Bill Text: TX HB29 | 2025-2026 | 89th Legislature | Enrolled
Bill Title: Relating to water losses reported by certain municipally owned utilities to the Texas Water Development Board; authorizing administrative penalties.
Sponsorship: Moderate Partisan Bill (Republican 4-1)
Status: (Passed) 2025-05-29 - Effective immediately [HB29 Detail]
Download: Texas-2025-HB29-Enrolled.html
| H.B. No. 29 | ||
|
|
||
| relating to water losses reported by certain municipally owned | ||
| utilities to the Texas Water Development Board; authorizing | ||
| administrative penalties. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Subchapter B, Chapter 16, Water Code, is amended | ||
| by adding Section 16.0122 to read as follows: | ||
| Sec. 16.0122. WATER AUDIT VALIDATION BY CERTAIN MUNICIPALLY | ||
| OWNED UTILITIES. (a) In this section, "municipally owned utility" | ||
| has the meaning assigned by Section 13.002. | ||
| (b) This section applies only to a municipally owned utility | ||
| that provides potable water through more than 150,000 service | ||
| connections. | ||
| (c) A municipally owned utility that has filed an annual | ||
| water audit under Section 16.0121 shall: | ||
| (1) not later than the 180th day after the date the | ||
| audit was filed, complete a validation of the audit to ensure the | ||
| utility accurately assessed potential inaccuracies in data used in | ||
| the audit; and | ||
| (2) not later than the first anniversary of the date | ||
| the audit was filed, develop and submit to the board a water loss | ||
| mitigation plan. | ||
| (d) Not later than December 31, 2030, and every 10 years | ||
| thereafter, a municipally owned utility that has filed an annual | ||
| water audit under Section 16.0121 shall: | ||
| (1) complete a more detailed validation of the | ||
| utility's most current water audit to: | ||
| (A) determine whether the implementation of | ||
| water leakage reduction strategies is appropriate; and | ||
| (B) investigate the accuracy of the utility's | ||
| billing data; and | ||
| (2) update the water loss mitigation plan developed by | ||
| the utility under Subsection (c)(2) accordingly. | ||
| (e) Each validation required under Subsection (c)(1) must | ||
| be performed by a person who has completed water audit validation | ||
| training and is certified to conduct the validation. The | ||
| validation: | ||
| (1) must follow board validation guidelines; and | ||
| (2) may not be conducted by a board staff member or the | ||
| person who submitted the water audit. | ||
| (f) Each water loss mitigation plan developed under | ||
| Subsection (c)(2), as updated under Subsection (d)(2), if | ||
| applicable, must be incorporated into the utility's most recent | ||
| water conservation plan required under Section 13.146 not later | ||
| than the first anniversary of the date the mitigation plan is | ||
| completed. As part of the utility's annual water conservation | ||
| report under Section 16.402(b), the utility shall report the | ||
| utility's progress in implementing the mitigation plan. The | ||
| mitigation plan must include: | ||
| (1) one-year, three-year, five-year, and ten-year | ||
| goals for water loss mitigation; | ||
| (2) descriptions of water loss mitigation projects or | ||
| programs designed to meet those goals; | ||
| (3) estimated financial savings from the | ||
| implementation of the projects or programs under Subdivision (2); | ||
| (4) estimated water savings from the implementation of | ||
| the projects or programs under Subdivision (2); and | ||
| (5) cost estimates for implementing each project or | ||
| program under Subdivision (2). | ||
| (g) If the utility must complete a validation under | ||
| Subsection (d)(1), the utility shall update the water loss | ||
| mitigation plan developed by the utility under Subsection (c)(2) to | ||
| revise the utility's one-year, three-year, five-year, and ten-year | ||
| goals. | ||
| (h) Each validation required under Subsection (d)(1) must | ||
| be performed by a person who is experienced in performing required | ||
| validation activities. The validation: | ||
| (1) must be based on the recommendations from the | ||
| utility's validation performed under Subsection (c)(1); | ||
| (2) must be completed in consultation with the person | ||
| who completed the validation under Subsection (c)(1); | ||
| (3) must be conducted in accordance with industry | ||
| standards; and | ||
| (4) may not be conducted by a board staff member or the | ||
| person who submitted the water audit. | ||
| (i) The commission shall assess against a municipally owned | ||
| utility an administrative penalty of $25,000 if the utility fails | ||
| to develop and submit to the board a water loss mitigation plan | ||
| required by Subsection (c)(2). | ||
| SECTION 2. This Act takes effect immediately if it receives | ||
| a vote of two-thirds of all the members elected to each house, as | ||
| provided by Section 39, Article III, Texas Constitution. If this | ||
| Act does not receive the vote necessary for immediate effect, this | ||
| Act takes effect September 1, 2025. | ||
| ______________________________ | ______________________________ | |
| President of the Senate | Speaker of the House | |
| I certify that H.B. No. 29 was passed by the House on April | ||
| 25, 2025, by the following vote: Yeas 138, Nays 0, 2 present, not | ||
| voting; and that the House concurred in Senate amendments to H.B. | ||
| No. 29 on May 19, 2025, by the following vote: Yeas 129, Nays 0, 1 | ||
| present, not voting. | ||
| ______________________________ | ||
| Chief Clerk of the House | ||
| I certify that H.B. No. 29 was passed by the Senate, with | ||
| amendments, on May 8, 2025, by the following vote: Yeas 31, Nays 0. | ||
| ______________________________ | ||
| Secretary of the Senate | ||
| APPROVED: __________________ | ||
| Date | ||
| __________________ | ||
| Governor | ||
