Bill Text: TX SB2014 | 2023-2024 | 88th Legislature | Engrossed
Bill Title: Relating to the legislature's goals for renewable electric generating capacity.
Sponsorship: Partisan Bill (Republican 6)
Status: (Engrossed - Dead) 2023-05-18 - Left pending in committee [SB2014 Detail]
Download: Texas-2023-SB2014-Engrossed.html
| By: King, et al. | S.B. No. 2014 | |
|
|
||
|
|
||
| relating to the legislature's goals for renewable electric | ||
| generating capacity. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Section 36.053(d), Utilities Code, is amended to | ||
| read as follows: | ||
| (d) If the commission issues a certificate of convenience | ||
| and necessity or if the commission, acting under the authority | ||
| formerly provided by Section 39.203(e), ordered [ |
||
| electric utility or a transmission and distribution utility to | ||
| construct or enlarge transmission or transmission-related | ||
| facilities to facilitate meeting the goal for generating capacity | ||
| from renewable energy technologies under former Section 39.904(a), | ||
| the commission shall find that the facilities are used and useful to | ||
| the utility in providing service for purposes of this section and | ||
| are prudent and includable in the rate base, regardless of the | ||
| extent of the utility's actual use of the facilities. | ||
| SECTION 2. Section 37.0541, Utilities Code, is amended to | ||
| read as follows: | ||
| Sec. 37.0541. CONSOLIDATION OF CERTAIN PROCEEDINGS. The | ||
| commission shall consolidate the proceeding on an application to | ||
| obtain or amend a certificate of convenience and necessity for the | ||
| construction of a transmission line with the proceeding on another | ||
| application to obtain or amend a certificate of convenience and | ||
| necessity for the construction of a transmission line if it is | ||
| apparent from the applications or a motion to intervene in either | ||
| proceeding that the transmission lines that are the subject of the | ||
| separate proceedings share a common point of interconnection. | ||
| [ |
||
| SECTION 3. Sections 37.056(c) and (d), Utilities Code, are | ||
| amended to read as follows: | ||
| (c) The commission shall grant each certificate on a | ||
| nondiscriminatory basis after considering: | ||
| (1) the adequacy of existing service; | ||
| (2) the need for additional service; | ||
| (3) the effect of granting the certificate on the | ||
| recipient of the certificate and any electric utility serving the | ||
| proximate area; and | ||
| (4) other factors, such as: | ||
| (A) community values; | ||
| (B) recreational and park areas; | ||
| (C) historical and aesthetic values; | ||
| (D) environmental integrity; and | ||
| (E) the probable improvement of service or | ||
| lowering of cost to consumers in the area if the certificate is | ||
| granted, including any potential economic or reliability benefits | ||
| associated with dual fuel and fuel storage capabilities in areas | ||
| outside the ERCOT power region[ |
||
| [ |
||
| (d) The commission by rule shall establish criteria, in | ||
| addition to the criteria described by Subsection (c), for granting | ||
| a certificate for a transmission project that serves the ERCOT | ||
| power region and[ |
||
| reliability standards[ |
||
| comparison of the estimated cost of the transmission project for | ||
| consumers and the estimated congestion cost savings for consumers | ||
| that may result from the transmission project, considering both | ||
| current and future expected congestion levels and the transmission | ||
| project's ability to reduce those congestion levels. The | ||
| commission shall include with its decision on an application for a | ||
| certificate to which this subsection applies findings on the | ||
| criteria. | ||
| SECTION 4. Section 39.002, Utilities Code, as amended by | ||
| Chapters 908 (H.B. 4492) and 950 (S.B. 1580), Acts of the 87th | ||
| Legislature, Regular Session, 2021, is reenacted and amended to | ||
| read as follows: | ||
| Sec. 39.002. APPLICABILITY. This chapter, other than | ||
| Sections 39.151, 39.1516, 39.155, 39.157(e), 39.159, 39.160, | ||
| 39.203, [ |
||
| M and N, does not apply to a municipally owned utility or an | ||
| electric cooperative. Sections 39.157(e) and[ |
||
| electric cooperative that is offering customer choice. If there is | ||
| a conflict between the specific provisions of this chapter and any | ||
| other provisions of this title, except for Chapters 40 and 41, the | ||
| provisions of this chapter control. | ||
| SECTION 5. Section 39.203(e), Utilities Code, is amended to | ||
| read as follows: | ||
| (e) The commission may require an electric utility or a | ||
| transmission and distribution utility to construct or enlarge | ||
| facilities to ensure safe and reliable service for the state's | ||
| electric markets and to reduce transmission constraints within | ||
| ERCOT in a cost-effective manner where the constraints are such | ||
| that they are not being resolved through Chapter 37 or the ERCOT | ||
| transmission planning process. [ |
||
| electric utility or transmission and distribution utility ordered | ||
| to construct or enlarge facilities under this subchapter need not | ||
| prove that the construction ordered is necessary for the service, | ||
| accommodation, convenience, or safety of the public and need not | ||
| address the factors listed in Sections 37.056(c)(1)-(3) and (4)(E). | ||
| Notwithstanding any other law, including Section 37.057, in any | ||
| proceeding brought under Chapter 37 by an electric utility or a | ||
| transmission and distribution utility related to an application for | ||
| a certificate of public convenience and necessity to construct or | ||
| enlarge transmission or transmission-related facilities under this | ||
| subsection, the commission shall issue a final order before the | ||
| 181st day after the date the application is filed with the | ||
| commission. If the commission does not issue a final order before | ||
| that date, the application is approved. | ||
| SECTION 6. Section 39.402(a), Utilities Code, is amended to | ||
| read as follows: | ||
| (a) Until the date on which an electric utility subject to | ||
| this subchapter is authorized by the commission to implement | ||
| customer choice, the rates of the utility shall be regulated under | ||
| traditional cost of service regulation and the utility is subject | ||
| to all applicable regulatory authority prescribed by this subtitle | ||
| and Subtitle A, including Chapters 14, 32, 33, 36, and 37. Until the | ||
| date on which an electric utility subject to this subchapter | ||
| implements customer choice, the provisions of this chapter, other | ||
| than this subchapter, Sections 39.1516[ |
||
| the provisions relating to the duty to obtain a permit from the | ||
| Texas Commission on Environmental Quality for an electric | ||
| generating facility and to reduce emissions from an electric | ||
| generating facility, shall not apply to that utility. That portion | ||
| of any commission order entered before September 1, 2001, to comply | ||
| with this subchapter shall be null and void. | ||
| SECTION 7. Section 39.452(d), Utilities Code, is amended to | ||
| read as follows: | ||
| (d) Until the date on which an electric utility subject to | ||
| this subchapter implements customer choice: | ||
| (1) the provisions of this chapter do not apply to that | ||
| electric utility, other than this subchapter, Sections 39.1516[ |
||
| permit from the Texas Commission on Environmental Quality for an | ||
| electric generating facility and to reduce emissions from an | ||
| electric generating facility, and the provisions of Subchapter G | ||
| that pertain to the recovery and securitization of hurricane | ||
| reconstruction costs authorized by Sections 39.458-39.463; and | ||
| (2) the electric utility is not subject to a rate | ||
| freeze and, subject to the limitation provided by Subsection (b), | ||
| may file for rate changes under Chapter 36 and for approval of one | ||
| or more of the rate rider mechanisms authorized by Sections 39.454 | ||
| and 39.455. | ||
| SECTION 8. Section 39.502(b), Utilities Code, is amended to | ||
| read as follows: | ||
| (b) Until the date on which an electric utility subject to | ||
| this subchapter implements customer choice, the provisions of this | ||
| chapter, other than this subchapter and Sections 39.1516[ |
||
| and 39.905, do not apply to that utility. | ||
| SECTION 9. Section 39.552(b), Utilities Code, is amended to | ||
| read as follows: | ||
| (b) Until the date on which an electric utility subject to | ||
| this subchapter implements customer choice, the provisions of this | ||
| chapter, other than this subchapter and Sections 39.1516[ |
||
| and 39.905, do not apply to that utility. | ||
| SECTION 10. Subchapter Z, Chapter 39, Utilities Code, is | ||
| amended by adding Sections 39.9111, 39.9112, and 39.9113 to read as | ||
| follows: | ||
| Sec. 39.9111. RULES RELATED TO RENEWABLE POWER FACILITIES. | ||
| The commission may adopt rules requiring renewable power facilities | ||
| to have reactive power control capabilities or any other feasible | ||
| technology designed to reduce the facilities' effects on system | ||
| reliability. | ||
| Sec. 39.9112. REPORT ON TRANSMISSION AND GENERATION | ||
| CAPACITY. The commission and the independent organization | ||
| certified under Section 39.151 for the ERCOT power region shall | ||
| study the need for increased transmission and generation capacity | ||
| throughout this state and report to the legislature the results of | ||
| the study and any recommendations for legislation. The report must | ||
| be filed with the legislature not later than December 31 of each | ||
| even-numbered year. | ||
| Sec. 39.9113. RENEWABLE ENERGY CREDITS. To facilitate | ||
| voluntary contractual obligations and verify claims regarding | ||
| environmental attributes of renewable energy production in this | ||
| state, the independent organization certified under Section 39.151 | ||
| for the ERCOT power region shall maintain an accreditation and | ||
| banking system to award and track voluntary renewable energy | ||
| credits generated by eligible facilities. | ||
| SECTION 11. Section 39.916(a), Utilities Code, is amended | ||
| by amending Subdivision (1) and adding Subdivision (4) to read as | ||
| follows: | ||
| (1) "Distributed renewable generation" means electric | ||
| generation with a capacity of not more than 2,000 kilowatts | ||
| provided by a renewable energy technology[ |
||
| the meter. | ||
| (4) "Renewable energy technology" means any | ||
| technology that relies exclusively on an energy source that is | ||
| naturally regenerated over a short time and is derived from the sun | ||
| directly or indirectly or from moving water or other natural | ||
| movements or mechanisms of the environment. The term includes a | ||
| technology that relies on energy derived from the sun directly, on | ||
| wind, geothermal, hydroelectric, wave, or tidal energy, or on | ||
| biomass or biomass-based waste products, including landfill gas. | ||
| The term does not include a technology that relies on an energy | ||
| resource derived from a fossil fuel, a waste product from a fossil | ||
| fuel, or a waste product from an inorganic source. | ||
| SECTION 12. Section 40.001(a), Utilities Code, is amended | ||
| to read as follows: | ||
| (a) Notwithstanding any other provision of law, except | ||
| Sections 39.155, 39.157(e), and 39.203, [ |
||
| governs the transition to and the establishment of a fully | ||
| competitive electric power industry for municipally owned | ||
| utilities. With respect to the regulation of municipally owned | ||
| utilities, this chapter controls over any other provision of this | ||
| title, except for sections in which the term "municipally owned | ||
| utility" is specifically used. | ||
| SECTION 13. Section 40.004, Utilities Code, is amended to | ||
| read as follows: | ||
| Sec. 40.004. JURISDICTION OF COMMISSION. Except as | ||
| specifically otherwise provided in this chapter, the commission has | ||
| jurisdiction over municipally owned utilities only for the | ||
| following purposes: | ||
| (1) to regulate wholesale transmission rates and | ||
| service, including terms of access, to the extent provided by | ||
| Subchapter A, Chapter 35; | ||
| (2) to regulate certification of retail service areas | ||
| to the extent provided by Chapter 37; | ||
| (3) to regulate rates on appeal under Subchapters D | ||
| and E, Chapter 33, subject to Section 40.051(c); | ||
| (4) to establish a code of conduct as provided by | ||
| Section 39.157(e) applicable to anticompetitive activities and to | ||
| affiliate activities limited to structurally unbundled affiliates | ||
| of municipally owned utilities, subject to Section 40.054; | ||
| (5) to establish terms and conditions for open access | ||
| to transmission and distribution facilities for municipally owned | ||
| utilities providing customer choice, as provided by Section 39.203; | ||
| (6) to administer [ |
||
| program under Section 39.9044(b); | ||
| (7) to require reports of municipally owned utility | ||
| operations only to the extent necessary to: | ||
| (A) enable the commission to determine the | ||
| aggregate load and energy requirements of the state and the | ||
| resources available to serve that load; or | ||
| (B) enable the commission to determine | ||
| information relating to market power as provided by Section 39.155; | ||
| and | ||
| (8) to evaluate and monitor the cybersecurity | ||
| preparedness of a municipally owned utility described by Section | ||
| 39.1516(a)(3) or (4). | ||
| SECTION 14. Section 41.001, Utilities Code, is amended to | ||
| read as follows: | ||
| Sec. 41.001. APPLICABLE LAW. Notwithstanding any other | ||
| provision of law, except Sections 39.155, 39.157(e), and 39.203, | ||
| [ |
||
| establishment of a fully competitive electric power industry for | ||
| electric cooperatives. Regarding the regulation of electric | ||
| cooperatives, this chapter shall control over any other provision | ||
| of this title, except for sections in which the term "electric | ||
| cooperative" is specifically used. | ||
| SECTION 15. Sections 39.904 and 39.916(g), Utilities Code, | ||
| are repealed. | ||
| SECTION 16. It is the intent of the 88th Legislature, | ||
| Regular Session, 2023, that the amendments made by this Act be | ||
| harmonized with another Act of the 88th Legislature, Regular | ||
| Session, 2023, relating to nonsubstantive additions to and | ||
| corrections in enacted codes. | ||
| SECTION 17. This Act takes effect September 1, 2023. | ||