Bill Text: TX SB2098 | 2017-2018 | 85th Legislature | Introduced
Bill Title: Relating to requirements for underground facility damage prevention and safety.
Sponsorship: Partisan Bill (Republican 1)
Status: (Introduced - Dead) 2017-04-25 - Left pending in committee [SB2098 Detail]
Download: Texas-2017-SB2098-Introduced.html
| 85R12219 JXC-F | ||
| By: Hall | S.B. No. 2098 | |
|
|
||
|
|
||
| relating to requirements for underground facility damage | ||
| prevention and safety. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Section 251.002(6), Utilities Code, is amended | ||
| to read as follows: | ||
| (6) "Excavator" means an individual who or legal | ||
| entity [ |
||
| this state. | ||
| SECTION 2. Subchapter A, Chapter 251, Utilities Code, is | ||
| amended by adding Section 251.0045 to read as follows: | ||
| Sec. 251.0045. EXCAVATION BY SUBCONTRACTOR. A | ||
| subcontractor who performs an excavation operation may not begin | ||
| the excavation unless the subcontractor has complied with the | ||
| requirements this chapter imposes on an excavator, regardless of | ||
| whether the general contractor that hired the subcontractor has | ||
| complied with the requirements. | ||
| SECTION 3. Section 251.151, Utilities Code, is amended by | ||
| amending Subsection (a) and adding Subsection (a-1) to read as | ||
| follows: | ||
| (a) Except as provided by Sections 251.155 and 251.156, an | ||
| excavator [ |
||
| notification center not earlier than the 14th day before the date | ||
| the excavation is to begin [ |
||
|
|
||
| legal holidays. An excavator may not excavate: | ||
| (1) before 8 a.m. on the third day after the date on | ||
| which the excavator gives the notice, excluding Saturdays, Sundays, | ||
| and legal holidays; or | ||
| (2) after the 21st day after the date on which the | ||
| excavator gives the notice, including Saturdays, Sundays, and legal | ||
| holidays. | ||
| (a-1) If markings made by an operator after notice is given | ||
| under Subsection (a) for an excavation operation showing the | ||
| location of underground facilities in the excavation area are no | ||
| longer visible, are unclear, or are damaged, the excavator shall | ||
| give another notice under Subsection (a) for the unfinished | ||
| portions of the excavation operation. | ||
| SECTION 4. Sections 251.157(a) and (d), Utilities Code, are | ||
| amended to read as follows: | ||
| (a) Each Class A underground facility operator contacted by | ||
| the notification system shall mark the approximate location of its | ||
| underground facilities at or near the site of the proposed | ||
| excavation if the operator believes that marking the location is | ||
| necessary. The operator shall mark the location not later than: | ||
| (1) 8 a.m. on the third day following the date on which | ||
| the excavator gives to the notification system notice of intent to | ||
| excavate under Section 251.151(a) [ |
||
|
|
||
|
|
||
| [ |
||
|
|
||
| [ |
||
|
|
||
| (2) [ |
||
| excavator. | ||
| (d) Not later than 8 a.m. on the third day following the date | ||
| on which the excavator gives to the notification system notice of | ||
| intent to excavate under Section 251.151(a), excluding Saturdays, | ||
| Sundays, and legal holidays [ |
||
|
|
||
|
|
||
| notify the excavator of the operator's plans to not mark the | ||
| proximate location of an underground facility at or near the site of | ||
| the proposed excavation. The operator must provide the | ||
| notification by e-mail or facsimile or by another verifiable | ||
| electronic method approved by the board. | ||
| SECTION 5. Section 251.151(b), Utilities Code, is repealed. | ||
| SECTION 6. This Act takes effect September 1, 2017. | ||
