Bill Text: OR HB3349 | 2011 | Regular Session | Introduced


Bill Title: Relating to preferences in public project construction for products produced within the United States; declaring an emergency.

Sponsorship: Partisan Bill (Democrat 1)

Status: (Failed) 2011-06-30 - In committee upon adjournment. [HB3349 Detail]

Download: Oregon-2011-HB3349-Introduced.html


     76th OREGON LEGISLATIVE ASSEMBLY--2011 Regular Session

NOTE:  Matter within  { +  braces and plus signs + } in an
amended section is new. Matter within  { -  braces and minus
signs - } is existing law to be omitted. New sections are within
 { +  braces and plus signs + } .

LC 3894

                         House Bill 3349

Sponsored by Representative SCHAUFLER

                             SUMMARY

The following summary is not prepared by the sponsors of the
measure and is not a part of the body thereof subject to
consideration by the Legislative Assembly. It is an editor's
brief statement of the essential features of the measure as
introduced.

  Prohibits contracting agency from awarding contract for public
improvement or public works unless iron, steel, wood products and
manufactured goods, including equipment, used in public
improvement or public works are produced within United States.
Specifies exceptions.
  Becomes operative on January 1, 2012.
  Declares emergency, effective on passage.

                        A BILL FOR AN ACT
Relating to preferences in public project construction for
  products produced within the United States; creating new
  provisions; amending ORS 279C.305; and declaring an emergency.
Be It Enacted by the People of the State of Oregon:
  SECTION 1. ORS 279C.305 is amended to read:
  279C.305. (1) { + (a) + }   { - It is - }  The policy of the
State of Oregon { +  is + } that contracting agencies shall make
every effort { + , subject to the provisions of paragraph (b) of
this subsection, + } to construct public improvements at the
least cost to the contracting agency.
   { +  (b)(A) A contracting agency may not award a contract for
a public improvement or public works as defined in ORS 279C.800
unless all of the iron, steel, wood products and manufactured
goods, including equipment, that will be used in the public
improvement or the public works are produced within the United
States.
  (B) Subparagraph (A) of this paragraph does not apply if the
contracting agency finds that:
  (i) Iron, steel, wood products and manufactured goods,
including equipment, that are necessary for the public
improvement or public works are not produced within the United
States in sufficient and reasonably available quantities or with
satisfactory quality;
  (ii) Using iron, steel, wood products and manufactured goods,
including equipment, that are produced within the United States
will increase the cost of the public improvement or public works
by 25 percent or more; or
  (iii) Implementing the provisions of subparagraph (A) of this
paragraph is inconsistent with the obligations of this state
under federal law or under the provisions of an international
treaty or trade agreement to which this state is a party or to
which this state has consented to be bound.
  (C) The Director of the Oregon Department of Administrative
Services and the Attorney General shall adopt rules under ORS
279A.065 to implement the policy set forth in subparagraph (A) of
this paragraph and to specify the proportion of content for
manufactured goods and equipment that must be produced within the
United States and what constitutes production within the United
States. + }
  (2)  { + A contracting agency, + } not less than 30 days
 { - prior to adoption of - }  { +  before adopting + } the
contracting agency's budget for the subsequent budget period,
 { - each contracting agency - }  shall prepare and file with the
Commissioner of the Bureau of Labor and Industries a list of
every public improvement   { - known to - }  the contracting
agency   { - that the contracting agency - }  { +  knows of
and + } plans to fund in the budget period, identifying each
improvement by name and estimating the total on-site construction
costs. The list shall also   { - contain a statement as to - }
 { +  state + } whether the contracting agency intends to perform
the construction through a private contractor. If the contracting
agency intends to perform construction work using the contracting
agency's own equipment and personnel on a project estimated to
cost more than $125,000, the contracting agency shall also show
that the contracting agency's decision conforms to the policy
stated in subsection (1) of this section. The list is a public
record and may be revised periodically by the { +
contracting + } agency.
  (3) Before a contracting agency constructs a public improvement
with   { - its - }  { +  the contracting agency's + } own
equipment or personnel:
  (a) If the estimated cost exceeds $125,000, the contracting
agency shall prepare adequate plans and specifications and the
estimated unit cost of each classification of work. The estimated
cost of the work must include a reasonable allowance for the
cost, including investment cost, of any equipment used. As used
in this paragraph, 'adequate' means sufficient to control the
performance of the work and to ensure satisfactory quality of
construction by the contracting agency personnel.
  (b) The contracting agency shall cause to be kept and preserved
a full, true and accurate account of the costs of performing the
work, including all engineering and administrative expenses and
the cost, including investment costs, of   { - any - } equipment
used. The final account of the costs is a public record.
  (4) Subsections (2) and (3) of this section do not apply to a
contracting agency   { - when - }  { +  if + } the public
improvement is   { - to be used - }  for   { - the distribution
or transmission of - }  { +  distributing or transmitting + }
electric power.
  (5) For purposes of this section, resurfacing   { - of - }
highways, roads or streets at a depth of two or more inches and
at an estimated cost that exceeds $125,000 is a public
improvement.
  SECTION 2.  { + The amendments to ORS 279C.305 by section 1 of
this 2011 Act apply to a contract that a contracting agency first
advertises or otherwise solicits on or after the operative date
set forth in section 3 of this 2011 Act or, if the contracting
agency does not advertise or solicit the contract, to a contract
that the contracting agency enters into on or after the operative
date set forth in section 3 of this 2011 Act. + }
  SECTION 3.  { + (1) The amendments to ORS 279C.305 by section 1
of this 2011 Act become operative on January 1, 2012.
  (2) The Director of the Oregon Department of Administrative
Services, the Attorney General or a contracting agency that
adopts rules under ORS 279A.065 may take any action before the
operative date set forth in subsection (1) of this section that
is necessary to enable the director, the Attorney General or the
contracting agency to exercise, on and after the operative date
set forth in subsection (1) of this section, all of the duties,
functions and powers conferred on the director, the Attorney
General or the contracting agency by the amendments to ORS
279C.305 by section 1 of this 2011 Act. + }
  SECTION 4.  { + This 2011 Act being necessary for the immediate
preservation of the public peace, health and safety, an emergency
is declared to exist, and this 2011 Act takes effect on its
passage. + }
                         ----------