Bill Text: TX HB3419 | 2013-2014 | 83rd Legislature | Introduced
Bill Title: Relating to the planning and funding of water projects to be constructed in a region other than the region proposing the project.
Sponsorship: Partisan Bill (Republican 1)
Status: (Introduced - Dead) 2013-03-20 - Referred to Natural Resources [HB3419 Detail]
Download: Texas-2013-HB3419-Introduced.html
| 83R9827 SLB-D | ||
| By: Lavender | H.B. No. 3419 | |
|
|
||
|
|
||
| relating to the planning and funding of water projects to be | ||
| constructed in a region other than the region proposing the | ||
| project. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Section 16.053(e-1), Water Code, is amended to | ||
| read as follows: | ||
| (e-1) A regional water plan may not include a proposal for | ||
| the construction of a water project in another regional water | ||
| planning area unless at least two-thirds of the members of the | ||
| regional water planning group for that area have consented to the | ||
| inclusion of the proposal in the plan [ |
||
|
|
||
|
|
||
| SECTION 2. Section 16.053(h)(4), Water Code, is amended to | ||
| read as follows: | ||
| (4) After the regional water plan is initially | ||
| prepared, the regional water planning group shall submit a copy of | ||
| the plan to the board. The board shall submit comments on the | ||
| regional water plan as to whether the plan meets the requirements of | ||
| Subsections (e) and (e-1) [ |
||
| SECTION 3. Section 16.053(j), Water Code, is amended to | ||
| read as follows: | ||
| (j) The board may provide financial assistance to political | ||
| subdivisions under Subchapters E and F of this chapter, Subchapters | ||
| C, D, E, F, J, O, Q, and R, Chapter 15, and Subchapters D, I, K, and | ||
| L, Chapter 17, for water supply projects only if: | ||
| (1) the board determines that the needs to be | ||
| addressed by the project will be addressed in a manner that is | ||
| consistent with the state water plan; | ||
| (2) beginning January 5, 2002[ |
||
| (A) the board has approved a regional water plan | ||
| as provided by Subsection (i), and any required updates of the plan, | ||
| for the region of the state that includes the area benefiting from | ||
| the proposed project; [ |
||
| (B) if the proposed project is to be constructed | ||
| in a regional water planning area other than the area benefiting | ||
| from the proposed project, at least two-thirds of the members of the | ||
| regional water planning group for the area in which the proposed | ||
| project is to be constructed have consented to the inclusion in that | ||
| regional water plan of the proposal to construct the project as | ||
| required by Subsection (e-1); and | ||
| (C) the board determines that the needs to be | ||
| addressed by the project will be addressed in a manner that is | ||
| consistent with that regional water plan; and | ||
| (3) the board finds that the water audit required | ||
| under Section 16.0121 has been completed and filed. | ||
| SECTION 4. This Act takes effect September 1, 2013. | ||