Bill Text: IL SB0684 | 2013-2014 | 98th General Assembly | Introduced
Bill Title: Amends the Public Utilities Act. Makes a technical change in a Section concerning authorization of water and sewer surcharges by the Illinois Commerce Commission.
Sponsorship: Partisan Bill (Democrat 1)
Status: (Failed) 2015-01-13 - Session Sine Die [SB0684 Detail]
Download: Illinois-2013-SB0684-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning utilities.
| |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
| 3 | represented in the General Assembly:
| |||||||||||||||||||
| 4 | Section 5. The Public Utilities Act is amended by changing | |||||||||||||||||||
| 5 | Section 9-220.2 as follows:
| |||||||||||||||||||
| 6 | (220 ILCS 5/9-220.2)
| |||||||||||||||||||
| 7 | Sec. 9-220.2. Water and sewer surcharges authorized.
| |||||||||||||||||||
| 8 | (a) The
The Commission may authorize a water or sewer | |||||||||||||||||||
| 9 | utility to file a
surcharge which adjusts rates and charges to | |||||||||||||||||||
| 10 | provide for recovery of (i) the
cost of purchased water, (ii) | |||||||||||||||||||
| 11 | the cost of purchased sewage treatment service,
(iii) other | |||||||||||||||||||
| 12 | costs which fluctuate for reasons beyond the utility's control | |||||||||||||||||||
| 13 | or
are difficult to predict, or (iv) costs associated with an | |||||||||||||||||||
| 14 | investment in
qualifying infrastructure plant, independent of | |||||||||||||||||||
| 15 | any other matters related to
the utility's revenue requirement. | |||||||||||||||||||
| 16 | A surcharge approved under this Section can
operate on an | |||||||||||||||||||
| 17 | historical or a prospective basis. | |||||||||||||||||||
| 18 | (b) For purposes of this Section, "costs associated with an | |||||||||||||||||||
| 19 | investment in
qualifying infrastructure plant" include a | |||||||||||||||||||
| 20 | return on the investment in and
depreciation expense related to | |||||||||||||||||||
| 21 | plant items or facilities (including, but not
limited to, | |||||||||||||||||||
| 22 | replacement mains, meters, services, and hydrants) which (i) | |||||||||||||||||||
| 23 | are
not reflected in the rate base used to establish the | |||||||||||||||||||
| |||||||
| |||||||
| 1 | utility's base rates and
(ii) are non-revenue producing. For | ||||||
| 2 | purposes
of this Section, a "non-revenue producing facility" is | ||||||
| 3 | one that is not
constructed or installed for the purpose of | ||||||
| 4 | serving a new customer.
| ||||||
| 5 | (c) On a periodic basis, the Commission shall initiate | ||||||
| 6 | hearings to reconcile
amounts collected under each surcharge | ||||||
| 7 | authorized pursuant to this Section with
the actual prudently | ||||||
| 8 | incurred costs recoverable for each annual period during
which | ||||||
| 9 | the surcharge was in effect.
| ||||||
| 10 | (Source: P.A. 91-638, eff. 1-1-00.)
| ||||||
