Bill Text: TX HB340 | 2013-2014 | 83rd Legislature | Engrossed
Bill Title: Relating to the power of the Texas Commission on Environmental Quality to authorize certain injection wells that transect or terminate in the Edwards Aquifer.
Sponsorship: Partisan Bill (Democrat 1)
Status: (Engrossed - Dead) 2013-05-09 - Referred to Natural Resources [HB340 Detail]
Download: Texas-2013-HB340-Engrossed.html
| 83R20621 SMH-F | ||
| By: Rodriguez of Travis | H.B. No. 340 | |
|
|
||
|
|
||
| relating to the power of the Texas Commission on Environmental | ||
| Quality to authorize certain injection wells that transect or | ||
| terminate in the Edwards Aquifer. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Subchapter D, Chapter 27, Water Code, is amended | ||
| by adding Section 27.0516 to read as follows: | ||
| Sec. 27.0516. PERMITS FOR INJECTION WELLS THAT TRANSECT OR | ||
| TERMINATE IN PORTION OF EDWARDS AQUIFER WITHIN EXTERNAL BOUNDARIES | ||
| OF BARTON SPRINGS-EDWARDS AQUIFER CONSERVATION DISTRICT. (a) In | ||
| this section: | ||
| (1) "Edwards Aquifer" means that portion of an arcuate | ||
| belt of porous, waterbearing limestones composed of the Edwards | ||
| Formation, Georgetown Formation, Comanche Peak Formation, Salmon | ||
| Peak Limestone, McKnight Formation, West Nueces Formation, Devil's | ||
| River Limestone, Person Formation, Kainer Formation, and Edwards | ||
| Group trending from west to east to northeast through Kinney, | ||
| Uvalde, Medina, Bexar, Kendall, Comal, Hays, Travis, and Williamson | ||
| Counties. The permeable aquifer units generally overlie the | ||
| less-permeable Glen Rose Formation to the south, overlie the | ||
| less-permeable Comanche Peak and Walnut Formations north of the | ||
| Colorado River, and underlie the less-permeable Del Rio Clay | ||
| regionally. | ||
| (2) "Engineered aquifer storage and recovery | ||
| facility" means a facility with one or more wells that is located, | ||
| designed, constructed, and operated for the purpose of injecting | ||
| fresh water into a subsurface permeable stratum and storing the | ||
| water for subsequent withdrawal and use for a beneficial purpose. | ||
| (3) "Fresh water" means surface water or groundwater, | ||
| without regard to whether the water has been physically, | ||
| chemically, or biologically altered, that: | ||
| (A) contains a total dissolved solids | ||
| concentration of not more than 1,000 milligrams per liter; and | ||
| (B) is otherwise suitable as a source of drinking | ||
| water supply. | ||
| (4) "Saline portion of the Edwards Aquifer" means the | ||
| portion of the Edwards Aquifer that contains only groundwater with | ||
| a total dissolved solids concentration of more than 1,000 | ||
| milligrams per liter. | ||
| (b) This section applies only to the portion of the Edwards | ||
| Aquifer that is within the geographic area circumscribed by the | ||
| external boundaries of the Barton Springs-Edwards Aquifer | ||
| Conservation District but is not in that district's territory or | ||
| the territory of the Edwards Aquifer Authority. | ||
| (c) This section prevails over Section 27.051(i) to the | ||
| extent of a conflict. | ||
| (d) Except as otherwise provided by this section, the | ||
| commission by rule or permit may not authorize an injection well | ||
| that transects or terminates in the Edwards Aquifer. | ||
| (e) The commission by rule may authorize: | ||
| (1) the injection of fresh water withdrawn from the | ||
| Edwards Aquifer into a well that transects or terminates in the | ||
| Edwards Aquifer for the purpose of providing additional recharge; | ||
| or | ||
| (2) the injection of rainwater, storm water, flood | ||
| water, or groundwater into the Edwards Aquifer by means of an | ||
| improved natural recharge feature such as a sinkhole or cave | ||
| located in a karst topographic area for the purpose of providing | ||
| additional recharge. | ||
| (f) The commission by general permit may authorize: | ||
| (1) an activity described by Subsection (e); | ||
| (2) an injection well that transects and isolates the | ||
| saline portion of the Edwards Aquifer and terminates in a lower | ||
| aquifer for the purpose of injecting: | ||
| (A) concentrate from a desalination facility; or | ||
| (B) fresh water as part of an engineered aquifer | ||
| storage and recovery facility; | ||
| (3) an injection well that terminates in that part of | ||
| the saline portion of the Edwards Aquifer that has a total dissolved | ||
| solids concentration of more than 10,000 milligrams per liter for | ||
| the purpose of injecting into the saline portion of the Edwards | ||
| Aquifer: | ||
| (A) concentrate from a desalination facility, | ||
| provided that the injection well must be at least three miles from | ||
| the closest outlet of Barton Springs; or | ||
| (B) fresh water as part of an engineered aquifer | ||
| and storage recovery facility, provided that each well used for | ||
| injection or withdrawal from the facility must be at least three | ||
| miles from the closest outlet of Barton Springs; or | ||
| (4) an injection well that transects or terminates in | ||
| the Edwards Aquifer for: | ||
| (A) aquifer remediation; | ||
| (B) the injection of a nontoxic tracer dye as | ||
| part of a hydrologic study; or | ||
| (C) another beneficial activity that is designed | ||
| and undertaken for the purpose of increasing protection of an | ||
| underground source of drinking water from pollution or other | ||
| deleterious effects. | ||
| (g) The commission must hold a public meeting before issuing | ||
| a general permit under this section. | ||
| (h) Rules adopted or a general permit issued under this | ||
| section: | ||
| (1) must require that an injection well authorized by | ||
| the rules or permit be monitored by means of: | ||
| (A) a monitoring well operated by the injection | ||
| well owner if the commission determines that there is an | ||
| underground source of drinking water in the area of review that is | ||
| potentially affected by the injection well; or | ||
| (B) if Paragraph (A) does not apply, a monitoring | ||
| well operated by a party other than the injection well owner, | ||
| provided that all results of monitoring are promptly made available | ||
| to the injection well owner; | ||
| (2) must ensure that an authorized activity will not | ||
| result in the waste or pollution of fresh water; | ||
| (3) may not authorize an injection well under | ||
| Subsection (f)(2) or (3) unless the well is initially associated | ||
| with a small-scale research project designed to evaluate the | ||
| long-term feasibility and safety of: | ||
| (A) the injection of concentrate from a | ||
| desalination facility; or | ||
| (B) an aquifer storage and recovery project; | ||
| (4) must require any authorization granted to be | ||
| renewed at least as frequently as every 10 years; | ||
| (5) must require that an injection well authorized | ||
| under Subsection (f)(2)(A) or (3)(A) be monitored on an ongoing | ||
| basis by or in coordination with the well owner and that the well | ||
| owner file monitoring reports with the commission at least as | ||
| frequently as every three months; and | ||
| (6) must ensure that any injection well authorized for | ||
| the purpose of injecting concentrate from a desalination facility | ||
| does not transect the fresh water portion of the Edwards Aquifer. | ||
| (i) A monitoring well described by Subsection (h)(1), if | ||
| properly sited and completed, may also be used for monitoring a | ||
| saline water production well. | ||
| (j) A project is considered to be a small-scale research | ||
| project for purposes of Subsection (h)(3) if the project consists | ||
| of one production well and one injection well that are operated on a | ||
| limited scale to provide requisite scientific and engineering | ||
| information. Such a project is considered to be a small-scale | ||
| research project regardless of the borehole size of the wells or the | ||
| equipment associated with the wells or whether the wells are | ||
| subsequently incorporated into a larger-scale commercial facility. | ||
| (k) Notwithstanding Subsection (h)(3), a general permit may | ||
| authorize the owner of an injection well authorized under | ||
| Subsection (f)(2) or (3) to continue operating the well for the | ||
| purpose of implementing the desalination or engineered aquifer | ||
| storage and recovery project following completion of the | ||
| small-scale research project, provided that: | ||
| (1) the injection well owner timely submits the | ||
| information collected as part of the research project, including | ||
| monitoring reports and information regarding the environmental | ||
| impact of the well, to the commission; | ||
| (2) the injection well owner, following the completion | ||
| of studies and monitoring adequate to characterize risks to the | ||
| fresh water portion of the Edwards Aquifer and other fresh water | ||
| associated with the continued operation of the well, and at least 90 | ||
| days before the date the owner initiates commercial well | ||
| operations, files with the commission a notice of intent to | ||
| continue operation of the well after completion of the research | ||
| project; and | ||
| (3) the commission, based on the studies and | ||
| monitoring, the report provided by Texas State University--San | ||
| Marcos under Subsection (l)(2), and any other reasonably available | ||
| information, determines that continued operation of the injection | ||
| well as described in the notice of intent does not pose an | ||
| unreasonable risk to the fresh water portion of the Edwards Aquifer | ||
| or other fresh water associated with the continued operation of the | ||
| well. | ||
| (l) Before the commission makes a determination under | ||
| Subsection (k)(3): | ||
| (1) the commission, not later than the 15th day after | ||
| the date of receipt of the results of the studies and monitoring, | ||
| must provide the information received to Texas State | ||
| University--San Marcos; and | ||
| (2) Texas State University--San Marcos, not later than | ||
| the 60th day after the date of receipt of the information, must | ||
| review and analyze the information and report its findings to the | ||
| commission. | ||
| (m) The commission shall make the information provided by | ||
| the owner of the injection well under Subsection (k)(1) and the | ||
| report provided by Texas State University--San Marcos under | ||
| Subsection (l)(2) easily accessible to the public in a timely | ||
| manner. The permit may authorize the owner of the well to continue | ||
| operating the well following completion of the research project | ||
| pending the determination by the commission. | ||
| (n) If the commission preliminarily determines that | ||
| continued operation of the injection well would pose an | ||
| unreasonable risk to the fresh water portion of the Edwards Aquifer | ||
| or other fresh water associated with the continued operation of the | ||
| well, the commission shall notify the operator and specify, if | ||
| possible, what well modifications would be adequate to prevent that | ||
| unreasonable risk. If the operator fails to modify the injection | ||
| well as specified by the commission, the commission shall require | ||
| the operator to cease operating the well. | ||
| SECTION 2. This Act takes effect September 1, 2013. | ||
