Bill Text: IL HB5837 | 2025-2026 | 104th General Assembly | Introduced
Bill Title: Amends the Counties Code. Provides that a county may require setback distances for a commercial wind energy facility, a commercial solar energy facility, or an energy storage system in excess of those established under the Act upon a finding by the county board that the setback distances would impair residential, commercial, agricultural, or industrial development or negatively affect residential, commercial, agricultural, or industrial property values. Provides that a county may deny the siting approval, issuance of a special use permit, or modification of an approved siting or special use permit for a commercial wind energy facility, a commercial solar energy facility, or an energy storage system if the county board finds that: (1) the energy facility or energy system will be located adjacent to a water treatment facility; (2) the energy facility or energy system will be located in a Metropolitan Statistical Area as delineated by the U.S. Office of Management and Budget; (3) the energy facility or energy system will limit housing opportunities in the county; (4) the energy facility or energy system will damage existing agricultural areas; or (5) any roadway will be unable to handle the traffic created by the energy facility or the energy system.
Sponsorship: Partisan Bill (Republican 2)
Status: (Introduced - Dead) 2026-11-17 - Referred to Rules Committee [HB5837 Detail]
Download: Illinois-2025-HB5837-Introduced.html
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| 1 | AN ACT concerning local government. | |||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||||
| 3 | represented in the General Assembly: | |||||||||||||||||||||
| 4 | Section 5. The Counties Code is amended by changing | |||||||||||||||||||||
| 5 | Sections 5-12020 and 5-12024 as follows: | |||||||||||||||||||||
| 6 | (55 ILCS 5/5-12020) | |||||||||||||||||||||
| 7 | Sec. 5-12020. Commercial wind energy facilities and | |||||||||||||||||||||
| 8 | commercial solar energy facilities. | |||||||||||||||||||||
| 9 | (a) As used in this Section: | |||||||||||||||||||||
| 10 | "Commercial solar energy facility" means a "commercial | |||||||||||||||||||||
| 11 | solar energy system" as defined in Section 10-720 of the | |||||||||||||||||||||
| 12 | Property Tax Code. "Commercial solar energy facility" does not | |||||||||||||||||||||
| 13 | mean a utility-scale solar energy facility being constructed | |||||||||||||||||||||
| 14 | at a site that was eligible to participate in a procurement | |||||||||||||||||||||
| 15 | event conducted by the Illinois Power Agency pursuant to | |||||||||||||||||||||
| 16 | subsection (c-5) of Section 1-75 of the Illinois Power Agency | |||||||||||||||||||||
| 17 | Act. | |||||||||||||||||||||
| 18 | "Commercial wind energy facility" means a wind energy | |||||||||||||||||||||
| 19 | conversion facility of equal or greater than 500 kilowatts in | |||||||||||||||||||||
| 20 | total nameplate generating capacity. "Commercial wind energy | |||||||||||||||||||||
| 21 | facility" includes a wind energy conversion facility seeking | |||||||||||||||||||||
| 22 | an extension of a permit to construct granted by a county or | |||||||||||||||||||||
| 23 | municipality before January 27, 2023 (the effective date of | |||||||||||||||||||||
| |||||||
| |||||||
| 1 | Public Act 102-1123). | ||||||
| 2 | "Facility owner" means (i) a person with a direct | ||||||
| 3 | ownership interest in a commercial wind energy facility or a | ||||||
| 4 | commercial solar energy facility, or both, regardless of | ||||||
| 5 | whether the person is involved in acquiring the necessary | ||||||
| 6 | rights, permits, and approvals or otherwise planning for the | ||||||
| 7 | construction and operation of the facility, and (ii) at the | ||||||
| 8 | time the facility is being developed, a person who is acting as | ||||||
| 9 | a developer of the facility by acquiring the necessary rights, | ||||||
| 10 | permits, and approvals or by planning for the construction and | ||||||
| 11 | operation of the facility, regardless of whether the person | ||||||
| 12 | will own or operate the facility. | ||||||
| 13 | "Nonparticipating property" means real property that is | ||||||
| 14 | not a participating property. | ||||||
| 15 | "Nonparticipating residence" means a residence that is | ||||||
| 16 | located on nonparticipating property and that is existing and | ||||||
| 17 | occupied on the date that an application for a permit to | ||||||
| 18 | develop the commercial wind energy facility or the commercial | ||||||
| 19 | solar energy facility is filed with the county. | ||||||
| 20 | "Occupied community building" means any one or more of the | ||||||
| 21 | following buildings that is existing and occupied on the date | ||||||
| 22 | that the application for a permit to develop the commercial | ||||||
| 23 | wind energy facility or the commercial solar energy facility | ||||||
| 24 | is filed with the county: a school, place of worship, early | ||||||
| 25 | care and education facility, public library, or community | ||||||
| 26 | center. | ||||||
| |||||||
| |||||||
| 1 | "Participating property" means real property that is the | ||||||
| 2 | subject of a written agreement between a facility owner and | ||||||
| 3 | the owner of the real property that provides the facility | ||||||
| 4 | owner an easement, option, lease, or license to use the real | ||||||
| 5 | property for the purpose of constructing a commercial wind | ||||||
| 6 | energy facility, a commercial solar energy facility, or | ||||||
| 7 | supporting facilities. "Participating property" also includes | ||||||
| 8 | real property that is owned by a facility owner for the purpose | ||||||
| 9 | of constructing a commercial wind energy facility, a | ||||||
| 10 | commercial solar energy facility, or supporting facilities. | ||||||
| 11 | "Participating residence" means a residence that is | ||||||
| 12 | located on participating property and that is existing and | ||||||
| 13 | occupied on the date that an application for a permit to | ||||||
| 14 | develop the commercial wind energy facility or the commercial | ||||||
| 15 | solar energy facility is filed with the county. | ||||||
| 16 | "Protected lands" means real property that is: | ||||||
| 17 | (1) subject to a permanent conservation right | ||||||
| 18 | consistent with the Real Property Conservation Rights Act; | ||||||
| 19 | or | ||||||
| 20 | (2) registered or designated as a nature preserve, | ||||||
| 21 | buffer, or land and water reserve under the Illinois | ||||||
| 22 | Natural Areas Preservation Act. | ||||||
| 23 | "Supporting facilities" means the transmission lines, | ||||||
| 24 | substations, access roads, meteorological towers, storage | ||||||
| 25 | containers, and equipment associated with the generation and | ||||||
| 26 | storage of electricity by the commercial wind energy facility | ||||||
| |||||||
| |||||||
| 1 | or commercial solar energy facility. "Supporting facilities" | ||||||
| 2 | includes energy storage systems capable of absorbing energy | ||||||
| 3 | and storing it for use at a later time, including, but not | ||||||
| 4 | limited to, batteries and other electrochemical and | ||||||
| 5 | electromechanical technologies or systems. | ||||||
| 6 | "Wind tower" includes the wind turbine tower, nacelle, and | ||||||
| 7 | blades. | ||||||
| 8 | (b) Notwithstanding any other provision of law or whether | ||||||
| 9 | the county has formed a zoning commission and adopted formal | ||||||
| 10 | zoning under Section 5-12007, a county may establish standards | ||||||
| 11 | for commercial wind energy facilities, commercial solar energy | ||||||
| 12 | facilities, or both. The standards may include all of the | ||||||
| 13 | requirements specified in this Section but may not include | ||||||
| 14 | requirements for commercial wind energy facilities or | ||||||
| 15 | commercial solar energy facilities that are more restrictive | ||||||
| 16 | than specified in this Section. A county may also regulate the | ||||||
| 17 | siting of commercial wind energy facilities with standards | ||||||
| 18 | that are not more restrictive than the requirements specified | ||||||
| 19 | in this Section in unincorporated areas of the county that are | ||||||
| 20 | outside the zoning jurisdiction of a municipality and that are | ||||||
| 21 | outside the 1.5-mile radius surrounding the zoning | ||||||
| 22 | jurisdiction of a municipality. A county may also regulate the | ||||||
| 23 | siting of commercial solar energy facilities with standards | ||||||
| 24 | that are not more restrictive than the requirements specified | ||||||
| 25 | in this Section in unincorporated areas of the county that are | ||||||
| 26 | outside of the zoning jurisdiction of a municipality. | ||||||
| |||||||
| |||||||
| 1 | (c) If a county has elected to establish standards under | ||||||
| 2 | subsection (b), before the county grants siting approval or a | ||||||
| 3 | special use permit for a commercial wind energy facility or a | ||||||
| 4 | commercial solar energy facility, or modification of an | ||||||
| 5 | approved siting or special use permit, the county board of the | ||||||
| 6 | county in which the facility is to be sited or the zoning board | ||||||
| 7 | of appeals for the county shall hold at least one public | ||||||
| 8 | hearing. The public hearing shall be conducted in accordance | ||||||
| 9 | with the Open Meetings Act and shall conclude not more than 60 | ||||||
| 10 | days after the filing of the application for the facility. The | ||||||
| 11 | county shall allow interested parties to a special use permit | ||||||
| 12 | an opportunity to present evidence and to cross-examine | ||||||
| 13 | witnesses at the hearing, but the county may impose reasonable | ||||||
| 14 | restrictions on the public hearing, including reasonable time | ||||||
| 15 | limitations on the presentation of evidence and the | ||||||
| 16 | cross-examination of witnesses. The county shall also allow | ||||||
| 17 | public comment at the public hearing in accordance with the | ||||||
| 18 | Open Meetings Act. The county shall make its siting and | ||||||
| 19 | permitting decisions not more than 30 days after the | ||||||
| 20 | conclusion of the public hearing. Notice of the hearing shall | ||||||
| 21 | be published in a newspaper of general circulation in the | ||||||
| 22 | county. A facility owner must enter into an agricultural | ||||||
| 23 | impact mitigation agreement with the Department of Agriculture | ||||||
| 24 | prior to the date of the required public hearing. A commercial | ||||||
| 25 | wind energy facility owner seeking an extension of a permit | ||||||
| 26 | granted by a county prior to July 24, 2015 (the effective date | ||||||
| |||||||
| |||||||
| 1 | of Public Act 99-132) must enter into an agricultural impact | ||||||
| 2 | mitigation agreement with the Department of Agriculture prior | ||||||
| 3 | to a decision by the county to grant the permit extension. | ||||||
| 4 | Counties may allow test wind towers or test solar energy | ||||||
| 5 | systems to be sited without formal approval by the county | ||||||
| 6 | board. | ||||||
| 7 | (d) A county with an existing zoning ordinance in conflict | ||||||
| 8 | with this Section shall amend that zoning ordinance to be in | ||||||
| 9 | compliance with this Section within 120 days after January 27, | ||||||
| 10 | 2023 (the effective date of Public Act 102-1123). | ||||||
| 11 | (e) A county may require: | ||||||
| 12 | (1) a wind tower of a commercial wind energy facility | ||||||
| 13 | to be sited as follows, with setback distances measured | ||||||
| 14 | from the center of the base of the wind tower: | ||||||
| 15 | Setback Description Setback Distance | ||||||
| 16 | Occupied Community 2.1 times the maximum blade tip | ||||||
| 17 | Buildings height of the wind tower to the | ||||||
| 18 | nearest point on the outside | ||||||
| 19 | wall of the structure | ||||||
| 20 | Participating Residences 1.1 times the maximum blade tip | ||||||
| 21 | height of the wind tower to the | ||||||
| 22 | nearest point on the outside | ||||||
| 23 | wall of the structure | ||||||
| |||||||
| |||||||
| 1 | Nonparticipating Residences 2.1 times the maximum blade tip | ||||||
| 2 | height of the wind tower to the | ||||||
| 3 | nearest point on the outside | ||||||
| 4 | wall of the structure | ||||||
| 5 | Boundary Lines of None | ||||||
| 6 | Participating Property | ||||||
| 7 | Boundary Lines of 1.1 times the maximum blade tip | ||||||
| 8 | Nonparticipating Property height of the wind tower to the | ||||||
| 9 | nearest point on the property | ||||||
| 10 | line of the nonparticipating | ||||||
| 11 | property | ||||||
| 12 | Public Road Rights-of-Way 1.1 times the maximum blade tip | ||||||
| 13 | height of the wind tower | ||||||
| 14 | to the center point of the | ||||||
| 15 | public road right-of-way | ||||||
| 16 | Overhead Communication and 1.1 times the maximum blade tip | ||||||
| 17 | Electric Transmission height of the wind tower to the | ||||||
| 18 | and Distribution Facilities nearest edge of the property | ||||||
| 19 | (Not Including Overhead line, easement, or | ||||||
| 20 | Utility Service Lines to right-of-way | ||||||
| 21 | Individual Houses or containing the overhead line | ||||||
| |||||||
| |||||||
| 1 | Outbuildings) | ||||||
| 2 | Overhead Utility Service None | ||||||
| 3 | Lines to Individual | ||||||
| 4 | Houses or Outbuildings | ||||||
| 5 | Fish and Wildlife Areas 2.1 times the maximum blade | ||||||
| 6 | and Illinois Nature tip height of the wind tower | ||||||
| 7 | Preserve Commission to the nearest point on the | ||||||
| 8 | Protected Lands property line of the fish and | ||||||
| 9 | wildlife area or protected | ||||||
| 10 | land | ||||||
| 11 | This Section does not exempt or excuse compliance with | ||||||
| 12 | electric facility clearances approved or required by the | ||||||
| 13 | National Electrical Code, the National Electrical Safety | ||||||
| 14 | Code, the Illinois Commerce Commission, and the Federal | ||||||
| 15 | Energy Regulatory Commission and their designees or | ||||||
| 16 | successors; | ||||||
| 17 | (2) a wind tower of a commercial wind energy facility | ||||||
| 18 | to be sited so that industry standard computer modeling | ||||||
| 19 | indicates that any occupied community building or | ||||||
| 20 | nonparticipating residence will not experience more than | ||||||
| 21 | 30 hours per year of shadow flicker under planned | ||||||
| 22 | operating conditions; | ||||||
| 23 | (3) a commercial solar energy facility to be sited as | ||||||
| 24 | follows, with setback distances measured from the nearest | ||||||
| |||||||
| |||||||
| 1 | edge of any above-ground component of the facility, | ||||||
| 2 | excluding fencing: | ||||||
| 3 | Setback Description Setback Distance | ||||||
| 4 | Occupied Community 150 feet from the nearest | ||||||
| 5 | Buildings and Dwellings on point on the outside wall | ||||||
| 6 | Nonparticipating Properties of the structure | ||||||
| 7 | Boundary Lines of None | ||||||
| 8 | Participating Property | ||||||
| 9 | Public Road Rights-of-Way 50 feet from the nearest | ||||||
| 10 | edge of the public | ||||||
| 11 | right-of-way | ||||||
| 12 | Boundary Lines of 50 feet to the nearest | ||||||
| 13 | Nonparticipating Property point on the property | ||||||
| 14 | line of the nonparticipating | ||||||
| 15 | property | ||||||
| 16 | (4) a commercial solar energy facility to be sited so | ||||||
| 17 | that the facility's perimeter is enclosed by fencing | ||||||
| 18 | having a height of at least 6 feet and no more than 25 | ||||||
| 19 | feet; and | ||||||
| 20 | (5) a commercial solar energy facility to be sited so | ||||||
| |||||||
| |||||||
| 1 | that no component of a solar panel has a height of more | ||||||
| 2 | than 20 feet above ground when the solar energy facility's | ||||||
| 3 | arrays are at full tilt. | ||||||
| 4 | This subsection (e) shall not preclude the ability of a | ||||||
| 5 | county to require a reasonable setback distance between | ||||||
| 6 | fencing and public rights-of-way if the requirement is not | ||||||
| 7 | specific to commercial wind energy facilities or commercial | ||||||
| 8 | solar energy facilities and does not preclude the development | ||||||
| 9 | of commercial wind energy facilities or commercial solar | ||||||
| 10 | energy facilities or the ability of commercial wind energy | ||||||
| 11 | facilities or commercial solar energy facilities to comply | ||||||
| 12 | with the requirements set forth in this subsection (e). | ||||||
| 13 | The requirements set forth in this subsection (e) may be | ||||||
| 14 | waived subject to the written consent of the owner of each | ||||||
| 15 | affected nonparticipating property. | ||||||
| 16 | (e-5) A county may require setback distances in excess of | ||||||
| 17 | those established under subsection (e) of this Section upon a | ||||||
| 18 | finding by the county board that the setback distances will | ||||||
| 19 | impair residential, commercial, agricultural, or industrial | ||||||
| 20 | development or negatively affect residential, commercial, | ||||||
| 21 | agricultural, or industrial property values. | ||||||
| 22 | (f) A county may not set a sound limitation for wind towers | ||||||
| 23 | in commercial wind energy facilities or any components in | ||||||
| 24 | commercial solar energy facilities that is more restrictive | ||||||
| 25 | than the sound limitations established by the Illinois | ||||||
| 26 | Pollution Control Board under 35 Ill. Adm. Code Parts 900, | ||||||
| |||||||
| |||||||
| 1 | 901, and 910. Additionally, in accordance with Section 25 of | ||||||
| 2 | the Environmental Protection Act, a participating property, | ||||||
| 3 | participating residence, nonparticipating property, | ||||||
| 4 | nonparticipating residence, or any combination of those | ||||||
| 5 | properties or residences may waive enforcement of the rules | ||||||
| 6 | adopted by the Illinois Pollution Control Board under 35 Ill. | ||||||
| 7 | Adm. Code Parts 900, 901, and 910 by written waiver that | ||||||
| 8 | complies with the applicable directive established in Section | ||||||
| 9 | 25 of the Environmental Protection Act and is recorded in the | ||||||
| 10 | Office of the Recorder of the county in which the | ||||||
| 11 | participating property, participating residence, | ||||||
| 12 | nonparticipating property, or nonparticipating residence is | ||||||
| 13 | located. Once recorded, such a waiver shall be binding on any | ||||||
| 14 | current and future owners, residents, lessees, invitees, and | ||||||
| 15 | users of the participating property, participating residence, | ||||||
| 16 | nonparticipating property, or nonparticipating residence for | ||||||
| 17 | enforcement purposes. An owner of any participating residence | ||||||
| 18 | or nonparticipating residence shall disclose the existence of | ||||||
| 19 | such a waiver to any lessee before entering any new lease for | ||||||
| 20 | the residence. | ||||||
| 21 | A seller or transferor of a participating property, | ||||||
| 22 | participating residence, nonparticipating property, | ||||||
| 23 | nonparticipating residence, or any combination of those | ||||||
| 24 | properties or residences shall disclose the existence of such | ||||||
| 25 | a waiver to any buyer or transferee before any sale or transfer | ||||||
| 26 | of the property. If disclosure of the waiver occurs after the | ||||||
| |||||||
| |||||||
| 1 | buyer has made an offer to purchase the property, the seller | ||||||
| 2 | shall disclose the existence of the waiver before accepting | ||||||
| 3 | the buyer's offer and shall (1) allow the buyer an opportunity | ||||||
| 4 | to review the disclosure and (2) inform the buyer that the | ||||||
| 5 | buyer has the right to amend the buyer's offer. | ||||||
| 6 | (g) A county may not place any restriction on the | ||||||
| 7 | installation or use of a commercial wind energy facility or a | ||||||
| 8 | commercial solar energy facility unless it adopts an ordinance | ||||||
| 9 | that complies with this Section. A county may not establish | ||||||
| 10 | siting standards for supporting facilities that preclude | ||||||
| 11 | development of commercial wind energy facilities or commercial | ||||||
| 12 | solar energy facilities. | ||||||
| 13 | A request for siting approval or a special use permit for a | ||||||
| 14 | commercial wind energy facility or a commercial solar energy | ||||||
| 15 | facility, or modification of an approved siting or special use | ||||||
| 16 | permit, shall be approved if the request is in compliance with | ||||||
| 17 | the standards and conditions imposed in this Act, the zoning | ||||||
| 18 | ordinance adopted consistent with this Act, and the conditions | ||||||
| 19 | imposed under State and federal statutes and regulations. | ||||||
| 20 | (h) (Blank). A county may not adopt zoning regulations | ||||||
| 21 | that disallow, permanently or temporarily, commercial wind | ||||||
| 22 | energy facilities or commercial solar energy facilities from | ||||||
| 23 | being developed or operated in any district zoned to allow | ||||||
| 24 | agricultural or industrial uses. | ||||||
| 25 | (i) (Blank). | ||||||
| 26 | (i-5) All siting approval or special use permit | ||||||
| |||||||
| |||||||
| 1 | application fees for a commercial wind energy facility or | ||||||
| 2 | commercial solar energy facility must be reasonable. Fees that | ||||||
| 3 | do not exceed $5,000 per each megawatt of nameplate capacity | ||||||
| 4 | of the energy facility, up to a maximum of $125,000, shall be | ||||||
| 5 | considered presumptively reasonable. A county may also require | ||||||
| 6 | reimbursement from the applicant for any reasonable expenses | ||||||
| 7 | incurred by the county in processing the siting approval or | ||||||
| 8 | special use permit application in excess of the maximum fee. A | ||||||
| 9 | siting approval or special use permit shall not be subject to | ||||||
| 10 | any time deadline to start construction or obtain a building | ||||||
| 11 | permit of less than 5 years from the date of siting approval or | ||||||
| 12 | special use permit approval. A county shall allow an applicant | ||||||
| 13 | to request an extension of the deadline based upon reasonable | ||||||
| 14 | cause for the extension request. The exemption shall not be | ||||||
| 15 | unreasonably withheld, conditioned, or denied. | ||||||
| 16 | (i-10) A county may require, for a commercial wind energy | ||||||
| 17 | facility or commercial solar energy facility, a single | ||||||
| 18 | building permit and a reasonable permit fee for the facility | ||||||
| 19 | which includes all supporting facilities. County building | ||||||
| 20 | permit fees for commercial wind energy facility or commercial | ||||||
| 21 | solar energy facility that do not exceed $5,000 per each | ||||||
| 22 | megawatt of nameplate capacity of the energy facility, up to a | ||||||
| 23 | maximum of $75,000, shall be considered presumptively | ||||||
| 24 | reasonable. A county may also require reimbursement from the | ||||||
| 25 | applicant for any reasonable expenses incurred by the county | ||||||
| 26 | in processing the building permit in excess of the maximum | ||||||
| |||||||
| |||||||
| 1 | fee. A county may require an applicant, upon start of | ||||||
| 2 | construction of the facility, to maintain liability insurance | ||||||
| 3 | that is commercially reasonable and consistent with prevailing | ||||||
| 4 | industry standards for similar energy facilities. | ||||||
| 5 | (i-15) A county may deny the siting approval, issuance of | ||||||
| 6 | a special use permit, or modification of an approved siting or | ||||||
| 7 | special use permit for a commercial wind energy facility or | ||||||
| 8 | commercial solar energy facility if the county board finds | ||||||
| 9 | that: | ||||||
| 10 | (1) the facility will be located adjacent to a water | ||||||
| 11 | treatment facility; | ||||||
| 12 | (2) the facility will be located in a Metropolitan | ||||||
| 13 | Statistical Area as delineated by the U.S. Office of | ||||||
| 14 | Management and Budget; | ||||||
| 15 | (3) the facility will limit housing opportunities in | ||||||
| 16 | the county; | ||||||
| 17 | (4) the facility will damage existing agricultural | ||||||
| 18 | areas; or | ||||||
| 19 | (5) any roadway will be unable to handle the traffic | ||||||
| 20 | created by the facility. | ||||||
| 21 | (j) Except as otherwise provided in this Section, a county | ||||||
| 22 | shall not require standards for construction, decommissioning, | ||||||
| 23 | or deconstruction of a commercial wind energy facility or | ||||||
| 24 | commercial solar energy facility or related financial | ||||||
| 25 | assurances that are more restrictive than those included in | ||||||
| 26 | the Department of Agriculture's standard wind farm | ||||||
| |||||||
| |||||||
| 1 | agricultural impact mitigation agreement, template 81818, or | ||||||
| 2 | standard solar agricultural impact mitigation agreement, | ||||||
| 3 | version 8.19.19, as applicable and in effect on December 31, | ||||||
| 4 | 2022. The amount of any decommissioning payment shall be in | ||||||
| 5 | accordance with the financial assurance required by those | ||||||
| 6 | agricultural impact mitigation agreements. | ||||||
| 7 | (j-5) A commercial wind energy facility or a commercial | ||||||
| 8 | solar energy facility shall file a farmland drainage plan with | ||||||
| 9 | the county and impacted drainage districts outlining how | ||||||
| 10 | surface and subsurface drainage of farmland will be restored | ||||||
| 11 | during and following construction or deconstruction of the | ||||||
| 12 | facility. The plan is to be created independently by the | ||||||
| 13 | facility developer and shall include the location of any | ||||||
| 14 | potentially impacted drainage district facilities to the | ||||||
| 15 | extent this information is publicly available from the county | ||||||
| 16 | or the drainage district, plans to repair any subsurface | ||||||
| 17 | drainage affected during construction or deconstruction using | ||||||
| 18 | procedures outlined in the agricultural impact mitigation | ||||||
| 19 | agreement entered into by the commercial wind energy facility | ||||||
| 20 | owner or commercial solar energy facility owner, and | ||||||
| 21 | procedures for the repair and restoration of surface drainage | ||||||
| 22 | affected during construction or deconstruction. All surface | ||||||
| 23 | and subsurface damage shall be repaired as soon as reasonably | ||||||
| 24 | practicable. | ||||||
| 25 | (k) A county may not condition approval of a commercial | ||||||
| 26 | wind energy facility or commercial solar energy facility on a | ||||||
| |||||||
| |||||||
| 1 | property value guarantee and may not require a facility owner | ||||||
| 2 | to pay into a neighboring property devaluation escrow account. | ||||||
| 3 | (l) A county may require certain vegetative screening | ||||||
| 4 | between a commercial solar energy facility and | ||||||
| 5 | nonparticipating residences. A county may not require earthen | ||||||
| 6 | berms or similar structures. Vegetative screening requirements | ||||||
| 7 | shall be commercially reasonable and limited in height at full | ||||||
| 8 | maturity to avoid reduction of the productive energy output of | ||||||
| 9 | the commercial solar energy facility. A county may not require | ||||||
| 10 | vegetative screening to exceed 5 feet in height when first | ||||||
| 11 | installed or prior to commercial operation date. The screening | ||||||
| 12 | requirements shall take into account the size and location of | ||||||
| 13 | the facility, visibility from nonparticipating residences, | ||||||
| 14 | compatibility of native plant species, cost and feasibility of | ||||||
| 15 | installation and maintenance, and industry standards and best | ||||||
| 16 | practices for commercial solar energy facilities. | ||||||
| 17 | (m) A county may set blade tip height limitations for wind | ||||||
| 18 | towers in commercial wind energy facilities but may not set a | ||||||
| 19 | blade tip height limitation that is more restrictive than the | ||||||
| 20 | height allowed under a Determination of No Hazard to Air | ||||||
| 21 | Navigation by the Federal Aviation Administration under 14 CFR | ||||||
| 22 | Part 77. | ||||||
| 23 | (n) A county may require that a commercial wind energy | ||||||
| 24 | facility owner or commercial solar energy facility owner | ||||||
| 25 | provide: | ||||||
| 26 | (1) the results and recommendations from consultation | ||||||
| |||||||
| |||||||
| 1 | with the Illinois Department of Natural Resources that are | ||||||
| 2 | obtained through the Ecological Compliance Assessment Tool | ||||||
| 3 | (EcoCAT) or a comparable successor tool; and | ||||||
| 4 | (2) (blank). | ||||||
| 5 | (o) A county may require a commercial wind energy facility | ||||||
| 6 | or commercial solar energy facility to adhere to the | ||||||
| 7 | recommendations provided by the Illinois Department of Natural | ||||||
| 8 | Resources in an EcoCAT natural resource review report under 17 | ||||||
| 9 | Ill. Adm. Code Part 1075. | ||||||
| 10 | (p) A county may require a facility owner to: | ||||||
| 11 | (1) demonstrate avoidance of protected lands as | ||||||
| 12 | identified by the Illinois Department of Natural Resources | ||||||
| 13 | and the Illinois Nature Preserve Commission; or | ||||||
| 14 | (2) consider the recommendations of the Illinois | ||||||
| 15 | Department of Natural Resources for setbacks from | ||||||
| 16 | protected lands, including areas identified by the | ||||||
| 17 | Illinois Nature Preserve Commission. | ||||||
| 18 | (q) A county may require that a facility owner provide | ||||||
| 19 | evidence of consultation with the Illinois State Historic | ||||||
| 20 | Preservation Office to assess potential impacts on | ||||||
| 21 | State-registered historic sites under the Illinois State | ||||||
| 22 | Agency Historic Resources Preservation Act. | ||||||
| 23 | (r) To maximize community benefits, including, but not | ||||||
| 24 | limited to, reduced stormwater runoff, flooding, and erosion | ||||||
| 25 | at the ground mounted solar energy system, improved soil | ||||||
| 26 | health, and increased foraging habitat for game birds, | ||||||
| |||||||
| |||||||
| 1 | songbirds, and pollinators, a county may (1) require a | ||||||
| 2 | commercial solar energy facility owner to plant, establish, | ||||||
| 3 | and maintain for the life of the facility vegetative ground | ||||||
| 4 | cover, consistent with the goals of the Pollinator-Friendly | ||||||
| 5 | Solar Site Act and (2) require the submittal of a vegetation | ||||||
| 6 | management plan that is in compliance with the agricultural | ||||||
| 7 | impact mitigation agreement in the application to construct | ||||||
| 8 | and operate a commercial solar energy facility in the county | ||||||
| 9 | if the vegetative ground cover and vegetation management plan | ||||||
| 10 | comply with the requirements of the underlying agreement with | ||||||
| 11 | the landowner or landowners where the facility will be | ||||||
| 12 | constructed. | ||||||
| 13 | No later than 90 days after January 27, 2023 (the | ||||||
| 14 | effective date of Public Act 102-1123), the Illinois | ||||||
| 15 | Department of Natural Resources shall develop guidelines for | ||||||
| 16 | vegetation management plans that may be required under this | ||||||
| 17 | subsection for commercial solar energy facilities. The | ||||||
| 18 | guidelines must include guidance for short-term and long-term | ||||||
| 19 | property management practices that provide and maintain native | ||||||
| 20 | and non-invasive naturalized perennial vegetation to protect | ||||||
| 21 | the health and well-being of pollinators. | ||||||
| 22 | (s) If a facility owner enters into a road use agreement | ||||||
| 23 | with the Illinois Department of Transportation, a road | ||||||
| 24 | district, or other unit of local government relating to a | ||||||
| 25 | commercial wind energy facility or a commercial solar energy | ||||||
| 26 | facility, the road use agreement shall require the facility | ||||||
| |||||||
| |||||||
| 1 | owner to be responsible for (i) the reasonable cost of | ||||||
| 2 | improving roads used by the facility owner to construct the | ||||||
| 3 | commercial wind energy facility or the commercial solar energy | ||||||
| 4 | facility and (ii) the reasonable cost of repairing roads used | ||||||
| 5 | by the facility owner during construction of the commercial | ||||||
| 6 | wind energy facility or the commercial solar energy facility | ||||||
| 7 | so that those roads are in a condition that is safe for the | ||||||
| 8 | driving public after the completion of the facility's | ||||||
| 9 | construction. Roadways improved in preparation for and during | ||||||
| 10 | the construction of the commercial wind energy facility or | ||||||
| 11 | commercial solar energy facility shall be repaired and | ||||||
| 12 | restored to the improved condition at the reasonable cost of | ||||||
| 13 | the developer if the roadways have degraded or were damaged as | ||||||
| 14 | a result of construction-related activities. | ||||||
| 15 | The road use agreement shall not require the facility | ||||||
| 16 | owner to pay costs, fees, or charges for road work that is not | ||||||
| 17 | specifically and uniquely attributable to the construction of | ||||||
| 18 | the commercial wind energy facility or the commercial solar | ||||||
| 19 | energy facility. No road district or other unit of local | ||||||
| 20 | government may request or require permit fees, fines, or other | ||||||
| 21 | payment obligations as a requirement for a road use agreement | ||||||
| 22 | with a facility owner unless the amount of the reasonable | ||||||
| 23 | permit fee or payment is equivalent to the amount of actual | ||||||
| 24 | expenses incurred by the road district or other unit of local | ||||||
| 25 | government for negotiating, executing, constructing, or | ||||||
| 26 | implementing the road use agreement. The road use agreement | ||||||
| |||||||
| |||||||
| 1 | shall not require any road work to be performed by or paid for | ||||||
| 2 | by the facility owner that is not specifically and uniquely | ||||||
| 3 | attributable to the road improvements required for the | ||||||
| 4 | construction of the commercial wind energy facility or the | ||||||
| 5 | commercial solar energy facility or the restoration of the | ||||||
| 6 | roads used by the facility owner during construction-related | ||||||
| 7 | activities. | ||||||
| 8 | (s-5) The facility owner shall also compensate landowners | ||||||
| 9 | for crop losses or other agricultural damages resulting from | ||||||
| 10 | damage to the drainage system caused by the construction of | ||||||
| 11 | the commercial wind energy facility or the commercial solar | ||||||
| 12 | energy facility. The commercial wind energy facility owner or | ||||||
| 13 | commercial solar energy facility owner shall repair or pay for | ||||||
| 14 | the repair of all damage to the subsurface drainage system | ||||||
| 15 | caused by the construction of the commercial wind energy | ||||||
| 16 | facility or the commercial solar energy facility in accordance | ||||||
| 17 | with the agriculture impact mitigation agreement requirements | ||||||
| 18 | for repair of drainage. The commercial wind energy facility | ||||||
| 19 | owner or commercial solar energy facility owner shall repair | ||||||
| 20 | or pay for the repair and restoration of surface drainage | ||||||
| 21 | caused by the construction or deconstruction of the commercial | ||||||
| 22 | wind energy facility or the commercial solar energy facility | ||||||
| 23 | as soon as reasonably practicable. | ||||||
| 24 | (t) Notwithstanding any other provision of law, a facility | ||||||
| 25 | owner with siting approval from a county to construct a | ||||||
| 26 | commercial wind energy facility or a commercial solar energy | ||||||
| |||||||
| |||||||
| 1 | facility is authorized to cross or impact a drainage system, | ||||||
| 2 | including, but not limited to, drainage tiles, open drainage | ||||||
| 3 | ditches, culverts, and water gathering vaults, owned or under | ||||||
| 4 | the control of a drainage district under the Illinois Drainage | ||||||
| 5 | Code without obtaining prior agreement or approval from the | ||||||
| 6 | drainage district in accordance with the farmland drainage | ||||||
| 7 | plan required by subsection (j-5). | ||||||
| 8 | (u) The amendments to this Section adopted in Public Act | ||||||
| 9 | 102-1123 do not apply to: (1) an application for siting | ||||||
| 10 | approval or for a special use permit for a commercial wind | ||||||
| 11 | energy facility or commercial solar energy facility if the | ||||||
| 12 | application was submitted to a unit of local government before | ||||||
| 13 | January 27, 2023 (the effective date of Public Act 102-1123); | ||||||
| 14 | (2) a commercial wind energy facility or a commercial solar | ||||||
| 15 | energy facility if the facility owner has submitted an | ||||||
| 16 | agricultural impact mitigation agreement to the Department of | ||||||
| 17 | Agriculture before January 27, 2023 (the effective date of | ||||||
| 18 | Public Act 102-1123); (3) a commercial wind energy or | ||||||
| 19 | commercial solar energy development on property that is | ||||||
| 20 | located within an enterprise zone certified under the Illinois | ||||||
| 21 | Enterprise Zone Act, that was classified as industrial by the | ||||||
| 22 | appropriate zoning authority on or before January 27, 2023, | ||||||
| 23 | and that is located within 4 miles of the intersection of | ||||||
| 24 | Interstate 88 and Interstate 39; or (4) a commercial wind | ||||||
| 25 | energy or commercial solar energy development on property in | ||||||
| 26 | Madison County that is located within the area that has as its | ||||||
| |||||||
| |||||||
| 1 | northern boundary the portion of Drexelius Road that is | ||||||
| 2 | between the intersection of Drexelius Road and Wolf Road and | ||||||
| 3 | the intersection of Drexelius Road and Fosterburg Road, that | ||||||
| 4 | has as its eastern boundary the portion of Fosterburg Road | ||||||
| 5 | that is between the intersection of Fosterburg Road and | ||||||
| 6 | Drexelius Road and the intersection of Fosterburg Road and | ||||||
| 7 | Wolf Road, and that has as its southern and western boundaries | ||||||
| 8 | the portion of Wolf Road that is between the intersection of | ||||||
| 9 | Fosterburg Road and Wolf Road and the intersection of | ||||||
| 10 | Drexelius Road and Wolf Road. | ||||||
| 11 | (Source: P.A. 103-81, eff. 6-9-23; 103-580, eff. 12-8-23; | ||||||
| 12 | 104-417, eff. 8-15-25; 104-458, eff. 6-1-26; 104-480, eff. | ||||||
| 13 | 7-1-26.) | ||||||
| 14 | (55 ILCS 5/5-12024) | ||||||
| 15 | Sec. 5-12024. Energy storage systems. | ||||||
| 16 | (a) As used in this Section: | ||||||
| 17 | "Energy storage system" means a facility with an aggregate | ||||||
| 18 | energy capacity that is greater than 1,000 kilowatts and that | ||||||
| 19 | is capable of absorbing energy and storing it for use at a | ||||||
| 20 | later time, including, but not limited to, electrochemical and | ||||||
| 21 | electromechanical technologies. "Energy storage system" does | ||||||
| 22 | not include technologies that require combustion. "Energy | ||||||
| 23 | storage system" also does not include energy storage systems | ||||||
| 24 | associated with commercial solar energy facilities or | ||||||
| 25 | commercial wind energy facilities as defined in Section | ||||||
| |||||||
| |||||||
| 1 | 5-12020. | ||||||
| 2 | "Excused service interruption" means any period during | ||||||
| 3 | which an energy storage system does not store or discharge | ||||||
| 4 | electricity and that is planned or reasonably foreseeable for | ||||||
| 5 | standard commercial operation, including any unavailability | ||||||
| 6 | caused by a buyer; storage capacity tests; system emergencies; | ||||||
| 7 | curtailments, including curtailment orders; transmission | ||||||
| 8 | system outages; compliance with any operating restriction; | ||||||
| 9 | serial defects; and planned outages. | ||||||
| 10 | "Facility owner" means (i) a person with a direct | ||||||
| 11 | ownership interest in an energy storage system, regardless of | ||||||
| 12 | whether the person is involved in acquiring the necessary | ||||||
| 13 | rights, permits, and approvals or otherwise planning for the | ||||||
| 14 | construction and operation of the facility and (ii) a person | ||||||
| 15 | who, at the time the facility is being developed, is acting as | ||||||
| 16 | a developer of the facility by acquiring the necessary rights, | ||||||
| 17 | permits, and approvals or by planning for the construction and | ||||||
| 18 | operation of the facility, regardless of whether the person | ||||||
| 19 | will own or operate the facility. | ||||||
| 20 | "Force majeure" means any event or circumstance that | ||||||
| 21 | delays or prevents an energy storage system from timely | ||||||
| 22 | performing all or a portion of its commercial operations if | ||||||
| 23 | the act or event, despite the exercise of commercially | ||||||
| 24 | reasonable efforts, cannot be avoided by and is beyond the | ||||||
| 25 | reasonable control, whether direct or indirect, of, and | ||||||
| 26 | without the fault or negligence of, a facility owner or | ||||||
| |||||||
| |||||||
| 1 | operator or any of its assignees. "Force majeure" includes, | ||||||
| 2 | but is not limited to: | ||||||
| 3 | (1) fire, flood, tornado, or other natural disasters | ||||||
| 4 | or acts of God; | ||||||
| 5 | (2) war, civil strife, terrorist attack, or other | ||||||
| 6 | similar acts of violence; | ||||||
| 7 | (3) unavailability of materials, equipment, services, | ||||||
| 8 | or labor, including unavailability due to global supply | ||||||
| 9 | chain shortages; | ||||||
| 10 | (4) utility or energy shortages or acts or omissions | ||||||
| 11 | of public utility providers; | ||||||
| 12 | (5) any delay resulting from a pandemic, epidemic, or | ||||||
| 13 | other public health emergency or related restrictions; and | ||||||
| 14 | (6) litigation or a regulatory proceeding regarding a | ||||||
| 15 | facility. | ||||||
| 16 | "NFPA" means the National Fire Protection Association. | ||||||
| 17 | "Nonparticipating property" means real property that is | ||||||
| 18 | not a participating property. | ||||||
| 19 | "Nonparticipating residence" means a residence that is | ||||||
| 20 | located on nonparticipating property and that exists and is | ||||||
| 21 | occupied on the date that the application for a permit to | ||||||
| 22 | develop an energy storage system is filed with the county. | ||||||
| 23 | "Occupied community building" means a school, place of | ||||||
| 24 | worship, early care and education facility, public library, or | ||||||
| 25 | community center that is occupied on the date that the | ||||||
| 26 | application for a permit to develop an energy storage system | ||||||
| |||||||
| |||||||
| 1 | is filed with the county in which the building is located. | ||||||
| 2 | "Participating property" means real property that is the | ||||||
| 3 | subject of a written agreement between a facility owner and | ||||||
| 4 | the owner of the real property and that provides the facility | ||||||
| 5 | owner an easement, option, lease, or license to use the real | ||||||
| 6 | property for the purpose of constructing an energy storage | ||||||
| 7 | system or supporting facilities. | ||||||
| 8 | "Protected lands" means real property that is: (i) subject | ||||||
| 9 | to a permanent conservation right consistent with the Real | ||||||
| 10 | Property Conservation Rights Act; or (ii) registered or | ||||||
| 11 | designated as a nature preserve, buffer, or land and water | ||||||
| 12 | reserve under the Illinois Natural Areas Preservation Act. | ||||||
| 13 | "Supporting facilities" means the transmission lines, | ||||||
| 14 | substations, switchyard, access roads, meteorological towers, | ||||||
| 15 | storage containers, and equipment associated with the | ||||||
| 16 | generation, storage, and dispatch of electricity by an energy | ||||||
| 17 | storage system. | ||||||
| 18 | (b) Notwithstanding any other provision of law, if a | ||||||
| 19 | county has formed a zoning commission and adopted formal | ||||||
| 20 | zoning under Section 5-12007, then a county may establish | ||||||
| 21 | standards for energy storage systems in areas of the county | ||||||
| 22 | that are not within the zoning jurisdiction of a municipality. | ||||||
| 23 | The standards may include all of the requirements specified in | ||||||
| 24 | this Section but may not include requirements for energy | ||||||
| 25 | storage systems that are more restrictive than specified in | ||||||
| 26 | this Section or requirements that are not specified in this | ||||||
| |||||||
| |||||||
| 1 | Section. | ||||||
| 2 | (c) A county may require the energy storage facility to | ||||||
| 3 | comply with the version of NFPA 855 "Standard for the | ||||||
| 4 | Installation of Stationary Energy Storage Systems" in effect | ||||||
| 5 | on the effective date of this amendatory Act or any successor | ||||||
| 6 | standard issued by the NFPA in effect on the date of siting or | ||||||
| 7 | special use permit approval. A county may not include | ||||||
| 8 | requirements for energy storage systems that are more | ||||||
| 9 | restrictive than NFPA 855 "Standard for the Installation of | ||||||
| 10 | Stationary Energy Storage Systems" unless required by this | ||||||
| 11 | Section. | ||||||
| 12 | (d) If a county has elected to establish standards under | ||||||
| 13 | subsection (b), then the zoning board of appeals for the | ||||||
| 14 | county shall hold at least one public hearing before the | ||||||
| 15 | county grants (i) siting approval or a special use permit for | ||||||
| 16 | an energy storage system or (ii) modification of an approved | ||||||
| 17 | siting or special use permit. The public hearing shall be | ||||||
| 18 | conducted in accordance with the Open Meetings Act and shall | ||||||
| 19 | conclude not more than 60 days after the filing of the | ||||||
| 20 | application for the facility. The county shall allow | ||||||
| 21 | interested parties to a special use permit an opportunity to | ||||||
| 22 | present evidence and to cross-examine witnesses at the | ||||||
| 23 | hearing, but the county may impose reasonable restrictions on | ||||||
| 24 | the public hearing, including reasonable time limitations on | ||||||
| 25 | the presentation of evidence and the cross-examination of | ||||||
| 26 | witnesses. The county shall also allow public comment at the | ||||||
| |||||||
| |||||||
| 1 | public hearing in accordance with the Open Meetings Act. The | ||||||
| 2 | county shall make its siting and permitting decisions not more | ||||||
| 3 | than 30 days after the conclusion of the public hearing. | ||||||
| 4 | Notice of the hearing shall be published in a newspaper of | ||||||
| 5 | general circulation in the county. | ||||||
| 6 | (e) A county with an existing zoning ordinance in conflict | ||||||
| 7 | with this Section shall amend that zoning ordinance to comply | ||||||
| 8 | with this Section within 120 days after the effective date of | ||||||
| 9 | this amendatory Act of the 104th General Assembly. | ||||||
| 10 | (f) Except as otherwise provided in subsection (f-5), a A | ||||||
| 11 | county shall require an energy storage system to be sited as | ||||||
| 12 | follows, with setback distances measured from the nearest edge | ||||||
| 13 | of the nearest battery or other electrochemical or | ||||||
| 14 | electromechanical enclosure: | ||||||
| 15 | Setback Description Setback Distance | ||||||
| 16 | Occupied Community 150 feet from the nearest | ||||||
| 17 | Buildings and point of the outside wall of | ||||||
| 18 | Nonparticipating Residences the occupied community building | ||||||
| 19 | or nonparticipating residence | ||||||
| 20 | Boundary Lines of 50 feet to the nearest point | ||||||
| 21 | Occupied Community on the property line of | ||||||
| 22 | Buildings and the occupied community building | ||||||
| 23 | Nonparticipating Residences or nonparticipating property | ||||||
| |||||||
| |||||||
| 1 | Public Road Rights-of-Way 50 feet from the nearest edge | ||||||
| 2 | of the right-of-way | ||||||
| 3 | (2) A county shall also require an energy storage | ||||||
| 4 | system to be sited so that the facility's perimeter is | ||||||
| 5 | enclosed by fencing having a height of at least 7 feet and | ||||||
| 6 | no more than 25 feet. | ||||||
| 7 | This Section does not exempt or excuse compliance with | ||||||
| 8 | electric facility clearances approved or required by the | ||||||
| 9 | National Electrical Code, the National Electrical Safety Code, | ||||||
| 10 | the Illinois Commerce Commission, the Federal Energy | ||||||
| 11 | Regulatory Commission, and their designees or successors. | ||||||
| 12 | (f-5) A county may require setback distances in excess of | ||||||
| 13 | those established under subsection (f) of this Section upon a | ||||||
| 14 | finding by the county board that the setback distances would | ||||||
| 15 | impair residential, commercial, agricultural, or industrial | ||||||
| 16 | development or negatively affect residential, commercial, | ||||||
| 17 | agricultural, or industrial property values. | ||||||
| 18 | (g) A county may not set a sound limitation for energy | ||||||
| 19 | storage systems that is more restrictive than the sound | ||||||
| 20 | limitations established by the Illinois Pollution Control | ||||||
| 21 | Board under 35 Ill. Adm. Code Parts 900, 901, and 910. After | ||||||
| 22 | commercial operation, a county may require the facility owner | ||||||
| 23 | to provide, not more than once, octave band sound pressure | ||||||
| 24 | level measurements from a reasonable number of sampled | ||||||
| 25 | locations at the perimeter of the energy storage system to | ||||||
| |||||||
| |||||||
| 1 | demonstrate compliance with this Section. | ||||||
| 2 | (h) The provisions set forth in subsection (f) may be | ||||||
| 3 | waived subject to the written consent of the owner of each | ||||||
| 4 | affected nonparticipating property or nonparticipating | ||||||
| 5 | residence. | ||||||
| 6 | (i) A county may not place any restriction on the | ||||||
| 7 | installation or use of an energy storage system unless it has | ||||||
| 8 | formed a zoning commission and adopted formal zoning under | ||||||
| 9 | Section 5-12007 and adopts an ordinance that complies with | ||||||
| 10 | this Section. A county may not establish siting standards for | ||||||
| 11 | supporting facilities that preclude development of an energy | ||||||
| 12 | storage system. | ||||||
| 13 | (j) A request for siting approval or a special use permit | ||||||
| 14 | for an energy storage system, or modification of an approved | ||||||
| 15 | siting approval or special use permit, shall be approved if | ||||||
| 16 | the request complies with the standards and conditions imposed | ||||||
| 17 | in this Code, the zoning ordinance adopted consistent with | ||||||
| 18 | this Section, and other State and federal statutes and | ||||||
| 19 | regulations. The siting approval or special use permit | ||||||
| 20 | approved by the county shall grant the facility owner a period | ||||||
| 21 | of at least 3 years after county approval to obtain a building | ||||||
| 22 | permit or commence construction of the energy storage system, | ||||||
| 23 | before the siting approval or special use permit may become | ||||||
| 24 | subject to revocation by the county. Facility owners may be | ||||||
| 25 | granted an extension on obtaining building permits or | ||||||
| 26 | commencing constructing upon a showing of good cause. A | ||||||
| |||||||
| |||||||
| 1 | facility owner's request for an extension may not be | ||||||
| 2 | unreasonably withheld, conditioned, or denied. | ||||||
| 3 | (j-5) A county may deny the siting approval, issuance of a | ||||||
| 4 | special use permit, or modification of an approved siting or | ||||||
| 5 | special use permit for an energy storage system if the county | ||||||
| 6 | board finds that: | ||||||
| 7 | (1) the energy storage system will be located adjacent | ||||||
| 8 | to a water treatment facility; | ||||||
| 9 | (2) the energy storage system will be located in a | ||||||
| 10 | Metropolitan Statistical Area as delineated by the U.S. | ||||||
| 11 | Office of Management and Budget; | ||||||
| 12 | (3) the energy storage system will limit housing | ||||||
| 13 | opportunities in the county; | ||||||
| 14 | (4) the energy storage system will damage existing | ||||||
| 15 | agricultural areas; or | ||||||
| 16 | (5) any roadway will be unable to handle the traffic | ||||||
| 17 | created by the energy storage system. | ||||||
| 18 | (k) (Blank). A county may not adopt zoning regulations | ||||||
| 19 | that disallow, permanently or temporarily, an energy storage | ||||||
| 20 | system from being developed or operated in any district zones | ||||||
| 21 | to allow agricultural or industrial uses. | ||||||
| 22 | (l) A facility owner shall file a farmland drainage plan | ||||||
| 23 | with the county and impacted drainage districts that outlines | ||||||
| 24 | how surface and subsurface drainage of farmland will be | ||||||
| 25 | restored during and following the construction or | ||||||
| 26 | deconstruction of the energy storage system. The plan shall be | ||||||
| |||||||
| |||||||
| 1 | created independently by the facility owner and shall include | ||||||
| 2 | the location of any potentially impacted drainage district | ||||||
| 3 | facilities to the extent the information is publicly available | ||||||
| 4 | from the county or the drainage district and plans to repair | ||||||
| 5 | any subsurface drainage affected during construction or | ||||||
| 6 | deconstruction using procedures outlined in the | ||||||
| 7 | decommissioning plan. All surface and subsurface damage shall | ||||||
| 8 | be repaired as soon as reasonably practicable. | ||||||
| 9 | (m) A facility owner shall compensate landowners for crop | ||||||
| 10 | losses or other agricultural damages resulting from damage to | ||||||
| 11 | a drainage system caused by the construction of an energy | ||||||
| 12 | storage system. The facility owner shall repair or pay for the | ||||||
| 13 | repair of all damage to the subsurface drainage system caused | ||||||
| 14 | by the construction of the energy storage system. The facility | ||||||
| 15 | owner shall repair or pay for the repair and restoration of | ||||||
| 16 | surface drainage caused by the construction or deconstruction | ||||||
| 17 | of the energy storage facility as soon as reasonably | ||||||
| 18 | practicable. | ||||||
| 19 | (n) County siting approval or special use permit | ||||||
| 20 | application fees for an energy storage system shall not exceed | ||||||
| 21 | the lesser of (i) $5,000 per each megawatt of nameplate | ||||||
| 22 | capacity of the energy storage system or (ii) $50,000. | ||||||
| 23 | (o) The county may require a facility owner to provide a | ||||||
| 24 | decommissioning plan to the county. The decommissioning plan | ||||||
| 25 | may include all requirements for decommissioning plans in NFPA | ||||||
| 26 | 855 and may also require the facility owner to: | ||||||
| |||||||
| |||||||
| 1 | (1) state how the energy storage system will be | ||||||
| 2 | decommissioned, including removal to a depth of 3 feet of | ||||||
| 3 | all structures that have no ongoing purpose and all debris | ||||||
| 4 | and restoration of the soil and any vegetation to a | ||||||
| 5 | condition as close as reasonably practicable to the soil's | ||||||
| 6 | and vegetation's preconstruction condition within 18 | ||||||
| 7 | months of the end of project life or facility abandonment; | ||||||
| 8 | (2) include provisions related to commercially | ||||||
| 9 | reasonable efforts to reuse or recycle of equipment and | ||||||
| 10 | components associated with the commercial offsite energy | ||||||
| 11 | storage system; | ||||||
| 12 | (3) include financial assurance in the form of a | ||||||
| 13 | reclamation or surety bond or other commercially available | ||||||
| 14 | financial assurance that is acceptable to the county, with | ||||||
| 15 | the county or participating property owner as beneficiary. | ||||||
| 16 | The amount of the financial assurance shall not be more | ||||||
| 17 | than the estimated cost of decommissioning the energy | ||||||
| 18 | facility, after deducting salvage value, as calculated by | ||||||
| 19 | a professional engineer licensed to practice engineering | ||||||
| 20 | in this State with expertise in preparing decommissioning | ||||||
| 21 | estimates, retained by the applicant. The financial | ||||||
| 22 | assurance shall be provided to the county incrementally as | ||||||
| 23 | follows: | ||||||
| 24 | (A) 25% before the start of full commercial | ||||||
| 25 | operation; | ||||||
| 26 | (B) 50% before the start of the 5th year of | ||||||
| |||||||
| |||||||
| 1 | commercial operation; and | ||||||
| 2 | (C) 100% by the start of the tenth year of | ||||||
| 3 | commercial operation; | ||||||
| 4 | (4) update the amount of the financial assurance not | ||||||
| 5 | more than every 5 years for the duration of commercial | ||||||
| 6 | operations. The amount shall be calculated by a | ||||||
| 7 | professional engineer licensed to practice engineering in | ||||||
| 8 | this State with expertise in decommissioning, hired by the | ||||||
| 9 | facility owner; and | ||||||
| 10 | (5) decommission the energy storage system, in | ||||||
| 11 | accordance with an approved decommissioning plan, within | ||||||
| 12 | 18 months after abandonment. An energy storage system that | ||||||
| 13 | has not stored electrical energy for 12 consecutive months | ||||||
| 14 | or that fails, for a period of 6 consecutive months, to pay | ||||||
| 15 | a property owner who is party to a written agreement, | ||||||
| 16 | including, but not limited to, an easement, option, lease, | ||||||
| 17 | or license under the terms of which an energy storage | ||||||
| 18 | system is constructed on the property, amounts owed in | ||||||
| 19 | accordance with the written agreement shall be considered | ||||||
| 20 | abandoned, except when the inability to store energy is | ||||||
| 21 | the result of an event of force majeure or excused service | ||||||
| 22 | interruption. | ||||||
| 23 | (p) A county may not condition approval of an energy | ||||||
| 24 | storage system on a property value guarantee and may not | ||||||
| 25 | require a facility owner to pay into a neighboring property | ||||||
| 26 | devaluation escrow account. | ||||||
| |||||||
| |||||||
| 1 | (q) A county may require that a facility owner provide the | ||||||
| 2 | results and recommendations from consultation with the | ||||||
| 3 | Department of Natural Resources that are obtained through the | ||||||
| 4 | Ecological Compliance Assessment Tool (EcoCAT) or a comparable | ||||||
| 5 | successor tool. | ||||||
| 6 | (r) A county may require an energy storage system to | ||||||
| 7 | adhere to the recommendations provided by the Department of | ||||||
| 8 | Natural Resources in an Agency Action Report under 17 Ill. | ||||||
| 9 | Adm. Code 1075. | ||||||
| 10 | (s) A county may require a facility owner to: | ||||||
| 11 | (1) demonstrate avoidance of protected lands as | ||||||
| 12 | identified by the Department of Natural Resources and the | ||||||
| 13 | Illinois Nature Preserves Commission; or | ||||||
| 14 | (2) consider the recommendations of the Department of | ||||||
| 15 | Natural Resources for setbacks from protected lands, | ||||||
| 16 | including areas identified by the Illinois Nature | ||||||
| 17 | Preserves Commission. | ||||||
| 18 | (t) A county may require that a facility owner provide | ||||||
| 19 | evidence of consultation with the Illinois Historic | ||||||
| 20 | Preservation Division to assess potential impacts on | ||||||
| 21 | State-registered historic sites under the Illinois State | ||||||
| 22 | Agency Historic Resources Preservation Act. | ||||||
| 23 | (u) A county may require that an application for siting | ||||||
| 24 | approval or special use permit include the following | ||||||
| 25 | information on a site plan: | ||||||
| 26 | (1) a description of the property lines and physical | ||||||
| |||||||
| |||||||
| 1 | features, including roads, for the facility site; | ||||||
| 2 | (2) a description of the proposed changes to the | ||||||
| 3 | landscape of the facility site, including vegetation | ||||||
| 4 | clearing and planting, exterior lighting, and screening or | ||||||
| 5 | structures; and | ||||||
| 6 | (3) a description of the zoning district designation | ||||||
| 7 | for the parcel of land comprising the facility site. | ||||||
| 8 | (v) A county may not prohibit an energy storage system | ||||||
| 9 | from undertaking periodic augmentation to maintain the | ||||||
| 10 | approximate original capacity of the energy storage system. A | ||||||
| 11 | county may not require renewed or additional siting approval | ||||||
| 12 | or special use permit approval of periodic augmentation to | ||||||
| 13 | maintain the approximate original capacity of the energy | ||||||
| 14 | storage system. | ||||||
| 15 | (w) A county that issues a building permit for energy | ||||||
| 16 | storage systems shall review and process building permit | ||||||
| 17 | applications within 60 days after receipt of the building | ||||||
| 18 | permit application. If a county does not grant or deny the | ||||||
| 19 | building permit application within 60 days, the building | ||||||
| 20 | permit shall be deemed granted. If a county denies a building | ||||||
| 21 | permit application, it shall specify the reason for the denial | ||||||
| 22 | in writing as part of its denial. | ||||||
| 23 | (x) A county may require a single building permit and a | ||||||
| 24 | reasonable permit fee for the facility which includes all | ||||||
| 25 | supporting facilities. A county building permit fee for an | ||||||
| 26 | energy storage system that does not exceed the lesser of (i) | ||||||
| |||||||
| |||||||
| 1 | $5,000 per each megawatt of nameplate capacity of the energy | ||||||
| 2 | storage system or (ii) $50,000 shall be considered | ||||||
| 3 | presumptively reasonable. A county may require that the | ||||||
| 4 | application for building permit contain: | ||||||
| 5 | (1) an electrical diagram detailing the battery energy | ||||||
| 6 | storage system layout, associated components, and | ||||||
| 7 | electrical interconnection methods, with all National | ||||||
| 8 | Electrical Code compliant disconnects and overcurrent | ||||||
| 9 | devices; and | ||||||
| 10 | (2) an equipment specification sheet. | ||||||
| 11 | (y) A county may require the facility owner to submit to | ||||||
| 12 | the county prior to the facility's commercial operation a | ||||||
| 13 | commissioning report meeting the requirements of NFPA 855 | ||||||
| 14 | Sections 4.2.4, 6.1.3, and 6.1.5.5, as published in 2023, or | ||||||
| 15 | the applicable Sections in the most recent version of NFPA | ||||||
| 16 | 855. | ||||||
| 17 | (z) A county may require the facility owner to submit to | ||||||
| 18 | the county prior to the facility's commercial operation a | ||||||
| 19 | hazard mitigation analysis meeting the requirements of NFPA | ||||||
| 20 | 855 Section 4.4 or the applicable Sections in the most recent | ||||||
| 21 | version of NFPA 855. | ||||||
| 22 | (aa) A county may require the facility owner to submit to | ||||||
| 23 | the county an emergency operations plan meeting the | ||||||
| 24 | requirements of NFPA 855 Section 4.3.2.1.4, published in 2023, | ||||||
| 25 | or applicable Sections in the most recent version of NFPA 855, | ||||||
| 26 | prior to commercial operation. | ||||||
| |||||||
| |||||||
| 1 | (bb) A county may require a warning that complies with | ||||||
| 2 | requirements in NFPA 855 Section 4.7.4, published in 2023, or | ||||||
| 3 | applicable sections in the most recent version of NFPA 855. | ||||||
| 4 | (cc) A county may require the energy storage system to | ||||||
| 5 | adhere to the principles for responsible outdoor lighting | ||||||
| 6 | provided by the International Dark-Sky Association and shall | ||||||
| 7 | limit outdoor lighting to that which is minimally required for | ||||||
| 8 | safety and operational purposes. Any outdoor lighting shall be | ||||||
| 9 | reasonably shielded and downcast from all residences and | ||||||
| 10 | adjacent properties. | ||||||
| 11 | (dd) This Section does not exempt compliance with fire and | ||||||
| 12 | safety standards and guidance established for the installation | ||||||
| 13 | of lithium-ion battery energy storage systems set by the NFPA. | ||||||
| 14 | (ee) Prior to commencement of commercial operation, the | ||||||
| 15 | facility owner shall offer to provide training for local fire | ||||||
| 16 | departments and emergency responders in accordance with the | ||||||
| 17 | facility emergency operations plan. A copy of the emergency | ||||||
| 18 | operations plan shall be given to the facility owner, the | ||||||
| 19 | local fire department, and emergency responders. All batteries | ||||||
| 20 | integrated within an energy storage system shall be listed | ||||||
| 21 | under the UL 1973 Standard. All batteries integrated within an | ||||||
| 22 | energy storage system shall be listed in accordance with UL | ||||||
| 23 | 9540 Standard, either from the manufacturer or by a field | ||||||
| 24 | evaluation. | ||||||
| 25 | (ff) If a facility owner enters into a road use agreement | ||||||
| 26 | with the Department of Transportation, a road district, or | ||||||
| |||||||
| |||||||
| 1 | other unit of local government relating to an energy storage | ||||||
| 2 | system, then the road use agreement shall require the facility | ||||||
| 3 | owner to be responsible for (i) the reasonable cost of | ||||||
| 4 | improving, if necessary, roads used by the facility owner to | ||||||
| 5 | construct the energy storage system and (ii) the reasonable | ||||||
| 6 | cost of repairing roads used by the facility owner during | ||||||
| 7 | construction of the energy storage system so that those roads | ||||||
| 8 | are in a condition that is safe for the driving public after | ||||||
| 9 | the completion of the facility's construction. A roadway | ||||||
| 10 | improved in preparation for and during the construction of the | ||||||
| 11 | energy storage system shall be repaired and restored to the | ||||||
| 12 | improved condition at the reasonable cost of the developer if | ||||||
| 13 | the roadways have degraded or were damaged as a result of | ||||||
| 14 | construction-related activities. | ||||||
| 15 | The road use agreement shall not require the facility | ||||||
| 16 | owner to pay costs, fees, or charges for road work that is not | ||||||
| 17 | specifically and uniquely attributable to the construction of | ||||||
| 18 | the energy storage system. No road district or other unit of | ||||||
| 19 | local government may request or require a fine, permit fee, or | ||||||
| 20 | other payment obligation as a requirement for a road use | ||||||
| 21 | agreement with a facility owner unless the amount of the fine, | ||||||
| 22 | permit fee, or other payment obligation is equivalent to the | ||||||
| 23 | amount of actual expenses incurred by the road district or | ||||||
| 24 | other unit of local government for negotiating, executing, | ||||||
| 25 | constructing, or implementing the road use agreement. The road | ||||||
| 26 | use agreement shall not require the facility owner to perform | ||||||
| |||||||
| |||||||
| 1 | or pay for any road work that is unrelated to the road | ||||||
| 2 | improvements required for the construction of the commercial | ||||||
| 3 | wind energy facility or the commercial solar energy facility | ||||||
| 4 | or the restoration of the roads used by the facility owner | ||||||
| 5 | during construction-related activities. | ||||||
| 6 | (gg) The provisions of this amendatory Act of the 104th | ||||||
| 7 | General Assembly do not apply to an application for siting | ||||||
| 8 | approval or special use permit for an energy storage system if | ||||||
| 9 | the application was submitted to a county before the effective | ||||||
| 10 | date of this amendatory Act of the 104th General Assembly. | ||||||
| 11 | (Source: P.A. 104-458, eff. 6-1-26; 104-480, eff. 7-1-26.) | ||||||