Bill Text: TX SB435 | 2027-2028 | 90th Legislature Regular Session | Introduced
Bill Title: Relating to the permitting of renewable energy generation facilities; authorizing fees.
Sponsorship: Partisan Bill (Republican 1)
Status: (Introduced) 2026-11-19 - Filed [SB435 Detail]
Download: Texas-2027-SB435-Introduced.html
| 90R1028 SCR-F | ||
| By: Hall | S.B. No. 435 | |
|
|
||
|
|
||
| relating to the permitting of renewable energy generation | ||
| facilities; authorizing fees. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Subchapter C, Chapter 15, Utilities Code, is | ||
| amended by adding Section 15.053 to read as follows: | ||
| Sec. 15.053. COMPLAINT REGARDING RENEWABLE ENERGY | ||
| GENERATION FACILITIES. (a) An affected person may complain to the | ||
| commission in writing setting forth an act or omission by an owner | ||
| or operator of a renewable energy generation facility in violation | ||
| or claimed violation of Subchapter F, Chapter 35. | ||
| (b) The commission shall keep for a reasonable period an | ||
| information file about each complaint filed with the commission | ||
| relating to an owner or operator of a renewable energy generation | ||
| facility. | ||
| (c) The commission, at least quarterly and until final | ||
| disposition of the written complaint, shall notify the parties to | ||
| the complaint of the status of the complaint unless the notice would | ||
| jeopardize an undercover investigation. | ||
| SECTION 2. Chapter 35, Utilities Code, is amended by adding | ||
| Subchapter F to read as follows: | ||
| SUBCHAPTER F. RENEWABLE ENERGY GENERATION FACILITY PERMIT | ||
| Sec. 35.201. DEFINITIONS; APPLICABILITY. (a) In this | ||
| subchapter: | ||
| (1) "Permit holder" means a person who holds a permit | ||
| issued under this subchapter. | ||
| (2) "Person" includes an electric cooperative and a | ||
| municipally owned utility. | ||
| (3) "Renewable energy generation facility" means: | ||
| (A) a wind power facility as defined by Section | ||
| 301.0001; | ||
| (B) a solar power facility as defined by Section | ||
| 302.0001; | ||
| (C) a battery energy storage facility as defined | ||
| by Section 303.0001 or another type of electric energy storage | ||
| facility; or | ||
| (D) a renewable power facility. | ||
| (4) "Renewable power facility" means a facility that: | ||
| (A) generates electric energy using a renewable | ||
| energy technology, as defined by Section 39.916, other than a | ||
| technology that relies exclusively on wind or solar energy; and | ||
| (B) is not an electric energy storage facility. | ||
| (b) The permit requirements of this subchapter apply to a | ||
| renewable energy generation facility regardless of whether the | ||
| facility is the subject of a facility agreement entered into under | ||
| Chapter 301, 302, or 303. | ||
| (c) This subchapter applies only to a renewable energy | ||
| generation facility that is intended to be used to sell energy or | ||
| ancillary services at wholesale. | ||
| Sec. 35.202. PERMIT REQUIRED. (a) A person may not | ||
| interconnect a renewable energy generation facility to a | ||
| transmission facility unless the person holds a permit to operate a | ||
| renewable energy generation facility issued by the commission under | ||
| this subchapter. | ||
| (b) The commission by rule shall require each permitted | ||
| renewable energy generation facility to be installed only in a | ||
| location that: | ||
| (1) for a solar power facility, is at least: | ||
| (A) 500 feet from any property line, unless the | ||
| permit holder has obtained a written waiver from each owner of | ||
| property located less than 500 feet from the permitted facility; | ||
| and | ||
| (B) 500 feet from any habitable structure, unless | ||
| the permit holder has obtained a written waiver from each owner of | ||
| the habitable structure; | ||
| (2) for a wind power facility, is at least twice the | ||
| height of the wind turbine, including the blades of the turbine, | ||
| from the property line of each property that borders the property on | ||
| which the permitted facility is located, unless the permit holder | ||
| has obtained a written waiver from each owner of property located in | ||
| the applicable area; and | ||
| (3) for a battery energy storage facility, is at | ||
| least: | ||
| (A) 500 feet from any property line, unless the | ||
| permit holder has obtained a written waiver from each owner of | ||
| property located less than 500 feet from the permitted facility; | ||
| and | ||
| (B) 500 feet from: | ||
| (i) public ways; | ||
| (ii) buildings; | ||
| (iii) stored combustible materials; | ||
| (iv) hazardous materials; | ||
| (v) high-piled stock; and | ||
| (vi) other exposure hazards not associated | ||
| with electrical grid infrastructure. | ||
| (c) The commission by rule shall require: | ||
| (1) each permitted renewable energy generation | ||
| facility to be installed only in a location that, in the event of an | ||
| emergency at the site of the permitted renewable energy generation | ||
| facility, will not block the only access point to a residential | ||
| area; or | ||
| (2) an alternate access point to be constructed for | ||
| any residential area in which an emergency at the site of the | ||
| permitted facility could block the only access point to the | ||
| residential area. | ||
| (d) A person may apply for a permit under this subchapter by | ||
| filing with the commission: | ||
| (1) a description of the proposed location of the | ||
| renewable energy generation facility; | ||
| (2) a description of the type of renewable energy | ||
| generation facility; | ||
| (3) a statement identifying the fire department, as | ||
| defined by Section 419.021, Government Code, volunteer fire | ||
| department, fire marshal, or other first responder entity that may | ||
| reasonably be expected to be the primary first responder to a fire | ||
| at the location of the renewable energy generation facility; | ||
| (4) a statement that the person has provided written | ||
| notice to the entity identified in Subdivision (3) of the | ||
| applicant's intent to install a renewable energy generation | ||
| facility; | ||
| (5) evidence of insurance coverage sufficient to | ||
| insure against losses arising from the operation of the renewable | ||
| energy generation facility; and | ||
| (6) any other information required by commission rule. | ||
| (e) When an application for a permit, or an amendment to a | ||
| permit issued under this section, is filed, the commission shall | ||
| give notice of the application to the county judge of the county in | ||
| which all or a majority of the renewable energy generation facility | ||
| is proposed to be located. The county shall publish the notice in | ||
| at least three consecutive issues of a newspaper with general | ||
| circulation in the county. The county shall also publish the notice | ||
| on the county's Internet website. The county may not remove the | ||
| notice from its Internet website after publication. | ||
| (f) The commission may hold one or more public meetings on a | ||
| permit application in the county in which the renewable energy | ||
| generation facility is proposed to be located. The commission | ||
| shall hold a public meeting: | ||
| (1) on the request of a member of the legislature who | ||
| represents the area in which the renewable energy generation | ||
| facility is proposed to be located; or | ||
| (2) if the commission determines there is substantial | ||
| public interest in the proposed permit. | ||
| (g) The commission by order or rule may delegate to the | ||
| executive director or another commission employee the authority to | ||
| hold a public meeting under this section. | ||
| (h) The commission may approve an application for a permit | ||
| only if the commission finds that: | ||
| (1) issuance of the permit would not violate state or | ||
| federal law; and | ||
| (2) the location of the proposed renewable energy | ||
| generation facility complies with rules adopted under Subsections | ||
| (b) and (c). | ||
| (i) The commission by rule shall adopt a fee to be imposed on | ||
| each permit applicant to cover costs associated with implementing | ||
| this section. | ||
| (j) For purposes of this subchapter: | ||
| (1) a provision of Subchapter B or E, Chapter 14, that | ||
| authorizes the commission to regulate a public utility also applies | ||
| to a person required to obtain a permit under this section, | ||
| including an electric cooperative or a municipally owned utility; | ||
| and | ||
| (2) a reference in Chapter 15 to a person includes a | ||
| person required to obtain a permit under this section, including an | ||
| electric cooperative or a municipally owned utility. | ||
| SECTION 3. As soon as practicable after the effective date | ||
| of this Act, the Public Utility Commission of Texas shall adopt | ||
| rules to effectuate the changes in law made by this Act. | ||
| SECTION 4. This Act takes effect immediately if it receives | ||
| a vote of two-thirds of all the members elected to each house, as | ||
| provided by Section 39, Article III, Texas Constitution. If this | ||
| Act does not receive the vote necessary for immediate effect, this | ||
| Act takes effect September 1, 2027. | ||
