Bill Title: Amends the Tax Increment Allocation Redevelopment Act of the Illinois Municipal Code. Provides that for redevelopment project areas created on and after the effective date of the amendatory Act, "blighted areas" must have a household median income of 100% or less of the area median income, as defined by the U.S. Department of Housing and Urban Development, in addition to the other requirements for "blighted areas". Provides that on or after January 1, 2019, tax increment revenues may be utilized for jointly undertaken and performed redevelopment projects only in an amount equal to the percentage of eligible costs undertaken within the redevelopment project area that received the revenue. Provides that tax increment revenues received in one redevelopment project area may not be used for eligible costs in another redevelopment project area on or after January 1, 2019 and tax increment revenues may not be transferred to another redevelopment project area on or after January 1, 2019. Provides that if there are any contracts or agreements in force on the effective date of the amendatory Act, tax increment revenues may continue to be used or transferred to another redevelopment project area or utilized for jointly undertaken and performed redevelopment projects after January 1, 2019 only to the extent necessary to comply with the contract or agreement.
Spectrum: Partisan Bill (Republican 2-0)
Status: (Failed) 2019-01-09 - Session Sine Die [SB2880 Detail]
Download: Illinois-2017-SB2880-Introduced.html
| |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
1 | AN ACT concerning local government.
| ||||||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||||||||
4 | Section 5. The Illinois Municipal Code is amended by | ||||||||||||||||||||||||||||||
5 | changing Sections 11-74.4-3, 11-74.4-3.1, and 11-74.4-4 and by | ||||||||||||||||||||||||||||||
6 | adding Section 11-74.4-4.3 as follows:
| ||||||||||||||||||||||||||||||
7 | (65 ILCS 5/11-74.4-3) (from Ch. 24, par. 11-74.4-3)
| ||||||||||||||||||||||||||||||
8 | Sec. 11-74.4-3. Definitions. The following terms, wherever | ||||||||||||||||||||||||||||||
9 | used or
referred to in this Division 74.4 shall have the | ||||||||||||||||||||||||||||||
10 | following respective meanings,
unless in any case a different | ||||||||||||||||||||||||||||||
11 | meaning clearly appears from the context.
| ||||||||||||||||||||||||||||||
12 | (a) For any redevelopment project area that has been | ||||||||||||||||||||||||||||||
13 | designated pursuant
to this
Section by an ordinance adopted | ||||||||||||||||||||||||||||||
14 | prior to November 1, 1999 (the effective
date of Public Act
| ||||||||||||||||||||||||||||||
15 | 91-478), "blighted area" shall have the meaning set
forth in | ||||||||||||||||||||||||||||||
16 | this Section
prior to that date.
| ||||||||||||||||||||||||||||||
17 | On and after November 1, 1999,
"blighted area" means any | ||||||||||||||||||||||||||||||
18 | improved or vacant area within the boundaries
of a | ||||||||||||||||||||||||||||||
19 | redevelopment project area located within the territorial | ||||||||||||||||||||||||||||||
20 | limits of
the municipality where:
| ||||||||||||||||||||||||||||||
21 | (1) If improved, industrial, commercial, and | ||||||||||||||||||||||||||||||
22 | residential buildings or
improvements are detrimental to | ||||||||||||||||||||||||||||||
23 | the public safety, health, or welfare
because of a |
| |||||||
| |||||||
1 | combination of 5 or more of the following factors, each of | ||||||
2 | which
is (i) present, with that presence documented, to a | ||||||
3 | meaningful extent so
that a municipality may reasonably | ||||||
4 | find that the factor is clearly
present within the intent | ||||||
5 | of the Act and (ii) reasonably distributed throughout
the | ||||||
6 | improved part of the redevelopment project area:
| ||||||
7 | (A) Dilapidation. An advanced state of disrepair | ||||||
8 | or neglect of
necessary
repairs to the primary | ||||||
9 | structural components of buildings or improvements in
| ||||||
10 | such a combination that a documented building | ||||||
11 | condition analysis determines
that major repair is | ||||||
12 | required or the defects are so serious and so extensive
| ||||||
13 | that the buildings must be removed.
| ||||||
14 | (B) Obsolescence. The condition or process of | ||||||
15 | falling into disuse.
Structures have become ill-suited | ||||||
16 | for the original use.
| ||||||
17 | (C) Deterioration. With respect to buildings, | ||||||
18 | defects
including, but not limited to, major defects in
| ||||||
19 | the secondary building components such as doors, | ||||||
20 | windows, porches, gutters and
downspouts, and fascia. | ||||||
21 | With respect to surface improvements, that the
| ||||||
22 | condition of roadways, alleys, curbs, gutters, | ||||||
23 | sidewalks, off-street parking,
and surface storage | ||||||
24 | areas evidence deterioration, including, but not | ||||||
25 | limited
to, surface cracking, crumbling, potholes, | ||||||
26 | depressions, loose paving material,
and weeds |
| |||||||
| |||||||
1 | protruding through paved surfaces.
| ||||||
2 | (D) Presence of structures below minimum code | ||||||
3 | standards. All structures
that do not meet the | ||||||
4 | standards of zoning, subdivision, building, fire, and
| ||||||
5 | other governmental codes applicable to property, but | ||||||
6 | not including housing and
property maintenance codes.
| ||||||
7 | (E) Illegal use of individual structures. The use | ||||||
8 | of structures in
violation of applicable federal, | ||||||
9 | State, or local laws, exclusive of those
applicable to | ||||||
10 | the presence of structures below minimum code | ||||||
11 | standards.
| ||||||
12 | (F) Excessive vacancies. The presence of
buildings | ||||||
13 | that are unoccupied or under-utilized and that | ||||||
14 | represent an adverse
influence on the area because of | ||||||
15 | the frequency, extent, or duration of the
vacancies.
| ||||||
16 | (G) Lack of ventilation, light, or sanitary | ||||||
17 | facilities. The absence of
adequate ventilation for | ||||||
18 | light or air circulation in spaces or rooms without
| ||||||
19 | windows, or that require the removal of dust, odor, | ||||||
20 | gas, smoke, or other
noxious airborne materials. | ||||||
21 | Inadequate natural light and ventilation means
the | ||||||
22 | absence of skylights or windows for interior spaces or | ||||||
23 | rooms and improper
window sizes and amounts by room | ||||||
24 | area to window area ratios. Inadequate
sanitary | ||||||
25 | facilities refers to the absence or inadequacy of | ||||||
26 | garbage storage and
enclosure,
bathroom facilities, |
| |||||||
| |||||||
1 | hot water and kitchens, and structural inadequacies
| ||||||
2 | preventing ingress and egress to and from all rooms and | ||||||
3 | units within a
building.
| ||||||
4 | (H) Inadequate utilities. Underground and overhead | ||||||
5 | utilities
such as storm sewers and storm drainage, | ||||||
6 | sanitary sewers, water lines, and
gas, telephone, and
| ||||||
7 | electrical services that are shown to be inadequate. | ||||||
8 | Inadequate utilities are
those that are: (i) of | ||||||
9 | insufficient capacity to serve the uses in the
| ||||||
10 | redevelopment project area, (ii) deteriorated,
| ||||||
11 | antiquated, obsolete, or in disrepair, or (iii) | ||||||
12 | lacking within the
redevelopment project area.
| ||||||
13 | (I) Excessive land coverage and overcrowding of | ||||||
14 | structures and community
facilities. The | ||||||
15 | over-intensive use of property and the crowding of | ||||||
16 | buildings
and accessory facilities onto a site. | ||||||
17 | Examples of problem conditions
warranting the | ||||||
18 | designation of an area as one exhibiting excessive land | ||||||
19 | coverage
are: (i) the presence of buildings either | ||||||
20 | improperly situated on parcels or
located
on parcels of | ||||||
21 | inadequate size and shape in relation to present-day | ||||||
22 | standards of
development for health and safety and (ii) | ||||||
23 | the presence of multiple buildings
on a
single parcel. | ||||||
24 | For there to be a finding of excessive land coverage,
| ||||||
25 | these parcels must exhibit one or more of the following | ||||||
26 | conditions:
insufficient provision for
light and air |
| |||||||
| |||||||
1 | within or around buildings, increased threat of spread | ||||||
2 | of fire
due to the close proximity of buildings, lack | ||||||
3 | of adequate or proper access to a
public right-of-way, | ||||||
4 | lack of reasonably required off-street parking, or
| ||||||
5 | inadequate provision for loading and service.
| ||||||
6 | (J) Deleterious land use or layout. The existence | ||||||
7 | of incompatible
land-use
relationships, buildings | ||||||
8 | occupied by inappropriate mixed-uses, or uses
| ||||||
9 | considered to be noxious, offensive, or unsuitable for | ||||||
10 | the
surrounding area.
| ||||||
11 | (K) Environmental clean-up. The proposed | ||||||
12 | redevelopment project area
has incurred Illinois | ||||||
13 | Environmental Protection Agency or United States
| ||||||
14 | Environmental Protection Agency remediation costs for, | ||||||
15 | or a study conducted by
an independent consultant | ||||||
16 | recognized as having expertise in environmental
| ||||||
17 | remediation has determined a need for, the
clean-up of | ||||||
18 | hazardous
waste, hazardous substances, or underground | ||||||
19 | storage tanks required by State or
federal law, | ||||||
20 | provided that the remediation costs constitute a | ||||||
21 | material
impediment to the development or | ||||||
22 | redevelopment of the redevelopment project
area.
| ||||||
23 | (L) Lack of community planning. The proposed | ||||||
24 | redevelopment project area
was
developed prior to or | ||||||
25 | without the benefit or guidance of a community plan.
| ||||||
26 | This means that the development occurred prior to the |
| |||||||
| |||||||
1 | adoption by the
municipality of a comprehensive or | ||||||
2 | other community plan or that the plan was
not followed | ||||||
3 | at the time of the area's development. This factor must | ||||||
4 | be
documented by evidence of adverse or incompatible | ||||||
5 | land-use relationships,
inadequate street layout, | ||||||
6 | improper subdivision, parcels of inadequate shape and
| ||||||
7 | size to meet contemporary development standards, or | ||||||
8 | other evidence
demonstrating
an absence of effective | ||||||
9 | community planning.
| ||||||
10 | (M) The total equalized assessed value of the | ||||||
11 | proposed redevelopment
project area has declined for 3 | ||||||
12 | of the last 5 calendar years
prior to the year in which | ||||||
13 | the redevelopment project area is designated
or is | ||||||
14 | increasing at an
annual rate that is less
than the | ||||||
15 | balance of the municipality for 3 of the last 5 | ||||||
16 | calendar years
for which
information is available or is | ||||||
17 | increasing at an annual rate that is less than
the | ||||||
18 | Consumer Price Index
for All Urban Consumers published | ||||||
19 | by the United States Department of Labor or
successor | ||||||
20 | agency for 3 of the last 5 calendar years
prior to the | ||||||
21 | year in which the redevelopment project area is | ||||||
22 | designated.
| ||||||
23 | (2) If vacant, the sound growth of the redevelopment | ||||||
24 | project area
is impaired by a
combination of 2 or more of | ||||||
25 | the following factors, each of which
is (i) present, with | ||||||
26 | that presence documented, to a meaningful extent so
that
a |
| |||||||
| |||||||
1 | municipality may reasonably find that the factor is clearly | ||||||
2 | present
within the intent of the Act and (ii) reasonably | ||||||
3 | distributed throughout the
vacant part of the
| ||||||
4 | redevelopment project area to which it pertains:
| ||||||
5 | (A) Obsolete platting of vacant land that results | ||||||
6 | in parcels of
limited or
narrow size or configurations | ||||||
7 | of parcels of irregular size or shape that would
be | ||||||
8 | difficult to develop on
a planned basis and in a manner | ||||||
9 | compatible with contemporary standards and
| ||||||
10 | requirements, or platting that failed to create | ||||||
11 | rights-of-ways for streets or
alleys or that created | ||||||
12 | inadequate right-of-way widths for streets, alleys, or
| ||||||
13 | other public rights-of-way or that omitted easements | ||||||
14 | for public utilities.
| ||||||
15 | (B) Diversity of ownership of parcels of vacant | ||||||
16 | land sufficient in
number to
retard or impede the | ||||||
17 | ability to assemble the land for development.
| ||||||
18 | (C) Tax and special assessment delinquencies exist | ||||||
19 | or the property has
been the subject of tax sales under | ||||||
20 | the Property Tax Code within the last 5
years.
| ||||||
21 | (D) Deterioration of structures or site | ||||||
22 | improvements in neighboring
areas adjacent to the | ||||||
23 | vacant land.
| ||||||
24 | (E) The area has incurred Illinois Environmental | ||||||
25 | Protection Agency or
United States Environmental | ||||||
26 | Protection Agency remediation costs for, or a study
|
| |||||||
| |||||||
1 | conducted by an independent consultant recognized as | ||||||
2 | having expertise in
environmental remediation has | ||||||
3 | determined a need for, the
clean-up of hazardous
waste, | ||||||
4 | hazardous substances, or underground storage tanks | ||||||
5 | required by State or
federal law, provided that the | ||||||
6 | remediation costs
constitute a material impediment to | ||||||
7 | the development or redevelopment of
the
redevelopment | ||||||
8 | project area.
| ||||||
9 | (F) The total equalized assessed value of the | ||||||
10 | proposed redevelopment
project area has declined for 3 | ||||||
11 | of the last 5 calendar years
prior to the year in which | ||||||
12 | the redevelopment project area is designated
or is | ||||||
13 | increasing at an
annual rate that is less
than the | ||||||
14 | balance of the municipality for 3 of the last 5 | ||||||
15 | calendar years for
which information is available or is | ||||||
16 | increasing at an annual rate that is less
than
the | ||||||
17 | Consumer Price Index
for All Urban Consumers published | ||||||
18 | by the United States Department of Labor or
successor | ||||||
19 | agency for 3 of the last 5 calendar years
prior to the | ||||||
20 | year in which the redevelopment project area is | ||||||
21 | designated.
| ||||||
22 | (3) If vacant, the sound growth of the redevelopment | ||||||
23 | project area is
impaired by one of the
following factors | ||||||
24 | that (i) is present, with that presence documented, to a
| ||||||
25 | meaningful extent so that a municipality may reasonably | ||||||
26 | find that the factor is
clearly
present within the intent |
| |||||||
| |||||||
1 | of the Act and (ii) is reasonably distributed
throughout | ||||||
2 | the vacant part of the
redevelopment project area to which | ||||||
3 | it pertains:
| ||||||
4 | (A) The area consists of one or more unused | ||||||
5 | quarries, mines, or strip
mine ponds.
| ||||||
6 | (B) The area consists of unused rail yards, rail | ||||||
7 | tracks, or railroad
rights-of-way.
| ||||||
8 | (C) The area, prior to its designation, is subject | ||||||
9 | to (i) chronic
flooding
that adversely impacts on real | ||||||
10 | property in the area as certified by a
registered
| ||||||
11 | professional engineer or appropriate regulatory agency | ||||||
12 | or (ii) surface water
that
discharges from all or a | ||||||
13 | part of the area and contributes to flooding within
the
| ||||||
14 | same watershed, but only if the redevelopment project | ||||||
15 | provides for facilities
or
improvements to contribute | ||||||
16 | to the alleviation of all or part of the
flooding.
| ||||||
17 | (D) The area consists of an unused or illegal | ||||||
18 | disposal site containing
earth,
stone, building | ||||||
19 | debris, or similar materials that were removed from
| ||||||
20 | construction, demolition, excavation, or dredge sites.
| ||||||
21 | (E) Prior to November 1, 1999, the area
is not less | ||||||
22 | than 50 nor more than 100 acres and 75%
of which is | ||||||
23 | vacant (notwithstanding that the area has been used
for | ||||||
24 | commercial agricultural purposes within 5 years prior | ||||||
25 | to the designation
of the redevelopment project area), | ||||||
26 | and the area meets at least one of
the factors itemized |
| |||||||
| |||||||
1 | in paragraph (1) of this subsection, the area
has been | ||||||
2 | designated as a town or village center by ordinance or | ||||||
3 | comprehensive
plan adopted prior to January 1, 1982, | ||||||
4 | and the area has not been developed
for that designated | ||||||
5 | purpose.
| ||||||
6 | (F) The area qualified as a blighted improved area | ||||||
7 | immediately prior to
becoming vacant, unless there has | ||||||
8 | been substantial private investment in the
immediately | ||||||
9 | surrounding area.
| ||||||
10 | In addition to the requirements of this definition, for | ||||||
11 | redevelopment project areas created on and after the effective | ||||||
12 | date of this amendatory Act of the 100th General Assembly, a | ||||||
13 | blighted area must have a median household income of 100% or | ||||||
14 | less of the area median income, as determined by the United | ||||||
15 | States Department of Housing and Urban Development. If the area | ||||||
16 | does not contain any residents, the census tracts adjoining the | ||||||
17 | blighted area must have a median household income of 100% or | ||||||
18 | less of the area median income. | ||||||
19 | (b) For any redevelopment project area that has been | ||||||
20 | designated pursuant
to this
Section by an ordinance adopted | ||||||
21 | prior to November 1, 1999 (the effective
date of Public Act
| ||||||
22 | 91-478), "conservation area" shall have the meaning
set forth | ||||||
23 | in this
Section prior to that date.
| ||||||
24 | On and after November 1, 1999,
"conservation area" means | ||||||
25 | any improved area within the boundaries
of a redevelopment | ||||||
26 | project area located within the territorial limits of
the |
| |||||||
| |||||||
1 | municipality in which 50% or more of the structures in the area | ||||||
2 | have
an age of 35 years or more.
Such an area is not yet a | ||||||
3 | blighted area but
because of a combination of 3 or more of the | ||||||
4 | following factors is detrimental
to the public safety, health, | ||||||
5 | morals
or welfare and such an area may become a blighted area:
| ||||||
6 | (1) Dilapidation. An advanced state of disrepair or | ||||||
7 | neglect of
necessary
repairs to the primary structural | ||||||
8 | components of buildings or improvements in
such a | ||||||
9 | combination that a documented building condition analysis | ||||||
10 | determines
that major repair is required or the defects are | ||||||
11 | so serious and so extensive
that the buildings must be | ||||||
12 | removed.
| ||||||
13 | (2) Obsolescence. The condition or process of falling | ||||||
14 | into disuse.
Structures have become ill-suited for the | ||||||
15 | original use.
| ||||||
16 | (3) Deterioration. With respect to buildings, defects
| ||||||
17 | including, but not limited to, major defects in
the | ||||||
18 | secondary building components such as doors, windows, | ||||||
19 | porches, gutters and
downspouts, and fascia. With respect | ||||||
20 | to surface improvements, that the
condition of roadways, | ||||||
21 | alleys, curbs, gutters, sidewalks, off-street parking,
and | ||||||
22 | surface storage areas evidence deterioration, including, | ||||||
23 | but not limited
to, surface cracking, crumbling, potholes, | ||||||
24 | depressions, loose paving material,
and weeds protruding | ||||||
25 | through paved surfaces.
| ||||||
26 | (4) Presence of structures below minimum code |
| |||||||
| |||||||
1 | standards. All structures
that do not meet the standards of | ||||||
2 | zoning, subdivision, building, fire, and
other | ||||||
3 | governmental codes applicable to property, but not | ||||||
4 | including housing and
property maintenance codes.
| ||||||
5 | (5) Illegal use of individual structures. The use of | ||||||
6 | structures in
violation of applicable federal, State, or | ||||||
7 | local laws, exclusive of those
applicable to the presence | ||||||
8 | of structures below minimum code standards.
| ||||||
9 | (6) Excessive vacancies. The presence of
buildings | ||||||
10 | that are unoccupied or under-utilized and that represent an | ||||||
11 | adverse
influence on the area because of the frequency, | ||||||
12 | extent, or duration of the
vacancies.
| ||||||
13 | (7) Lack of ventilation, light, or sanitary | ||||||
14 | facilities. The absence of
adequate ventilation for light | ||||||
15 | or air circulation in spaces or rooms without
windows, or | ||||||
16 | that require the removal of dust, odor, gas, smoke, or | ||||||
17 | other
noxious airborne materials. Inadequate natural light | ||||||
18 | and ventilation means
the absence or inadequacy of | ||||||
19 | skylights or windows for interior spaces or rooms
and | ||||||
20 | improper
window sizes and amounts by room area to window | ||||||
21 | area ratios. Inadequate
sanitary facilities refers to the | ||||||
22 | absence or inadequacy of garbage storage and
enclosure,
| ||||||
23 | bathroom facilities, hot water and kitchens, and | ||||||
24 | structural inadequacies
preventing ingress and egress to | ||||||
25 | and from all rooms and units within a
building.
| ||||||
26 | (8) Inadequate utilities. Underground and overhead |
| |||||||
| |||||||
1 | utilities
such as storm sewers and storm drainage, sanitary | ||||||
2 | sewers, water lines, and gas,
telephone, and
electrical | ||||||
3 | services that are shown to be inadequate. Inadequate | ||||||
4 | utilities are
those that are: (i) of insufficient capacity | ||||||
5 | to serve the uses in the
redevelopment project area, (ii) | ||||||
6 | deteriorated,
antiquated, obsolete, or in disrepair, or | ||||||
7 | (iii) lacking within the
redevelopment project area.
| ||||||
8 | (9) Excessive land coverage and overcrowding of | ||||||
9 | structures and community
facilities. The over-intensive | ||||||
10 | use of property and the crowding of buildings
and accessory | ||||||
11 | facilities onto a site. Examples of problem conditions
| ||||||
12 | warranting the designation of an area as one exhibiting | ||||||
13 | excessive land coverage
are: the presence of buildings | ||||||
14 | either improperly situated on parcels or located
on parcels | ||||||
15 | of inadequate size and shape in relation to present-day | ||||||
16 | standards of
development for health and safety and the | ||||||
17 | presence of multiple buildings on a
single parcel. For | ||||||
18 | there to be a finding of excessive land coverage,
these | ||||||
19 | parcels must exhibit one or more of the following | ||||||
20 | conditions:
insufficient provision for
light and air | ||||||
21 | within or around buildings, increased threat of spread of | ||||||
22 | fire
due to the close proximity of buildings, lack of | ||||||
23 | adequate or proper access to a
public right-of-way, lack of | ||||||
24 | reasonably required off-street parking, or
inadequate | ||||||
25 | provision for loading and service.
| ||||||
26 | (10) Deleterious land use or layout. The existence of |
| |||||||
| |||||||
1 | incompatible
land-use
relationships, buildings occupied by | ||||||
2 | inappropriate mixed-uses, or uses
considered to be | ||||||
3 | noxious, offensive, or unsuitable for the
surrounding | ||||||
4 | area.
| ||||||
5 | (11) Lack of community planning. The proposed | ||||||
6 | redevelopment project area
was
developed prior to or | ||||||
7 | without the benefit or guidance of a community plan.
This | ||||||
8 | means that the development occurred prior to the adoption | ||||||
9 | by the
municipality of a comprehensive or other community | ||||||
10 | plan or that the plan was
not followed at the time of the | ||||||
11 | area's development. This factor must be
documented by | ||||||
12 | evidence of adverse or incompatible land-use | ||||||
13 | relationships,
inadequate street layout, improper | ||||||
14 | subdivision, parcels of inadequate shape and
size to meet | ||||||
15 | contemporary development standards, or other evidence
| ||||||
16 | demonstrating
an absence of effective community planning.
| ||||||
17 | (12) The area has incurred Illinois Environmental | ||||||
18 | Protection Agency or
United
States Environmental | ||||||
19 | Protection Agency remediation costs for, or a study
| ||||||
20 | conducted by an independent consultant recognized as | ||||||
21 | having expertise in
environmental remediation has | ||||||
22 | determined a need for, the clean-up of hazardous
waste, | ||||||
23 | hazardous substances, or underground storage tanks | ||||||
24 | required by State
or federal law, provided that the | ||||||
25 | remediation costs constitute a material
impediment to the | ||||||
26 | development or redevelopment of the redevelopment project
|
| |||||||
| |||||||
1 | area.
| ||||||
2 | (13) The total equalized assessed value of the proposed | ||||||
3 | redevelopment
project area has declined for 3 of the last 5 | ||||||
4 | calendar years
for which information is
available or is | ||||||
5 | increasing at an annual rate that is less than the balance | ||||||
6 | of
the municipality for 3 of the last 5 calendar years for | ||||||
7 | which information is
available or is increasing at an | ||||||
8 | annual rate that is less
than the Consumer Price Index for | ||||||
9 | All Urban Consumers published by the United
States | ||||||
10 | Department of Labor or successor agency for 3 of the last 5 | ||||||
11 | calendar
years for which information is available.
| ||||||
12 | (c) "Industrial park" means an area in a blighted or | ||||||
13 | conservation
area suitable for use by any manufacturing, | ||||||
14 | industrial, research or
transportation enterprise, of | ||||||
15 | facilities to include but not be limited to
factories, mills, | ||||||
16 | processing plants, assembly plants, packing plants,
| ||||||
17 | fabricating plants, industrial distribution centers, | ||||||
18 | warehouses, repair
overhaul or service facilities, freight | ||||||
19 | terminals, research facilities,
test facilities or railroad | ||||||
20 | facilities.
| ||||||
21 | (d) "Industrial park conservation area" means an area | ||||||
22 | within the
boundaries of a redevelopment project area located | ||||||
23 | within the territorial
limits of a municipality that is a labor | ||||||
24 | surplus municipality or within 1
1/2 miles of the territorial | ||||||
25 | limits of a municipality that is a labor
surplus municipality | ||||||
26 | if the area is annexed to the municipality; which
area is zoned |
| |||||||
| |||||||
1 | as industrial no later than at the time the municipality by
| ||||||
2 | ordinance designates the redevelopment project area, and which | ||||||
3 | area
includes both vacant land suitable for use as an | ||||||
4 | industrial park and a
blighted area or conservation area | ||||||
5 | contiguous to such vacant land.
| ||||||
6 | (e) "Labor surplus municipality" means a municipality in | ||||||
7 | which, at any
time during the 6 months before the municipality | ||||||
8 | by ordinance designates
an industrial park conservation area, | ||||||
9 | the unemployment rate was over 6% and was
also 100% or more of | ||||||
10 | the national average unemployment rate for that same
time as | ||||||
11 | published in the United States Department of Labor Bureau of | ||||||
12 | Labor
Statistics publication entitled "The Employment | ||||||
13 | Situation" or its successor
publication. For the purpose of | ||||||
14 | this subsection, if unemployment rate
statistics for the | ||||||
15 | municipality are not available, the unemployment rate in
the | ||||||
16 | municipality shall be deemed to be the same as the unemployment | ||||||
17 | rate in
the principal county in which the municipality is | ||||||
18 | located.
| ||||||
19 | (f) "Municipality" shall mean a city, village, | ||||||
20 | incorporated town, or a township that is located in the | ||||||
21 | unincorporated portion of a county with 3 million or more | ||||||
22 | inhabitants, if the county adopted an ordinance that approved | ||||||
23 | the township's redevelopment plan.
| ||||||
24 | (g) "Initial Sales Tax Amounts" means the amount of taxes | ||||||
25 | paid under
the Retailers' Occupation Tax Act, Use Tax Act, | ||||||
26 | Service Use Tax Act, the
Service Occupation Tax Act, the |
| |||||||
| |||||||
1 | Municipal Retailers' Occupation Tax Act,
and the Municipal | ||||||
2 | Service Occupation Tax Act by
retailers and servicemen on | ||||||
3 | transactions at places located in a
State Sales Tax Boundary | ||||||
4 | during the calendar year 1985.
| ||||||
5 | (g-1) "Revised Initial Sales Tax Amounts" means the amount | ||||||
6 | of taxes paid
under the Retailers' Occupation Tax Act, Use Tax | ||||||
7 | Act, Service Use Tax Act, the
Service Occupation Tax Act, the | ||||||
8 | Municipal Retailers' Occupation Tax Act,
and the Municipal | ||||||
9 | Service Occupation Tax Act by retailers and servicemen on
| ||||||
10 | transactions at places located within the State Sales Tax | ||||||
11 | Boundary
revised pursuant to Section 11-74.4-8a(9) of this Act.
| ||||||
12 | (h) "Municipal Sales Tax Increment" means an amount equal | ||||||
13 | to the
increase in the aggregate amount of taxes paid to a | ||||||
14 | municipality from the
Local Government Tax Fund arising from | ||||||
15 | sales by retailers and servicemen
within the redevelopment | ||||||
16 | project area or State Sales Tax Boundary, as
the case may be, | ||||||
17 | for as long as the redevelopment project area or State
Sales | ||||||
18 | Tax Boundary, as the case may be, exist over and above the | ||||||
19 | aggregate
amount of taxes as certified by the Illinois | ||||||
20 | Department of Revenue and paid
under the Municipal Retailers' | ||||||
21 | Occupation Tax Act and the Municipal Service
Occupation Tax Act | ||||||
22 | by retailers and servicemen, on transactions at places
of | ||||||
23 | business located in the redevelopment project area or State | ||||||
24 | Sales Tax
Boundary, as the case may be, during the
base year | ||||||
25 | which shall be the calendar year immediately prior to the year | ||||||
26 | in
which the municipality adopted tax increment allocation |
| |||||||
| |||||||
1 | financing. For
purposes of computing the aggregate amount of | ||||||
2 | such taxes for base years
occurring prior to 1985, the | ||||||
3 | Department of Revenue shall determine the
Initial Sales Tax | ||||||
4 | Amounts for such taxes and deduct therefrom an amount
equal to | ||||||
5 | 4% of the aggregate amount of taxes per year for each year the
| ||||||
6 | base year is prior to 1985, but not to exceed a total deduction | ||||||
7 | of 12%.
The amount so determined shall be known as the | ||||||
8 | "Adjusted Initial Sales Tax
Amounts". For purposes of | ||||||
9 | determining the Municipal Sales Tax Increment,
the Department | ||||||
10 | of Revenue shall for each period subtract from the amount
paid | ||||||
11 | to the municipality from the Local Government Tax Fund arising | ||||||
12 | from
sales by retailers and servicemen on transactions
located | ||||||
13 | in the redevelopment project area or the State Sales Tax | ||||||
14 | Boundary,
as the case may be, the certified Initial Sales Tax
| ||||||
15 | Amounts, the Adjusted Initial Sales Tax Amounts or the Revised | ||||||
16 | Initial
Sales Tax Amounts for the Municipal Retailers'
| ||||||
17 | Occupation Tax Act and the Municipal Service
Occupation Tax | ||||||
18 | Act. For the State Fiscal Year 1989, this calculation shall
be | ||||||
19 | made by utilizing the calendar year 1987 to determine the tax | ||||||
20 | amounts
received. For the State Fiscal Year 1990, this | ||||||
21 | calculation shall be made
by utilizing the period from January | ||||||
22 | 1, 1988, until September 30, 1988, to
determine the tax amounts | ||||||
23 | received from retailers and servicemen pursuant
to the | ||||||
24 | Municipal Retailers' Occupation Tax and the Municipal Service
| ||||||
25 | Occupation Tax Act, which shall have deducted therefrom
| ||||||
26 | nine-twelfths of the certified Initial Sales Tax Amounts, the |
| |||||||
| |||||||
1 | Adjusted Initial
Sales Tax Amounts or the Revised Initial Sales | ||||||
2 | Tax Amounts as appropriate.
For the State Fiscal Year 1991, | ||||||
3 | this calculation shall be made by utilizing
the period from | ||||||
4 | October 1, 1988, to June 30, 1989, to determine the tax
amounts | ||||||
5 | received from retailers and servicemen pursuant to the | ||||||
6 | Municipal
Retailers' Occupation Tax and the Municipal Service | ||||||
7 | Occupation Tax Act
which shall have deducted therefrom | ||||||
8 | nine-twelfths of the
certified Initial Sales Tax Amounts, | ||||||
9 | Adjusted Initial Sales Tax
Amounts or the Revised Initial Sales | ||||||
10 | Tax Amounts as appropriate. For every
State Fiscal Year | ||||||
11 | thereafter, the applicable period shall be the 12 months
| ||||||
12 | beginning July 1 and ending June 30 to determine the tax | ||||||
13 | amounts received
which shall have deducted therefrom the | ||||||
14 | certified Initial Sales Tax
Amounts, the Adjusted Initial Sales | ||||||
15 | Tax Amounts or the Revised Initial
Sales Tax Amounts, as the | ||||||
16 | case may be.
| ||||||
17 | (i) "Net State Sales Tax Increment" means the sum of the | ||||||
18 | following: (a)
80% of the first $100,000 of State Sales Tax | ||||||
19 | Increment annually generated
within a State Sales Tax Boundary; | ||||||
20 | (b) 60% of the amount in excess of
$100,000 but not exceeding | ||||||
21 | $500,000 of State Sales Tax Increment annually
generated within | ||||||
22 | a State Sales Tax Boundary; and (c) 40% of all amounts in
| ||||||
23 | excess of $500,000 of State Sales Tax Increment annually | ||||||
24 | generated within a
State Sales Tax Boundary. If, however, a | ||||||
25 | municipality established a tax
increment financing district in | ||||||
26 | a county with a population in excess of
3,000,000 before |
| |||||||
| |||||||
1 | January 1, 1986, and the municipality entered into a
contract | ||||||
2 | or issued bonds after January 1, 1986, but before December 31, | ||||||
3 | 1986,
to finance redevelopment project costs within a State | ||||||
4 | Sales Tax
Boundary, then the Net State Sales Tax Increment | ||||||
5 | means, for the fiscal years
beginning July 1, 1990, and July 1, | ||||||
6 | 1991, 100% of the State Sales Tax
Increment annually generated | ||||||
7 | within a State Sales Tax Boundary; and
notwithstanding any | ||||||
8 | other provision of this Act, for those fiscal years the
| ||||||
9 | Department of Revenue shall distribute to those municipalities | ||||||
10 | 100% of
their Net State Sales Tax Increment before any | ||||||
11 | distribution to any other
municipality and regardless of | ||||||
12 | whether or not those other municipalities
will receive 100% of | ||||||
13 | their Net State Sales Tax Increment. For Fiscal Year
1999, and | ||||||
14 | every year thereafter until the year 2007, for any municipality
| ||||||
15 | that has not entered into a contract or has not issued bonds | ||||||
16 | prior to June
1, 1988 to finance redevelopment project costs | ||||||
17 | within a State Sales Tax
Boundary, the Net State Sales Tax | ||||||
18 | Increment shall be calculated as follows:
By multiplying the | ||||||
19 | Net State Sales Tax Increment by 90% in the State Fiscal
Year | ||||||
20 | 1999; 80% in the State Fiscal Year 2000; 70% in the State | ||||||
21 | Fiscal Year
2001; 60% in the State Fiscal Year 2002; 50% in the | ||||||
22 | State Fiscal Year 2003; 40%
in the State Fiscal Year 2004; 30% | ||||||
23 | in the State Fiscal Year 2005; 20% in
the State Fiscal Year | ||||||
24 | 2006; and 10% in the State Fiscal Year 2007. No
payment shall | ||||||
25 | be made for State Fiscal Year 2008 and thereafter.
| ||||||
26 | Municipalities that issued bonds in connection with a |
| |||||||
| |||||||
1 | redevelopment project
in a redevelopment project area within | ||||||
2 | the State Sales Tax Boundary prior to
July 29, 1991,
or that | ||||||
3 | entered into contracts in connection with a redevelopment | ||||||
4 | project in
a redevelopment project area before June 1, 1988,
| ||||||
5 | shall continue to receive their proportional share of the
| ||||||
6 | Illinois Tax Increment Fund distribution until the date on | ||||||
7 | which the
redevelopment project is completed or terminated.
If, | ||||||
8 | however, a municipality that issued bonds in connection with a
| ||||||
9 | redevelopment project in a redevelopment project area within | ||||||
10 | the State Sales
Tax Boundary prior to July 29, 1991 retires the | ||||||
11 | bonds prior to June 30, 2007 or
a municipality that entered | ||||||
12 | into contracts in connection with a redevelopment
project in a | ||||||
13 | redevelopment project area before June 1, 1988 completes the
| ||||||
14 | contracts prior to June 30, 2007, then so long as the | ||||||
15 | redevelopment project is
not
completed or is not terminated, | ||||||
16 | the Net State Sales Tax Increment shall be
calculated, | ||||||
17 | beginning on the date on which the bonds are retired or the
| ||||||
18 | contracts are completed, as follows: By multiplying the Net | ||||||
19 | State Sales Tax
Increment by 60% in the State Fiscal Year
2002; | ||||||
20 | 50% in the State Fiscal Year 2003; 40% in the State Fiscal Year | ||||||
21 | 2004; 30%
in the State Fiscal Year 2005; 20% in the State | ||||||
22 | Fiscal Year 2006; and 10% in
the State Fiscal Year 2007. No | ||||||
23 | payment shall be made for State Fiscal Year
2008 and | ||||||
24 | thereafter.
Refunding of any bonds issued
prior to July 29, | ||||||
25 | 1991, shall not alter the Net State Sales Tax Increment.
| ||||||
26 | (j) "State Utility Tax Increment Amount" means an amount |
| |||||||
| |||||||
1 | equal to the
aggregate increase in State electric and gas tax | ||||||
2 | charges imposed on owners
and tenants, other than residential | ||||||
3 | customers, of properties located within
the redevelopment | ||||||
4 | project area under Section 9-222 of the Public Utilities
Act, | ||||||
5 | over and above the aggregate of such charges as certified by | ||||||
6 | the
Department of Revenue and paid by owners and tenants, other | ||||||
7 | than
residential customers, of properties within the | ||||||
8 | redevelopment project area
during the base year, which shall be | ||||||
9 | the calendar year immediately prior to
the year of the adoption | ||||||
10 | of the ordinance authorizing tax increment allocation
| ||||||
11 | financing.
| ||||||
12 | (k) "Net State Utility Tax Increment" means the sum of the | ||||||
13 | following:
(a) 80% of the first $100,000 of State Utility Tax | ||||||
14 | Increment annually
generated by a redevelopment project area; | ||||||
15 | (b) 60% of the amount in excess
of $100,000 but not exceeding | ||||||
16 | $500,000 of the State Utility Tax Increment
annually generated | ||||||
17 | by a redevelopment project area; and (c) 40% of all
amounts in | ||||||
18 | excess of $500,000 of State Utility Tax Increment annually
| ||||||
19 | generated by a redevelopment project area. For the State Fiscal | ||||||
20 | Year 1999,
and every year thereafter until the year 2007, for | ||||||
21 | any municipality that
has not entered into a contract or has | ||||||
22 | not issued bonds prior to June 1,
1988 to finance redevelopment | ||||||
23 | project costs within a redevelopment project
area, the Net | ||||||
24 | State Utility Tax Increment shall be calculated as follows:
By | ||||||
25 | multiplying the Net State Utility Tax Increment by 90% in the | ||||||
26 | State
Fiscal Year 1999; 80% in the State Fiscal Year 2000; 70% |
| |||||||
| |||||||
1 | in the State
Fiscal Year 2001; 60% in the State Fiscal Year | ||||||
2 | 2002; 50% in the State
Fiscal Year 2003; 40% in the State | ||||||
3 | Fiscal Year 2004; 30% in the State
Fiscal Year 2005; 20% in the | ||||||
4 | State Fiscal Year 2006; and 10% in the State
Fiscal Year 2007. | ||||||
5 | No payment shall be made for the State Fiscal Year 2008
and | ||||||
6 | thereafter.
| ||||||
7 | Municipalities that issue bonds in connection with the | ||||||
8 | redevelopment project
during the period from June 1, 1988 until | ||||||
9 | 3 years after the effective date
of this Amendatory Act of 1988 | ||||||
10 | shall receive the Net State Utility Tax
Increment, subject to | ||||||
11 | appropriation, for 15 State Fiscal Years after the
issuance of | ||||||
12 | such bonds. For the 16th through the 20th State Fiscal Years
| ||||||
13 | after issuance of the bonds, the Net State Utility Tax | ||||||
14 | Increment shall be
calculated as follows: By multiplying the | ||||||
15 | Net State Utility Tax Increment
by 90% in year 16; 80% in year | ||||||
16 | 17; 70% in year 18; 60% in year 19; and 50%
in year 20. | ||||||
17 | Refunding of any bonds issued prior to June 1, 1988, shall not
| ||||||
18 | alter the revised Net State Utility Tax Increment payments set | ||||||
19 | forth above.
| ||||||
20 | (l) "Obligations" mean bonds, loans, debentures, notes, | ||||||
21 | special certificates
or other evidence of indebtedness issued | ||||||
22 | by the municipality to carry out
a redevelopment project or to | ||||||
23 | refund outstanding obligations.
| ||||||
24 | (m) "Payment in lieu of taxes" means those estimated tax | ||||||
25 | revenues from
real property in a redevelopment project area | ||||||
26 | derived from real property that
has been acquired by a |
| |||||||
| |||||||
1 | municipality
which according to the redevelopment project or | ||||||
2 | plan is to be used for a
private use which taxing districts | ||||||
3 | would have received had a municipality
not acquired the real | ||||||
4 | property and adopted tax increment allocation
financing and | ||||||
5 | which would result from
levies made after the time of the | ||||||
6 | adoption of tax increment allocation
financing to the time the | ||||||
7 | current equalized value of real property in the
redevelopment | ||||||
8 | project area exceeds the total initial equalized value of
real | ||||||
9 | property in said area.
| ||||||
10 | (n) "Redevelopment plan" means the comprehensive program | ||||||
11 | of
the municipality for development or redevelopment intended | ||||||
12 | by the payment of
redevelopment project costs to reduce or | ||||||
13 | eliminate those conditions the
existence of which qualified the | ||||||
14 | redevelopment project area as
a "blighted
area" or | ||||||
15 | "conservation area" or combination thereof or "industrial park
| ||||||
16 | conservation area," and thereby to enhance the tax bases of the | ||||||
17 | taxing
districts which extend into the redevelopment project | ||||||
18 | area, provided that, with respect to redevelopment project | ||||||
19 | areas described in subsections (p-1) and (p-2), "redevelopment | ||||||
20 | plan" means the comprehensive program of the affected | ||||||
21 | municipality for the development of qualifying transit | ||||||
22 | facilities.
On and after November 1, 1999 (the effective date | ||||||
23 | of
Public Act 91-478), no
redevelopment plan may be approved or | ||||||
24 | amended that includes the development of
vacant land (i) with a | ||||||
25 | golf course and related clubhouse and other facilities
or (ii) | ||||||
26 | designated by federal, State, county, or municipal government |
| |||||||
| |||||||
1 | as public
land for outdoor recreational activities or for | ||||||
2 | nature preserves and used for
that purpose within 5
years prior | ||||||
3 | to the adoption of the redevelopment plan. For the purpose of
| ||||||
4 | this subsection, "recreational activities" is limited to mean | ||||||
5 | camping and
hunting.
Each
redevelopment plan shall set forth in | ||||||
6 | writing the program to be undertaken
to accomplish the | ||||||
7 | objectives and shall include but not be limited to:
| ||||||
8 | (A) an itemized list of estimated redevelopment | ||||||
9 | project costs;
| ||||||
10 | (B) evidence indicating that the redevelopment project | ||||||
11 | area on the whole
has not been subject to growth and | ||||||
12 | development through investment by private
enterprise, | ||||||
13 | provided that such evidence shall not be required for any | ||||||
14 | redevelopment project area located within a transit | ||||||
15 | facility improvement area established pursuant to Section | ||||||
16 | 11-74.4-3.3;
| ||||||
17 | (C) an assessment of any financial impact of the | ||||||
18 | redevelopment project
area on or any increased demand for | ||||||
19 | services from any taxing district affected
by the plan and | ||||||
20 | any program to address such financial impact or increased
| ||||||
21 | demand;
| ||||||
22 | (D) the sources of funds to pay costs;
| ||||||
23 | (E) the nature and term of the obligations to be | ||||||
24 | issued;
| ||||||
25 | (F) the most recent equalized assessed valuation of the | ||||||
26 | redevelopment
project area;
|
| |||||||
| |||||||
1 | (G) an estimate as to the equalized assessed valuation | ||||||
2 | after redevelopment
and the general land uses to apply in | ||||||
3 | the redevelopment project area;
| ||||||
4 | (H) a commitment to fair employment practices and an | ||||||
5 | affirmative action
plan;
| ||||||
6 | (I) if it concerns an industrial park
conservation | ||||||
7 | area, the plan shall
also include a general description
of | ||||||
8 | any proposed developer, user and tenant of any property, a | ||||||
9 | description
of the type, structure and general character of | ||||||
10 | the facilities to be
developed, a description of the type, | ||||||
11 | class and number of new employees to
be employed in the | ||||||
12 | operation of the facilities to be developed; and
| ||||||
13 | (J) if property is to be annexed to the municipality, | ||||||
14 | the plan shall
include the terms of the annexation | ||||||
15 | agreement.
| ||||||
16 | The provisions of items (B) and (C) of this subsection (n) | ||||||
17 | shall not apply to
a municipality that before March 14, 1994 | ||||||
18 | (the effective date of Public Act
88-537) had fixed, either by | ||||||
19 | its
corporate authorities or by a commission designated under | ||||||
20 | subsection (k) of
Section 11-74.4-4, a time and place for a | ||||||
21 | public hearing as required by
subsection (a) of Section | ||||||
22 | 11-74.4-5.
No redevelopment plan shall be adopted unless a
| ||||||
23 | municipality complies with all of the following requirements:
| ||||||
24 | (1) The municipality finds that the redevelopment | ||||||
25 | project area on
the whole has not been subject to growth | ||||||
26 | and development through investment
by private enterprise |
| |||||||
| |||||||
1 | and would not reasonably be anticipated to be
developed | ||||||
2 | without the adoption of the redevelopment plan, provided, | ||||||
3 | however, that such a finding shall not be required with | ||||||
4 | respect to any redevelopment project area located within a | ||||||
5 | transit facility improvement area established pursuant to | ||||||
6 | Section 11-74.4-3.3.
| ||||||
7 | (2) The municipality finds that the redevelopment plan | ||||||
8 | and project conform
to the comprehensive plan for the | ||||||
9 | development of the municipality as a whole,
or, for | ||||||
10 | municipalities with a population of 100,000 or more, | ||||||
11 | regardless of when
the redevelopment plan and project was | ||||||
12 | adopted, the redevelopment plan and
project either: (i) | ||||||
13 | conforms to the strategic economic development or
| ||||||
14 | redevelopment plan issued by the designated planning | ||||||
15 | authority of the
municipality, or (ii) includes land uses | ||||||
16 | that have been approved by the
planning commission of the | ||||||
17 | municipality.
| ||||||
18 | (3) The redevelopment plan establishes the estimated | ||||||
19 | dates of completion
of the redevelopment project and | ||||||
20 | retirement of obligations issued to finance
redevelopment | ||||||
21 | project costs. Those dates may not be later than the dates | ||||||
22 | set forth under Section 11-74.4-3.5.
| ||||||
23 | A municipality may by municipal ordinance amend an | ||||||
24 | existing redevelopment
plan to conform to this paragraph | ||||||
25 | (3) as amended by Public Act 91-478, which
municipal | ||||||
26 | ordinance may be adopted without
further hearing or
notice |
| |||||||
| |||||||
1 | and without complying with the procedures provided in this | ||||||
2 | Act
pertaining to an amendment to or the initial approval | ||||||
3 | of a redevelopment plan
and project and
designation of a | ||||||
4 | redevelopment project area.
| ||||||
5 | (3.5) The municipality finds, in the case of an | ||||||
6 | industrial
park
conservation area, also that the | ||||||
7 | municipality is a labor surplus municipality
and that the | ||||||
8 | implementation of the redevelopment plan will reduce | ||||||
9 | unemployment,
create new jobs and by the provision of new | ||||||
10 | facilities enhance the tax base of
the taxing districts | ||||||
11 | that extend into the redevelopment project area.
| ||||||
12 | (4) If any incremental revenues are being utilized | ||||||
13 | under
Section 8(a)(1)
or 8(a)(2) of this Act in | ||||||
14 | redevelopment project areas approved by ordinance
after | ||||||
15 | January 1, 1986, the municipality finds: (a) that the | ||||||
16 | redevelopment
project area would not reasonably be | ||||||
17 | developed without the use of such
incremental revenues, and | ||||||
18 | (b) that such incremental revenues will be
exclusively | ||||||
19 | utilized for the development of the redevelopment project | ||||||
20 | area.
| ||||||
21 | (5) If: (a)
the redevelopment plan will not result in
| ||||||
22 | displacement of
residents from 10 or more inhabited | ||||||
23 | residential units, and the
municipality certifies in the | ||||||
24 | plan that
such displacement will not result from the plan; | ||||||
25 | or (b) the redevelopment plan is for a redevelopment | ||||||
26 | project area located within a transit facility improvement |
| |||||||
| |||||||
1 | area established pursuant to Section 11-74.4-3.3, and the | ||||||
2 | applicable project is subject to the process for evaluation | ||||||
3 | of environmental effects under the National Environmental | ||||||
4 | Policy Act of 1969, 42 U.S.C. 4321 et seq., then a housing | ||||||
5 | impact study
need not be performed.
If, however, the | ||||||
6 | redevelopment plan would result in the displacement
of
| ||||||
7 | residents from 10 or more inhabited
residential units,
or | ||||||
8 | if the redevelopment project area contains 75 or more | ||||||
9 | inhabited residential
units and no
certification is made,
| ||||||
10 | then the municipality shall prepare, as part of the | ||||||
11 | separate
feasibility report required by subsection (a) of | ||||||
12 | Section 11-74.4-5, a housing
impact study.
| ||||||
13 | Part I of the housing impact study shall include (i) | ||||||
14 | data as to whether
the residential units are single family | ||||||
15 | or multi-family units,
(ii) the number and type of rooms | ||||||
16 | within the units, if that information is
available, (iii) | ||||||
17 | whether
the
units are inhabited or uninhabited, as | ||||||
18 | determined not less than 45
days before the date that the | ||||||
19 | ordinance or resolution required
by subsection (a) of | ||||||
20 | Section 11-74.4-5 is passed, and (iv) data as to the
racial | ||||||
21 | and ethnic composition of the residents in the inhabited | ||||||
22 | residential
units. The data requirement as to the racial | ||||||
23 | and ethnic composition of the
residents in the inhabited | ||||||
24 | residential units shall be deemed to be fully
satisfied by | ||||||
25 | data from the most recent federal census.
| ||||||
26 | Part II of the housing impact study shall identify the |
| |||||||
| |||||||
1 | inhabited
residential units in the proposed redevelopment | ||||||
2 | project area that are to be or
may be removed. If inhabited | ||||||
3 | residential units are to be removed, then the
housing | ||||||
4 | impact study shall identify (i) the number and location of | ||||||
5 | those units
that will or may be removed, (ii) the | ||||||
6 | municipality's plans for relocation
assistance for those | ||||||
7 | residents in the proposed redevelopment project area
whose | ||||||
8 | residences are to be removed, (iii) the availability of | ||||||
9 | replacement
housing for those residents whose residences | ||||||
10 | are to be removed, and shall
identify the type, location, | ||||||
11 | and cost of the housing, and (iv) the type and
extent
of | ||||||
12 | relocation assistance to be provided.
| ||||||
13 | (6) On and after November 1, 1999, the
housing impact | ||||||
14 | study required by paragraph (5) shall be
incorporated in | ||||||
15 | the redevelopment plan for the
redevelopment project area.
| ||||||
16 | (7) On and after November 1, 1999, no
redevelopment | ||||||
17 | plan shall be adopted, nor an
existing plan amended, nor | ||||||
18 | shall residential housing that is
occupied by households of | ||||||
19 | low-income and very low-income
persons in currently | ||||||
20 | existing redevelopment project
areas be removed after | ||||||
21 | November 1, 1999 unless the redevelopment plan provides, | ||||||
22 | with
respect to inhabited housing units that are to be | ||||||
23 | removed for
households of low-income and very low-income | ||||||
24 | persons, affordable
housing and relocation assistance not | ||||||
25 | less than that which would
be provided under the federal | ||||||
26 | Uniform Relocation Assistance and
Real Property |
| |||||||
| |||||||
1 | Acquisition Policies Act of 1970 and the regulations
under | ||||||
2 | that Act, including the eligibility criteria.
Affordable | ||||||
3 | housing may be either existing or newly constructed
| ||||||
4 | housing. For purposes of this paragraph (7), "low-income
| ||||||
5 | households", "very low-income households", and "affordable
| ||||||
6 | housing" have the meanings set forth in the Illinois | ||||||
7 | Affordable
Housing Act.
The municipality shall make a good | ||||||
8 | faith effort to ensure that this affordable
housing is | ||||||
9 | located in or near the redevelopment project area within | ||||||
10 | the
municipality.
| ||||||
11 | (8) On and after November 1, 1999, if,
after the | ||||||
12 | adoption of the redevelopment plan for the
redevelopment | ||||||
13 | project area, any municipality desires to amend its
| ||||||
14 | redevelopment plan
to remove more inhabited residential | ||||||
15 | units than
specified in its original redevelopment plan, | ||||||
16 | that change shall be made in
accordance with the procedures | ||||||
17 | in subsection (c) of Section 11-74.4-5.
| ||||||
18 | (9) For redevelopment project areas designated prior | ||||||
19 | to November 1,
1999, the redevelopment plan may be amended | ||||||
20 | without further joint review board
meeting or hearing, | ||||||
21 | provided that the municipality shall give notice of any
| ||||||
22 | such changes by mail to each affected taxing district and | ||||||
23 | registrant on the
interested party registry, to authorize | ||||||
24 | the municipality to expend tax
increment revenues for | ||||||
25 | redevelopment project costs defined by paragraphs (5)
and | ||||||
26 | (7.5), subparagraphs (E) and (F) of paragraph (11), and |
| |||||||
| |||||||
1 | paragraph (11.5) of
subsection (q) of Section 11-74.4-3, so | ||||||
2 | long as the changes do not increase the
total estimated | ||||||
3 | redevelopment project costs set out in the redevelopment | ||||||
4 | plan
by more than 5% after adjustment for inflation from | ||||||
5 | the date the plan was
adopted.
| ||||||
6 | (o) "Redevelopment project" means any public and private | ||||||
7 | development project
in furtherance of the objectives of a | ||||||
8 | redevelopment plan.
On and after November 1, 1999 (the | ||||||
9 | effective date of Public Act 91-478), no
redevelopment plan may | ||||||
10 | be approved or amended that includes the development
of vacant | ||||||
11 | land (i) with a golf course and related clubhouse and other
| ||||||
12 | facilities
or (ii) designated by federal, State, county, or | ||||||
13 | municipal government as public
land for outdoor recreational | ||||||
14 | activities or for nature preserves and used for
that purpose | ||||||
15 | within 5
years prior to the adoption of the redevelopment plan. | ||||||
16 | For the purpose of
this subsection, "recreational activities" | ||||||
17 | is limited to mean camping and
hunting.
| ||||||
18 | (p) "Redevelopment project area" means an area designated | ||||||
19 | by
the
municipality, which is not less in the aggregate than 1 | ||||||
20 | 1/2 acres and in
respect to which the municipality has made a | ||||||
21 | finding that there exist
conditions which cause the area to be | ||||||
22 | classified as an industrial park
conservation area or a | ||||||
23 | blighted area or a conservation area, or a
combination of both | ||||||
24 | blighted areas and conservation areas.
| ||||||
25 | (p-1) Notwithstanding any provision of this Act to the | ||||||
26 | contrary, on and after August 25, 2009 (the effective date of |
| |||||||
| |||||||
1 | Public Act 96-680), a redevelopment project area may include | ||||||
2 | areas within a one-half mile radius of an existing or proposed | ||||||
3 | Regional Transportation Authority Suburban Transit Access | ||||||
4 | Route (STAR Line) station without a finding that the area is | ||||||
5 | classified as an industrial park conservation area, a blighted | ||||||
6 | area, a conservation area, or a combination thereof, but only | ||||||
7 | if the municipality receives unanimous consent from the joint | ||||||
8 | review board created to review the proposed redevelopment | ||||||
9 | project area. | ||||||
10 | (p-2) Notwithstanding any provision of this Act to the | ||||||
11 | contrary, on and after the effective date of this amendatory | ||||||
12 | Act of the 99th General Assembly, a redevelopment project area | ||||||
13 | may include areas within a transit facility improvement area | ||||||
14 | that has been established pursuant to Section 11-74.4-3.3 | ||||||
15 | without a finding that the area is classified as an industrial | ||||||
16 | park conservation area, a blighted area, a conservation area, | ||||||
17 | or any combination thereof. | ||||||
18 | (q) "Redevelopment project costs", except for | ||||||
19 | redevelopment project areas created pursuant to subsection | ||||||
20 | (p-1) or (p-2), means and includes the sum total of all
| ||||||
21 | reasonable or necessary costs incurred or estimated to be | ||||||
22 | incurred, and
any such costs incidental to a redevelopment plan | ||||||
23 | and a redevelopment
project. Such costs include, without | ||||||
24 | limitation, the following:
| ||||||
25 | (1) Costs of studies, surveys, development of plans, | ||||||
26 | and
specifications, implementation and administration of |
| |||||||
| |||||||
1 | the redevelopment
plan including but not limited to staff | ||||||
2 | and professional service costs for
architectural, | ||||||
3 | engineering, legal, financial, planning or other
services, | ||||||
4 | provided however that no charges for professional services | ||||||
5 | may be
based on a percentage of the tax increment | ||||||
6 | collected; except that on and
after November 1, 1999 (the | ||||||
7 | effective date of Public Act 91-478), no
contracts for
| ||||||
8 | professional services, excluding architectural and | ||||||
9 | engineering services, may be
entered into if the terms of | ||||||
10 | the contract extend
beyond a period of 3 years. In | ||||||
11 | addition, "redevelopment project costs" shall
not include | ||||||
12 | lobbying expenses.
After consultation with the | ||||||
13 | municipality, each tax
increment consultant or advisor to a | ||||||
14 | municipality that plans to designate or
has designated a | ||||||
15 | redevelopment project area shall inform the municipality | ||||||
16 | in
writing of any contracts that the consultant or advisor | ||||||
17 | has entered into with
entities or individuals that have | ||||||
18 | received, or are receiving, payments financed
by tax
| ||||||
19 | increment revenues produced by the redevelopment project | ||||||
20 | area with respect to
which the consultant or advisor has | ||||||
21 | performed, or will be performing, service
for the
| ||||||
22 | municipality. This requirement shall be satisfied by the | ||||||
23 | consultant or advisor
before the commencement of services | ||||||
24 | for the municipality and thereafter
whenever any other | ||||||
25 | contracts with those individuals or entities are executed | ||||||
26 | by
the consultant or advisor;
|
| |||||||
| |||||||
1 | (1.5) After July 1, 1999, annual administrative costs | ||||||
2 | shall
not include general overhead or
administrative costs | ||||||
3 | of the municipality
that would still have been incurred by | ||||||
4 | the municipality if the municipality had
not
designated a | ||||||
5 | redevelopment project area or approved a redevelopment | ||||||
6 | plan;
| ||||||
7 | (1.6) The cost of
marketing sites within the | ||||||
8 | redevelopment project area to prospective
businesses, | ||||||
9 | developers, and investors;
| ||||||
10 | (2) Property assembly costs, including but not limited | ||||||
11 | to acquisition
of land and other property, real or | ||||||
12 | personal, or rights or interests therein,
demolition of | ||||||
13 | buildings, site preparation, site improvements that serve | ||||||
14 | as an
engineered barrier addressing ground level or below | ||||||
15 | ground environmental
contamination, including, but not | ||||||
16 | limited to parking lots and other concrete
or asphalt | ||||||
17 | barriers, and the clearing and grading of
land;
| ||||||
18 | (3) Costs of rehabilitation, reconstruction or repair | ||||||
19 | or remodeling of
existing public or private buildings, | ||||||
20 | fixtures, and leasehold
improvements; and the cost of | ||||||
21 | replacing
an existing public building if pursuant to the | ||||||
22 | implementation of a
redevelopment project the existing | ||||||
23 | public building is to be demolished to use
the site for | ||||||
24 | private investment or
devoted to a different use requiring | ||||||
25 | private investment; including any direct or indirect costs | ||||||
26 | relating to Green Globes or LEED certified construction |
| |||||||
| |||||||
1 | elements or construction elements with an equivalent | ||||||
2 | certification;
| ||||||
3 | (4) Costs of the construction of public works or | ||||||
4 | improvements, including any direct or indirect costs | ||||||
5 | relating to Green Globes or LEED certified construction | ||||||
6 | elements or construction elements with an equivalent | ||||||
7 | certification, except
that on and after November 1, 1999,
| ||||||
8 | redevelopment
project costs shall not include the cost of | ||||||
9 | constructing a
new municipal public building principally | ||||||
10 | used to provide
offices, storage space, or conference | ||||||
11 | facilities or vehicle storage,
maintenance, or repair for | ||||||
12 | administrative,
public safety, or public works personnel
| ||||||
13 | and that is not intended to replace an existing
public | ||||||
14 | building as provided under paragraph (3) of subsection (q) | ||||||
15 | of Section
11-74.4-3
unless either (i) the construction of | ||||||
16 | the new municipal building
implements a redevelopment | ||||||
17 | project that was included in a redevelopment plan
that was | ||||||
18 | adopted by the municipality prior to November 1, 1999, (ii) | ||||||
19 | the
municipality makes a reasonable
determination in the | ||||||
20 | redevelopment plan, supported by information that provides
| ||||||
21 | the basis for that determination, that the new municipal | ||||||
22 | building is required
to meet an increase in the need for | ||||||
23 | public safety purposes anticipated to
result from the | ||||||
24 | implementation of the redevelopment plan, or (iii) the new | ||||||
25 | municipal public building is for the storage, maintenance, | ||||||
26 | or repair of transit vehicles and is located in a transit |
| |||||||
| |||||||
1 | facility improvement area that has been established | ||||||
2 | pursuant to Section 11-74.4-3.3;
| ||||||
3 | (5) Costs of job training and retraining projects, | ||||||
4 | including the cost of
"welfare to work" programs | ||||||
5 | implemented by businesses located within the
redevelopment | ||||||
6 | project area;
| ||||||
7 | (6) Financing costs, including but not limited to all | ||||||
8 | necessary and
incidental expenses related to the issuance | ||||||
9 | of obligations and which may
include payment of interest on | ||||||
10 | any obligations issued hereunder including
interest | ||||||
11 | accruing
during the estimated period of construction of any | ||||||
12 | redevelopment project
for which such obligations are | ||||||
13 | issued and for not exceeding 36 months
thereafter and | ||||||
14 | including reasonable reserves related thereto;
| ||||||
15 | (7) To the extent the municipality by written agreement | ||||||
16 | accepts and
approves
the same, all or a portion of a taxing | ||||||
17 | district's capital costs resulting
from the redevelopment | ||||||
18 | project necessarily incurred or to be incurred within a
| ||||||
19 | taxing district in
furtherance of the objectives of the | ||||||
20 | redevelopment plan and project;
| ||||||
21 | (7.5) For redevelopment project areas designated (or | ||||||
22 | redevelopment
project areas amended to add or increase the | ||||||
23 | number of
tax-increment-financing assisted housing units) | ||||||
24 | on or after November 1,
1999,
an elementary, secondary,
or | ||||||
25 | unit school
district's increased costs attributable to | ||||||
26 | assisted housing units located
within the
redevelopment |
| |||||||
| |||||||
1 | project area for which the developer or redeveloper | ||||||
2 | receives
financial assistance through an agreement with | ||||||
3 | the municipality or because the
municipality incurs the | ||||||
4 | cost of necessary infrastructure improvements within
the | ||||||
5 | boundaries of the assisted housing sites necessary for the | ||||||
6 | completion of
that housing
as authorized by this Act, and | ||||||
7 | which costs shall be paid by the municipality
from the | ||||||
8 | Special Tax Allocation Fund when the tax increment revenue | ||||||
9 | is received
as a result of the assisted housing units and | ||||||
10 | shall be calculated annually as
follows:
| ||||||
11 | (A) for foundation districts, excluding any school | ||||||
12 | district in a
municipality with a population in excess | ||||||
13 | of 1,000,000, by multiplying the
district's increase | ||||||
14 | in attendance resulting from the net increase in new
| ||||||
15 | students enrolled in that school district who reside in | ||||||
16 | housing units within
the redevelopment project area | ||||||
17 | that have received financial assistance through
an | ||||||
18 | agreement with the municipality or because the | ||||||
19 | municipality incurs the cost
of necessary | ||||||
20 | infrastructure improvements within the boundaries of | ||||||
21 | the housing
sites necessary for the completion of that | ||||||
22 | housing as authorized by this Act
since the designation | ||||||
23 | of the redevelopment project area by the most recently
| ||||||
24 | available per capita tuition cost as defined in Section | ||||||
25 | 10-20.12a of the School
Code less any increase in | ||||||
26 | general State aid as defined in Section 18-8.05 of
the |
| |||||||
| |||||||
1 | School Code or evidence-based funding as defined in | ||||||
2 | Section 18-8.15 of the School Code attributable to | ||||||
3 | these added new students subject to the
following | ||||||
4 | annual limitations:
| ||||||
5 | (i) for unit school districts with a district | ||||||
6 | average 1995-96 Per
Capita
Tuition Charge of less | ||||||
7 | than $5,900, no more than 25% of the total amount | ||||||
8 | of
property tax increment revenue produced by | ||||||
9 | those housing units that have
received tax | ||||||
10 | increment finance assistance under this Act;
| ||||||
11 | (ii) for elementary school districts with a | ||||||
12 | district average 1995-96
Per
Capita Tuition Charge | ||||||
13 | of less than $5,900, no more than 17% of the total | ||||||
14 | amount
of property tax increment revenue produced | ||||||
15 | by those housing units that have
received tax | ||||||
16 | increment finance assistance under this Act; and
| ||||||
17 | (iii) for secondary school districts with a | ||||||
18 | district average 1995-96
Per
Capita Tuition Charge | ||||||
19 | of less than $5,900, no more than 8% of the total | ||||||
20 | amount
of property tax increment revenue produced | ||||||
21 | by those housing units that have
received tax | ||||||
22 | increment finance assistance under this Act.
| ||||||
23 | (B) For alternate method districts, flat grant | ||||||
24 | districts, and foundation
districts with a district | ||||||
25 | average 1995-96 Per Capita Tuition Charge equal to or
| ||||||
26 | more than $5,900, excluding any school district with a |
| |||||||
| |||||||
1 | population in excess of
1,000,000, by multiplying the | ||||||
2 | district's increase in attendance
resulting
from the | ||||||
3 | net increase in new students enrolled in that school | ||||||
4 | district who
reside in
housing units within the | ||||||
5 | redevelopment project area that have received
| ||||||
6 | financial assistance through an agreement with the | ||||||
7 | municipality or because the
municipality incurs the | ||||||
8 | cost of necessary infrastructure improvements within
| ||||||
9 | the boundaries of the housing sites necessary for the | ||||||
10 | completion of that
housing as authorized by this Act | ||||||
11 | since the designation of the redevelopment
project | ||||||
12 | area by the most recently available per capita tuition | ||||||
13 | cost as defined
in Section 10-20.12a of the School Code | ||||||
14 | less any increase in general state aid
as defined in | ||||||
15 | Section 18-8.05 of the School Code or evidence-based | ||||||
16 | funding as defined in Section 18-8.15 of the School | ||||||
17 | Code attributable to these added
new students subject | ||||||
18 | to the following annual limitations:
| ||||||
19 | (i) for unit school districts, no more than 40% | ||||||
20 | of the total amount of
property tax increment | ||||||
21 | revenue produced by those housing units that have
| ||||||
22 | received tax increment finance assistance under | ||||||
23 | this Act;
| ||||||
24 | (ii) for elementary school districts, no more | ||||||
25 | than 27% of the total
amount
of property tax | ||||||
26 | increment revenue produced by those housing units |
| |||||||
| |||||||
1 | that have
received tax increment finance | ||||||
2 | assistance under this Act; and
| ||||||
3 | (iii) for secondary school districts, no more | ||||||
4 | than 13% of the total
amount
of property tax | ||||||
5 | increment revenue produced by those housing units | ||||||
6 | that have
received tax increment finance | ||||||
7 | assistance under this Act.
| ||||||
8 | (C) For any school district in a municipality with | ||||||
9 | a population in
excess of
1,000,000, the following | ||||||
10 | restrictions shall apply to the
reimbursement of | ||||||
11 | increased costs under this paragraph (7.5):
| ||||||
12 | (i) no increased costs shall be reimbursed | ||||||
13 | unless the school district
certifies that each of | ||||||
14 | the schools affected by the assisted housing | ||||||
15 | project
is at or over its student capacity;
| ||||||
16 | (ii) the amount reimbursable shall be reduced | ||||||
17 | by the value of any
land
donated to the school | ||||||
18 | district by the municipality or developer, and by | ||||||
19 | the
value of any physical improvements made to the | ||||||
20 | schools by the
municipality or developer; and
| ||||||
21 | (iii) the amount reimbursed may not affect | ||||||
22 | amounts otherwise obligated
by
the terms of any | ||||||
23 | bonds, notes, or other funding instruments, or the | ||||||
24 | terms of
any redevelopment agreement.
| ||||||
25 | Any school district seeking payment under this | ||||||
26 | paragraph (7.5) shall,
after July 1 and before |
| |||||||
| |||||||
1 | September 30 of each year,
provide the municipality | ||||||
2 | with reasonable evidence to support its claim for
| ||||||
3 | reimbursement before the municipality shall be | ||||||
4 | required to approve or make
the payment to the school | ||||||
5 | district. If the school district fails to provide
the | ||||||
6 | information during this period in any year, it shall | ||||||
7 | forfeit any claim to
reimbursement for that year. | ||||||
8 | School districts may adopt a resolution
waiving the | ||||||
9 | right to all or a portion of the reimbursement | ||||||
10 | otherwise required
by this paragraph
(7.5). By | ||||||
11 | acceptance of this reimbursement the school
district | ||||||
12 | waives the right to directly or indirectly set aside, | ||||||
13 | modify, or
contest in any manner the establishment of | ||||||
14 | the redevelopment project area or
projects;
| ||||||
15 | (7.7) For redevelopment project areas designated (or | ||||||
16 | redevelopment
project areas amended to add or increase the | ||||||
17 | number of
tax-increment-financing assisted housing units) | ||||||
18 | on or after
January 1, 2005 (the effective date of Public | ||||||
19 | Act 93-961),
a public library
district's increased costs | ||||||
20 | attributable to assisted housing units located
within the
| ||||||
21 | redevelopment project area for which the developer or | ||||||
22 | redeveloper receives
financial assistance through an | ||||||
23 | agreement with the municipality or because the
| ||||||
24 | municipality incurs the cost of necessary infrastructure | ||||||
25 | improvements within
the boundaries of the assisted housing | ||||||
26 | sites necessary for the completion of
that housing
as |
| |||||||
| |||||||
1 | authorized by this Act shall be paid to the library | ||||||
2 | district by the
municipality
from the Special Tax | ||||||
3 | Allocation Fund when the tax increment revenue is received
| ||||||
4 | as a result of the assisted housing units. This paragraph | ||||||
5 | (7.7) applies only if (i) the library district is located | ||||||
6 | in a county that is subject to the Property Tax Extension | ||||||
7 | Limitation Law or (ii) the library district is not located | ||||||
8 | in a county that is subject to the Property Tax Extension | ||||||
9 | Limitation Law but the district is prohibited by any other | ||||||
10 | law from increasing its tax levy rate without a prior voter | ||||||
11 | referendum.
| ||||||
12 | The amount paid to a library district under this | ||||||
13 | paragraph (7.7) shall be
calculated
by multiplying (i) the | ||||||
14 | net increase in the number of persons eligible to obtain
a
| ||||||
15 | library card
in that district who reside in housing units | ||||||
16 | within
the redevelopment project area that have received | ||||||
17 | financial assistance through
an agreement with the | ||||||
18 | municipality or because the municipality incurs the cost
of | ||||||
19 | necessary infrastructure improvements within the | ||||||
20 | boundaries of the housing
sites necessary for the | ||||||
21 | completion of that housing as authorized by this Act
since | ||||||
22 | the designation of the redevelopment project area by (ii)
| ||||||
23 | the per-patron cost of providing library services so long | ||||||
24 | as it does not exceed $120.
The per-patron cost shall be | ||||||
25 | the Total Operating Expenditures Per Capita for the library | ||||||
26 | in the previous fiscal year.
The municipality may deduct |
| |||||||
| |||||||
1 | from the amount that it must pay to a library district | ||||||
2 | under this paragraph any amount that it has voluntarily | ||||||
3 | paid to the library district from the tax increment | ||||||
4 | revenue. The amount paid to a library district under this | ||||||
5 | paragraph (7.7) shall be no
more
than 2% of the amount | ||||||
6 | produced by the assisted housing units and deposited into | ||||||
7 | the Special Tax Allocation Fund.
| ||||||
8 | A library district is not eligible for any payment | ||||||
9 | under this paragraph
(7.7)
unless the library district has | ||||||
10 | experienced an increase in the
number of patrons from the | ||||||
11 | municipality that created the tax-increment-financing | ||||||
12 | district since the designation of the redevelopment | ||||||
13 | project area.
| ||||||
14 | Any library district seeking payment under this | ||||||
15 | paragraph (7.7) shall,
after July 1 and before September 30 | ||||||
16 | of each year,
provide the municipality with convincing | ||||||
17 | evidence to support its claim for
reimbursement before the | ||||||
18 | municipality shall be required to approve or make
the | ||||||
19 | payment to the library district. If the library district | ||||||
20 | fails to provide
the information during this period in any | ||||||
21 | year, it shall forfeit any claim to
reimbursement for that | ||||||
22 | year. Library districts may adopt a resolution
waiving the | ||||||
23 | right to all or a portion of the reimbursement otherwise | ||||||
24 | required by this paragraph (7.7). By acceptance of such | ||||||
25 | reimbursement, the library district shall forfeit any | ||||||
26 | right to directly or indirectly set aside, modify, or |
| |||||||
| |||||||
1 | contest in any manner whatsoever the establishment of the | ||||||
2 | redevelopment project area or
projects; | ||||||
3 | (8) Relocation costs to the extent that a municipality | ||||||
4 | determines that
relocation costs shall be paid or is | ||||||
5 | required to make payment of relocation
costs by federal or | ||||||
6 | State law or in order to satisfy subparagraph (7) of
| ||||||
7 | subsection (n);
| ||||||
8 | (9) Payment in lieu of taxes;
| ||||||
9 | (10) Costs of job training, retraining, advanced | ||||||
10 | vocational education
or career
education, including but | ||||||
11 | not limited to courses in occupational,
semi-technical or | ||||||
12 | technical fields leading directly to employment, incurred
| ||||||
13 | by one or more taxing districts, provided that such costs | ||||||
14 | (i) are related
to the establishment and maintenance of | ||||||
15 | additional job training, advanced
vocational education or | ||||||
16 | career education programs for persons employed or
to be | ||||||
17 | employed by employers located in a redevelopment project | ||||||
18 | area; and
(ii) when incurred by a taxing district or taxing | ||||||
19 | districts other than the
municipality, are set forth in a | ||||||
20 | written agreement by or among the
municipality and the | ||||||
21 | taxing district or taxing districts, which agreement
| ||||||
22 | describes the program to be undertaken, including but not | ||||||
23 | limited to the
number of employees to be trained, a | ||||||
24 | description of the training and
services to be provided, | ||||||
25 | the number and type of positions available or to
be | ||||||
26 | available, itemized costs of the program and sources of |
| |||||||
| |||||||
1 | funds to pay for the
same, and the term of the agreement. | ||||||
2 | Such costs include, specifically, the
payment by community | ||||||
3 | college districts of costs pursuant to Sections 3-37,
3-38, | ||||||
4 | 3-40 and 3-40.1 of the Public Community College Act and by | ||||||
5 | school
districts of costs pursuant to Sections 10-22.20a | ||||||
6 | and 10-23.3a of the School
Code;
| ||||||
7 | (11) Interest cost incurred by a redeveloper related to | ||||||
8 | the
construction, renovation or rehabilitation of a | ||||||
9 | redevelopment project
provided that:
| ||||||
10 | (A) such costs are to be paid directly from the | ||||||
11 | special tax
allocation fund established pursuant to | ||||||
12 | this Act;
| ||||||
13 | (B) such payments in any one year may not exceed | ||||||
14 | 30% of the annual
interest costs incurred by the | ||||||
15 | redeveloper with regard to the redevelopment
project | ||||||
16 | during that year;
| ||||||
17 | (C) if there are not sufficient funds available in | ||||||
18 | the special tax
allocation fund to make the payment | ||||||
19 | pursuant to this paragraph (11) then
the amounts so due | ||||||
20 | shall accrue and be payable when sufficient funds are
| ||||||
21 | available in the special tax allocation fund;
| ||||||
22 | (D) the total of such interest payments paid | ||||||
23 | pursuant to this Act
may not exceed 30% of the total | ||||||
24 | (i) cost paid or incurred by the
redeveloper for the | ||||||
25 | redevelopment project plus (ii) redevelopment project
| ||||||
26 | costs excluding any property assembly costs and any |
| |||||||
| |||||||
1 | relocation costs
incurred by a municipality pursuant | ||||||
2 | to this Act;
| ||||||
3 | (E) the cost limits set forth in subparagraphs (B) | ||||||
4 | and (D) of
paragraph (11) shall be modified for the | ||||||
5 | financing of rehabilitated or
new housing units for | ||||||
6 | low-income households and very low-income households, | ||||||
7 | as
defined in
Section 3 of the Illinois Affordable | ||||||
8 | Housing Act. The percentage of
75% shall be substituted | ||||||
9 | for 30% in subparagraphs (B) and (D) of
paragraph (11); | ||||||
10 | and
| ||||||
11 | (F) instead of the eligible costs provided by | ||||||
12 | subparagraphs (B) and (D)
of
paragraph (11), as | ||||||
13 | modified by this subparagraph, and notwithstanding
any | ||||||
14 | other provisions of this Act to the contrary, the | ||||||
15 | municipality may
pay from tax increment revenues up to | ||||||
16 | 50% of the cost of construction
of new housing units to | ||||||
17 | be occupied by low-income households and very
| ||||||
18 | low-income
households as defined in Section 3 of the | ||||||
19 | Illinois Affordable Housing
Act. The cost of | ||||||
20 | construction of those units may be derived from the
| ||||||
21 | proceeds of bonds issued by the municipality under this | ||||||
22 | Act or
other constitutional or statutory authority or | ||||||
23 | from other sources of
municipal revenue that may be | ||||||
24 | reimbursed from tax increment
revenues or the proceeds | ||||||
25 | of bonds issued to finance the construction
of that | ||||||
26 | housing.
|
| |||||||
| |||||||
1 | The eligible costs provided under this | ||||||
2 | subparagraph (F) of paragraph (11)
shall
be
an eligible | ||||||
3 | cost for the construction, renovation, and | ||||||
4 | rehabilitation of all
low and very low-income housing | ||||||
5 | units, as defined in Section 3 of the Illinois
| ||||||
6 | Affordable Housing Act, within the redevelopment | ||||||
7 | project area. If the low and
very
low-income units are | ||||||
8 | part of a residential redevelopment project that | ||||||
9 | includes
units not affordable to low and very | ||||||
10 | low-income households, only the low and
very | ||||||
11 | low-income units shall be eligible for benefits under | ||||||
12 | this subparagraph (F) of
paragraph (11).
The standards | ||||||
13 | for maintaining the occupancy
by low-income households | ||||||
14 | and very low-income households,
as
defined in Section 3 | ||||||
15 | of the Illinois Affordable Housing Act,
of those units | ||||||
16 | constructed with eligible costs made available under | ||||||
17 | the
provisions of
this subparagraph (F) of paragraph | ||||||
18 | (11)
shall be
established by guidelines adopted by the | ||||||
19 | municipality. The
responsibility for annually | ||||||
20 | documenting the initial occupancy of
the units by | ||||||
21 | low-income households and very low-income households, | ||||||
22 | as defined
in
Section 3
of the Illinois Affordable | ||||||
23 | Housing Act, shall be that of the then current
owner of | ||||||
24 | the property.
For ownership units, the guidelines will | ||||||
25 | provide, at a minimum, for a
reasonable recapture of | ||||||
26 | funds, or other appropriate methods designed to
|
| |||||||
| |||||||
1 | preserve the original affordability of the ownership | ||||||
2 | units. For rental units,
the guidelines will provide, | ||||||
3 | at a minimum, for the affordability of rent to low
and | ||||||
4 | very low-income households. As units become available, | ||||||
5 | they shall be
rented to income-eligible tenants.
The | ||||||
6 | municipality may modify these
guidelines from time to | ||||||
7 | time; the guidelines, however, shall be in effect
for | ||||||
8 | as long as tax increment revenue is being used to pay | ||||||
9 | for costs
associated with the units or for the | ||||||
10 | retirement of bonds issued to finance
the units or for | ||||||
11 | the life of the redevelopment project area, whichever | ||||||
12 | is
later;
| ||||||
13 | (11.5) If the redevelopment project area is located | ||||||
14 | within a municipality
with a population of more than | ||||||
15 | 100,000, the cost of day care services for
children of | ||||||
16 | employees from
low-income
families working for businesses | ||||||
17 | located within the redevelopment project area
and all or a
| ||||||
18 | portion of the cost of operation of day care centers | ||||||
19 | established by
redevelopment project
area businesses to | ||||||
20 | serve employees from low-income families working in
| ||||||
21 | businesses
located in the redevelopment project area. For | ||||||
22 | the purposes of this paragraph,
"low-income families" | ||||||
23 | means families whose annual income does not exceed 80% of
| ||||||
24 | the
municipal, county, or regional median income, adjusted | ||||||
25 | for family size, as the
annual
income and municipal, | ||||||
26 | county, or regional median income are determined from
time |
| |||||||
| |||||||
1 | to
time by the United States Department of Housing and | ||||||
2 | Urban Development.
| ||||||
3 | Unless explicitly stated herein the cost of construction of | ||||||
4 | new
privately-owned buildings shall not be an eligible | ||||||
5 | redevelopment project cost.
| ||||||
6 | After November 1, 1999 (the effective date of Public Act
| ||||||
7 | 91-478), none of
the
redevelopment project costs enumerated in | ||||||
8 | this subsection shall be eligible
redevelopment project costs | ||||||
9 | if those costs would provide direct financial
support to a
| ||||||
10 | retail entity initiating operations in the
redevelopment | ||||||
11 | project area while
terminating operations at another Illinois | ||||||
12 | location within 10 miles of the
redevelopment project area but | ||||||
13 | outside the boundaries of the redevelopment
project area | ||||||
14 | municipality. For
purposes of this paragraph, termination | ||||||
15 | means a
closing of a retail operation that is directly related | ||||||
16 | to the opening of the
same operation or like retail entity | ||||||
17 | owned or operated by more than 50% of the
original ownership in | ||||||
18 | a redevelopment project area, but
it does not mean
closing an | ||||||
19 | operation for reasons beyond the control of the
retail entity, | ||||||
20 | as
documented by the retail entity, subject to a reasonable | ||||||
21 | finding by the
municipality that the current location contained | ||||||
22 | inadequate space, had become
economically obsolete, or was no | ||||||
23 | longer a viable location for the retailer or
serviceman.
| ||||||
24 | No cost shall be a redevelopment project cost in a | ||||||
25 | redevelopment project area if used to demolish, remove, or | ||||||
26 | substantially modify a historic resource, after August 26, 2008 |
| |||||||
| |||||||
1 | (the effective date of Public Act 95-934), unless no prudent | ||||||
2 | and feasible alternative exists. "Historic resource" for the | ||||||
3 | purpose of this paragraph means (i) a place or structure that | ||||||
4 | is included or eligible for inclusion on the National Register | ||||||
5 | of Historic Places or (ii) a contributing structure in a | ||||||
6 | district on the National Register of Historic Places. This | ||||||
7 | paragraph does not apply to a place or structure for which | ||||||
8 | demolition, removal, or modification is subject to review by | ||||||
9 | the preservation agency of a Certified Local Government | ||||||
10 | designated as such by the National Park Service of the United | ||||||
11 | States Department of the Interior. | ||||||
12 | If a special service area has been established pursuant to
| ||||||
13 | the Special Service Area Tax Act or Special Service Area Tax | ||||||
14 | Law, then any
tax increment revenues derived
from the tax | ||||||
15 | imposed pursuant to the Special Service Area Tax Act or Special
| ||||||
16 | Service Area Tax Law may
be used within the redevelopment | ||||||
17 | project area for the purposes permitted by
that Act or Law as | ||||||
18 | well as the purposes permitted by this Act.
| ||||||
19 | (q-1) For redevelopment project areas created pursuant to | ||||||
20 | subsection (p-1), redevelopment project costs are limited to | ||||||
21 | those costs in paragraph (q) that are related to the existing | ||||||
22 | or proposed Regional Transportation Authority Suburban Transit | ||||||
23 | Access Route (STAR Line) station. | ||||||
24 | (q-2) For a redevelopment project area located within a | ||||||
25 | transit facility improvement area established pursuant to | ||||||
26 | Section 11-74.4-3.3, redevelopment project costs means those |
| |||||||
| |||||||
1 | costs described in subsection (q) that are related to the | ||||||
2 | construction, reconstruction, rehabilitation, remodeling, or | ||||||
3 | repair of any existing or proposed transit facility. | ||||||
4 | (r) "State Sales Tax Boundary" means the redevelopment | ||||||
5 | project area or
the amended redevelopment project area | ||||||
6 | boundaries which are determined
pursuant to subsection (9) of | ||||||
7 | Section 11-74.4-8a of this
Act. The Department of Revenue shall | ||||||
8 | certify pursuant to subsection (9) of
Section 11-74.4-8a the | ||||||
9 | appropriate boundaries eligible for the
determination of State | ||||||
10 | Sales Tax Increment.
| ||||||
11 | (s) "State Sales Tax Increment" means an amount equal to | ||||||
12 | the increase
in the aggregate amount of taxes paid by retailers | ||||||
13 | and servicemen, other
than retailers and servicemen subject to | ||||||
14 | the Public Utilities Act,
on transactions at places of business | ||||||
15 | located within a State Sales Tax
Boundary pursuant to the | ||||||
16 | Retailers' Occupation Tax Act, the Use Tax Act,
the Service Use | ||||||
17 | Tax Act, and the Service Occupation Tax Act, except such
| ||||||
18 | portion of such increase that is paid into the State and Local | ||||||
19 | Sales Tax
Reform Fund, the Local Government Distributive Fund, | ||||||
20 | the Local
Government Tax Fund and the County and Mass Transit | ||||||
21 | District Fund, for as
long as State participation exists, over | ||||||
22 | and above the Initial Sales Tax
Amounts, Adjusted Initial Sales | ||||||
23 | Tax Amounts or the Revised Initial Sales
Tax Amounts for such | ||||||
24 | taxes as certified by the Department of Revenue and
paid under | ||||||
25 | those Acts by retailers and servicemen on transactions at | ||||||
26 | places
of business located within the State Sales Tax Boundary |
| |||||||
| |||||||
1 | during the base
year which shall be the calendar year | ||||||
2 | immediately prior to the year in
which the municipality adopted | ||||||
3 | tax increment allocation financing, less
3.0% of such amounts | ||||||
4 | generated under the Retailers' Occupation Tax Act, Use
Tax Act | ||||||
5 | and Service Use Tax Act and the Service Occupation Tax Act, | ||||||
6 | which
sum shall be appropriated to the Department of Revenue to | ||||||
7 | cover its costs
of administering and enforcing this Section. | ||||||
8 | For purposes of computing the
aggregate amount of such taxes | ||||||
9 | for base years occurring prior to 1985, the
Department of | ||||||
10 | Revenue shall compute the Initial Sales Tax Amount for such
| ||||||
11 | taxes and deduct therefrom an amount equal to 4% of the | ||||||
12 | aggregate amount of
taxes per year for each year the base year | ||||||
13 | is prior to 1985, but not to
exceed a total deduction of 12%. | ||||||
14 | The amount so determined shall be known
as the "Adjusted | ||||||
15 | Initial Sales Tax Amount". For purposes of determining the
| ||||||
16 | State Sales Tax Increment the Department of Revenue shall for | ||||||
17 | each period
subtract from the tax amounts received from | ||||||
18 | retailers and servicemen on
transactions located in the State | ||||||
19 | Sales Tax Boundary, the certified Initial
Sales Tax Amounts, | ||||||
20 | Adjusted Initial Sales Tax Amounts or Revised Initial
Sales Tax | ||||||
21 | Amounts for the Retailers' Occupation Tax Act, the Use Tax Act,
| ||||||
22 | the Service Use Tax Act and the Service Occupation Tax Act. For | ||||||
23 | the State
Fiscal Year 1989 this calculation shall be made by | ||||||
24 | utilizing the calendar
year 1987 to determine the tax amounts | ||||||
25 | received. For the State Fiscal Year
1990, this calculation | ||||||
26 | shall be made by utilizing the period from January
1, 1988, |
| |||||||
| |||||||
1 | until September 30, 1988, to determine the tax amounts received
| ||||||
2 | from retailers and servicemen, which shall have deducted | ||||||
3 | therefrom
nine-twelfths of the certified Initial Sales Tax | ||||||
4 | Amounts, Adjusted Initial
Sales Tax Amounts or the Revised | ||||||
5 | Initial Sales Tax Amounts as appropriate.
For the State Fiscal | ||||||
6 | Year 1991, this calculation shall be made by utilizing
the | ||||||
7 | period from October 1, 1988, until June 30, 1989, to determine | ||||||
8 | the tax
amounts received from retailers and servicemen, which | ||||||
9 | shall have
deducted therefrom nine-twelfths of the certified | ||||||
10 | Initial State Sales Tax
Amounts, Adjusted Initial Sales Tax | ||||||
11 | Amounts or the Revised Initial Sales
Tax Amounts as | ||||||
12 | appropriate. For every State Fiscal Year thereafter, the
| ||||||
13 | applicable period shall be the 12 months beginning July 1 and | ||||||
14 | ending on
June 30, to determine the tax amounts received which | ||||||
15 | shall have deducted
therefrom the certified Initial Sales Tax | ||||||
16 | Amounts, Adjusted Initial Sales
Tax Amounts or the Revised | ||||||
17 | Initial Sales Tax Amounts. Municipalities
intending to receive | ||||||
18 | a distribution of State Sales Tax Increment must
report a list | ||||||
19 | of retailers to the Department of Revenue by October 31, 1988
| ||||||
20 | and by July 31, of each year thereafter.
| ||||||
21 | (t) "Taxing districts" means counties, townships, cities | ||||||
22 | and incorporated
towns and villages, school, road, park, | ||||||
23 | sanitary, mosquito abatement, forest
preserve, public health, | ||||||
24 | fire protection, river conservancy, tuberculosis
sanitarium | ||||||
25 | and any other municipal corporations or districts with the | ||||||
26 | power
to levy taxes.
|
| |||||||
| |||||||
1 | (u) "Taxing districts' capital costs" means those costs of | ||||||
2 | taxing districts
for capital improvements that are found by the | ||||||
3 | municipal corporate authorities
to be necessary and directly | ||||||
4 | result from the redevelopment project.
| ||||||
5 | (v) As used in subsection (a) of Section 11-74.4-3 of this
| ||||||
6 | Act, "vacant
land" means any parcel or combination of parcels | ||||||
7 | of real property without
industrial, commercial, and | ||||||
8 | residential buildings which has not been used
for commercial | ||||||
9 | agricultural purposes within 5 years prior to the
designation | ||||||
10 | of the redevelopment project area, unless the parcel
is | ||||||
11 | included in an industrial park conservation area or the parcel | ||||||
12 | has
been subdivided; provided that if the parcel was part of a | ||||||
13 | larger tract that
has been divided into 3 or more smaller | ||||||
14 | tracts that were accepted for
recording during the period from | ||||||
15 | 1950 to 1990, then the parcel shall be deemed
to have been | ||||||
16 | subdivided, and all proceedings and actions of the municipality
| ||||||
17 | taken in that connection with respect to any previously | ||||||
18 | approved or designated
redevelopment project area or amended | ||||||
19 | redevelopment project area are hereby
validated and hereby | ||||||
20 | declared to be legally sufficient for all purposes of this
Act.
| ||||||
21 | For purposes of this Section and only for land subject to
the | ||||||
22 | subdivision requirements of the Plat Act, land is subdivided | ||||||
23 | when the
original plat of
the proposed Redevelopment Project | ||||||
24 | Area or relevant portion thereof has
been
properly certified, | ||||||
25 | acknowledged, approved, and recorded or filed in accordance
| ||||||
26 | with the Plat Act and a preliminary plat, if any, for any |
| |||||||
| |||||||
1 | subsequent phases of
the
proposed Redevelopment Project Area or | ||||||
2 | relevant portion thereof has been
properly approved and filed | ||||||
3 | in accordance with the applicable ordinance of the
| ||||||
4 | municipality.
| ||||||
5 | (w) "Annual Total Increment" means the sum of each | ||||||
6 | municipality's
annual Net Sales Tax Increment and each | ||||||
7 | municipality's annual Net Utility
Tax Increment. The ratio of | ||||||
8 | the Annual Total Increment of each
municipality to the Annual | ||||||
9 | Total Increment for all municipalities, as most
recently | ||||||
10 | calculated by the Department, shall determine the proportional
| ||||||
11 | shares of the Illinois Tax Increment Fund to be distributed to | ||||||
12 | each
municipality.
| ||||||
13 | (x) "LEED certified" means any certification level of | ||||||
14 | construction elements by a qualified Leadership in Energy and | ||||||
15 | Environmental Design Accredited Professional as determined by | ||||||
16 | the U.S. Green Building Council. | ||||||
17 | (y) "Green Globes certified" means any certification level | ||||||
18 | of construction elements by a qualified Green Globes | ||||||
19 | Professional as determined by the Green Building Initiative. | ||||||
20 | (Source: P.A. 99-792, eff. 8-12-16; 100-201, eff. 8-18-17; | ||||||
21 | 100-465, eff. 8-31-17.)
| ||||||
22 | (65 ILCS 5/11-74.4-3.1)
| ||||||
23 | Sec. 11-74.4-3.1. Redevelopment project area within an | ||||||
24 | intermodal terminal facility area. | ||||||
25 | (a) Notwithstanding any other provision of law to the |
| |||||||
| |||||||
1 | contrary, if a municipality designates an area within the | ||||||
2 | territorial limits of the municipality as an intermodal | ||||||
3 | terminal facility area, then that municipality may establish a | ||||||
4 | redevelopment project area within the intermodal terminal | ||||||
5 | facility area for the purpose of developing new intermodal | ||||||
6 | terminal facilities, rehabilitating obsolete intermodal | ||||||
7 | terminal facilities, or both. If there is no existing | ||||||
8 | intermodal terminal facility within the redevelopment project | ||||||
9 | area, then the municipality must establish a new intermodal | ||||||
10 | terminal facility within the redevelopment project area. If | ||||||
11 | there is an obsolete intermodal terminal facility within the | ||||||
12 | redevelopment project area, then the municipality may | ||||||
13 | establish a new intermodal terminal facility, rehabilitate the | ||||||
14 | existing intermodal terminal facility for use as an intermodal | ||||||
15 | terminal facility or for any other commercial purpose, or both. | ||||||
16 | (b) For purposes of this Division, an intermodal terminal | ||||||
17 | facility area is deemed to be a blighted area and no proof of | ||||||
18 | blight other than the median household income requirement of | ||||||
19 | Section 11-74.4-3 need be shown in establishing a redevelopment | ||||||
20 | project area in accordance with this Section.
| ||||||
21 | (c) As used in this Section: | ||||||
22 | "Intermodal terminal facility area" means an area that: (i) | ||||||
23 | does not include any existing intermodal terminal facility or | ||||||
24 | includes an obsolete intermodal terminal facility; (ii) | ||||||
25 | comprises a minimum of 150 acres and not more than 2 square | ||||||
26 | miles in total area, exclusive of lakes and waterways; (iii) |
| |||||||
| |||||||
1 | has at least one Class 1 railroad right-of-way located within | ||||||
2 | it or within one quarter mile of it; and (iv) has no boundary | ||||||
3 | limit further than 3 miles from the right-of-way. | ||||||
4 | "Intermodal terminal facility" means land, improvements to | ||||||
5 | land, equipment, and appliances necessary for the receipt and | ||||||
6 | transfer of goods between one mode of transportation and | ||||||
7 | another, at least one of which must be transportation by rail.
| ||||||
8 | (Source: P.A. 94-546, eff. 1-1-06.)
| ||||||
9 | (65 ILCS 5/11-74.4-4) (from Ch. 24, par. 11-74.4-4)
| ||||||
10 | Sec. 11-74.4-4. Municipal powers and duties; redevelopment | ||||||
11 | project
areas. The changes made by this amendatory Act of the | ||||||
12 | 91st General Assembly
do not apply to a municipality that, (i) | ||||||
13 | before the effective date of this
amendatory Act of the 91st | ||||||
14 | General Assembly, has adopted an ordinance or
resolution fixing | ||||||
15 | a time and place for a
public hearing under Section 11-74.4-5 | ||||||
16 | or (ii) before July 1, 1999, has
adopted an ordinance or | ||||||
17 | resolution providing for a feasibility study under
Section | ||||||
18 | 11-74.4-4.1, but has not yet adopted an ordinance
approving | ||||||
19 | redevelopment plans and redevelopment projects or designating
| ||||||
20 | redevelopment project areas under this Section, until after | ||||||
21 | that
municipality adopts an ordinance
approving redevelopment | ||||||
22 | plans and redevelopment projects or designating
redevelopment | ||||||
23 | project areas under this Section; thereafter the changes made | ||||||
24 | by
this amendatory Act of the 91st General Assembly apply to | ||||||
25 | the same extent that
they apply to
redevelopment plans and |
| |||||||
| |||||||
1 | redevelopment projects that were approved and
redevelopment | ||||||
2 | projects that were designated before the effective date of this
| ||||||
3 | amendatory Act of the 91st General Assembly.
| ||||||
4 | A municipality may: | ||||||
5 | (a) By ordinance introduced in the
governing body of | ||||||
6 | the municipality within 14 to 90 days from the completion
| ||||||
7 | of the hearing specified in Section 11-74.4-5
approve | ||||||
8 | redevelopment plans and redevelopment projects, and | ||||||
9 | designate
redevelopment project areas pursuant to notice | ||||||
10 | and hearing required by this
Act. No redevelopment project | ||||||
11 | area shall be designated unless a plan and
project are | ||||||
12 | approved
prior to the designation of such area and such | ||||||
13 | area
shall include only those contiguous parcels of real | ||||||
14 | property and
improvements thereon substantially benefited | ||||||
15 | by the proposed redevelopment
project improvements.
Upon | ||||||
16 | adoption of the ordinances, the municipality shall | ||||||
17 | forthwith transmit to
the county clerk of the county or | ||||||
18 | counties within which the redevelopment
project area is | ||||||
19 | located a certified copy of the ordinances, a legal | ||||||
20 | description
of the redevelopment project area, a map of the | ||||||
21 | redevelopment project area,
identification of the year | ||||||
22 | that the county clerk shall use for determining the
total | ||||||
23 | initial equalized assessed value of the redevelopment | ||||||
24 | project area
consistent with subsection (a) of Section | ||||||
25 | 11-74.4-9, and a
list of the parcel or tax identification | ||||||
26 | number of each parcel of property
included in the |
| |||||||
| |||||||
1 | redevelopment project area.
| ||||||
2 | (b) Make and enter into all contracts with property | ||||||
3 | owners, developers,
tenants, overlapping taxing bodies, | ||||||
4 | and others necessary or incidental to the
implementation | ||||||
5 | and furtherance of its redevelopment plan and project.
| ||||||
6 | Contract provisions concerning loan repayment obligations | ||||||
7 | in contracts
entered into on or after the effective date of | ||||||
8 | this amendatory Act
of
the 93rd
General Assembly shall | ||||||
9 | terminate no later than the last to occur of the
estimated | ||||||
10 | dates of
completion of the
redevelopment project and | ||||||
11 | retirement of the obligations issued to finance
| ||||||
12 | redevelopment
project costs as required by item (3) of | ||||||
13 | subsection (n) of Section 11-74.4-3.
Payments received | ||||||
14 | under
contracts entered
into by the
municipality prior to | ||||||
15 | the effective date of this amendatory Act of the 93rd
| ||||||
16 | General
Assembly that are received after the redevelopment | ||||||
17 | project area has been
terminated by
municipal ordinance | ||||||
18 | shall be deposited into a special fund of the municipality
| ||||||
19 | to be used
for other community redevelopment needs within | ||||||
20 | the redevelopment project
area.
| ||||||
21 | (c) Within a redevelopment project area, acquire by | ||||||
22 | purchase, donation,
lease or
eminent domain; own, convey, | ||||||
23 | lease, mortgage or dispose of land
and other property, real | ||||||
24 | or personal, or rights or interests therein, and
grant or | ||||||
25 | acquire licenses, easements and options with respect | ||||||
26 | thereto, all
in the manner and at such price the |
| |||||||
| |||||||
1 | municipality determines is reasonably
necessary to achieve | ||||||
2 | the objectives of the redevelopment plan and project.
No | ||||||
3 | conveyance, lease, mortgage, disposition of land or other | ||||||
4 | property owned
by a municipality, or
agreement relating to | ||||||
5 | the development of such municipal property
shall be
made | ||||||
6 | except
upon the adoption of an ordinance by the corporate | ||||||
7 | authorities of the
municipality. Furthermore, no | ||||||
8 | conveyance, lease, mortgage, or other
disposition of land | ||||||
9 | owned by a municipality or agreement relating to the
| ||||||
10 | development of such municipal property
shall be made | ||||||
11 | without making public disclosure of the terms of the
| ||||||
12 | disposition and all bids and proposals made in response to | ||||||
13 | the
municipality's request. The procedures for obtaining | ||||||
14 | such bids and
proposals shall provide reasonable | ||||||
15 | opportunity for any person to submit
alternative proposals | ||||||
16 | or bids.
| ||||||
17 | (d) Within a redevelopment project area, clear any area | ||||||
18 | by
demolition or removal of any existing buildings and | ||||||
19 | structures.
| ||||||
20 | (e) Within a redevelopment project area, renovate or | ||||||
21 | rehabilitate or
construct any structure or building, as | ||||||
22 | permitted under this Act.
| ||||||
23 | (f) Install, repair, construct, reconstruct or | ||||||
24 | relocate streets, utilities
and site improvements | ||||||
25 | essential to the preparation of the redevelopment
area for | ||||||
26 | use in accordance with a redevelopment plan.
|
| |||||||
| |||||||
1 | (g) Within a redevelopment project area, fix, charge | ||||||
2 | and collect fees,
rents and charges for the use of any | ||||||
3 | building or property owned or leased
by it or any part | ||||||
4 | thereof, or facility therein.
| ||||||
5 | (h) Accept grants, guarantees and donations of | ||||||
6 | property, labor, or other
things of value from a public or | ||||||
7 | private source for use within a project
redevelopment area.
| ||||||
8 | (i) Acquire and construct public facilities within a | ||||||
9 | redevelopment project
area, as permitted under this Act.
| ||||||
10 | (j) Incur project redevelopment costs and reimburse | ||||||
11 | developers who incur
redevelopment project costs | ||||||
12 | authorized by a redevelopment agreement; provided,
| ||||||
13 | however, that on and
after the effective date of this | ||||||
14 | amendatory
Act of the 91st General Assembly, no | ||||||
15 | municipality shall incur redevelopment
project costs | ||||||
16 | (except for planning costs and any other eligible costs
| ||||||
17 | authorized by municipal ordinance or resolution that are | ||||||
18 | subsequently included
in the
redevelopment plan for the | ||||||
19 | area and are incurred by the municipality after the
| ||||||
20 | ordinance or resolution is adopted)
that are
not consistent | ||||||
21 | with the program for
accomplishing the objectives of the
| ||||||
22 | redevelopment plan as included in that plan and approved by | ||||||
23 | the
municipality until the municipality has amended
the | ||||||
24 | redevelopment plan as provided elsewhere in this Act.
| ||||||
25 | (k) Create a commission of not less than 5 or more than | ||||||
26 | 15 persons to
be appointed by the mayor or president of the |
| |||||||
| |||||||
1 | municipality with the consent
of the majority of the | ||||||
2 | governing board of the municipality. Members of a
| ||||||
3 | commission appointed after the effective date of this | ||||||
4 | amendatory Act of
1987 shall be appointed for initial terms | ||||||
5 | of 1, 2, 3, 4 and 5 years,
respectively, in such numbers as | ||||||
6 | to provide that the terms of not more than
1/3 of all such | ||||||
7 | members shall expire in any one year. Their successors
| ||||||
8 | shall be appointed for a term of 5 years. The commission, | ||||||
9 | subject to
approval of the corporate authorities may | ||||||
10 | exercise the powers enumerated in
this Section. The | ||||||
11 | commission shall also have the power to hold the public
| ||||||
12 | hearings required by this division and make | ||||||
13 | recommendations to the
corporate authorities concerning | ||||||
14 | the adoption of redevelopment plans,
redevelopment | ||||||
15 | projects and designation of redevelopment project areas.
| ||||||
16 | (l) Make payment in lieu of taxes or a portion thereof | ||||||
17 | to taxing districts.
If payments in lieu of taxes or a | ||||||
18 | portion thereof are made to taxing districts,
those | ||||||
19 | payments shall be made to all districts within a project | ||||||
20 | redevelopment
area on a basis which is proportional to the | ||||||
21 | current collections of revenue
which each taxing district | ||||||
22 | receives from real property in the redevelopment
project | ||||||
23 | area.
| ||||||
24 | (m) Exercise any and all other powers necessary to | ||||||
25 | effectuate the purposes
of this Act.
| ||||||
26 | (n) If any member of the corporate authority, a member |
| |||||||
| |||||||
1 | of a commission
established pursuant to Section | ||||||
2 | 11-74.4-4(k) of this Act, or an employee
or consultant of | ||||||
3 | the municipality involved in the planning and preparation
| ||||||
4 | of a redevelopment plan, or project for a redevelopment | ||||||
5 | project area or
proposed redevelopment project area, as | ||||||
6 | defined in Sections 11-74.4-3(i)
through (k) of this Act, | ||||||
7 | owns or controls an interest, direct or indirect,
in any | ||||||
8 | property included in any redevelopment area, or proposed
| ||||||
9 | redevelopment area, he or she shall disclose the same in | ||||||
10 | writing to the
clerk of the municipality, and shall also so | ||||||
11 | disclose the dates and terms
and conditions of any | ||||||
12 | disposition of any such interest, which disclosures
shall | ||||||
13 | be acknowledged by the corporate authorities and entered | ||||||
14 | upon the
minute books of the corporate authorities. If an | ||||||
15 | individual
holds such an interest then that individual | ||||||
16 | shall refrain from any further
official involvement in | ||||||
17 | regard to such redevelopment plan, project or area,
from | ||||||
18 | voting on any matter pertaining to such redevelopment plan, | ||||||
19 | project
or area, or communicating with other members | ||||||
20 | concerning corporate authorities,
commission or employees | ||||||
21 | concerning any matter pertaining to said redevelopment
| ||||||
22 | plan, project or area. Furthermore, no such member or | ||||||
23 | employee shall acquire
of any interest direct, or indirect, | ||||||
24 | in any property in a redevelopment
area or proposed | ||||||
25 | redevelopment area after either (a) such individual | ||||||
26 | obtains
knowledge of such plan, project or area or (b) |
| |||||||
| |||||||
1 | first public notice of such
plan, project or area pursuant | ||||||
2 | to Section 11-74.4-6 of this Division, whichever
occurs | ||||||
3 | first.
For the
purposes of this subsection, a property | ||||||
4 | interest
acquired in a
single parcel of property by a | ||||||
5 | member of the corporate authority, which
property
is used
| ||||||
6 | exclusively as the member's primary residence, shall not be | ||||||
7 | deemed to
constitute an
interest in any property included | ||||||
8 | in a redevelopment area or proposed
redevelopment area
that | ||||||
9 | was established before December 31, 1989, but the member | ||||||
10 | must disclose the
acquisition to the municipal clerk under | ||||||
11 | the provisions of this subsection.
A single property | ||||||
12 | interest
acquired within one year after the effective date | ||||||
13 | of this amendatory Act of the 94th General Assembly or 2 | ||||||
14 | years after the effective date of this amendatory Act of | ||||||
15 | the 95th General Assembly by a member of the corporate | ||||||
16 | authority does not
constitute an
interest in any property | ||||||
17 | included in any redevelopment area or proposed
| ||||||
18 | redevelopment area, regardless of when the redevelopment | ||||||
19 | area was established, if (i) the
property
is used
| ||||||
20 | exclusively as the member's primary residence, (ii) the | ||||||
21 | member discloses the acquisition to the municipal clerk | ||||||
22 | under the provisions of this subsection, (iii) the | ||||||
23 | acquisition is for fair market value, (iv) the member | ||||||
24 | acquires the property as a result of the property being | ||||||
25 | publicly advertised for sale, and (v) the member refrains | ||||||
26 | from voting on, and communicating with other members |
| |||||||
| |||||||
1 | concerning, any matter when the benefits to the | ||||||
2 | redevelopment project or area would be significantly | ||||||
3 | greater than the benefits to the municipality as a whole. | ||||||
4 | For the purposes of this subsection, a month-to-month | ||||||
5 | leasehold interest
in a single parcel of property by a | ||||||
6 | member of the corporate authority
shall not be deemed to | ||||||
7 | constitute an interest in any property included in any
| ||||||
8 | redevelopment area or proposed redevelopment area, but the | ||||||
9 | member must disclose
the interest to the municipal clerk | ||||||
10 | under the provisions of this subsection.
| ||||||
11 | (o) Create a Tax Increment Economic Development | ||||||
12 | Advisory Committee to
be appointed by the Mayor or | ||||||
13 | President of the municipality with the consent
of the | ||||||
14 | majority of the governing board of the municipality, the | ||||||
15 | members of
which Committee shall be appointed for initial | ||||||
16 | terms of 1, 2, 3, 4 and 5
years respectively, in such | ||||||
17 | numbers as to provide that the terms of not
more than 1/3 | ||||||
18 | of all such members shall expire in any one year. Their
| ||||||
19 | successors shall be appointed for a term of 5 years. The | ||||||
20 | Committee shall
have none of the powers enumerated in this | ||||||
21 | Section. The Committee shall
serve in an advisory capacity | ||||||
22 | only. The Committee may advise the governing
Board of the | ||||||
23 | municipality and other municipal officials regarding
| ||||||
24 | development issues and opportunities within the | ||||||
25 | redevelopment project area
or the area within the State | ||||||
26 | Sales Tax Boundary. The Committee may also
promote and |
| |||||||
| |||||||
1 | publicize development opportunities in the redevelopment
| ||||||
2 | project area or the area within the State Sales Tax | ||||||
3 | Boundary.
| ||||||
4 | (p) Municipalities may jointly undertake and perform | ||||||
5 | redevelopment plans
and projects and utilize the | ||||||
6 | provisions of the Act wherever they have
contiguous | ||||||
7 | redevelopment project areas or they determine to adopt tax
| ||||||
8 | increment financing with respect to a redevelopment | ||||||
9 | project area which
includes contiguous real property | ||||||
10 | within the boundaries of the
municipalities, and in doing | ||||||
11 | so, they may, by agreement between
municipalities, issue | ||||||
12 | obligations, separately or jointly, and expend
revenues | ||||||
13 | received under the Act for eligible expenses anywhere | ||||||
14 | within
contiguous redevelopment project areas or as | ||||||
15 | otherwise permitted in the Act. With respect to | ||||||
16 | redevelopment project areas that are established within a | ||||||
17 | transit facility improvement area, the provisions of this | ||||||
18 | subsection apply only with respect to such redevelopment | ||||||
19 | project areas that are contiguous to each other. | ||||||
20 | On or after January 1, 2019, revenues received under | ||||||
21 | this Act may be utilized under this subsection (p) for | ||||||
22 | jointly undertaken and performed redevelopment plans and | ||||||
23 | projects only in an amount equal to the percentage of | ||||||
24 | eligible costs undertaken within the redevelopment project | ||||||
25 | area that received the revenue. However, if there are any | ||||||
26 | contracts or agreements in force on the effective date of |
| |||||||
| |||||||
1 | this amendatory Act of the 100th General Assembly | ||||||
2 | consistent with the provisions of this subsection (p), | ||||||
3 | revenues received under this Act may continue to be used in | ||||||
4 | accordance with the contract or agreement after January 1, | ||||||
5 | 2019 only to the extent necessary to comply with the | ||||||
6 | contract or agreement. The contract or agreement may not be | ||||||
7 | renewed or extended after the effective date of this | ||||||
8 | amendatory Act of the 100th General Assembly unless the | ||||||
9 | contract or agreement complies with the provisions of this | ||||||
10 | subsection (p) of the time the contract is executed.
| ||||||
11 | (q) Before January 1, 2019, utilize Utilize revenues, | ||||||
12 | other than State sales tax increment revenues,
received | ||||||
13 | under this Act from one redevelopment project area for
| ||||||
14 | eligible
costs in another redevelopment project area that | ||||||
15 | is:
| ||||||
16 | (i) contiguous to the redevelopment project area | ||||||
17 | from which the revenues are received; | ||||||
18 | (ii) separated only by a public right of way from | ||||||
19 | the redevelopment project area from which the revenues | ||||||
20 | are received; or | ||||||
21 | (iii) separated only by forest preserve property | ||||||
22 | from the redevelopment project
area from which the | ||||||
23 | revenues are received if the closest boundaries of the | ||||||
24 | redevelopment project areas that are separated by the | ||||||
25 | forest preserve property are less than one mile apart.
| ||||||
26 | Utilize tax increment revenues for eligible costs that |
| |||||||
| |||||||
1 | are received from a
redevelopment project area created | ||||||
2 | under the Industrial Jobs Recovery Law that
is either | ||||||
3 | contiguous to, or is separated only by a public right of | ||||||
4 | way from,
the redevelopment project area created under this | ||||||
5 | Act which initially receives
these revenues. Utilize | ||||||
6 | revenues, other than State sales tax increment
revenues, by | ||||||
7 | transferring or loaning such revenues to a redevelopment | ||||||
8 | project
area created under the Industrial Jobs Recovery Law | ||||||
9 | that is either contiguous
to, or separated only by a public | ||||||
10 | right of way from the redevelopment project
area that | ||||||
11 | initially produced and received those revenues; and, if the
| ||||||
12 | redevelopment
project area (i) was established before the | ||||||
13 | effective date of this amendatory
Act of the 91st General | ||||||
14 | Assembly and (ii) is located within a municipality with
a | ||||||
15 | population of more than 100,000,
utilize revenues or | ||||||
16 | proceeds of obligations authorized by Section 11-74.4-7 of
| ||||||
17 | this
Act, other than use or occupation tax revenues, to pay | ||||||
18 | for any redevelopment
project costs as defined by | ||||||
19 | subsection (q) of Section 11-74.4-3 to the extent
that the | ||||||
20 | redevelopment project costs involve public property that | ||||||
21 | is either
contiguous to, or separated only by a public | ||||||
22 | right of way from, a redevelopment
project area whether or | ||||||
23 | not redevelopment project costs or the source of
payment | ||||||
24 | for the costs are specifically set forth in the | ||||||
25 | redevelopment plan for
the redevelopment project area.
| ||||||
26 | (r) If no redevelopment project has been initiated in a
|
| |||||||
| |||||||
1 | redevelopment
project area within 7 years after the area | ||||||
2 | was designated by ordinance under
subsection (a), the | ||||||
3 | municipality shall adopt an ordinance repealing the area's
| ||||||
4 | designation as a redevelopment project area; provided, | ||||||
5 | however, that if an area
received its
designation more than | ||||||
6 | 3 years before the effective date of this amendatory Act
of | ||||||
7 | 1994 and no redevelopment project has been initiated
within | ||||||
8 | 4 years after the effective date of this amendatory Act of | ||||||
9 | 1994, the
municipality shall adopt an ordinance repealing | ||||||
10 | its designation as a
redevelopment project area. | ||||||
11 | Initiation of a redevelopment project shall be
evidenced by | ||||||
12 | either a signed redevelopment agreement or expenditures on
| ||||||
13 | eligible redevelopment project costs associated with a | ||||||
14 | redevelopment project. | ||||||
15 | Notwithstanding any other provision of this Section to | ||||||
16 | the contrary, with respect to a redevelopment project area | ||||||
17 | designated by an ordinance that was adopted on July 29, | ||||||
18 | 1998 by the City of Chicago, the City of Chicago shall | ||||||
19 | adopt an ordinance repealing the area's designation as a | ||||||
20 | redevelopment project area if no redevelopment project has | ||||||
21 | been initiated in the redevelopment project area within 15 | ||||||
22 | years after the designation of the area. The City of | ||||||
23 | Chicago may retroactively repeal any ordinance adopted by | ||||||
24 | the City of Chicago, pursuant to this subsection (r), that | ||||||
25 | repealed the designation of a redevelopment project area | ||||||
26 | designated by an ordinance that was adopted by the City of |
| |||||||
| |||||||
1 | Chicago on July 29, 1998. The City of Chicago has 90 days | ||||||
2 | after the effective date of this amendatory Act to repeal | ||||||
3 | the ordinance. The changes to this Section made by this | ||||||
4 | amendatory Act of the 96th General Assembly apply | ||||||
5 | retroactively to July 27, 2005.
| ||||||
6 | (Source: P.A. 99-792, eff. 8-12-16.)
| ||||||
7 | (65 ILCS 5/11-74.4-4.3 new) | ||||||
8 | Sec. 11-74.4-4.3. Use or transfer of revenues to another | ||||||
9 | redevelopment project area. | ||||||
10 | (a) Revenues received under this Act in one redevelopment | ||||||
11 | project area may not be used for eligible costs in another | ||||||
12 | redevelopment project area on or after January 1, 2019 and | ||||||
13 | revenues received under this Act may not be transferred to | ||||||
14 | another redevelopment project area on or after January 1, 2019. | ||||||
15 | (b) If there are any contracts or agreements in force on | ||||||
16 | the effective date of this amendatory Act of the 100th General | ||||||
17 | Assembly, including contracts or agreements for the purposes | ||||||
18 | described in subsection (q) of Section 11-74.4-4 of this Act, | ||||||
19 | revenues received under this Act may be continue to be used for | ||||||
20 | eligible costs in another redevelopment project area or | ||||||
21 | transferred to another redevelopment project area after | ||||||
22 | January 1, 2019 only to the extent necessary to comply with the | ||||||
23 | contract or agreement. The contract or agreement may not be | ||||||
24 | renewed or extended after the effective date of this amendatory | ||||||
25 | Act of the 100th General Assembly unless the contract or |
| |||||||
| |||||||
1 | agreement complies with the provisions of this Act at the time | ||||||
2 | the contract is executed.
|