Bill Text: TX HB291 | 2021-2022 | 87th Legislature | Introduced
Bill Title: Relating to the regulation of certain aggregate production operations by the Texas Commission on Environmental Quality; authorizing an increase in the amount of a fee.
Sponsorship: Partisan Bill (Republican 2)
Status: (Introduced - Dead) 2021-04-19 - Left pending in committee [HB291 Detail]
Download: Texas-2021-HB291-Introduced.html
| 87R2004 JXC-D | ||
| By: Murr | H.B. No. 291 | |
|
|
||
|
|
||
| relating to the regulation of certain aggregate production | ||
| operations by the Texas Commission on Environmental Quality; | ||
| authorizing an increase in the amount of a fee. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Chapter 28A, Water Code, is amended by adding | ||
| Subchapter D to read as follows: | ||
| SUBCHAPTER D. RECLAMATION | ||
| Sec. 28A.151. APPLICABILITY. This subchapter applies only | ||
| to an aggregate production operation: | ||
| (1) that is first required to be registered on or after | ||
| January 1, 2016; and | ||
| (2) the site of which: | ||
| (A) occupies at least 10 acres; and | ||
| (B) is located inside the boundaries or | ||
| extraterritorial jurisdiction of a municipality. | ||
| Sec. 28A.152. REGISTRATION. (a) The initial application | ||
| filed by the responsible party for the registration of an aggregate | ||
| production operation, or the first renewal application filed after | ||
| September 1, 2021, in the case of an aggregate production operation | ||
| that was first required to be registered before that date, must: | ||
| (1) include a reclamation plan that complies with | ||
| Section 28A.154; and | ||
| (2) be accompanied by a performance bond that complies | ||
| with Section 28A.155. | ||
| (b) If the reclamation plan is amended, the first renewal | ||
| application for registration filed by the responsible party after | ||
| the date the plan is amended must include the amended plan. | ||
| (c) Notwithstanding Section 28A.051(b), the requirements of | ||
| this subchapter apply to an aggregate production operation until | ||
| the commission determines that the responsible party has | ||
| successfully complied with all reclamation requirements of this | ||
| subchapter and the reclamation plan. | ||
| Sec. 28A.153. REGISTRATION FEE. Notwithstanding Section | ||
| 28A.101(b), the commission shall set the fee for an initial or | ||
| renewal application for the registration of an aggregate production | ||
| operation that is required to include a reclamation plan in an | ||
| amount not to exceed $1,900. | ||
| Sec. 28A.154. RECLAMATION REQUIREMENTS. (a) A reclamation | ||
| plan must: | ||
| (1) specify which parts of the aggregate production | ||
| operation will be reclaimed for forest, pasture, crop, | ||
| horticultural, homesite, recreational, industrial, or other uses, | ||
| including use by wildlife for food, shelter, or ground cover; | ||
| (2) require any ridge or peak of overburden created by | ||
| surface mining to be graded to a rolling topography traversable by | ||
| machines and equipment customarily used in connection with the use | ||
| to be made of the land after reclamation, except that: | ||
| (A) the slope of a ridge or peak of overburden is | ||
| not required to be reduced to a grade less than the original grade | ||
| of the area before mining; and | ||
| (B) the slope of the ridge of overburden | ||
| resulting from a box cut is not required to be reduced to less than | ||
| 25 degrees from the horizontal; | ||
| (3) if the extraction activities have exposed the face | ||
| of a mineral seam in which significant concentrations of | ||
| acid-forming materials are present, require the operator to cover | ||
| the exposed face of the seam: | ||
| (A) to a depth of not less than three feet with | ||
| earth that will support plant life; or | ||
| (B) with a permanent water impoundment; | ||
| (4) require the operator to grade down the bank of any | ||
| pit or depression created by the removal of aggregates by surface | ||
| mining to a degree of slope determined in accordance with | ||
| commission rules, taking into consideration: | ||
| (A) the natural topography of the land affected | ||
| by the extraction activities and of the adjacent land; | ||
| (B) the composition of the bank; and | ||
| (C) the most beneficial use of the pit or | ||
| depression after reclamation; | ||
| (5) require that all land affected by the extraction | ||
| activities, except land that is to be covered with water or used for | ||
| homesite or industrial purposes, be revegetated by the planting of | ||
| seeds, trees, shrubs, or other plantings that are appropriate to | ||
| the use to be made of the land after reclamation as determined by | ||
| the operator; and | ||
| (6) require that all mining equipment, including | ||
| dredges, drag lines, crushers, screens, conveyors, on-site mining | ||
| vehicles, haul trucks, and loaders, be removed from the site. | ||
| (b) Subsection (a)(2) does not apply to a surface mining | ||
| operation conducted in an area that is in the floodplain of a river | ||
| or stream and is subject to periodic flooding. | ||
| (c) A reclamation plan may allow an operator to construct an | ||
| earthen dam for the purpose of forming a lake in a pit that results | ||
| from surface mining operations if the formation of the lake does | ||
| not: | ||
| (1) interfere with another mining operation; or | ||
| (2) damage the property of another person. | ||
| (d) Notwithstanding Subsection (a)(4), if the pit or | ||
| depression created by the removal of aggregates by surface mining | ||
| is deeper than 10 feet, the reclamation plan may allow the operator | ||
| to bench the highwall as long as the benches do not exceed 10 feet in | ||
| height. | ||
| (e) The commission by rule may prescribe the required | ||
| density of planting for purposes of Subsection (a)(5) and, if the | ||
| operator elects to reclaim in stages different parts of the | ||
| aggregate production operation as extraction activities on those | ||
| parts cease, may require replanting of those parts as necessary | ||
| before planting of the entire operation is completed. | ||
| (f) Notwithstanding Subsections (a)(5) and (e), planting is | ||
| not required on land affected by extraction activities at an | ||
| aggregate production operation if the chemical and physical | ||
| characteristics of the soil of the land are so toxic or deficient in | ||
| plant nutrients, or the soil of the land is composed of sand, | ||
| gravel, shale, or stone to such an extent, as to seriously inhibit | ||
| plant growth. | ||
| (g) Except as otherwise provided by this subsection, an | ||
| operator must complete all required grading not later than six | ||
| months after extraction activities at the aggregate production | ||
| operation cease. If the operator is unable to complete the required | ||
| grading by the deadline because of weather conditions, the | ||
| commission shall grant the operator an extension of time until | ||
| weather conditions permit completion of the required grading. | ||
| (h) Except as otherwise provided by this subsection, an | ||
| operator must begin planting seeds, trees, shrubs, or other | ||
| plantings on the land affected by extraction activities at the | ||
| aggregate production operation at the first appropriate time after | ||
| completion of the required grading. If the operator is unable to | ||
| acquire sufficient planting stock of appropriate species from local | ||
| nurseries or to acquire sufficient stock from other sources at | ||
| comparable prices, the commission shall grant the operator an | ||
| extension of time until sufficient stock at such prices is | ||
| available to plant the land in accordance with the reclamation | ||
| plan. | ||
| Sec. 28A.155. PERFORMANCE BOND. (a) A performance bond | ||
| must: | ||
| (1) be payable to this state and conditioned on the | ||
| faithful performance of the requirements of this subchapter and the | ||
| reclamation plan; | ||
| (2) cover the area to be affected by the extraction | ||
| activities at the aggregate production operation; | ||
| (3) be in an amount equal to $2,500 for each acre to be | ||
| affected by the extraction activities at the aggregate production | ||
| operation; and | ||
| (4) be executed by the responsible party and a | ||
| corporate surety licensed to do business in this state. | ||
| (b) Liability under a performance bond is for the duration | ||
| of the activities at the aggregate production operation, including | ||
| the activities necessary and incidental to the reclamation of the | ||
| land affected by the extraction activities at the operation. | ||
| (c) The commission may release all or part of a performance | ||
| bond if the commission is satisfied that the reclamation covered by | ||
| the bond or part of the reclamation, as applicable, has been | ||
| accomplished as required by this subchapter and the reclamation | ||
| plan. | ||
| (d) The commission shall declare a performance bond | ||
| forfeited if the operator fails to comply with the requirements of | ||
| this subchapter or the reclamation plan. | ||
| Sec. 28A.156. INSPECTION BY COMMISSION. The commission may | ||
| periodically inspect an aggregate production operation after | ||
| extraction activities at the operation have ceased to verify that | ||
| the operator is complying with the requirements of this subchapter | ||
| and the reclamation plan. | ||
| Sec. 28A.157. NOTICE OF COMPLETION OF RECLAMATION; | ||
| INSPECTION AND DETERMINATION BY COMMISSION. (a) After reclamation | ||
| activities at an aggregate production operation have been | ||
| accomplished as required by this subchapter and the reclamation | ||
| plan, the operator shall notify the commission in writing that the | ||
| activities have been completed. | ||
| (b) The commission shall inspect the aggregate production | ||
| operation to determine whether the operator has completed | ||
| reclamation of the operation as required by this subchapter and the | ||
| reclamation plan. If the commission determines that the | ||
| reclamation of the aggregate production operation has been | ||
| completed as required by this subchapter and the reclamation plan: | ||
| (1) the commission shall release any remaining part of | ||
| the performance bond; and | ||
| (2) the requirements of this subchapter are no longer | ||
| applicable to the operation. | ||
| Sec. 28A.158. WAIVER BY MUNICIPALITY OF RECLAMATION | ||
| REQUIREMENTS. (a) If the reclamation activities required by a | ||
| reclamation plan conflict with a potential reasonable future use of | ||
| the aggregate production operation on cessation of extraction | ||
| activities at the operation, the responsible party may submit a | ||
| proposal to the governing body of the municipality inside the | ||
| boundaries or extraterritorial jurisdiction of which the operation | ||
| is located to amend the plan. | ||
| (b) The governing body of the municipality shall approve the | ||
| proposed amendment to the reclamation plan if, after a public | ||
| meeting on the proposal, the governing body determines that the | ||
| proposed amendment appears to be in the best interest of the | ||
| municipality, the county in which the aggregate production | ||
| operation is located, and this state. | ||
| (c) If the governing body of the municipality approves the | ||
| proposed amendment to the reclamation plan, the governing body | ||
| shall notify the responsible party and the commission. The | ||
| commission shall give effect to the proposed amendment to the plan | ||
| and shall release all or part of the performance bond, as | ||
| applicable. | ||
| SECTION 2. This Act takes effect September 1, 2021. | ||
