Bill Text: IL HB2701 | 2013-2014 | 98th General Assembly | Introduced
Bill Title: Amends the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act. Sets forth requirements for responsible bidders on material testing contracts.
Sponsorship: Partisan Bill (Democrat 1)
Status: (Failed) 2014-12-03 - Session Sine Die [HB2701 Detail]
Download: Illinois-2013-HB2701-Introduced.html
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| 1 | AN ACT concerning finance.
| |||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||||
| 3 | represented in the General Assembly:
| |||||||||||||||||||||
| 4 | Section 5. The Architectural, Engineering, and Land | |||||||||||||||||||||
| 5 | Surveying
Qualifications Based Selection Act is amended by | |||||||||||||||||||||
| 6 | changing Section 15 and by adding Section 36 as follows:
| |||||||||||||||||||||
| 7 | (30 ILCS 535/15) (from Ch. 127, par. 4151-15)
| |||||||||||||||||||||
| 8 | Sec. 15. Definitions. As used in this Act:
| |||||||||||||||||||||
| 9 | "Architectural services" means any professional service as | |||||||||||||||||||||
| 10 | defined in
Section 5 of the Illinois Architecture Practice Act | |||||||||||||||||||||
| 11 | of 1989.
| |||||||||||||||||||||
| 12 | "Engineering services" means any professional service as | |||||||||||||||||||||
| 13 | defined in
Section 4 of the Professional Engineering Practice | |||||||||||||||||||||
| 14 | Act of 1989 or Section 5
of the Structural Engineering Practice | |||||||||||||||||||||
| 15 | Act of 1989.
| |||||||||||||||||||||
| 16 | "Firm" means any individual, sole proprietorship, firm, | |||||||||||||||||||||
| 17 | partnership,
corporation, association, or other legal entity | |||||||||||||||||||||
| 18 | permitted by law to
practice the profession of architecture, | |||||||||||||||||||||
| 19 | engineering, or land surveying and
provide those services.
| |||||||||||||||||||||
| 20 | "Land surveying services" means any professional service | |||||||||||||||||||||
| 21 | as defined in
Section 5 of the Illinois Professional Land | |||||||||||||||||||||
| 22 | Surveyor Act of 1989.
| |||||||||||||||||||||
| 23 | "Material testing" means hand coring and drilling for | |||||||||||||||||||||
| |||||||
| |||||||
| 1 | testing of materials; field inspection of uncured concrete and | ||||||
| 2 | asphalt; field inspection of welds, structural steel, | ||||||
| 3 | fireproofing, masonry, soil, facade, reinforcing steel, | ||||||
| 4 | formwork, cured concrete, and concrete and asphalt batch | ||||||
| 5 | plants; and adjusting proportions of bituminous mixtures. | ||||||
| 6 | "Project" means any capital improvement project or any | ||||||
| 7 | design, study,
plan, survey, or new or existing program | ||||||
| 8 | activity of a State agency,
including development of new or | ||||||
| 9 | existing programs that require
architectural, engineering, or | ||||||
| 10 | land surveying services.
| ||||||
| 11 | "State agency" means any department, commission, council, | ||||||
| 12 | board, bureau,
committee, institution, agency, university, | ||||||
| 13 | government corporation,
authority, or other establishment or | ||||||
| 14 | official of this State.
| ||||||
| 15 | (Source: P.A. 91-91, eff. 1-1-00.)
| ||||||
| 16 | (30 ILCS 535/36 new) | ||||||
| 17 | Sec. 36. Material testing contracts; responsible bidder | ||||||
| 18 | requirements. To be considered a responsible bidder on a | ||||||
| 19 | material testing contract for purposes of this Act, a bidder | ||||||
| 20 | must comply with all of the following requirements and must | ||||||
| 21 | present satisfactory evidence of that compliance to the | ||||||
| 22 | appropriate construction agency: | ||||||
| 23 | (a) Evidence of compliance with all applicable laws | ||||||
| 24 | concerning the bidder's entitlement to conduct business in | ||||||
| 25 | Illinois. | ||||||
| |||||||
| |||||||
| 1 | (b) A sworn statement of the bidder's compliance with | ||||||
| 2 | all provisions of the applicable Prevailing Wage Act. | ||||||
| 3 | (c) A sworn statement of the bidder's compliance with | ||||||
| 4 | Subchapter VI (Equal Employment Opportunities) of Chapter | ||||||
| 5 | 21 of Title 42 of the United States Code (42 U.S.C. 2000e | ||||||
| 6 | and following) and with federal Executive Order No. 11246 | ||||||
| 7 | as amended by federal Executive Order No. 11375. | ||||||
| 8 | (d) Evidence of a valid Federal Employer | ||||||
| 9 | Identification Number or, if an individual, a valid Social | ||||||
| 10 | Security Number. | ||||||
| 11 | (e) Evidence that the bidder and all bidder's | ||||||
| 12 | subcontractors secured workers' compensation insurance for | ||||||
| 13 | covered employees. If the bidder or bidder's | ||||||
| 14 | subcontractors are insured with a carrier, the evidence of | ||||||
| 15 | workers' compensation insurance must be a copy of the first | ||||||
| 16 | page of the information page of the bidder's and bidder's | ||||||
| 17 | subcontractors' workers' compensation policy, and any | ||||||
| 18 | continuation attachments of that information page, and a | ||||||
| 19 | certificate of liability insurance.
| ||||||
| 20 | (1) The information page must include the name and | ||||||
| 21 | address of the insured as well as the class codes the | ||||||
| 22 | compensation premium is based on and the total | ||||||
| 23 | estimated remuneration per class code.
| ||||||
| 24 | (2) The certificate of liability insurance must | ||||||
| 25 | include the following information and documentation in | ||||||
| 26 | order to be considered valid evidence of workers' | ||||||
| |||||||
| |||||||
| 1 | compensation insurance coverage: | ||||||
| 2 | (A) the producer section listing the | ||||||
| 3 | producer's name, address, and telephone phone | ||||||
| 4 | number; | ||||||
| 5 | (B) the insurer's affording coverage section | ||||||
| 6 | listing the name of the carrier that is providing | ||||||
| 7 | workers' compensation insurance; | ||||||
| 8 | (C) the name of the bidder or bidder's | ||||||
| 9 | subcontractors listed as the insured; | ||||||
| 10 | (D) the proper policy number or binder number | ||||||
| 11 | for the workers' compensation and employers' | ||||||
| 12 | liability insurance; | ||||||
| 13 | (E) the dollar limits of coverage listed for | ||||||
| 14 | the workers' compensation and employers' liability | ||||||
| 15 | insurance; | ||||||
| 16 | (F) the signature of an authorized | ||||||
| 17 | representative under the certificate of liability | ||||||
| 18 | insurance; | ||||||
| 19 | (G) an issue date of the certificate of | ||||||
| 20 | liability insurance that precedes the date the | ||||||
| 21 | bidder submitted a bid for the project; and | ||||||
| 22 | (H) a date or time frame under which the work | ||||||
| 23 | is to be performed by the bidder and bidder's | ||||||
| 24 | subcontractors that falls within the policy | ||||||
| 25 | effective and policy expiration dates listed on | ||||||
| 26 | the certificate of liability insurance.
| ||||||
| |||||||
| |||||||
| 1 | (3) The information required under items (1) and | ||||||
| 2 | (2) of this subdivision (e) must be provided by the | ||||||
| 3 | bidder's or bidder's subcontractors' carrier and may | ||||||
| 4 | not be provided by the bidder's or bidder's | ||||||
| 5 | subcontractors' insurance agent.
| ||||||
| 6 | (iv) The information required under items (1) and | ||||||
| 7 | (2) of this subdivision (e) must be preserved by the | ||||||
| 8 | bidder for at least 3 years and must be made available | ||||||
| 9 | to the construction agency and the public in accordance | ||||||
| 10 | with the Freedom of Information Act.
| ||||||
| 11 | (f) Evidence that the bidder and all bidder's | ||||||
| 12 | subcontractors participate in applicable apprenticeship | ||||||
| 13 | and training programs approved by and registered with the | ||||||
| 14 | United States Department of Labor's Office of | ||||||
| 15 | Apprenticeship, or its successor organization.
| ||||||
| 16 | (g) Evidence of compliance with the requirements of the | ||||||
| 17 | Public Construction Bond Act and furnishing, supplying, | ||||||
| 18 | and delivering a surety bond by a surety company acceptable | ||||||
| 19 | to the appropriate construction agency. It is recommended | ||||||
| 20 | that the surety company issuing the bond or surety be | ||||||
| 21 | listed in Best's Key Rating Guide with a rating of B or | ||||||
| 22 | better, be listed in the Treasury Circular, or be listed in | ||||||
| 23 | both. The bond and sureties are subject to the right of | ||||||
| 24 | reasonable approval or disapproval, including suspension, | ||||||
| 25 | by the appropriate construction agency.
| ||||||
| 26 | (h) Evidence of any professional or trade license | ||||||
| |||||||
| |||||||
| 1 | required by law for any trade or specialty area in which | ||||||
| 2 | the bidder is seeking a contract award. Additionally, the | ||||||
| 3 | bidder must disclose any suspension or revocation of such a | ||||||
| 4 | license held by the bidder or by any director, officer, or | ||||||
| 5 | manager employed by the bidder.
| ||||||
| 6 | (i) Bidders must provide a sworn statement that | ||||||
| 7 | employees to be employed on the project are properly | ||||||
| 8 | classified as either (i) an employee or (ii) an independent | ||||||
| 9 | contractor under all applicable state and federal laws and | ||||||
| 10 | local ordinances.
| ||||||
| 11 | (j) The information, documentation, and evidence | ||||||
| 12 | required under this Section are a material part of the | ||||||
| 13 | contract and the failure of a bidder to comply with the | ||||||
| 14 | provisions of this Section shall result in the bidder's | ||||||
| 15 | disqualification from being awarded the contract.
| ||||||
| 16 | (k) When the award is not recommended to be given to | ||||||
| 17 | the lowest bidder, a statement of the reasons for that | ||||||
| 18 | recommendation must be prepared by the construction | ||||||
| 19 | agency.
| ||||||
| 20 | (l) The provisions of this Section do not apply to any | ||||||
| 21 | federally funded construction project if application to | ||||||
| 22 | that project would jeopardize the receipt or use of federal | ||||||
| 23 | funds in support of that project.
| ||||||
