| (d) The governing body of a municipally owned utility shall | ||
| provide oversight and adopt rates, rules, and procedures to allow | ||
| interconnection and provide net metering consistent with the goals | ||
| of Section 39.916. This section does not prevent the governing body | ||
| of a municipally owned utility from adopting rates, rules, and | ||
| procedures for interconnection and net metering that are more | ||
| favorable to a distributed renewable generation owner than those | ||
| established by Section 39.916 or rules of the commission. | ||
| (e) If a municipally owned utility implements customer | ||
| choice under Chapter 40, the commission: | ||
| (1) has jurisdiction over the municipally owned | ||
| utility's distributed renewable generation interconnection and net | ||
| metering; and | ||
| (2) by rule shall establish minimum standards and | ||
| procedures for interconnection and net metering by the municipally | ||
| owned utility. | ||
| (f) A municipally owned utility that had retail sales of | ||
| 500,000 megawatt hours or greater in 2008 shall file its | ||
| interconnection and net metering rates, rules, and procedures with | ||
| the state energy conservation office not later than January 1, | ||
| 2012, and shall make timely updates to the utility's filed rates, | ||
| rules, and procedures. | ||
| (g) A municipally owned utility that has adopted rules and | ||
| procedures related to interconnection and net metering shall make | ||
| available, on a publicly accessible Internet website or at the | ||
| customary location for publicly posted notices: | ||
| (1) information on the purchase price offered per | ||
| kilowatt hour for surplus electricity produced by distributed | ||
| renewable generation; and | ||
| (2) information instructing customers with | ||
| distributed renewable generation how to request and obtain the | ||
| purchase rates offered. | ||
| (h) The governing body of a municipally owned utility that | ||
| had retail sales of less than 500,000 megawatt hours in 2008 shall | ||
| provide oversight and adopt rules and procedures related to | ||
| interconnection and net metering of distributed renewable | ||
| generation systems sized with a generating capacity deemed | ||
| appropriate by the municipally owned utility on or before the 120th | ||
| day after the date the governing body receives a bona fide request | ||
| for interconnection. | ||
| Sec. 39.917. INFORMATION ON INTERNET REGARDING PURCHASE OF | ||
| SURPLUS ELECTRICITY PRODUCED BY DISTRIBUTED RENEWABLE GENERATION. | ||
| (a) In this section: | ||
| (1) "Distributed renewable generation" means electric | ||
| generation with a capacity of not more than 2,000 kilowatts | ||
| provided by a renewable energy technology, as defined by Section | ||
| 39.904, that is installed on a retail electric customer's side of | ||
| the meter. | ||
| (2) "Distributed renewable generation owner" means: | ||
| (A) the owner of distributed renewable | ||
| generation; | ||
| (B) a retail electric customer who contracts with | ||
| another person to finance, install, or maintain distributed | ||
| renewable generation on the customer's side of the meter, | ||
| regardless of whether the customer takes ownership of the installed | ||
| distributed renewable generation; or | ||
| (C) a person who by contract is assigned | ||
| ownership rights to distributed renewable generation located at the | ||
| premises of a customer on the customer's side of the meter. | ||
| (b) On the Internet website found at | ||
| http://www.powertochoose.org, the commission shall provide for | ||
| access to easily comparable information regarding retail electric | ||
| providers' offers to residential distributed renewable generation | ||
| owners for their surplus electricity, including information | ||
| regarding their contract terms, for each retail electric provider | ||
| using that website. | ||
| (c) On the Internet website found at | ||
| http://www.powertochoose.org, the commission shall provide for | ||
| access to easily comparable information regarding offers of | ||
| renewable energy credit marketers to residential distributed | ||
| renewable generation owners, for each renewable energy credit | ||
| marketer using that website. | ||
| (d) The commission by rule shall require electric | ||
| utilities, electric cooperatives, and retail electric providers to | ||
| provide on publicly accessible Internet websites information on | ||
| purchase price offers per kilowatt hour for surplus electricity | ||
| produced by residential distributed renewable generation and | ||
| information instructing customers with distributed renewable | ||
| generation on how to request and obtain the purchase rates offered. | ||
| Sec. 39.918. INFORMATION ON INTERNET REGARDING PURCHASE OF | ||
| SURPLUS ELECTRICITY PRODUCED BY DISTRIBUTED SOLAR GENERATION. (a) | ||
| In this section, "distributed solar generation," "owner of | ||
| distributed solar generation," and "surplus electricity" have the | ||
| meanings assigned by Section 39.9155(a). | ||
| (b) On the Internet website found at | ||
| http://www.powertochoose.org, the commission shall provide for | ||
| access to easily comparable information regarding retail electric | ||
| providers' offers to owners of distributed solar generation for | ||
| their surplus electricity, including information regarding their | ||
| contract terms, for each retail electric provider using that | ||
| website. | ||
| (c) On the Internet website found at | ||
| http://www.powertochoose.org, the commission shall provide for | ||
| access to easily comparable information regarding offers of | ||
| renewable energy credit marketers to owners of distributed solar | ||
| generation, for each renewable energy credit marketer using that | ||
| website. | ||
| (d) The commission by rule shall require electric | ||
| utilities, electric cooperatives, and retail electric providers to | ||
| provide on publicly accessible Internet websites information on | ||
| purchase price offers per kilowatt hour for surplus electricity and | ||
| information instructing customers with distributed solar | ||
| generation on how to request and obtain the purchase rates offered. | ||
| SECTION 7. Chapter 202, Property Code, is amended by adding | ||
| Section 202.010 to read as follows: | ||
| Sec. 202.010. REGULATION OF SOLAR ENERGY DEVICES. (a) In | ||
| this section, "solar energy device" has the meaning assigned by | ||
| Section 171.107, Tax Code. | ||
| (b) Except as otherwise provided by this section, a property | ||
| owners' association may not include or enforce a provision in a | ||
| dedicatory instrument that prohibits or restricts a property owner | ||
| from installing a solar energy device. | ||
| (c) A provision that violates Subsection (b) is void. | ||
| (d) This section does not prohibit the inclusion or | ||
| enforcement of a provision in a dedicatory instrument that | ||
| prohibits a solar energy device that: | ||
| (1) a court determines threatens the public health or | ||
| safety; | ||
| (2) a court determines violates a law; | ||
| (3) is located on property owned or maintained by the | ||
| property owners' association; | ||
| (4) is located on property owned in common by the | ||
| members of the property owners' association; or | ||
| (5) is located in an area on the property owner's | ||
| property other than: | ||
| (A) on the roof of the home; or | ||
| (B) in a fenced yard or patio maintained by the | ||
| property owner. | ||
| SECTION 8. Subtitle C, Title 5, Business & Commerce Code, is | ||
| amended by adding Chapter 106 to read as follows: | ||
| CHAPTER 106. REGULATION OF CONSTRUCTION CONTRACTS | ||
| Sec. 106.001. SOLAR PANEL OPTION REQUIRED IN CERTAIN | ||
| SUBDIVISIONS. (a) In this section, "solar energy device" means a | ||
| system or series of mechanisms designed primarily to provide | ||
| heating or cooling or to produce electrical or mechanical power by | ||
| collecting and transferring solar-generated energy. The term | ||
| includes a mechanical or chemical device that has the ability to | ||
| store solar-generated energy for use in heating or cooling or in the | ||
| production of power. | ||
| (b) This chapter applies only to a contract for construction | ||
| of a new home in a subdivision that contains more than 50 lots on | ||
| which the builder has built or is offering to build new homes. | ||
| (c) A builder who enters into a contract to which this | ||
| chapter applies shall offer the home buyer an option to install a | ||
| solar energy device on the home for heating or cooling or for the | ||
| production of power. | ||
| SECTION 9. Subchapter D, Chapter 2305, Government Code, is | ||
| amended by adding Section 2305.0321 to read as follows: | ||
| Sec. 2305.0321. PILOT REVOLVING LOAN PROGRAM FOR SOLAR | ||
| ENERGY FOR SCHOOL BUILDINGS. (a) The energy office shall establish | ||
| a pilot program under the loanstar revolving loan program to | ||
| provide loans to pay the cost of installing photovoltaic solar | ||
| panels on public school buildings and the cost of associated energy | ||
| efficiency improvements to the buildings. The energy office shall | ||
| allocate to the pilot program at least $4 million from the funds | ||
| available to the loanstar revolving loan program. | ||
| (b) The energy office by rule shall establish the terms | ||
| under which a loan may be made under the pilot program, including | ||
| the interest rate for repayment of pilot program loans. | ||
| (c) Through the pilot program, the energy office shall offer | ||
| to each school district the opportunity to apply for a loan to pay | ||
| the cost of installing photovoltaic solar panels on at least one | ||
| school building of the school district's choice and the cost of | ||
| associated energy efficiency improvements to that building. The | ||
| energy office by rule shall establish a procedure for determining | ||
| which school districts qualify for a loan under the pilot program, | ||
| including rules for selecting the school districts that will | ||
| receive a loan if there is not sufficient money set aside for pilot | ||
| program improvements at all school districts. | ||
| (d) Each school district that receives a loan shall pay for | ||
| the principal of and interest on the loan for each school building | ||
| improvement primarily from the amount budgeted for the energy costs | ||
| of the school at which the solar panels are installed. The school | ||
| district may make additional payments of the principal of or | ||
| interest on a loan from money rebated to it as compensation for | ||
| electric energy generated by the solar panels or money received as a | ||
| gift or grant for the purpose of paying the loan. | ||
| (e) This section expires September 1, 2013, and the pilot | ||
| program established under this section is abolished on that date. | ||
| SECTION 10. The Public Utility Commission of Texas shall | ||
| adopt rules establishing the programs required under Sections | ||
| 39.9155 and 39.9156, Utilities Code, as added by this Act, as soon | ||
| as practicable. | ||
| SECTION 11. Not later than January 1, 2012, the Public | ||
| Utility Commission of Texas shall provide the methodology for | ||
| determining a fair market value price for surplus electricity | ||
| generated by distributed renewable generation, as required by | ||
| Section 39.916(k), Utilities Code, as added by this Act. | ||
| SECTION 12. (a) The Public Utility Commission shall | ||
| conduct a study to determine the effect of the pricing methodology | ||
| the commission develops under Section 39.916(k), Utilities Code, as | ||
| added by this Act, and shall report its findings and | ||
| recommendations to the 83rd Legislature not later than January 15, | ||
| 2013. The study must include an assessment of: | ||
| (1) the development of the market in ERCOT for the sale | ||
| of surplus electricity, including the prices that retail electric | ||
| providers and electric utilities, municipal electric utilities, | ||
| and electric cooperatives in areas in which customer choice has not | ||
| been introduced pay for surplus electricity, and the amount of | ||
| surplus electricity those entities have purchased; | ||
| (2) the rate of adoption by customers in this state of | ||
| distributed renewable generation, including generation by solar | ||
| and other on-site renewable technologies, including a comparison of | ||
| adopted rates in this state compared to the adopted rates in other | ||
| states, the extent to which adopted rates vary by retail market | ||
| structure, the amount of direct installation incentives, the | ||
| pricing for purchasing of surplus electricity, and the extent to | ||
| which adopted rates are affected by the cost of other electric | ||
| supplies; | ||
| (3) a comparison of the default fair market value | ||
| price for surplus electricity to: | ||
| (A) the local market clearing prices of energy at | ||
| the time of day surplus electricity has been made available to the | ||
| grid; and | ||
| (B) the avoided costs of electric utilities as | ||
| determined in accordance with commission rules; and | ||
| (4) the extent to which electric service customers | ||
| with distributed renewable generation help avoid transmission and | ||
| distribution upgrades and reduce pollution, including an | ||
| estimation of the value of those benefits regionally. | ||
| (b) The study report must include any recommendations for | ||
| improvements in policies necessary to appropriately encourage the | ||
| development of distributed renewable generation technologies on | ||
| customer premises. | ||
| SECTION 13. Section 202.010, Property Code, as added by | ||
| this Act, applies to a deed restriction enacted before, on, or after | ||
| the effective date of this Act. | ||
| SECTION 14. Chapter 106, Business & Commerce Code, as added | ||
| by this Act, applies only to a contract for new home construction | ||
| entered into on or after the effective date of this Act. A contract | ||
| entered into before the effective date of this Act is governed by | ||
| the law in effect immediately before the effective date of this Act, | ||
| and that law is continued in effect for that purpose. | ||
| SECTION 15. The state energy conservation office shall | ||
| establish a program under Section 2305.0321, Government Code, as | ||
| added by this Act, not later than January 1, 2012. | ||
| SECTION 16. This Act takes effect immediately if it | ||
| receives a vote of two-thirds of all the members elected to each | ||
| house, as provided by Section 39, Article III, Texas Constitution. | ||
| If this Act does not receive the vote necessary for immediate | ||
| effect, this Act takes effect September 1, 2011. | ||
