Bill Text: TX HB3687 | 2015-2016 | 84th Legislature | Introduced
Bill Title: Relating to design-build procedures for civil works projects.
Sponsorship: Partisan Bill (Republican 1)
Status: (Introduced - Dead) 2015-03-23 - Referred to Government Transparency & Operation [HB3687 Detail]
Download: Texas-2015-HB3687-Introduced.html
| 84R11280 TSR-F | ||
| By: Frank | H.B. No. 3687 | |
|
|
||
|
|
||
| relating to design-build procedures for civil works projects. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Section 2269.353(a), Government Code, is amended | ||
| to read as follows: | ||
| (a) A governmental entity may use the design-build method | ||
| for the construction, rehabilitation, alteration, or repair of a | ||
| civil works project. In using this method and in entering into a | ||
| contract for the services of a design-build firm, the contracting | ||
| governmental entity and the design-build firm shall follow the | ||
| procedures provided by this subchapter. The governmental entity | ||
| shall select the design-build firm in a one-step or two-step | ||
| process. | ||
| SECTION 2. The heading to Section 2269.357, Government | ||
| Code, is amended to read as follows: | ||
| Sec. 2269.357. REQUEST FOR PROPOSALS OR QUALIFICATIONS. | ||
| SECTION 3. Section 2269.357, Government Code, is amended by | ||
| amending Subsection (a) and adding Subsections (c) and (d) to read | ||
| as follows: | ||
| (a) The governmental entity shall prepare a single request | ||
| for proposals, in the case of a one-step process, or an initial | ||
| request for qualifications, in the case of a two-step process, that | ||
| includes a statement that the selection process is a one-step or | ||
| two-step process and: | ||
| (1) information on the civil works project site; | ||
| (2) project scope; | ||
| (3) project budget; | ||
| (4) project schedule; | ||
| (5) criteria for selection under Section 2269.359 and | ||
| the formula for evaluating proposals [ |
||
| and | ||
| (6) other information that may assist potential | ||
| design-build firms in submitting proposals or responses to a | ||
| request for qualifications for the project. | ||
| (c) If a one-step process is used, in addition to the | ||
| information required by Subsection (a), the request for proposals | ||
| shall include the design criteria package. | ||
| (d) If a two-step process is used, the governmental entity | ||
| may not request, as part of the offeror's response to the request | ||
| for qualifications, the offeror's cost proposal or technical | ||
| proposal. | ||
| SECTION 4. Section 2269.359, Government Code, is amended by | ||
| amending Subsections (a) and (c) and adding Subsection (a-1) to | ||
| read as follows: | ||
| (a) The governmental entity shall receive proposals, in the | ||
| case of a one-step process, or responses to a request for | ||
| qualifications, in the case of a two-step process, and shall | ||
| evaluate each offeror's experience, technical competence, project | ||
| approach, cost methodology, and capability to perform, the past | ||
| performance of the offeror's team and members of the team, and other | ||
| appropriate factors submitted by the team or firm in response to the | ||
| request for proposals or qualifications. The governmental entity | ||
| may not evaluate any cost-related or price-related factors, other | ||
| than the offeror's cost methodology[ |
||
|
|
||
| (a-1) If a one-step process is used, the governmental entity | ||
| shall also evaluate, for each offeror, the results of each | ||
| offeror's interview, if the governmental entity included the | ||
| results of an interview process in the selection criteria. | ||
| (c) If a two-step process is used, the [ |
||
| entity shall, in accordance with the evaluation criteria described | ||
| by Subsection (a), qualify five or fewer offerors to: | ||
| (1) submit additional information, including the | ||
| offeror's cost proposal and technical proposal under Section | ||
| 2269.361; and | ||
| (2) submit to an interview, if the governmental entity | ||
| included the results of an interview process in the selection | ||
| criteria [ |
||
| SECTION 5. Section 2269.360, Government Code, is amended to | ||
| read as follows: | ||
| Sec. 2269.360. SELECTION OF DESIGN-BUILD FIRM. (a) If a | ||
| one-step process is used to select a design-build firm, the | ||
| governmental entity shall select the firm after evaluating the | ||
| proposals received in accordance with Section 2269.359 and the | ||
| governmental entity's selection criteria, as stated in the request | ||
| for proposals. | ||
| (b) If a two-step process is used to select a design-build | ||
| firm, the [ |
||
|
|
||
| proposals as provided by Section 2269.361. | ||
| SECTION 6. The heading to Section 2269.361, Government | ||
| Code, is amended to read as follows: | ||
| Sec. 2269.361. PROCEDURES FOR SELECTION OF DESIGN-BUILD | ||
| FIRM UNDER TWO-STEP PROCESS [ |
||
|
|
||
| SECTION 7. Sections 2269.361(a) and (e), Government Code, | ||
| are amended to read as follows: | ||
| (a) A governmental entity shall request proposals from | ||
| design-build firms identified under Section 2269.359(c). A firm | ||
| must submit a proposal not later than the 180th day after the date | ||
| the governmental entity makes a public request for the proposals | ||
| from the selected firms. The request for proposals must include: | ||
| (1) a design criteria package; | ||
| (2) if the project site is identified, a geotechnical | ||
| baseline report or other information that provides the design-build | ||
| firm minimum geotechnical design parameters to submit a proposal; | ||
| (3) detailed instructions for preparing both a cost | ||
| proposal and a [ |
||
| included in the technical proposal, including a description of the | ||
| form and level of completeness of drawings expected; and | ||
| (4) the [ |
||
|
|
||
| and ranked. | ||
| (e) The governmental entity shall first open, evaluate, and | ||
| score each responsive technical proposal submitted on the basis of | ||
| the criteria described in the request for proposals and assign | ||
| points on the basis of the formula [ |
||
| request for proposals. The governmental entity may reject as | ||
| nonresponsive any firm that makes a significant change to the | ||
| composition of its firm as initially submitted. The governmental | ||
| entity shall subsequently open, evaluate, and score the cost | ||
| proposals from firms that submitted a responsive technical proposal | ||
| and assign points on the basis of the formula [ |
||
| in the request for proposals. The governmental entity shall select | ||
| the design-build firm in accordance with the formula provided in | ||
| the request for proposals. | ||
| SECTION 8. Section 2269.362, Government Code, is amended to | ||
| read as follows: | ||
| Sec. 2269.362. NEGOTIATION. After selecting the | ||
| highest-ranked design-build firm under Section 2269.360 for a | ||
| one-step process, or Section 2269.361 for a two-step process, the | ||
| governmental entity shall first attempt to negotiate a contract | ||
| with the selected firm. If the governmental entity is unable to | ||
| negotiate a satisfactory contract with the selected firm, the | ||
| entity shall, formally and in writing, end all negotiations with | ||
| that firm and proceed to negotiate with the next firm in the order | ||
| of the selection ranking until a contract is reached or | ||
| negotiations with all ranked firms end. | ||
| SECTION 9. Section 2269.364(c), Government Code, is amended | ||
| to read as follows: | ||
| (c) The governmental entity may offer an unsuccessful | ||
| design-build firm that submits a proposal in response to the | ||
| entity's request for proposals in a one-step process under Section | ||
| 2269.357, or the entity's request for proposals in a two-step | ||
| process [ |
||
| for preliminary engineering costs associated with the development | ||
| of the proposal. The stipend must be [ |
||
|
|
||
| for proposals or qualifications. If the offer is accepted and paid, | ||
| the governmental entity may make use of any work product contained | ||
| in the proposal, including the techniques, methods, processes, and | ||
| information contained in the proposal. The use by the governmental | ||
| entity of any design element contained in an unsuccessful proposal | ||
| is at the sole risk and discretion of the entity and does not confer | ||
| liability on the recipient of the stipend under this subsection. | ||
| SECTION 10. The following provisions of the Government Code | ||
| are repealed. | ||
| (1) Section 2269.352; | ||
| (2) Sections 2269.353(b) and (c); and | ||
| (3) Section 2269.354. | ||
| SECTION 11. This Act takes effect immediately if it | ||
| receives a vote of two-thirds of all the members elected to each | ||
| house, as provided by Section 39, Article III, Texas Constitution. | ||
| If this Act does not receive the vote necessary for immediate | ||
| effect, this Act takes effect September 1, 2015. | ||