| 1 | AMENDMENT TO SENATE BILL 950
| ||||||
| 2 | AMENDMENT NO. ______. Amend Senate Bill 950 by replacing | ||||||
| 3 | everything after the enacting clause with the following:
| ||||||
| 4 | "Section 5. The Department of Central Management Services | ||||||
| 5 | Law of the Civil Administrative Code of Illinois is amended by | ||||||
| 6 | changing Section 405-10, and adding Section 405-294 as follows:
| ||||||
| 7 | (20 ILCS 405/405-10) (was 20 ILCS 405/35.3)
| ||||||
| 8 | Sec. 405-10. Director's duties; State policy. It shall be | ||||||
| 9 | the duty of
the Director and the policy of the State of | ||||||
| 10 | Illinois to do the following:
| ||||||
| 11 | (1) Place financial responsibility on State agencies | ||||||
| 12 | (as
defined in subsection (b) of Section 405-5) and hold | ||||||
| 13 | them
accountable for the proper discharge of this | ||||||
| 14 | responsibility.
| ||||||
| 15 | (2) Require professional, accurate, and current | ||||||
| 16 | accounting with the
State agencies (as defined in | ||||||
| |||||||
| |||||||
| 1 | subsection (b) of Section 405-5).
| ||||||
| 2 | (3) Decentralize fiscal, procedural, and | ||||||
| 3 | administrative operations to
expedite the business of the | ||||||
| 4 | State and to avoid expense, unwieldiness,
inefficiency, | ||||||
| 5 | and unnecessary duplication where decentralization is | ||||||
| 6 | consistent
with proper fiscal management.
| ||||||
| 7 | (4) Manage or delegate the management of the | ||||||
| 8 | procurement, retention,
installation, maintenance, and | ||||||
| 9 | operation of all electronic data processing
equipment used | ||||||
| 10 | by State agencies as defined in Section 405-20, so as to | ||||||
| 11 | achieve
maximum economy consistent with development of | ||||||
| 12 | adequate and timely information
in a form suitable for | ||||||
| 13 | management analysis, in a manner that provides for
adequate | ||||||
| 14 | security protection and back-up facilities for that | ||||||
| 15 | equipment, the
establishment of bonding requirements, and | ||||||
| 16 | a code of conduct for all
electronic data processing | ||||||
| 17 | personnel to ensure the privacy of
electronic data | ||||||
| 18 | processing information as provided by law.
| ||||||
| 19 | (5) Manage or delegate the management of the strategic | ||||||
| 20 | sourcing of any and all supplies and non-construction | ||||||
| 21 | related services used by State agencies in accordance with | ||||||
| 22 | Section 405-294. This duty shall not limit the authority of | ||||||
| 23 | a chief procurement officer established under the Illinois | ||||||
| 24 | Procurement Code. For the purposes of this paragraph (5) | ||||||
| 25 | and Section 405-294, "State agency" means each State | ||||||
| 26 | agency, department, board, and commission directly | ||||||
| |||||||
| |||||||
| 1 | responsible to the Governor. | ||||||
| 2 | (Source: P.A. 91-239, eff. 1-1-00.)
| ||||||
| 3 | (20 ILCS 405/405-294 new) | ||||||
| 4 | Sec. 405-294. Strategic sourcing. To manage or delegate the | ||||||
| 5 | management of the strategic sourcing of any and all supplies | ||||||
| 6 | and non-construction related services used by State agencies to | ||||||
| 7 | ensure that State agencies maximize the value of public funds | ||||||
| 8 | spent on supplies and non-construction related services. | ||||||
| 9 | Nothing in this Section shall be construed to limit a State | ||||||
| 10 | agency's authority to lead a procurement when required to do so | ||||||
| 11 | by law. For the purposes of this Section, "State agency" shall | ||||||
| 12 | have the same meaning as defined in paragraph (5) of Section | ||||||
| 13 | 405-10.
| ||||||
| 14 | Section 10. The Illinois Procurement Code is amended by | ||||||
| 15 | changing Section 25-45 as follows:
| ||||||
| 16 | (30 ILCS 500/25-45)
| ||||||
| 17 | Sec. 25-45. Executive agency energy conservation and | ||||||
| 18 | saving measures Energy conservation program. | ||||||
| 19 | (a) Definitions. As used in this Section: | ||||||
| 20 | "Board" means the Capital Development Board or its | ||||||
| 21 | successors. | ||||||
| 22 | "Contracting authority" means the Department, the Board, | ||||||
| 23 | or other such agencies as may be delegated to execute certain | ||||||
| |||||||
| |||||||
| 1 | of its statutory procurement functions through | ||||||
| 2 | intergovernmental agreements specifically developed for the | ||||||
| 3 | purpose of securing energy conservation services. | ||||||
| 4 | "Department" means the Department of Central Management | ||||||
| 5 | Services acting in its capacity as the statutory owner and | ||||||
| 6 | manager of all properties owned and operated by the State of | ||||||
| 7 | Illinois on behalf of agencies, boards, and commissions | ||||||
| 8 | functioning under the executive authority of the Governor. | ||||||
| 9 | "Energy conservation measure" means any improvement, | ||||||
| 10 | repair, alteration, or betterment of any executive agency | ||||||
| 11 | facility or any equipment, fixture, or furnishing to be added | ||||||
| 12 | to or used in an executive agency facility, that is designed to | ||||||
| 13 | reduce energy consumption or operating costs, and may include, | ||||||
| 14 | but is not limited to, one or more of the following: | ||||||
| 15 | (1) Insulation of the building structure or systems | ||||||
| 16 | within the building. | ||||||
| 17 | (2) Storm windows or doors, caulking or weather | ||||||
| 18 | stripping, multiglazed windows or doors, heat-absorbing or | ||||||
| 19 | heat-reflective glazed and coated window or door systems, | ||||||
| 20 | additional glazing, reductions in glass area, or other | ||||||
| 21 | window and door system modifications that reduce energy | ||||||
| 22 | consumption. | ||||||
| 23 | (3) Automated or computerized energy control systems. | ||||||
| 24 | (4) Heating, ventilating, or air conditioning system, | ||||||
| 25 | modifications, or replacements. | ||||||
| 26 | (5) Replacement or modification of lighting fixtures | ||||||
| |||||||
| |||||||
| 1 | to increase the energy efficiency of the lighting system | ||||||
| 2 | without increasing the overall illumination of a building, | ||||||
| 3 | unless an increase in illumination is necessary to conform | ||||||
| 4 | to the applicable State or local building code for the | ||||||
| 5 | lighting system after the proposed modifications are made. | ||||||
| 6 | (6) Energy recovery systems. | ||||||
| 7 | (7) Energy conservation measures that provide | ||||||
| 8 | long-term operating cost reductions. | ||||||
| 9 | "Executive agency facility" means a building owned and | ||||||
| 10 | operated by the State of Illinois through an agency, board, or | ||||||
| 11 | commission statutorily functioning under the executive | ||||||
| 12 | authority of the Governor or other constitutional officers. | ||||||
| 13 | "Guaranteed energy savings contract" means a contract for: | ||||||
| 14 | (i) the implementation of an energy audit, data collection, and | ||||||
| 15 | other related analyses preliminary to the undertaking of energy | ||||||
| 16 | conservation measures; (ii) the evaluation and recommendation | ||||||
| 17 | of energy conservation measures; (iii) the implementation of | ||||||
| 18 | one or more energy conservation measures; and (iv) the | ||||||
| 19 | implementation of project monitoring and data collection to | ||||||
| 20 | verify post installation energy consumption and energy related | ||||||
| 21 | operating costs. The contract shall provide that all payments, | ||||||
| 22 | except obligations on termination of the contract before its | ||||||
| 23 | expiration, are to be made over time and that the savings are | ||||||
| 24 | guaranteed to the extent necessary to pay the costs of the | ||||||
| 25 | energy conservation measures. "Energy savings" may include | ||||||
| 26 | energy reduction and offsetting sources of renewable energy | ||||||
| |||||||
| |||||||
| 1 | funds, including renewable energy credits and carbon credits. | ||||||
| 2 | "Qualified provider" means a person whose employees are | ||||||
| 3 | experienced and trained in the design, implementation, or | ||||||
| 4 | installation of energy conservation measures. The minimum | ||||||
| 5 | training required for any person or employee under this Section | ||||||
| 6 | shall be the satisfactory completion of at least 40 hours of | ||||||
| 7 | course instruction dealing with energy conservation measures. | ||||||
| 8 | A qualified provider to whom the contract is awarded shall give | ||||||
| 9 | a sufficient bond to the executive agency or for its faithful | ||||||
| 10 | performance. | ||||||
| 11 | (b) Before entering into a guaranteed energy savings | ||||||
| 12 | contract, the contracting authority shall issue a request for | ||||||
| 13 | proposals in accordance with Article 30 of this Code requesting | ||||||
| 14 | competitive sealed offers for innovative solutions and | ||||||
| 15 | conservation measures. A request for proposals shall be | ||||||
| 16 | published in the volume of the Illinois Procurement Bulletin | ||||||
| 17 | under the authority of the chief procurement officer for the | ||||||
| 18 | Capital Development Board for at least 30 days before offers | ||||||
| 19 | are due. The request for proposals shall, at a minimum, include | ||||||
| 20 | all of the following: | ||||||
| 21 | (1) The name and address of the executive agency. | ||||||
| 22 | (2) The name, address, title, and phone number of an | ||||||
| 23 | executive agency contact person who will respond to | ||||||
| 24 | questions regarding the request for proposals. | ||||||
| 25 | (3) Notice indicating that the contracting authority | ||||||
| 26 | is requesting qualified providers to propose energy | ||||||
| |||||||
| |||||||
| 1 | conservation measures through a guaranteed energy savings | ||||||
| 2 | contract. | ||||||
| 3 | (4) The date, time, and place where offers must be | ||||||
| 4 | received. | ||||||
| 5 | (5) The evaluation criteria for evaluating offers. | ||||||
| 6 | (6) Any other stipulations and clarifications the | ||||||
| 7 | contracting authority or executive agency facility may | ||||||
| 8 | require. | ||||||
| 9 | (7) A written disclosure that identifies any energy | ||||||
| 10 | services contractor that participated in the preparation | ||||||
| 11 | of specifications. If no energy services contractor | ||||||
| 12 | participated in the preparation of specifications, then | ||||||
| 13 | the request for proposals must include a disclosure that no | ||||||
| 14 | energy services contractor participated in the preparation | ||||||
| 15 | of the specifications. | ||||||
| 16 | (c) The evaluation of offers shall analyze the estimates of | ||||||
| 17 | all costs of installations, modifications, or remodeling, | ||||||
| 18 | including, but not limited to, costs of a pre-installation | ||||||
| 19 | energy audit or analysis, design, engineering, installation, | ||||||
| 20 | maintenance, repairs, debt service, conversions to a different | ||||||
| 21 | energy or fuel source, or post-installation project | ||||||
| 22 | monitoring, data collection, and reporting. The evaluation | ||||||
| 23 | shall include a detailed analysis of whether either the energy | ||||||
| 24 | consumed or the operating costs, or both, will be reduced. If a | ||||||
| 25 | licensed architect or registered professional engineer on the | ||||||
| 26 | executive agency's or contracting authority's staff is | ||||||
| |||||||
| |||||||
| 1 | unavailable to serve as an evaluator, then the evaluation shall | ||||||
| 2 | include a registered professional engineer or architect, who is | ||||||
| 3 | retained by the executive agency or contracting authority. A | ||||||
| 4 | licensed architect or registered professional engineer | ||||||
| 5 | participating on an evaluation team under this Section must not | ||||||
| 6 | have any financial or contractual relationship with an offeror | ||||||
| 7 | or other source that would constitute a conflict of interest. | ||||||
| 8 | The contracting authority or executive agency facility may pay | ||||||
| 9 | a reasonable fee for evaluation of the proposal or include the | ||||||
| 10 | fee as part of the payments made under subsection (e) of this | ||||||
| 11 | Section. Any contracting agency shall coordinate with the Board | ||||||
| 12 | to ensure that there are no conflicts with the proposals and | ||||||
| 13 | current or upcoming Board projects. | ||||||
| 14 | (d) After evaluating the proposals, a contracting | ||||||
| 15 | authority for an executive agency facility may enter into a | ||||||
| 16 | guaranteed energy savings contract with the best-qualified | ||||||
| 17 | offeror if the contracting authority finds that the amount it | ||||||
| 18 | would spend on the energy conservation measures recommended in | ||||||
| 19 | the proposal would not exceed the amount to be saved in either | ||||||
| 20 | energy or operational costs, or both, within a 20-year period | ||||||
| 21 | from the date of installation if the recommendations in the | ||||||
| 22 | proposal are followed. Contracts let or awarded must be | ||||||
| 23 | published in the volume of the Illinois Procurement Bulletin | ||||||
| 24 | under the authority of the chief procurement officer for the | ||||||
| 25 | Capital Development Board or as otherwise prescribed by | ||||||
| 26 | agreement between the Capital Development Board and the | ||||||
| |||||||
| |||||||
| 1 | contracting authority. | ||||||
| 2 | (e) The guaranteed energy savings contract shall include | ||||||
| 3 | the contractor's guarantee that either the energy or | ||||||
| 4 | operational cost savings, or both, will meet or exceed within | ||||||
| 5 | 20 years the costs of the energy conservation measures. The | ||||||
| 6 | contractor shall reimburse the State for any shortfall of | ||||||
| 7 | guaranteed energy savings projected in the contract. A | ||||||
| 8 | contractor shall provide a sufficient bond, as determined by | ||||||
| 9 | the State, to the contracting authority for the installation | ||||||
| 10 | and the faithful performance of all the measures included in | ||||||
| 11 | the contract. The guaranteed energy savings contract may | ||||||
| 12 | provide for payments over a period of time, not to exceed 20 | ||||||
| 13 | years from the date of final installation of the energy | ||||||
| 14 | conservation measures. | ||||||
| 15 | (f) The contracting authority may enter into an installment | ||||||
| 16 | payment contract or lease purchase agreement with a contractor | ||||||
| 17 | for services solicited under this Section or with a third | ||||||
| 18 | party, as authorized by law, for the funding or financing of | ||||||
| 19 | the purchase and installation of energy conservation measures. | ||||||
| 20 | The State of Illinois may issue certificates evidencing the | ||||||
| 21 | indebtedness incurred pursuant to the contracts. Each contract | ||||||
| 22 | or agreement entered into by a contracting authority pursuant | ||||||
| 23 | to this Section shall be authorized by official action of the | ||||||
| 24 | contracting authority. The authority granted in this Section is | ||||||
| 25 | in addition to any other authority granted by law. If an energy | ||||||
| 26 | audit is performed by an energy services contractor for an | ||||||
| |||||||
| |||||||
| 1 | executive agency facility within the 3 years immediately | ||||||
| 2 | preceding the request for proposals, then the contracting | ||||||
| 3 | authority must publish as a reference document in the | ||||||
| 4 | solicitation for energy conservation measures the following: | ||||||
| 5 | (1) an executive summary of the energy audit, provided | ||||||
| 6 | that the contracting authority and executive agency | ||||||
| 7 | facility may exclude any proprietary or trademarked | ||||||
| 8 | information or practices; or | ||||||
| 9 | (2) the energy audit, provided that the contracting | ||||||
| 10 | authority and executive agency facility may redact any | ||||||
| 11 | proprietary or trademarked information or practices. | ||||||
| 12 | An executive agency facility or contracting authority may | ||||||
| 13 | not withhold the disclosure of information related to: (i) the | ||||||
| 14 | executive agency facility's consumption of energy, (ii) the | ||||||
| 15 | physical condition of the executive agency's facilities, and | ||||||
| 16 | (iii) any limitations prescribed by the executive agency | ||||||
| 17 | facility or contracting authority. | ||||||
| 18 | (g) Guaranteed energy savings contracts may extend beyond | ||||||
| 19 | the fiscal year in which they become effective. The agency | ||||||
| 20 | responsible for payments under such a contract shall include in | ||||||
| 21 | its annual budget and appropriations measures for each | ||||||
| 22 | subsequent fiscal year any amounts payable under guaranteed | ||||||
| 23 | energy savings contracts during that fiscal year. | ||||||
| 24 | (h) In cooperation with the contracting authority, the | ||||||
| 25 | executive agency facility shall document the operational and | ||||||
| 26 | energy cost savings specified in the guaranteed energy savings | ||||||
| |||||||
| |||||||
| 1 | contract and designate and appropriate that amount for an | ||||||
| 2 | annual payment of the contract. If the annual energy savings | ||||||
| 3 | are less than projected under the guaranteed energy savings | ||||||
| 4 | contract the contractor shall pay the difference as provided in | ||||||
| 5 | subsection (e) of this Section. | ||||||
| 6 | (i) An executive agency facility or contracting authority | ||||||
| 7 | may use funds designated for operating or capital expenditures | ||||||
| 8 | for any guaranteed energy savings contract including purchases | ||||||
| 9 | using installment payment contracts or lease purchase | ||||||
| 10 | agreements. An executive agency facility or contracting | ||||||
| 11 | authority that enters into such a contract or agreement may | ||||||
| 12 | covenant in the contract or agreement that payments made under | ||||||
| 13 | the contract or agreement shall be payable from the first funds | ||||||
| 14 | legally available in each fiscal year. | ||||||
| 15 | (j) Operating and maintenance funds and other amounts | ||||||
| 16 | appropriated for distribution to or reimbursement of an | ||||||
| 17 | executive agency facility or contracting authority shall not be | ||||||
| 18 | reduced as a result of energy savings realized from a | ||||||
| 19 | guaranteed energy savings contract or a lease purchase | ||||||
| 20 | agreement for the purchase and installation of energy | ||||||
| 21 | conservation measures. | ||||||
| 22 | (k) Other State laws and related administrative | ||||||
| 23 | requirements apply to this Section, including, but not limited | ||||||
| 24 | to, the following laws and related administrative | ||||||
| 25 | requirements: the Illinois Human Rights Act, the Prevailing | ||||||
| 26 | Wage Act, the Public Construction Bond Act, the Employment of | ||||||
| |||||||
| |||||||
| 1 | Illinois Workers on Public Works Act, the Freedom of | ||||||
| 2 | Information Act, the Open Meetings Act, the Illinois | ||||||
| 3 | Architecture Practice Act of 1989, the Professional | ||||||
| 4 | Engineering Practice Act of 1989, the Structural Engineering | ||||||
| 5 | Practice Act of 1989, the Local Government Professional | ||||||
| 6 | Services Selection Act, and the Contractor Unified License and | ||||||
| 7 | Permit Bond Act. | ||||||
| 8 | (l) In order to protect the integrity of historic | ||||||
| 9 | buildings, no provision of this Section shall be interpreted to | ||||||
| 10 | require the implementation of energy conservation measures | ||||||
| 11 | that conflict with respect to any property eligible for, | ||||||
| 12 | nominated to, or entered on the National Register of Historic | ||||||
| 13 | Places, pursuant to the federal National Historic Preservation | ||||||
| 14 | Act of 1966, or the Illinois Register of Historic Places, | ||||||
| 15 | pursuant to the Illinois Historic Preservation Act. | ||||||
| 16 | State
purchasing officers may enter into
energy conservation | ||||||
| 17 | program contracts that provide for utility
cost savings. The | ||||||
| 18 | chief procurement officer shall
promulgate and adopt rules for | ||||||
| 19 | the implementation of this Section.
| ||||||
| 20 | (Source: P.A. 90-572, eff. date - See Sec. 99-5.)".
| ||||||