1.2relating to capital improvements; authorizing spending to acquire and better
1.3public land and buildings and other improvements of a capital nature at the
1.4Minnesota State Colleges and Universities; authorizing the sale and issuance
1.5of state bonds; appropriating money.
1.6BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
1.8The sums shown in the column under "APPROPRIATIONS" are appropriated from
1.9the bond proceeds fund, or another named fund, to the state agencies or officials indicated,
1.10to be spent for public purposes. Appropriations of bond proceeds must be spent as
1.11authorized by the Minnesota Constitution, article XI, section 5, paragraph (a), to acquire
1.12and better public land and buildings and other public improvements of a capital nature, or
1.13as authorized by the Minnesota Constitution, article XI, section 5, paragraphs (b) to (j), or
1.14article XIV. Unless otherwise specified, the appropriations in this act are available until
1.15the project is completed or abandoned subject to Minnesota Statutes, section 16A.642.
1.20To the Board of Trustees of the Minnesota
1.21State Colleges and Universities for the
1.22purposes specified in this section.
2.1To be spent in accordance with Minnesota
2.2Statutes, section 135A.046.
2.6To renovate, furnish, and equip existing
2.7classroom, lab, and support space and
2.8infrastructure for the technical trade
2.9programs, science, technology, engineering,
2.10and math initiatives.
2.13To complete the design of and to renovate,
2.14furnish, and equip classroom and student
2.15service spaces, to replace HVAC system,
2.16to construct, furnish, and equip an
2.17updated campus entry, and to demolish the
2.18Administration Building.
2.22To renovate, furnish, and equip existing
2.23classroom and lab spaces and to design,
2.24furnish, and equip a classroom, lab, and
2.25entryway addition and replace HVAC
2.26systems.
2.29To complete the design of and to renovate,
2.30furnish, and equip existing campus spaces
2.31and to design, furnish, and equip an addition
2.32for the library and learning resource center
3.1for science and health labs, technical
3.2programs, and science and math initiatives.
3.6To complete the design of and to renovate,
3.7furnish, and equip a science lab addition
3.8for the allied health programs, science,
3.9technology, engineering, and math initiatives.
3.13To complete the design of and to construct,
3.14furnish, and equip bioscience and allied
3.15health addition for existing and new
3.16bioscience and nursing programs.
3.19To complete the design to renovate portions
3.20of the existing Science and Math Building
3.21and to construct a Plant Science Learning
3.22Center addition, replace the HVAC system,
3.23and reconfigure labs and classrooms to
3.24support biology, medical technology,
3.25cytotechnology, environmental science, and
3.26geology programs.
3.29To complete the design for an addition for
3.30the college's health and science programs,
3.31including the elimination of crowding in
3.32existing labs and the demolition of obsolete
3.33space.
4.3To design, construct, furnish, and
4.4equip a classroom addition with six
4.5technology-enhanced classrooms, to
4.6renovate lab spaces, and to replace the HVAC
4.7system.
4.10To complete the design of and to renovate,
4.11furnish, and equip existing transportation and
4.12technical space to provide classrooms and
4.13lab spaces for flexible program use, and to
4.14replace the HVAC system.
4.19To complete the design of and to renovate,
4.20furnish, and equip existing Heintz Center
4.21space and to design, construct, furnish, and
4.22equip an addition to the Heintz Center for the
4.23offices and shared spaces and services of the
4.24Minnesota Workforce Center - Rochester,
4.25and to replace the HVAC system.
4.27To complete the design for renovation of
4.28Plaza and Memorial Halls to support science,
4.29technology, and math initiatives and allied
4.30health programs, to replace the HVAC
4.31system, and to install a fire suppression
4.32system.
5.2To design, renovate, furnish, and equip space
5.3to meet workforce training needs on ten
5.4campuses and remove obsolete spaces. This
5.5appropriation may be used at the following
5.6campuses: Bemidji State University; Century
5.7College; Inver Hills Community College;
5.8Minnesota State Community and Technical
5.9College, Moorhead; Minnesota State
5.10University, Moorhead; Northeast Higher
5.11Education District, Hibbing Community
5.12College, Itasca Community College and
5.13Mesabi Range Community and Technical
5.14College; and Pine Technical College.
5.17To complete the design for the Clinical
5.18Science Facility construction and renovation
5.19of existing space to colocate the Nursing,
5.20Dental Hygiene, and Speech, Language, and
5.21Hearing departments, clinics, and labs into
5.22one facility.
5.26To complete the design of the renovation
5.27and addition for space for the business
5.28department, to demolish obsolete buildings,
5.29and to replace the HVAC system.
5.33To complete the design of and to construct,
5.34furnish, and equip the Science Education
6.1Center to support science, technology,
6.2engineering, and math initiatives and for
6.3allied health and teaching programs.
6.6To complete the design of and to renovate,
6.7furnish, and equip Staples Main campus
6.8spaces for science, technology, and math
6.9initiatives, agriculture and energy programs,
6.10and to replace HVAC systems.
6.14To complete the design of and to renovate,
6.15furnish, and equip existing instructional
6.16and student services spaces, to design,
6.17construct, furnish, and equip an addition with
6.18multipurpose classrooms, and to demolish
6.19Donovan Hall.
6.23To complete the design of and renovate,
6.24furnish, and equip existing space for multiuse
6.25classroom space, to replace HVAC systems,
6.26and to demolish the obsolete Gateway
6.27Building.
6.30To design, renovate, demolish, construct,
6.31furnish, and equip space for workforce
6.32training and programs for energy and
6.33sustainable development. This appropriation
7.1may be used at the following campuses:
7.2Anoka Technical College; Century College;
7.3Minnesota West Community and Technical
7.4College, Canby and Jackson; and Northeast
7.5Higher Education District, Hibbing
7.6Community College, and Itasca Community
7.7College.
7.11To design, renovate, furnish, and equip space
7.12for classrooms to meet workforce training
7.13needs. This appropriation may be used at the
7.14following campuses: Century College; Inver
7.15Hills Community College; Northeast Higher
7.16Education District, Vermillion Community
7.17College; and Saint Paul College.
7.22To complete the design of, and to renovate,
7.23furnish, and equip existing space and to
7.24design, furnish, and equip an addition with
7.25new labs, to replace HVAC systems, and to
7.26demolish an obsolete facilities building.
7.29To complete the design of and to renovate,
7.30furnish, and equip existing space in Somsen
7.31and Wabasha Halls for flexible, active
7.32learning classrooms for the business and
7.33other programs and to acquire an empty lot
7.34to expand parking.
8.5To complete the design of and to renovate,
8.6furnish, and equip existing industrial and lab
8.7space, to design, construct, furnish, and equip
8.8an addition for lab space, and to demolish
8.9obsolete space.
8.14To renovate, furnish, and equip existing
8.15space for library and information commons,
8.16to design, construct, furnish, and equip an
8.17addition for classrooms and resource areas,
8.18and to demolish temporary space used for
8.19the library.
8.21(a) Except as provided in paragraph (b), the
8.22board shall pay the debt service on one-third
8.23of the principal amount of state bonds sold to
8.24finance projects authorized by this section.
8.25After each sale of general obligation bonds,
8.26the commissioner of management and budget
8.27shall notify the board of the amounts assessed
8.28for each year for the life of the bonds.
8.29(b) The board need not pay debt service
8.30on bonds sold to finance higher education
8.31asset preservation and replacement. Where a
8.32nonstate match is required, the debt service is
8.33due on a principal amount equal to one-third
8.34of the total project cost, less the match
8.35committed before the bonds are sold.
9.1(c) The commissioner of management and
9.2budget shall reduce the board's assessment
9.3each year by one-third of the net income
9.4from investment of general obligation bond
9.5proceeds in proportion to the amount of
9.6principal and interest otherwise required to
9.7be paid by the board. The board shall pay its
9.8resulting net assessment to the commissioner
9.9of management and budget by December
9.101 each year. If the board fails to make
9.11a payment when due, the commissioner
9.12of management and budget shall reduce
9.13allotments for appropriations from the
9.14general fund otherwise available to the board
9.15and apply the amount of the reduction to
9.16cover the missed debt service payment. The
9.17commissioner of management and budget
9.18shall credit the payments received from the
9.19board to the bond debt service account in
9.20the state bond fund each December 1 before
9.21money is transferred from the general fund
9.22under Minnesota Statutes, section 16A.641,
9.23subdivision 10.
9.24 Sec. 3. BOND SALE AUTHORIZATION.
9.25To provide the money appropriated in this act from the bond proceeds fund, the
9.26commissioner of management and budget shall sell and issue bonds of the state in an
9.27amount up to $278,722,000 in the manner, upon the terms, and with the effect prescribed
9.28by Minnesota Statutes, sections 16A.631 to 16A.675, and by the Minnesota Constitution,
9.29article XI, sections 4 to 7.
9.30 Sec. 4. EFFECTIVE DATE.
9.31This act is effective the day following final enactment.
1.3public land and buildings and other improvements of a capital nature at the
1.4Minnesota State Colleges and Universities; authorizing the sale and issuance
1.5of state bonds; appropriating money.
1.6BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
| 1.7 |
Section 1. CAPITAL IMPROVEMENT APPROPRIATIONS. |
1.9the bond proceeds fund, or another named fund, to the state agencies or officials indicated,
1.10to be spent for public purposes. Appropriations of bond proceeds must be spent as
1.11authorized by the Minnesota Constitution, article XI, section 5, paragraph (a), to acquire
1.12and better public land and buildings and other public improvements of a capital nature, or
1.13as authorized by the Minnesota Constitution, article XI, section 5, paragraphs (b) to (j), or
1.14article XIV. Unless otherwise specified, the appropriations in this act are available until
1.15the project is completed or abandoned subject to Minnesota Statutes, section 16A.642.
| 1.16 |
APPROPRIATIONS |
||||||
| 1.17 1.18 |
Sec. 2. MINNESOTA STATE COLLEGES AND UNIVERSITIES |
||||||
| 1.19 |
Subdivision 1.Total Appropriation |
$ |
278,722,000 |
||||
1.21State Colleges and Universities for the
1.22purposes specified in this section.
| 1.23 1.24 |
Subd. 2.Higher Education Asset Preservation and Replacement (HEAPR) |
110,000,000 |
|||||
2.2Statutes, section 135A.046.
| 2.3 2.4 |
Subd. 3.Minneapolis Community and Technical College |
||||||
| 2.5 |
Workforce Program Renovation |
13,389,000 |
|||||
2.7classroom, lab, and support space and
2.8infrastructure for the technical trade
2.9programs, science, technology, engineering,
2.10and math initiatives.
| 2.11 |
Subd. 4.Ridgewater College - Willmar |
||||||
| 2.12 |
Technical Instruction Lab Renovation |
13,851,000 |
|||||
2.14furnish, and equip classroom and student
2.15service spaces, to replace HVAC system,
2.16to construct, furnish, and equip an
2.17updated campus entry, and to demolish the
2.18Administration Building.
| 2.19 2.20 |
Subd. 5.Minnesota West Community and Technical College - Worthington |
||||||
| 2.21 |
Renovation and Addition |
4,606,000 |
|||||
2.23classroom and lab spaces and to design,
2.24furnish, and equip a classroom, lab, and
2.25entryway addition and replace HVAC
2.26systems.
| 2.27 |
Subd. 6.South Central College - Faribault |
||||||
| 2.28 |
Classroom Renovation and Addition |
13,315,000 |
|||||
2.30furnish, and equip existing campus spaces
2.31and to design, furnish, and equip an addition
2.32for the library and learning resource center
3.1for science and health labs, technical
3.2programs, and science and math initiatives.
| 3.3 3.4 |
Subd. 7.Anoka Ramsey Community College - Coon Rapids |
||||||
| 3.5 |
Bioscience and Allied Health Addition |
980,000 |
|||||
3.7furnish, and equip a science lab addition
3.8for the allied health programs, science,
3.9technology, engineering, and math initiatives.
| 3.10 3.11 |
Subd. 8.North Hennepin Community College - Brooklyn Park |
||||||
| 3.12 |
Bioscience and Health Careers Addition |
26,292,000 |
|||||
3.14furnish, and equip bioscience and allied
3.15health addition for existing and new
3.16bioscience and nursing programs.
| 3.17 |
Subd. 9.Southwest Minnesota State University |
||||||
| 3.18 |
Science Lab Renovation Design |
500,000 |
|||||
3.20of the existing Science and Math Building
3.21and to construct a Plant Science Learning
3.22Center addition, replace the HVAC system,
3.23and reconfigure labs and classrooms to
3.24support biology, medical technology,
3.25cytotechnology, environmental science, and
3.26geology programs.
| 3.27 |
Subd. 10.Saint Paul College |
||||||
| 3.28 |
Health and Science Alliance Center Design |
1,500,000 |
|||||
3.30the college's health and science programs,
3.31including the elimination of crowding in
3.32existing labs and the demolition of obsolete
3.33space.
| 4.1 |
Subd. 11.Century College |
||||||
| 4.2 |
Classroom Addition and Lab Renovation |
5,000,000 |
|||||
4.4equip a classroom addition with six
4.5technology-enhanced classrooms, to
4.6renovate lab spaces, and to replace the HVAC
4.7system.
| 4.8 |
Subd. 12.Dakota County Technical College |
||||||
| 4.9 |
Transportation and Emerging Lab Renovation |
7,230,000 |
|||||
4.11furnish, and equip existing transportation and
4.12technical space to provide classrooms and
4.13lab spaces for flexible program use, and to
4.14replace the HVAC system.
| 4.15 4.16 |
Subd. 13.Rochester Community and Technical College |
||||||
| 4.17 4.18 |
(a) Renovation and Addition for Workforce Center Colocation |
3,146,000 |
|||||
4.20furnish, and equip existing Heintz Center
4.21space and to design, construct, furnish, and
4.22equip an addition to the Heintz Center for the
4.23offices and shared spaces and services of the
4.24Minnesota Workforce Center - Rochester,
4.25and to replace the HVAC system.
| 4.26 |
(b) Classroom Renovation Design |
900,000 |
|||||
4.28Plaza and Memorial Halls to support science,
4.29technology, and math initiatives and allied
4.30health programs, to replace the HVAC
4.31system, and to install a fire suppression
4.32system.
| 4.33 4.34 |
Subd. 14.Systemwide Science, Technology, Engineering, and Math |
||||||
| 5.1 |
Workforce Training Needs Renovations |
5,200,000 |
|||||
5.3to meet workforce training needs on ten
5.4campuses and remove obsolete spaces. This
5.5appropriation may be used at the following
5.6campuses: Bemidji State University; Century
5.7College; Inver Hills Community College;
5.8Minnesota State Community and Technical
5.9College, Moorhead; Minnesota State
5.10University, Moorhead; Northeast Higher
5.11Education District, Hibbing Community
5.12College, Itasca Community College and
5.13Mesabi Range Community and Technical
5.14College; and Pine Technical College.
| 5.15 |
Subd. 15.Minnesota State University, Mankato |
||||||
| 5.16 |
Clinical Science Facility Design |
2,065,000 |
|||||
5.18Science Facility construction and renovation
5.19of existing space to colocate the Nursing,
5.20Dental Hygiene, and Speech, Language, and
5.21Hearing departments, clinics, and labs into
5.22one facility.
| 5.23 |
Subd. 16.Bemidji State University |
||||||
| 5.24 5.25 |
Business Building Addition, Renovation, Design, and Demolition |
3,303,000 |
|||||
5.27and addition for space for the business
5.28department, to demolish obsolete buildings,
5.29and to replace the HVAC system.
| 5.30 5.31 |
Subd. 17.Metropolitan State University, St. Paul |
||||||
| 5.32 |
Science Education Center Construction |
31,000,000 |
|||||
5.34furnish, and equip the Science Education
6.1Center to support science, technology,
6.2engineering, and math initiatives and for
6.3allied health and teaching programs.
| 6.4 |
Subd. 18.Central Lakes College, Staples |
||||||
| 6.5 |
Main Campus Renovation |
3,458,000 |
|||||
6.7furnish, and equip Staples Main campus
6.8spaces for science, technology, and math
6.9initiatives, agriculture and energy programs,
6.10and to replace HVAC systems.
| 6.11 6.12 |
Subd. 19.Northeast Higher Education District - Itasca Community College |
||||||
| 6.13 |
Renovation, Addition, and Demolition |
4,549,000 |
|||||
6.15furnish, and equip existing instructional
6.16and student services spaces, to design,
6.17construct, furnish, and equip an addition with
6.18multipurpose classrooms, and to demolish
6.19Donovan Hall.
| 6.20 6.21 |
Subd. 20.Riverland Community College - Albert Lea |
||||||
| 6.22 |
Renovation and Demolition |
3,083,000 |
|||||
6.24furnish, and equip existing space for multiuse
6.25classroom space, to replace HVAC systems,
6.26and to demolish the obsolete Gateway
6.27Building.
| 6.28 |
Subd. 21.Systemwide Energy Initiative |
||||||
| 6.29 |
Renovation, Construction, and Demolition |
3,700,000 |
|||||
6.31furnish, and equip space for workforce
6.32training and programs for energy and
6.33sustainable development. This appropriation
7.1may be used at the following campuses:
7.2Anoka Technical College; Century College;
7.3Minnesota West Community and Technical
7.4College, Canby and Jackson; and Northeast
7.5Higher Education District, Hibbing
7.6Community College, and Itasca Community
7.7College.
| 7.8 7.9 |
Subd. 22.Systemwide Classroom Renovation Initiative |
||||||
| 7.10 |
Classroom Renovation |
2,675,000 |
|||||
7.12for classrooms to meet workforce training
7.13needs. This appropriation may be used at the
7.14following campuses: Century College; Inver
7.15Hills Community College; Northeast Higher
7.16Education District, Vermillion Community
7.17College; and Saint Paul College.
| 7.18 7.19 |
Subd. 23.Minnesota State Community and Technical College - Moorhead |
||||||
| 7.20 7.21 |
Transportation Center Renovation, Addition, and Demolition |
5,210,000 |
|||||
7.23furnish, and equip existing space and to
7.24design, furnish, and equip an addition with
7.25new labs, to replace HVAC systems, and to
7.26demolish an obsolete facilities building.
| 7.27 |
Subd. 24.Winona State University |
||||||
| 7.28 |
Business and Classroom Renovation |
5,828,000 |
|||||
7.30furnish, and equip existing space in Somsen
7.31and Wabasha Halls for flexible, active
7.32learning classrooms for the business and
7.33other programs and to acquire an empty lot
7.34to expand parking.
| 8.1 8.2 |
Subd. 25.St. Cloud State Technical and Community College |
||||||
| 8.3 8.4 |
Medium Heavy Truck and Auto Body Addition, Renovation, and Demolition |
4,067,000 |
|||||
8.6furnish, and equip existing industrial and lab
8.7space, to design, construct, furnish, and equip
8.8an addition for lab space, and to demolish
8.9obsolete space.
| 8.10 8.11 |
Subd. 26.Alexandria Technical and Community College |
||||||
| 8.12 8.13 |
Main Building Renovation, Addition, and Demolition |
3,875,000 |
|||||
8.15space for library and information commons,
8.16to design, construct, furnish, and equip an
8.17addition for classrooms and resource areas,
8.18and to demolish temporary space used for
8.19the library.
| 8.20 |
Subd. 27. Debt Service |
||||||
8.22board shall pay the debt service on one-third
8.23of the principal amount of state bonds sold to
8.24finance projects authorized by this section.
8.25After each sale of general obligation bonds,
8.26the commissioner of management and budget
8.27shall notify the board of the amounts assessed
8.28for each year for the life of the bonds.
8.29(b) The board need not pay debt service
8.30on bonds sold to finance higher education
8.31asset preservation and replacement. Where a
8.32nonstate match is required, the debt service is
8.33due on a principal amount equal to one-third
8.34of the total project cost, less the match
8.35committed before the bonds are sold.
9.1(c) The commissioner of management and
9.2budget shall reduce the board's assessment
9.3each year by one-third of the net income
9.4from investment of general obligation bond
9.5proceeds in proportion to the amount of
9.6principal and interest otherwise required to
9.7be paid by the board. The board shall pay its
9.8resulting net assessment to the commissioner
9.9of management and budget by December
9.101 each year. If the board fails to make
9.11a payment when due, the commissioner
9.12of management and budget shall reduce
9.13allotments for appropriations from the
9.14general fund otherwise available to the board
9.15and apply the amount of the reduction to
9.16cover the missed debt service payment. The
9.17commissioner of management and budget
9.18shall credit the payments received from the
9.19board to the bond debt service account in
9.20the state bond fund each December 1 before
9.21money is transferred from the general fund
9.22under Minnesota Statutes, section 16A.641,
9.23subdivision 10.
9.24 Sec. 3. BOND SALE AUTHORIZATION.
9.25To provide the money appropriated in this act from the bond proceeds fund, the
9.26commissioner of management and budget shall sell and issue bonds of the state in an
9.27amount up to $278,722,000 in the manner, upon the terms, and with the effect prescribed
9.28by Minnesota Statutes, sections 16A.631 to 16A.675, and by the Minnesota Constitution,
9.29article XI, sections 4 to 7.
9.30 Sec. 4. EFFECTIVE DATE.
9.31This act is effective the day following final enactment.