Bill Text: IL HR0152 | 2021-2022 | 102nd General Assembly | Introduced
Bill Title: Mourns the passing of Rev. Thomas G. Henry Sr.
Sponsorship: Partisan Bill (Democrat 1)
Status: (Passed) 2021-03-18 - Resolution Adopted [HR0152 Detail]
Download: Illinois-2021-HR0152-Introduced.html
| |||||||
| |||||||
| |||||||
| 1 | HOUSE JOINT RESOLUTION
| ||||||
| 2 | WHEREAS, Interstate 55 (I-55) experiences serious | ||||||
| 3 | congestion daily for extended periods of time and is unable to | ||||||
| 4 | acclimate to current traffic demands due to limited roadway | ||||||
| 5 | capacity, roadway design constraints, high truck volumes, and | ||||||
| 6 | numerous interchanges; and
| ||||||
| 7 | WHEREAS, Commuters have limited public transit options for | ||||||
| 8 | their commutes, which has consequently led to increased | ||||||
| 9 | congestion, long and unreliable travel times, reductions in | ||||||
| 10 | safety, and increased costs for delivery of goods and | ||||||
| 11 | services; and
| ||||||
| 12 | WHEREAS, To improve automobile transportation along the | ||||||
| 13 | I-55 corridor from the I-355 (Veterans Memorial Tollway) to | ||||||
| 14 | the I-90/I-94 (Dan Ryan Expressway), the Illinois Department | ||||||
| 15 | of Transportation (IDOT) initiated the "I-55 Managed Lane | ||||||
| 16 | Project" to study the advantages of adding managed lanes; and
| ||||||
| 17 | WHEREAS, A managed lane is a type of highway lane that is | ||||||
| 18 | administered via a management scheme, such as lane use | ||||||
| 19 | restrictions or variable tolling, to improve traffic flow, | ||||||
| 20 | provide commuters with travel options, increase average | ||||||
| 21 | vehicle occupancy, and support transit ridership; and
| ||||||
| |||||||
| |||||||
| 1 | WHEREAS, The project assessed implementing two Express | ||||||
| 2 | Toll Lanes (ETLs) in each direction on the eastern section of | ||||||
| 3 | the corridor, between I-294 (Central Tri-State Tollway) and | ||||||
| 4 | the I-90/94; additionally, the section from I-355 to I-294 | ||||||
| 5 | will have one ETL in each direction; and
| ||||||
| 6 | WHEREAS, IDOT led this project in partnership with the | ||||||
| 7 | Federal Highway Administration (FHWA); furthermore, to reach a | ||||||
| 8 | broad range of stakeholders, the partnership sought input from | ||||||
| 9 | area residents, municipalities, counties, townships, agencies, | ||||||
| 10 | elected officials, and interested groups; and
| ||||||
| 11 | WHEREAS, An environmental study has been completed to meet | ||||||
| 12 | the National Environmental Policy Act (NEPA) requirements; the | ||||||
| 13 | NEPA requires federal agencies to analyze the environmental | ||||||
| 14 | impacts of the proposed actions and requires the evaluation of | ||||||
| 15 | reasonable alternatives; and
| ||||||
| 16 | WHEREAS, Phase II, the "Final Design and Contract Plan | ||||||
| 17 | Preparation," is funded in IDOT's Fiscal Year 2020-2025 | ||||||
| 18 | Proposed Highway Improvement Program; however, IDOT does not | ||||||
| 19 | presently have funding for Phase III which is the construction | ||||||
| 20 | of the project; and
| ||||||
| 21 | WHEREAS, IDOT is evaluating alternative project delivery | ||||||
| 22 | opportunities, such as a public-private partnership or P3, to | ||||||
| |||||||
| |||||||
| 1 | involve industry and best leverage resources for this project; | ||||||
| 2 | using the P3 method, IDOT can deliver an I-55 project that is | ||||||
| 3 | the safest, most efficient, and most cost-effective; and
| ||||||
| 4 | WHEREAS, Under the Public Private Partnership for | ||||||
| 5 | Transportation Act, IDOT must receive approval from the | ||||||
| 6 | General Assembly to pursue the project as a P3 and see the | ||||||
| 7 | project through to completion; therefore, be it
| ||||||
| 8 | RESOLVED, BY THE HOUSE OF REPRESENTATIVES OF THE ONE | ||||||
| 9 | HUNDRED SECOND GENERAL ASSEMBLY OF THE STATE OF ILLINOIS, THE | ||||||
| 10 | SENATE CONCURRING HEREIN, that we support the "I-55 Managed | ||||||
| 11 | Lane Project" and IDOT's efforts to pursue the project as a P3.
| ||||||
