Bill Text: IL HB5837 | 2025-2026 | 104th General Assembly | Introduced


Bill Title: Amends the Counties Code. Provides that a county may require setback distances for a commercial wind energy facility, a commercial solar energy facility, or an energy storage system in excess of those established under the Act upon a finding by the county board that the setback distances would impair residential, commercial, agricultural, or industrial development or negatively affect residential, commercial, agricultural, or industrial property values. Provides that a county may deny the siting approval, issuance of a special use permit, or modification of an approved siting or special use permit for a commercial wind energy facility, a commercial solar energy facility, or an energy storage system if the county board finds that: (1) the energy facility or energy system will be located adjacent to a water treatment facility; (2) the energy facility or energy system will be located in a Metropolitan Statistical Area as delineated by the U.S. Office of Management and Budget; (3) the energy facility or energy system will limit housing opportunities in the county; (4) the energy facility or energy system will damage existing agricultural areas; or (5) any roadway will be unable to handle the traffic created by the energy facility or the energy system.

Sponsorship: Partisan Bill (Republican 2)

Status: (Introduced - Dead) 2026-11-17 - Referred to Rules Committee [HB5837 Detail]

Download: Illinois-2025-HB5837-Introduced.html

 


 
104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026
HB5837

 

Introduced , by Rep. Amy Elik

 

SYNOPSIS AS INTRODUCED:
 
55 ILCS 5/5-12020
55 ILCS 5/5-12024

    Amends the Counties Code. Provides that a county may require setback distances for a commercial wind energy facility, a commercial solar energy facility, or an energy storage system in excess of those established under the Act upon a finding by the county board that the setback distances would impair residential, commercial, agricultural, or industrial development or negatively affect residential, commercial, agricultural, or industrial property values. Provides that a county may deny the siting approval, issuance of a special use permit, or modification of an approved siting or special use permit for a commercial wind energy facility, a commercial solar energy facility, or an energy storage system if the county board finds that: (1) the energy facility or energy system will be located adjacent to a water treatment facility; (2) the energy facility or energy system will be located in a Metropolitan Statistical Area as delineated by the U.S. Office of Management and Budget; (3) the energy facility or energy system will limit housing opportunities in the county; (4) the energy facility or energy system will damage existing agricultural areas; or (5) any roadway will be unable to handle the traffic created by the energy facility or the energy system.


LRB104 23685 TRT 40200 b

 

 

A BILL FOR

 

HB5837LRB104 23685 TRT 40200 b

1    AN ACT concerning local government.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Counties Code is amended by changing
5Sections 5-12020 and 5-12024 as follows:
 
6    (55 ILCS 5/5-12020)
7    Sec. 5-12020. Commercial wind energy facilities and
8commercial solar energy facilities.
9    (a) As used in this Section:
10    "Commercial solar energy facility" means a "commercial
11solar energy system" as defined in Section 10-720 of the
12Property Tax Code. "Commercial solar energy facility" does not
13mean a utility-scale solar energy facility being constructed
14at a site that was eligible to participate in a procurement
15event conducted by the Illinois Power Agency pursuant to
16subsection (c-5) of Section 1-75 of the Illinois Power Agency
17Act.
18    "Commercial wind energy facility" means a wind energy
19conversion facility of equal or greater than 500 kilowatts in
20total nameplate generating capacity. "Commercial wind energy
21facility" includes a wind energy conversion facility seeking
22an extension of a permit to construct granted by a county or
23municipality before January 27, 2023 (the effective date of

 

 

HB5837- 2 -LRB104 23685 TRT 40200 b

1Public Act 102-1123).
2    "Facility owner" means (i) a person with a direct
3ownership interest in a commercial wind energy facility or a
4commercial solar energy facility, or both, regardless of
5whether the person is involved in acquiring the necessary
6rights, permits, and approvals or otherwise planning for the
7construction and operation of the facility, and (ii) at the
8time the facility is being developed, a person who is acting as
9a developer of the facility by acquiring the necessary rights,
10permits, and approvals or by planning for the construction and
11operation of the facility, regardless of whether the person
12will own or operate the facility.
13    "Nonparticipating property" means real property that is
14not a participating property.
15    "Nonparticipating residence" means a residence that is
16located on nonparticipating property and that is existing and
17occupied on the date that an application for a permit to
18develop the commercial wind energy facility or the commercial
19solar energy facility is filed with the county.
20    "Occupied community building" means any one or more of the
21following buildings that is existing and occupied on the date
22that the application for a permit to develop the commercial
23wind energy facility or the commercial solar energy facility
24is filed with the county: a school, place of worship, early
25care and education facility, public library, or community
26center.

 

 

HB5837- 3 -LRB104 23685 TRT 40200 b

1    "Participating property" means real property that is the
2subject of a written agreement between a facility owner and
3the owner of the real property that provides the facility
4owner an easement, option, lease, or license to use the real
5property for the purpose of constructing a commercial wind
6energy facility, a commercial solar energy facility, or
7supporting facilities. "Participating property" also includes
8real property that is owned by a facility owner for the purpose
9of constructing a commercial wind energy facility, a
10commercial solar energy facility, or supporting facilities.
11    "Participating residence" means a residence that is
12located on participating property and that is existing and
13occupied on the date that an application for a permit to
14develop the commercial wind energy facility or the commercial
15solar energy facility is filed with the county.
16    "Protected lands" means real property that is:
17        (1) subject to a permanent conservation right
18    consistent with the Real Property Conservation Rights Act;
19    or
20        (2) registered or designated as a nature preserve,
21    buffer, or land and water reserve under the Illinois
22    Natural Areas Preservation Act.
23    "Supporting facilities" means the transmission lines,
24substations, access roads, meteorological towers, storage
25containers, and equipment associated with the generation and
26storage of electricity by the commercial wind energy facility

 

 

HB5837- 4 -LRB104 23685 TRT 40200 b

1or commercial solar energy facility. "Supporting facilities"
2includes energy storage systems capable of absorbing energy
3and storing it for use at a later time, including, but not
4limited to, batteries and other electrochemical and
5electromechanical technologies or systems.
6    "Wind tower" includes the wind turbine tower, nacelle, and
7blades.
8    (b) Notwithstanding any other provision of law or whether
9the county has formed a zoning commission and adopted formal
10zoning under Section 5-12007, a county may establish standards
11for commercial wind energy facilities, commercial solar energy
12facilities, or both. The standards may include all of the
13requirements specified in this Section but may not include
14requirements for commercial wind energy facilities or
15commercial solar energy facilities that are more restrictive
16than specified in this Section. A county may also regulate the
17siting of commercial wind energy facilities with standards
18that are not more restrictive than the requirements specified
19in this Section in unincorporated areas of the county that are
20outside the zoning jurisdiction of a municipality and that are
21outside the 1.5-mile radius surrounding the zoning
22jurisdiction of a municipality. A county may also regulate the
23siting of commercial solar energy facilities with standards
24that are not more restrictive than the requirements specified
25in this Section in unincorporated areas of the county that are
26outside of the zoning jurisdiction of a municipality.

 

 

HB5837- 5 -LRB104 23685 TRT 40200 b

1    (c) If a county has elected to establish standards under
2subsection (b), before the county grants siting approval or a
3special use permit for a commercial wind energy facility or a
4commercial solar energy facility, or modification of an
5approved siting or special use permit, the county board of the
6county in which the facility is to be sited or the zoning board
7of appeals for the county shall hold at least one public
8hearing. The public hearing shall be conducted in accordance
9with the Open Meetings Act and shall conclude not more than 60
10days after the filing of the application for the facility. The
11county shall allow interested parties to a special use permit
12an opportunity to present evidence and to cross-examine
13witnesses at the hearing, but the county may impose reasonable
14restrictions on the public hearing, including reasonable time
15limitations on the presentation of evidence and the
16cross-examination of witnesses. The county shall also allow
17public comment at the public hearing in accordance with the
18Open Meetings Act. The county shall make its siting and
19permitting decisions not more than 30 days after the
20conclusion of the public hearing. Notice of the hearing shall
21be published in a newspaper of general circulation in the
22county. A facility owner must enter into an agricultural
23impact mitigation agreement with the Department of Agriculture
24prior to the date of the required public hearing. A commercial
25wind energy facility owner seeking an extension of a permit
26granted by a county prior to July 24, 2015 (the effective date

 

 

HB5837- 6 -LRB104 23685 TRT 40200 b

1of Public Act 99-132) must enter into an agricultural impact
2mitigation agreement with the Department of Agriculture prior
3to a decision by the county to grant the permit extension.
4Counties may allow test wind towers or test solar energy
5systems to be sited without formal approval by the county
6board.
7    (d) A county with an existing zoning ordinance in conflict
8with this Section shall amend that zoning ordinance to be in
9compliance with this Section within 120 days after January 27,
102023 (the effective date of Public Act 102-1123).
11    (e) A county may require:
12        (1) a wind tower of a commercial wind energy facility
13    to be sited as follows, with setback distances measured
14    from the center of the base of the wind tower:
 
15Setback Description           Setback Distance
 
16Occupied Community            2.1 times the maximum blade tip
17Buildings                     height of the wind tower to the
18                              nearest point on the outside
19                              wall of the structure
 
20Participating Residences      1.1 times the maximum blade tip
21                              height of the wind tower to the
22                              nearest point on the outside
23                              wall of the structure
 

 

 

HB5837- 7 -LRB104 23685 TRT 40200 b

1Nonparticipating Residences   2.1 times the maximum blade tip
2                              height of the wind tower to the
3                              nearest point on the outside
4                              wall of the structure
 
5Boundary Lines of             None
6Participating Property 
 
7Boundary Lines of             1.1 times the maximum blade tip
8Nonparticipating Property     height of the wind tower to the
9                              nearest point on the property
10                              line of the nonparticipating
11                              property
 
12Public Road Rights-of-Way     1.1 times the maximum blade tip
13                              height of the wind tower
14                              to the center point of the
15                              public road right-of-way
 
16Overhead Communication and    1.1 times the maximum blade tip
17Electric Transmission         height of the wind tower to the
18and Distribution Facilities   nearest edge of the property
19(Not Including Overhead       line, easement, or 
20Utility Service Lines to      right-of-way 
21Individual Houses or          containing the overhead line

 

 

HB5837- 8 -LRB104 23685 TRT 40200 b

1Outbuildings)
 
2Overhead Utility Service      None
3Lines to Individual
4Houses or Outbuildings
 
5Fish and Wildlife Areas       2.1 times the maximum blade
6and Illinois Nature           tip height of the wind tower
7Preserve Commission           to the nearest point on the
8Protected Lands               property line of the fish and
9                              wildlife area or protected
10                              land
11    This Section does not exempt or excuse compliance with
12    electric facility clearances approved or required by the
13    National Electrical Code, the National Electrical Safety
14    Code, the Illinois Commerce Commission, and the Federal
15    Energy Regulatory Commission and their designees or
16    successors;
17        (2) a wind tower of a commercial wind energy facility
18    to be sited so that industry standard computer modeling
19    indicates that any occupied community building or
20    nonparticipating residence will not experience more than
21    30 hours per year of shadow flicker under planned
22    operating conditions;
23        (3) a commercial solar energy facility to be sited as
24    follows, with setback distances measured from the nearest

 

 

HB5837- 9 -LRB104 23685 TRT 40200 b

1    edge of any above-ground component of the facility,
2    excluding fencing:
 
3Setback Description           Setback Distance
 
4Occupied Community            150 feet from the nearest
5Buildings and Dwellings on    point on the outside wall 
6Nonparticipating Properties   of the structure
 
7Boundary Lines of             None
8Participating Property    
 
9Public Road Rights-of-Way     50 feet from the nearest
10                              edge of the public 
11                              right-of-way 
 
12Boundary Lines of             50 feet to the nearest
13Nonparticipating Property     point on the property
14                              line of the nonparticipating
15                              property
 
16        (4) a commercial solar energy facility to be sited so
17    that the facility's perimeter is enclosed by fencing
18    having a height of at least 6 feet and no more than 25
19    feet; and
20        (5) a commercial solar energy facility to be sited so

 

 

HB5837- 10 -LRB104 23685 TRT 40200 b

1    that no component of a solar panel has a height of more
2    than 20 feet above ground when the solar energy facility's
3    arrays are at full tilt.
4    This subsection (e) shall not preclude the ability of a
5county to require a reasonable setback distance between
6fencing and public rights-of-way if the requirement is not
7specific to commercial wind energy facilities or commercial
8solar energy facilities and does not preclude the development
9of commercial wind energy facilities or commercial solar
10energy facilities or the ability of commercial wind energy
11facilities or commercial solar energy facilities to comply
12with the requirements set forth in this subsection (e).
13    The requirements set forth in this subsection (e) may be
14waived subject to the written consent of the owner of each
15affected nonparticipating property.
16    (e-5) A county may require setback distances in excess of
17those established under subsection (e) of this Section upon a
18finding by the county board that the setback distances will
19impair residential, commercial, agricultural, or industrial
20development or negatively affect residential, commercial,
21agricultural, or industrial property values.    
22    (f) A county may not set a sound limitation for wind towers
23in commercial wind energy facilities or any components in
24commercial solar energy facilities that is more restrictive
25than the sound limitations established by the Illinois
26Pollution Control Board under 35 Ill. Adm. Code Parts 900,

 

 

HB5837- 11 -LRB104 23685 TRT 40200 b

1901, and 910. Additionally, in accordance with Section 25 of
2the Environmental Protection Act, a participating property,
3participating residence, nonparticipating property,
4nonparticipating residence, or any combination of those
5properties or residences may waive enforcement of the rules
6adopted by the Illinois Pollution Control Board under 35 Ill.
7Adm. Code Parts 900, 901, and 910 by written waiver that
8complies with the applicable directive established in Section
925 of the Environmental Protection Act and is recorded in the
10Office of the Recorder of the county in which the
11participating property, participating residence,
12nonparticipating property, or nonparticipating residence is
13located. Once recorded, such a waiver shall be binding on any
14current and future owners, residents, lessees, invitees, and
15users of the participating property, participating residence,
16nonparticipating property, or nonparticipating residence for
17enforcement purposes. An owner of any participating residence
18or nonparticipating residence shall disclose the existence of
19such a waiver to any lessee before entering any new lease for
20the residence.
21    A seller or transferor of a participating property,
22participating residence, nonparticipating property,
23nonparticipating residence, or any combination of those
24properties or residences shall disclose the existence of such
25a waiver to any buyer or transferee before any sale or transfer
26of the property. If disclosure of the waiver occurs after the

 

 

HB5837- 12 -LRB104 23685 TRT 40200 b

1buyer has made an offer to purchase the property, the seller
2shall disclose the existence of the waiver before accepting
3the buyer's offer and shall (1) allow the buyer an opportunity
4to review the disclosure and (2) inform the buyer that the
5buyer has the right to amend the buyer's offer.
6    (g) A county may not place any restriction on the
7installation or use of a commercial wind energy facility or a
8commercial solar energy facility unless it adopts an ordinance
9that complies with this Section. A county may not establish
10siting standards for supporting facilities that preclude
11development of commercial wind energy facilities or commercial
12solar energy facilities.
13    A request for siting approval or a special use permit for a
14commercial wind energy facility or a commercial solar energy
15facility, or modification of an approved siting or special use
16permit, shall be approved if the request is in compliance with
17the standards and conditions imposed in this Act, the zoning
18ordinance adopted consistent with this Act, and the conditions
19imposed under State and federal statutes and regulations.
20    (h) (Blank). A county may not adopt zoning regulations
21that disallow, permanently or temporarily, commercial wind
22energy facilities or commercial solar energy facilities from
23being developed or operated in any district zoned to allow
24agricultural or industrial uses.    
25    (i) (Blank).
26    (i-5) All siting approval or special use permit

 

 

HB5837- 13 -LRB104 23685 TRT 40200 b

1application fees for a commercial wind energy facility or
2commercial solar energy facility must be reasonable. Fees that
3do not exceed $5,000 per each megawatt of nameplate capacity
4of the energy facility, up to a maximum of $125,000, shall be
5considered presumptively reasonable. A county may also require
6reimbursement from the applicant for any reasonable expenses
7incurred by the county in processing the siting approval or
8special use permit application in excess of the maximum fee. A
9siting approval or special use permit shall not be subject to
10any time deadline to start construction or obtain a building
11permit of less than 5 years from the date of siting approval or
12special use permit approval. A county shall allow an applicant
13to request an extension of the deadline based upon reasonable
14cause for the extension request. The exemption shall not be
15unreasonably withheld, conditioned, or denied.
16    (i-10) A county may require, for a commercial wind energy
17facility or commercial solar energy facility, a single
18building permit and a reasonable permit fee for the facility
19which includes all supporting facilities. County building
20permit fees for commercial wind energy facility or commercial
21solar energy facility that do not exceed $5,000 per each
22megawatt of nameplate capacity of the energy facility, up to a
23maximum of $75,000, shall be considered presumptively
24reasonable. A county may also require reimbursement from the
25applicant for any reasonable expenses incurred by the county
26in processing the building permit in excess of the maximum

 

 

HB5837- 14 -LRB104 23685 TRT 40200 b

1fee. A county may require an applicant, upon start of
2construction of the facility, to maintain liability insurance
3that is commercially reasonable and consistent with prevailing
4industry standards for similar energy facilities.
5    (i-15) A county may deny the siting approval, issuance of
6a special use permit, or modification of an approved siting or
7special use permit for a commercial wind energy facility or
8commercial solar energy facility if the county board finds
9that:
10        (1) the facility will be located adjacent to a water
11    treatment facility;
12        (2) the facility will be located in a Metropolitan
13    Statistical Area as delineated by the U.S. Office of
14    Management and Budget;
15        (3) the facility will limit housing opportunities in
16    the county;
17        (4) the facility will damage existing agricultural
18    areas; or
19        (5) any roadway will be unable to handle the traffic
20    created by the facility.    
21    (j) Except as otherwise provided in this Section, a county
22shall not require standards for construction, decommissioning,
23or deconstruction of a commercial wind energy facility or
24commercial solar energy facility or related financial
25assurances that are more restrictive than those included in
26the Department of Agriculture's standard wind farm

 

 

HB5837- 15 -LRB104 23685 TRT 40200 b

1agricultural impact mitigation agreement, template 81818, or
2standard solar agricultural impact mitigation agreement,
3version 8.19.19, as applicable and in effect on December 31,
42022. The amount of any decommissioning payment shall be in
5accordance with the financial assurance required by those
6agricultural impact mitigation agreements.
7    (j-5) A commercial wind energy facility or a commercial
8solar energy facility shall file a farmland drainage plan with
9the county and impacted drainage districts outlining how
10surface and subsurface drainage of farmland will be restored
11during and following construction or deconstruction of the
12facility. The plan is to be created independently by the
13facility developer and shall include the location of any
14potentially impacted drainage district facilities to the
15extent this information is publicly available from the county
16or the drainage district, plans to repair any subsurface
17drainage affected during construction or deconstruction using
18procedures outlined in the agricultural impact mitigation
19agreement entered into by the commercial wind energy facility
20owner or commercial solar energy facility owner, and
21procedures for the repair and restoration of surface drainage
22affected during construction or deconstruction. All surface
23and subsurface damage shall be repaired as soon as reasonably
24practicable.
25    (k) A county may not condition approval of a commercial
26wind energy facility or commercial solar energy facility on a

 

 

HB5837- 16 -LRB104 23685 TRT 40200 b

1property value guarantee and may not require a facility owner
2to pay into a neighboring property devaluation escrow account.
3    (l) A county may require certain vegetative screening
4between a commercial solar energy facility and
5nonparticipating residences. A county may not require earthen
6berms or similar structures. Vegetative screening requirements
7shall be commercially reasonable and limited in height at full
8maturity to avoid reduction of the productive energy output of
9the commercial solar energy facility. A county may not require
10vegetative screening to exceed 5 feet in height when first
11installed or prior to commercial operation date. The screening
12requirements shall take into account the size and location of
13the facility, visibility from nonparticipating residences,
14compatibility of native plant species, cost and feasibility of
15installation and maintenance, and industry standards and best
16practices for commercial solar energy facilities.
17    (m) A county may set blade tip height limitations for wind
18towers in commercial wind energy facilities but may not set a
19blade tip height limitation that is more restrictive than the
20height allowed under a Determination of No Hazard to Air
21Navigation by the Federal Aviation Administration under 14 CFR
22Part 77.
23    (n) A county may require that a commercial wind energy
24facility owner or commercial solar energy facility owner
25provide:
26        (1) the results and recommendations from consultation

 

 

HB5837- 17 -LRB104 23685 TRT 40200 b

1    with the Illinois Department of Natural Resources that are
2    obtained through the Ecological Compliance Assessment Tool
3    (EcoCAT) or a comparable successor tool; and
4        (2) (blank).
5    (o) A county may require a commercial wind energy facility
6or commercial solar energy facility to adhere to the
7recommendations provided by the Illinois Department of Natural
8Resources in an EcoCAT natural resource review report under 17
9Ill. Adm. Code Part 1075.
10    (p) A county may require a facility owner to:
11        (1) demonstrate avoidance of protected lands as
12    identified by the Illinois Department of Natural Resources
13    and the Illinois Nature Preserve Commission; or
14        (2) consider the recommendations of the Illinois
15    Department of Natural Resources for setbacks from
16    protected lands, including areas identified by the
17    Illinois Nature Preserve Commission.
18    (q) A county may require that a facility owner provide
19evidence of consultation with the Illinois State Historic
20Preservation Office to assess potential impacts on
21State-registered historic sites under the Illinois State
22Agency Historic Resources Preservation Act.
23    (r) To maximize community benefits, including, but not
24limited to, reduced stormwater runoff, flooding, and erosion
25at the ground mounted solar energy system, improved soil
26health, and increased foraging habitat for game birds,

 

 

HB5837- 18 -LRB104 23685 TRT 40200 b

1songbirds, and pollinators, a county may (1) require a
2commercial solar energy facility owner to plant, establish,
3and maintain for the life of the facility vegetative ground
4cover, consistent with the goals of the Pollinator-Friendly
5Solar Site Act and (2) require the submittal of a vegetation
6management plan that is in compliance with the agricultural
7impact mitigation agreement in the application to construct
8and operate a commercial solar energy facility in the county
9if the vegetative ground cover and vegetation management plan
10comply with the requirements of the underlying agreement with
11the landowner or landowners where the facility will be
12constructed.
13    No later than 90 days after January 27, 2023 (the
14effective date of Public Act 102-1123), the Illinois
15Department of Natural Resources shall develop guidelines for
16vegetation management plans that may be required under this
17subsection for commercial solar energy facilities. The
18guidelines must include guidance for short-term and long-term
19property management practices that provide and maintain native
20and non-invasive naturalized perennial vegetation to protect
21the health and well-being of pollinators.
22    (s) If a facility owner enters into a road use agreement
23with the Illinois Department of Transportation, a road
24district, or other unit of local government relating to a
25commercial wind energy facility or a commercial solar energy
26facility, the road use agreement shall require the facility

 

 

HB5837- 19 -LRB104 23685 TRT 40200 b

1owner to be responsible for (i) the reasonable cost of
2improving roads used by the facility owner to construct the
3commercial wind energy facility or the commercial solar energy
4facility and (ii) the reasonable cost of repairing roads used
5by the facility owner during construction of the commercial
6wind energy facility or the commercial solar energy facility
7so that those roads are in a condition that is safe for the
8driving public after the completion of the facility's
9construction. Roadways improved in preparation for and during
10the construction of the commercial wind energy facility or
11commercial solar energy facility shall be repaired and
12restored to the improved condition at the reasonable cost of
13the developer if the roadways have degraded or were damaged as
14a result of construction-related activities.
15    The road use agreement shall not require the facility
16owner to pay costs, fees, or charges for road work that is not
17specifically and uniquely attributable to the construction of
18the commercial wind energy facility or the commercial solar
19energy facility. No road district or other unit of local
20government may request or require permit fees, fines, or other
21payment obligations as a requirement for a road use agreement
22with a facility owner unless the amount of the reasonable
23permit fee or payment is equivalent to the amount of actual
24expenses incurred by the road district or other unit of local
25government for negotiating, executing, constructing, or
26implementing the road use agreement. The road use agreement

 

 

HB5837- 20 -LRB104 23685 TRT 40200 b

1shall not require any road work to be performed by or paid for
2by the facility owner that is not specifically and uniquely
3attributable to the road improvements required for the
4construction of the commercial wind energy facility or the
5commercial solar energy facility or the restoration of the
6roads used by the facility owner during construction-related
7activities.
8    (s-5) The facility owner shall also compensate landowners
9for crop losses or other agricultural damages resulting from
10damage to the drainage system caused by the construction of
11the commercial wind energy facility or the commercial solar
12energy facility. The commercial wind energy facility owner or
13commercial solar energy facility owner shall repair or pay for
14the repair of all damage to the subsurface drainage system
15caused by the construction of the commercial wind energy
16facility or the commercial solar energy facility in accordance
17with the agriculture impact mitigation agreement requirements
18for repair of drainage. The commercial wind energy facility
19owner or commercial solar energy facility owner shall repair
20or pay for the repair and restoration of surface drainage
21caused by the construction or deconstruction of the commercial
22wind energy facility or the commercial solar energy facility
23as soon as reasonably practicable.
24    (t) Notwithstanding any other provision of law, a facility
25owner with siting approval from a county to construct a
26commercial wind energy facility or a commercial solar energy

 

 

HB5837- 21 -LRB104 23685 TRT 40200 b

1facility is authorized to cross or impact a drainage system,
2including, but not limited to, drainage tiles, open drainage
3ditches, culverts, and water gathering vaults, owned or under
4the control of a drainage district under the Illinois Drainage
5Code without obtaining prior agreement or approval from the
6drainage district in accordance with the farmland drainage
7plan required by subsection (j-5).
8    (u) The amendments to this Section adopted in Public Act
9102-1123 do not apply to: (1) an application for siting
10approval or for a special use permit for a commercial wind
11energy facility or commercial solar energy facility if the
12application was submitted to a unit of local government before
13January 27, 2023 (the effective date of Public Act 102-1123);
14(2) a commercial wind energy facility or a commercial solar
15energy facility if the facility owner has submitted an
16agricultural impact mitigation agreement to the Department of
17Agriculture before January 27, 2023 (the effective date of
18Public Act 102-1123); (3) a commercial wind energy or
19commercial solar energy development on property that is
20located within an enterprise zone certified under the Illinois
21Enterprise Zone Act, that was classified as industrial by the
22appropriate zoning authority on or before January 27, 2023,
23and that is located within 4 miles of the intersection of
24Interstate 88 and Interstate 39; or (4) a commercial wind
25energy or commercial solar energy development on property in
26Madison County that is located within the area that has as its

 

 

HB5837- 22 -LRB104 23685 TRT 40200 b

1northern boundary the portion of Drexelius Road that is
2between the intersection of Drexelius Road and Wolf Road and
3the intersection of Drexelius Road and Fosterburg Road, that
4has as its eastern boundary the portion of Fosterburg Road
5that is between the intersection of Fosterburg Road and
6Drexelius Road and the intersection of Fosterburg Road and
7Wolf Road, and that has as its southern and western boundaries
8the portion of Wolf Road that is between the intersection of
9Fosterburg Road and Wolf Road and the intersection of
10Drexelius Road and Wolf Road.
11(Source: P.A. 103-81, eff. 6-9-23; 103-580, eff. 12-8-23;
12104-417, eff. 8-15-25; 104-458, eff. 6-1-26; 104-480, eff.
137-1-26.)
 
14    (55 ILCS 5/5-12024)
15    Sec. 5-12024. Energy storage systems.
16    (a) As used in this Section:
17    "Energy storage system" means a facility with an aggregate
18energy capacity that is greater than 1,000 kilowatts and that
19is capable of absorbing energy and storing it for use at a
20later time, including, but not limited to, electrochemical and
21electromechanical technologies. "Energy storage system" does
22not include technologies that require combustion. "Energy
23storage system" also does not include energy storage systems
24associated with commercial solar energy facilities or
25commercial wind energy facilities as defined in Section

 

 

HB5837- 23 -LRB104 23685 TRT 40200 b

15-12020.
2    "Excused service interruption" means any period during
3which an energy storage system does not store or discharge
4electricity and that is planned or reasonably foreseeable for
5standard commercial operation, including any unavailability
6caused by a buyer; storage capacity tests; system emergencies;
7curtailments, including curtailment orders; transmission
8system outages; compliance with any operating restriction;
9serial defects; and planned outages.
10    "Facility owner" means (i) a person with a direct
11ownership interest in an energy storage system, regardless of
12whether the person is involved in acquiring the necessary
13rights, permits, and approvals or otherwise planning for the
14construction and operation of the facility and (ii) a person
15who, at the time the facility is being developed, is acting as
16a developer of the facility by acquiring the necessary rights,
17permits, and approvals or by planning for the construction and
18operation of the facility, regardless of whether the person
19will own or operate the facility.
20    "Force majeure" means any event or circumstance that
21delays or prevents an energy storage system from timely
22performing all or a portion of its commercial operations if
23the act or event, despite the exercise of commercially
24reasonable efforts, cannot be avoided by and is beyond the
25reasonable control, whether direct or indirect, of, and
26without the fault or negligence of, a facility owner or

 

 

HB5837- 24 -LRB104 23685 TRT 40200 b

1operator or any of its assignees. "Force majeure" includes,
2but is not limited to:
3        (1) fire, flood, tornado, or other natural disasters
4    or acts of God;
5        (2) war, civil strife, terrorist attack, or other
6    similar acts of violence;
7        (3) unavailability of materials, equipment, services,
8    or labor, including unavailability due to global supply
9    chain shortages;
10        (4) utility or energy shortages or acts or omissions
11    of public utility providers;
12        (5) any delay resulting from a pandemic, epidemic, or
13    other public health emergency or related restrictions; and
14        (6) litigation or a regulatory proceeding regarding a
15    facility.
16    "NFPA" means the National Fire Protection Association.
17    "Nonparticipating property" means real property that is
18not a participating property.
19    "Nonparticipating residence" means a residence that is
20located on nonparticipating property and that exists and is
21occupied on the date that the application for a permit to
22develop an energy storage system is filed with the county.
23    "Occupied community building" means a school, place of
24worship, early care and education facility, public library, or
25community center that is occupied on the date that the
26application for a permit to develop an energy storage system

 

 

HB5837- 25 -LRB104 23685 TRT 40200 b

1is filed with the county in which the building is located.
2    "Participating property" means real property that is the
3subject of a written agreement between a facility owner and
4the owner of the real property and that provides the facility
5owner an easement, option, lease, or license to use the real
6property for the purpose of constructing an energy storage
7system or supporting facilities.
8    "Protected lands" means real property that is: (i) subject
9to a permanent conservation right consistent with the Real
10Property Conservation Rights Act; or (ii) registered or
11designated as a nature preserve, buffer, or land and water
12reserve under the Illinois Natural Areas Preservation Act.
13    "Supporting facilities" means the transmission lines,
14substations, switchyard, access roads, meteorological towers,
15storage containers, and equipment associated with the
16generation, storage, and dispatch of electricity by an energy
17storage system.
18    (b) Notwithstanding any other provision of law, if a
19county has formed a zoning commission and adopted formal
20zoning under Section 5-12007, then a county may establish
21standards for energy storage systems in areas of the county
22that are not within the zoning jurisdiction of a municipality.
23The standards may include all of the requirements specified in
24this Section but may not include requirements for energy
25storage systems that are more restrictive than specified in
26this Section or requirements that are not specified in this

 

 

HB5837- 26 -LRB104 23685 TRT 40200 b

1Section.
2    (c) A county may require the energy storage facility to
3comply with the version of NFPA 855 "Standard for the
4Installation of Stationary Energy Storage Systems" in effect
5on the effective date of this amendatory Act or any successor
6standard issued by the NFPA in effect on the date of siting or
7special use permit approval. A county may not include
8requirements for energy storage systems that are more
9restrictive than NFPA 855 "Standard for the Installation of
10Stationary Energy Storage Systems" unless required by this
11Section.
12    (d) If a county has elected to establish standards under
13subsection (b), then the zoning board of appeals for the
14county shall hold at least one public hearing before the
15county grants (i) siting approval or a special use permit for
16an energy storage system or (ii) modification of an approved
17siting or special use permit. The public hearing shall be
18conducted in accordance with the Open Meetings Act and shall
19conclude not more than 60 days after the filing of the
20application for the facility. The county shall allow
21interested parties to a special use permit an opportunity to
22present evidence and to cross-examine witnesses at the
23hearing, but the county may impose reasonable restrictions on
24the public hearing, including reasonable time limitations on
25the presentation of evidence and the cross-examination of
26witnesses. The county shall also allow public comment at the

 

 

HB5837- 27 -LRB104 23685 TRT 40200 b

1public hearing in accordance with the Open Meetings Act. The
2county shall make its siting and permitting decisions not more
3than 30 days after the conclusion of the public hearing.
4Notice of the hearing shall be published in a newspaper of
5general circulation in the county.
6    (e) A county with an existing zoning ordinance in conflict
7with this Section shall amend that zoning ordinance to comply
8with this Section within 120 days after the effective date of
9this amendatory Act of the 104th General Assembly.
10    (f) Except as otherwise provided in subsection (f-5), a A    
11county shall require an energy storage system to be sited as
12follows, with setback distances measured from the nearest edge
13of the nearest battery or other electrochemical or
14electromechanical enclosure:
 
15Setback Description           Setback Distance
 
16Occupied Community            150 feet from the nearest 
17Buildings and                 point of the outside wall of
18Nonparticipating Residences   the occupied community building
19                              or nonparticipating residence
 
20Boundary Lines of             50 feet to the nearest point
21Occupied Community            on the property line of
22Buildings and                 the occupied community building
23Nonparticipating Residences   or nonparticipating property
 

 

 

HB5837- 28 -LRB104 23685 TRT 40200 b

1Public Road Rights-of-Way     50 feet from the nearest edge
2                              of the right-of-way
3        (2) A county shall also require an energy storage
4    system to be sited so that the facility's perimeter is
5    enclosed by fencing having a height of at least 7 feet and
6    no more than 25 feet.
7    This Section does not exempt or excuse compliance with
8electric facility clearances approved or required by the
9National Electrical Code, the National Electrical Safety Code,
10the Illinois Commerce Commission, the Federal Energy
11Regulatory Commission, and their designees or successors.
12    (f-5) A county may require setback distances in excess of
13those established under subsection (f) of this Section upon a
14finding by the county board that the setback distances would
15impair residential, commercial, agricultural, or industrial
16development or negatively affect residential, commercial,
17agricultural, or industrial property values.    
18    (g) A county may not set a sound limitation for energy
19storage systems that is more restrictive than the sound
20limitations established by the Illinois Pollution Control
21Board under 35 Ill. Adm. Code Parts 900, 901, and 910. After
22commercial operation, a county may require the facility owner
23to provide, not more than once, octave band sound pressure
24level measurements from a reasonable number of sampled
25locations at the perimeter of the energy storage system to

 

 

HB5837- 29 -LRB104 23685 TRT 40200 b

1demonstrate compliance with this Section.
2    (h) The provisions set forth in subsection (f) may be
3waived subject to the written consent of the owner of each
4affected nonparticipating property or nonparticipating
5residence.
6    (i) A county may not place any restriction on the
7installation or use of an energy storage system unless it has
8formed a zoning commission and adopted formal zoning under
9Section 5-12007 and adopts an ordinance that complies with
10this Section. A county may not establish siting standards for
11supporting facilities that preclude development of an energy
12storage system.
13    (j) A request for siting approval or a special use permit
14for an energy storage system, or modification of an approved
15siting approval or special use permit, shall be approved if
16the request complies with the standards and conditions imposed
17in this Code, the zoning ordinance adopted consistent with
18this Section, and other State and federal statutes and
19regulations. The siting approval or special use permit
20approved by the county shall grant the facility owner a period
21of at least 3 years after county approval to obtain a building
22permit or commence construction of the energy storage system,
23before the siting approval or special use permit may become
24subject to revocation by the county. Facility owners may be
25granted an extension on obtaining building permits or
26commencing constructing upon a showing of good cause. A

 

 

HB5837- 30 -LRB104 23685 TRT 40200 b

1facility owner's request for an extension may not be
2unreasonably withheld, conditioned, or denied.
3    (j-5) A county may deny the siting approval, issuance of a
4special use permit, or modification of an approved siting or
5special use permit for an energy storage system if the county
6board finds that:
7        (1) the energy storage system will be located adjacent
8    to a water treatment facility;
9        (2) the energy storage system will be located in a
10    Metropolitan Statistical Area as delineated by the U.S.
11    Office of Management and Budget;
12        (3) the energy storage system will limit housing
13    opportunities in the county;
14        (4) the energy storage system will damage existing
15    agricultural areas; or
16        (5) any roadway will be unable to handle the traffic
17    created by the energy storage system.    
18    (k) (Blank). A county may not adopt zoning regulations
19that disallow, permanently or temporarily, an energy storage
20system from being developed or operated in any district zones
21to allow agricultural or industrial uses.
22    (l) A facility owner shall file a farmland drainage plan
23with the county and impacted drainage districts that outlines
24how surface and subsurface drainage of farmland will be
25restored during and following the construction or
26deconstruction of the energy storage system. The plan shall be

 

 

HB5837- 31 -LRB104 23685 TRT 40200 b

1created independently by the facility owner and shall include
2the location of any potentially impacted drainage district
3facilities to the extent the information is publicly available
4from the county or the drainage district and plans to repair
5any subsurface drainage affected during construction or
6deconstruction using procedures outlined in the
7decommissioning plan. All surface and subsurface damage shall
8be repaired as soon as reasonably practicable.
9    (m) A facility owner shall compensate landowners for crop
10losses or other agricultural damages resulting from damage to
11a drainage system caused by the construction of an energy
12storage system. The facility owner shall repair or pay for the
13repair of all damage to the subsurface drainage system caused
14by the construction of the energy storage system. The facility
15owner shall repair or pay for the repair and restoration of
16surface drainage caused by the construction or deconstruction
17of the energy storage facility as soon as reasonably
18practicable.
19    (n) County siting approval or special use permit
20application fees for an energy storage system shall not exceed
21the lesser of (i) $5,000 per each megawatt of nameplate
22capacity of the energy storage system or (ii) $50,000.
23    (o) The county may require a facility owner to provide a
24decommissioning plan to the county. The decommissioning plan
25may include all requirements for decommissioning plans in NFPA
26855 and may also require the facility owner to:

 

 

HB5837- 32 -LRB104 23685 TRT 40200 b

1        (1) state how the energy storage system will be
2    decommissioned, including removal to a depth of 3 feet of
3    all structures that have no ongoing purpose and all debris
4    and restoration of the soil and any vegetation to a
5    condition as close as reasonably practicable to the soil's
6    and vegetation's preconstruction condition within 18
7    months of the end of project life or facility abandonment;
8        (2) include provisions related to commercially
9    reasonable efforts to reuse or recycle of equipment and
10    components associated with the commercial offsite energy
11    storage system;
12        (3) include financial assurance in the form of a
13    reclamation or surety bond or other commercially available
14    financial assurance that is acceptable to the county, with
15    the county or participating property owner as beneficiary.
16    The amount of the financial assurance shall not be more
17    than the estimated cost of decommissioning the energy
18    facility, after deducting salvage value, as calculated by
19    a professional engineer licensed to practice engineering
20    in this State with expertise in preparing decommissioning
21    estimates, retained by the applicant. The financial
22    assurance shall be provided to the county incrementally as
23    follows:
24            (A) 25% before the start of full commercial
25        operation;
26            (B) 50% before the start of the 5th year of

 

 

HB5837- 33 -LRB104 23685 TRT 40200 b

1        commercial operation; and
2            (C) 100% by the start of the tenth year of
3        commercial operation;
4        (4) update the amount of the financial assurance not
5    more than every 5 years for the duration of commercial
6    operations. The amount shall be calculated by a
7    professional engineer licensed to practice engineering in
8    this State with expertise in decommissioning, hired by the
9    facility owner; and
10        (5) decommission the energy storage system, in
11    accordance with an approved decommissioning plan, within
12    18 months after abandonment. An energy storage system that
13    has not stored electrical energy for 12 consecutive months
14    or that fails, for a period of 6 consecutive months, to pay
15    a property owner who is party to a written agreement,
16    including, but not limited to, an easement, option, lease,
17    or license under the terms of which an energy storage
18    system is constructed on the property, amounts owed in
19    accordance with the written agreement shall be considered
20    abandoned, except when the inability to store energy is
21    the result of an event of force majeure or excused service
22    interruption.
23    (p) A county may not condition approval of an energy
24storage system on a property value guarantee and may not
25require a facility owner to pay into a neighboring property
26devaluation escrow account.

 

 

HB5837- 34 -LRB104 23685 TRT 40200 b

1    (q) A county may require that a facility owner provide the
2results and recommendations from consultation with the
3Department of Natural Resources that are obtained through the
4Ecological Compliance Assessment Tool (EcoCAT) or a comparable
5successor tool.
6    (r) A county may require an energy storage system to
7adhere to the recommendations provided by the Department of
8Natural Resources in an Agency Action Report under 17 Ill.
9Adm. Code 1075.
10    (s) A county may require a facility owner to:
11        (1) demonstrate avoidance of protected lands as
12    identified by the Department of Natural Resources and the
13    Illinois Nature Preserves Commission; or
14        (2) consider the recommendations of the Department of
15    Natural Resources for setbacks from protected lands,
16    including areas identified by the Illinois Nature
17    Preserves Commission.
18    (t) A county may require that a facility owner provide
19evidence of consultation with the Illinois Historic
20Preservation Division to assess potential impacts on
21State-registered historic sites under the Illinois State
22Agency Historic Resources Preservation Act.
23    (u) A county may require that an application for siting
24approval or special use permit include the following
25information on a site plan:
26        (1) a description of the property lines and physical

 

 

HB5837- 35 -LRB104 23685 TRT 40200 b

1    features, including roads, for the facility site;
2        (2) a description of the proposed changes to the
3    landscape of the facility site, including vegetation
4    clearing and planting, exterior lighting, and screening or
5    structures; and
6        (3) a description of the zoning district designation
7    for the parcel of land comprising the facility site.
8    (v) A county may not prohibit an energy storage system
9from undertaking periodic augmentation to maintain the
10approximate original capacity of the energy storage system. A
11county may not require renewed or additional siting approval
12or special use permit approval of periodic augmentation to
13maintain the approximate original capacity of the energy
14storage system.
15    (w) A county that issues a building permit for energy
16storage systems shall review and process building permit
17applications within 60 days after receipt of the building
18permit application. If a county does not grant or deny the
19building permit application within 60 days, the building
20permit shall be deemed granted. If a county denies a building
21permit application, it shall specify the reason for the denial
22in writing as part of its denial.
23    (x) A county may require a single building permit and a
24reasonable permit fee for the facility which includes all
25supporting facilities. A county building permit fee for an
26energy storage system that does not exceed the lesser of (i)

 

 

HB5837- 36 -LRB104 23685 TRT 40200 b

1$5,000 per each megawatt of nameplate capacity of the energy
2storage system or (ii) $50,000 shall be considered
3presumptively reasonable. A county may require that the
4application for building permit contain:
5        (1) an electrical diagram detailing the battery energy
6    storage system layout, associated components, and
7    electrical interconnection methods, with all National
8    Electrical Code compliant disconnects and overcurrent
9    devices; and
10        (2) an equipment specification sheet.
11    (y) A county may require the facility owner to submit to
12the county prior to the facility's commercial operation a
13commissioning report meeting the requirements of NFPA 855
14Sections 4.2.4, 6.1.3, and 6.1.5.5, as published in 2023, or
15the applicable Sections in the most recent version of NFPA
16855.
17    (z) A county may require the facility owner to submit to
18the county prior to the facility's commercial operation a
19hazard mitigation analysis meeting the requirements of NFPA
20855 Section 4.4 or the applicable Sections in the most recent
21version of NFPA 855.
22    (aa) A county may require the facility owner to submit to
23the county an emergency operations plan meeting the
24requirements of NFPA 855 Section 4.3.2.1.4, published in 2023,
25or applicable Sections in the most recent version of NFPA 855,
26prior to commercial operation.

 

 

HB5837- 37 -LRB104 23685 TRT 40200 b

1    (bb) A county may require a warning that complies with
2requirements in NFPA 855 Section 4.7.4, published in 2023, or
3applicable sections in the most recent version of NFPA 855.
4    (cc) A county may require the energy storage system to
5adhere to the principles for responsible outdoor lighting
6provided by the International Dark-Sky Association and shall
7limit outdoor lighting to that which is minimally required for
8safety and operational purposes. Any outdoor lighting shall be
9reasonably shielded and downcast from all residences and
10adjacent properties.
11    (dd) This Section does not exempt compliance with fire and
12safety standards and guidance established for the installation
13of lithium-ion battery energy storage systems set by the NFPA.
14    (ee) Prior to commencement of commercial operation, the
15facility owner shall offer to provide training for local fire
16departments and emergency responders in accordance with the
17facility emergency operations plan. A copy of the emergency
18operations plan shall be given to the facility owner, the
19local fire department, and emergency responders. All batteries
20integrated within an energy storage system shall be listed
21under the UL 1973 Standard. All batteries integrated within an
22energy storage system shall be listed in accordance with UL
239540 Standard, either from the manufacturer or by a field
24evaluation.
25    (ff) If a facility owner enters into a road use agreement
26with the Department of Transportation, a road district, or

 

 

HB5837- 38 -LRB104 23685 TRT 40200 b

1other unit of local government relating to an energy storage
2system, then the road use agreement shall require the facility
3owner to be responsible for (i) the reasonable cost of
4improving, if necessary, roads used by the facility owner to
5construct the energy storage system and (ii) the reasonable
6cost of repairing roads used by the facility owner during
7construction of the energy storage system so that those roads
8are in a condition that is safe for the driving public after
9the completion of the facility's construction. A roadway
10improved in preparation for and during the construction of the
11energy storage system shall be repaired and restored to the
12improved condition at the reasonable cost of the developer if
13the roadways have degraded or were damaged as a result of
14construction-related activities.
15    The road use agreement shall not require the facility
16owner to pay costs, fees, or charges for road work that is not
17specifically and uniquely attributable to the construction of
18the energy storage system. No road district or other unit of
19local government may request or require a fine, permit fee, or
20other payment obligation as a requirement for a road use
21agreement with a facility owner unless the amount of the fine,
22permit fee, or other payment obligation is equivalent to the
23amount of actual expenses incurred by the road district or
24other unit of local government for negotiating, executing,
25constructing, or implementing the road use agreement. The road
26use agreement shall not require the facility owner to perform

 

 

HB5837- 39 -LRB104 23685 TRT 40200 b

1or pay for any road work that is unrelated to the road
2improvements required for the construction of the commercial
3wind energy facility or the commercial solar energy facility
4or the restoration of the roads used by the facility owner
5during construction-related activities.
6    (gg) The provisions of this amendatory Act of the 104th
7General Assembly do not apply to an application for siting
8approval or special use permit for an energy storage system if
9the application was submitted to a county before the effective
10date of this amendatory Act of the 104th General Assembly.
11(Source: P.A. 104-458, eff. 6-1-26; 104-480, eff. 7-1-26.)