Bill Text: TX SB1978 | 2025-2026 | 89th Legislature | Engrossed
Bill Title: Relating to the interconnection of a facility in the ERCOT power region to certain other facilities.
Sponsorship: Partisan Bill (Republican 3)
Status: (Engrossed - Dead) 2025-05-23 - Referred to State Affairs [SB1978 Detail]
Download: Texas-2025-SB1978-Engrossed.html
| By: Hall, Hughes | S.B. No. 1978 | |
| Kolkhorst | ||
|
|
||
|
|
||
| relating to the interconnection of a facility in the ERCOT power | ||
| region to certain other facilities. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Section 37.051, Utilities Code, is amended by | ||
| amending Subsections (c), (c-1), (c-2), and (c-3) and adding | ||
| Subsection (c-4) to read as follows: | ||
| (c) Notwithstanding any other provision of this chapter | ||
| except Subsection (c-1)[ |
||
| cooperative is not required to obtain a certificate of public | ||
| convenience and necessity for the construction, installation, | ||
| operation, or extension of any generating facilities or necessary | ||
| interconnection facilities. | ||
| (c-1) In this subsection, "facility" means a facility that | ||
| consumes, generates, transmits, or distributes electricity. | ||
| Notwithstanding any other provision of this title except Section | ||
| 11.009, and except as provided by Subsection (c-3) [ |
||
| electric cooperative, [ |
||
| [ |
||
| interconnect a facility in [ |
||
| located wholly or partly outside of this state or to a facility that | ||
| is connected directly or indirectly with a facility located wholly | ||
| or partly outside of this state, [ |
||
| (1) the proposed interconnection will not subject the | ||
| ERCOT power region to additional federal control or jurisdiction; | ||
| (2) the commission first determines that the proposed | ||
| interconnection is in the public interest after considering: | ||
| (A) the technical attributes of the proposed | ||
| interconnection; | ||
| (B) the expected costs to the public to install, | ||
| operate, and maintain the interconnection; | ||
| (C) the results of relevant criteria adopted by | ||
| the commission under Section 37.056(d); | ||
| (D) the results of a reliability assessment | ||
| conducted by the independent organization certified under Section | ||
| 39.151 for the ERCOT power region; and | ||
| (E) any other information the commission | ||
| considers appropriate; | ||
| (3) the cooperative, utility, or person applies for a | ||
| public interest determination from the commission under | ||
| Subdivision (2) [ |
||
| cooperative, utility, or person seeks any order from the Federal | ||
| Energy Regulatory Commission related to the proposed | ||
| interconnection; and | ||
| (4) after the cooperative, utility, or person obtains | ||
| any order from the Federal Energy Regulatory Commission related to | ||
| the proposed interconnection, the commission grants a certificate | ||
| stating that public convenience or necessity requires or will | ||
| require the interconnection. | ||
| (c-2) The commission shall apply Section 37.056 in | ||
| considering an application under Subsection (c-1) [ |
||
| implement Subsection (c-1) [ |
||
| [ |
||
| December 31, 2014. | ||
| (c-3) [ |
||
| after the date the application is filed, shall approve an | ||
| application filed under Subsection (c-1) for a facility that is to | ||
| be constructed under an interconnection agreement appended to an | ||
| offer of settlement approved in a final order of the Federal Energy | ||
| Regulatory Commission that was issued in Docket No. TX11-01-001 on | ||
| or before December 31, 2014, directing physical connection between | ||
| the ERCOT and SERC regions under Sections 210, 211, and 212 of the | ||
| Federal Power Act (16 U.S.C. Sections 824i, 824j, and 824k). In | ||
| approving the application, the commission may prescribe reasonable | ||
| conditions to protect the public interest that are consistent with | ||
| the final order of the Federal Energy Regulatory Commission. | ||
| (c-4) [ |
||
| (c-3) is intended to restrict the authority of the commission or the | ||
| independent organization certified under Section 39.151 for the | ||
| ERCOT power region to adopt rules or protocols of general | ||
| applicability. | ||
| SECTION 2. The changes in law made by this Act in Section | ||
| 37.051, Utilities Code, apply only to an interconnection made on or | ||
| after the effective date of this Act. An interconnection made | ||
| before the effective date of this Act is governed by the law in | ||
| effect when the interconnection was made, and the former law is | ||
| continued in effect for that purpose. | ||
| SECTION 3. This Act takes effect immediately if it receives | ||
| a vote of two-thirds of all the members elected to each house, as | ||
| provided by Section 39, Article III, Texas Constitution. If this | ||
| Act does not receive the vote necessary for immediate effect, this | ||
| Act takes effect September 1, 2025. | ||