Bill Text: IL SB3399 | 2009-2010 | 96th General Assembly | Introduced
Bill Title: Amends the Illinois Procurement Code. Removes the 2012 elimination of the Capital Development Board's authority to waive, under certain circumstances, the separate bid requirement for the 5 subdivisions of work with respect to construction contracts in excess of $250,000. Effective immediately.
Sponsorship: Partisan Bill (Democrat 1)
Status: (Introduced - Dead) 2010-03-04 - Tabled By Sponsor Sen. Jeffrey M. Schoenberg [SB3399 Detail]
Download: Illinois-2009-SB3399-Introduced.html
|
|
|||||||||||||||||||||||||
|
|||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| 1 | AN ACT concerning finance.
| ||||||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
| 3 | represented in the General Assembly:
| ||||||||||||||||||||||||
| 4 | Section 5. The Illinois Procurement Code is amended by | ||||||||||||||||||||||||
| 5 | changing Section 30-30 as follows:
| ||||||||||||||||||||||||
| 6 | (30 ILCS 500/30-30)
| ||||||||||||||||||||||||
| 7 | Sec. 30-30. Contracts in excess of $250,000. For
building | ||||||||||||||||||||||||
| 8 | construction contracts in excess of
$250,000, separate | ||||||||||||||||||||||||
| 9 | specifications shall be prepared for all
equipment, labor, and | ||||||||||||||||||||||||
| 10 | materials in
connection with the following 5 subdivisions of | ||||||||||||||||||||||||
| 11 | the work to be
performed:
| ||||||||||||||||||||||||
| 12 | (1) plumbing;
| ||||||||||||||||||||||||
| 13 | (2) heating, piping, refrigeration, and automatic
| ||||||||||||||||||||||||
| 14 | temperature control systems,
including the testing and | ||||||||||||||||||||||||
| 15 | balancing of those systems;
| ||||||||||||||||||||||||
| 16 | (3) ventilating and distribution systems for
| ||||||||||||||||||||||||
| 17 | conditioned air, including the testing
and balancing of | ||||||||||||||||||||||||
| 18 | those systems;
| ||||||||||||||||||||||||
| 19 | (4) electric wiring; and
| ||||||||||||||||||||||||
| 20 | (5) general contract work.
| ||||||||||||||||||||||||
| 21 | The specifications must be so drawn as to permit separate | ||||||||||||||||||||||||
| 22 | and
independent bidding upon
each of the 5 subdivisions of | ||||||||||||||||||||||||
| 23 | work. All contracts awarded
for any part thereof shall
award | ||||||||||||||||||||||||
| |||||||
| |||||||
| 1 | the 5 subdivisions of work separately to responsible and
| ||||||
| 2 | reliable persons, firms, or
corporations engaged in these | ||||||
| 3 | classes of work. The contracts, at
the discretion of the
| ||||||
| 4 | construction agency, may be assigned to the successful bidder | ||||||
| 5 | on
the general contract work or
to the successful bidder on the | ||||||
| 6 | subdivision of work designated by
the construction agency | ||||||
| 7 | before
the bidding as the prime subdivision of work, provided | ||||||
| 8 | that all
payments will be made directly
to the contractors for | ||||||
| 9 | the 5 subdivisions of work upon compliance
with the conditions | ||||||
| 10 | of the
contract. A contract may be let for one or more | ||||||
| 11 | buildings in any
project to the same contractor.
The | ||||||
| 12 | specifications shall require, however, that unless the
| ||||||
| 13 | buildings are identical, a separate price
shall be submitted | ||||||
| 14 | for each building. The contract may be awarded
to the lowest | ||||||
| 15 | responsible
bidder for each or all of the buildings included in | ||||||
| 16 | the
specifications.
| ||||||
| 17 | The Until a date 3 years after the effective date of this | ||||||
| 18 | amendatory Act of the 95th General Assembly, the requirements | ||||||
| 19 | of this Section do not apply to a construction project for | ||||||
| 20 | which the Capital Development Board is the construction agency | ||||||
| 21 | if: (i) the project budget is at least $20,000,000; (ii) the | ||||||
| 22 | Capital Development Board has submitted to the Procurement | ||||||
| 23 | Policy Board a written request for a public hearing on waiver | ||||||
| 24 | of the application of the requirements of this Section to that | ||||||
| 25 | project, including its reasons for seeking the waiver and why | ||||||
| 26 | the waiver is in the best interest of the State; (iii) the | ||||||
| |||||||
| |||||||
| 1 | Capital Development Board has posted notice of the waiver | ||||||
| 2 | hearing on its procurement web page and on the online | ||||||
| 3 | Procurement Bulletin at least 15 working days before the | ||||||
| 4 | hearing;
(iv) the Procurement Policy Board, after conducting | ||||||
| 5 | the public hearing on the waiver request, reviews and approves | ||||||
| 6 | the request in writing before the award of the contract; (v) | ||||||
| 7 | the successful low bidder has prequalified with the Capital | ||||||
| 8 | Development Board; (vi) the bid of the successful low bidder | ||||||
| 9 | identifies the name of the subcontractor, if any, and the bid | ||||||
| 10 | proposal costs for each of the 5 subdivisions of work set forth | ||||||
| 11 | in this Section; and (vii) the contract entered into with the | ||||||
| 12 | successful bidder provides that no identified subcontractor | ||||||
| 13 | may be terminated without the written consent of the Capital | ||||||
| 14 | Development Board.
With respect to any construction project | ||||||
| 15 | described in this paragraph, the Capital Development Board | ||||||
| 16 | shall: (i) provide to the Auditor General an affidavit that the | ||||||
| 17 | waiver of the application of the requirements of this Section | ||||||
| 18 | is in the best interest of the State; (ii) specify in writing | ||||||
| 19 | as a public record that the project shall comply with the | ||||||
| 20 | disadvantaged business practices of the Business Enterprise | ||||||
| 21 | for Minorities, Females, and Persons with Disabilities Act and | ||||||
| 22 | the equal employment practices of Section 2-105 of the Illinois | ||||||
| 23 | Human Rights Act; and (iii) report annually to the Governor and | ||||||
| 24 | the General Assembly on the bidding, award, and performance. On | ||||||
| 25 | and after the effective date of this amendatory Act of the 95th | ||||||
| 26 | General Assembly, the Capital Development Board may award in | ||||||
| |||||||
| |||||||
| 1 | each year contracts with an aggregate total value of no more | ||||||
| 2 | than $100,000,000 with respect to construction projects | ||||||
| 3 | described in this paragraph. | ||||||
| 4 | Until a date 5 years after the effective date of this | ||||||
| 5 | amendatory Act of the 94th General Assembly, the requirements | ||||||
| 6 | of this Section do not apply to the Capitol Building HVAC | ||||||
| 7 | upgrade project if (i) the bid of the successful bidder | ||||||
| 8 | identifies the name of the subcontractor, if any, and the bid | ||||||
| 9 | proposal costs for each of the 5 subdivisions of work set forth | ||||||
| 10 | in this Section, and (ii) the contract entered into with the | ||||||
| 11 | successful bidder provides that no identified subcontractor | ||||||
| 12 | may be terminated without the written consent of the Capital | ||||||
| 13 | Development Board.
| ||||||
| 14 | (Source: P.A. 94-699, eff. 11-29-05; 95-758, eff. 1-1-09.)
| ||||||
| 15 | Section 99. Effective date. This Act takes effect upon | ||||||
| 16 | becoming law.
| ||||||