Bill Text: IL HB2721 | 2023-2024 | 103rd General Assembly | Introduced
Bill Title: Amends the Public Utilities Act. In provisions concerning water and sewer surcharges, removes language allowing the Illinois Commerce Commission to authorize a water or sewer utility to file a surcharge which adjusts rates and charges to provide for recovery of costs associated with an investment in qualifying infrastructure plant. Makes a corresponding change.
Sponsorship: Partisan Bill (Democrat 4)
Status: (Failed) 2025-01-07 - Session Sine Die [HB2721 Detail]
Download: Illinois-2023-HB2721-Introduced.html
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning regulation.
| |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
| 3 | represented in the General Assembly:
| |||||||||||||||||||
| 4 | Section 5. The Public Utilities Act is amended by changing | |||||||||||||||||||
| 5 | Section 9-220.2 as follows:
| |||||||||||||||||||
| 6 | (220 ILCS 5/9-220.2)
| |||||||||||||||||||
| 7 | Sec. 9-220.2. Water and sewer surcharges authorized.
| |||||||||||||||||||
| 8 | (a) The Commission may authorize a water or sewer utility | |||||||||||||||||||
| 9 | to file a
surcharge which adjusts rates and charges to provide | |||||||||||||||||||
| 10 | for recovery of (i) the
cost of purchased water, (ii) the cost | |||||||||||||||||||
| 11 | of purchased sewage treatment service,
or (iii) other costs | |||||||||||||||||||
| 12 | which fluctuate for reasons beyond the utility's control or
| |||||||||||||||||||
| 13 | are difficult to predict, or (iv) costs associated with an | |||||||||||||||||||
| 14 | investment in
qualifying infrastructure plant, independent of | |||||||||||||||||||
| 15 | any other matters related to
the utility's revenue | |||||||||||||||||||
| 16 | requirement. A surcharge approved under this Section can
| |||||||||||||||||||
| 17 | operate on an historical or a prospective basis.
| |||||||||||||||||||
| 18 | (b) (Blank). For purposes of this Section, "costs | |||||||||||||||||||
| 19 | associated with an investment in
qualifying infrastructure | |||||||||||||||||||
| 20 | plant" include a return on the investment in and
depreciation | |||||||||||||||||||
| 21 | expense related to plant items or facilities (including, but | |||||||||||||||||||
| 22 | not
limited to, replacement mains, meters, services, and | |||||||||||||||||||
| 23 | hydrants) which (i) are
not reflected in the rate base used to | |||||||||||||||||||
| |||||||
| |||||||
| 1 | establish the utility's base rates and
(ii) are non-revenue | ||||||
| 2 | producing. For purposes
of this Section, a "non-revenue | ||||||
| 3 | producing facility" is one that is not
constructed or | ||||||
| 4 | installed for the purpose of serving a new customer.
| ||||||
| 5 | (c) On a periodic basis, the Commission shall initiate | ||||||
| 6 | hearings to reconcile
amounts collected under each surcharge | ||||||
| 7 | authorized pursuant to this Section with
the actual prudently | ||||||
| 8 | incurred costs recoverable for each annual period during
which | ||||||
| 9 | the surcharge was in effect.
| ||||||
| 10 | (Source: P.A. 91-638, eff. 1-1-00.)
| ||||||
