Bill Amendment: IL HB4803 | 2025-2026 | 104th General Assembly
NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: ELECTRIC TRANSMISSION SITING
Status: 2026-04-17 - House Floor Amendment No. 2 Rule 19(c) / Re-referred to Rules Committee [HB4803 Detail]
Download: Illinois-2025-HB4803-House_Amendment_001.html
Bill Title: ELECTRIC TRANSMISSION SITING
Status: 2026-04-17 - House Floor Amendment No. 2 Rule 19(c) / Re-referred to Rules Committee [HB4803 Detail]
Download: Illinois-2025-HB4803-House_Amendment_001.html
| |||||||
| |||||||
| 1 | AMENDMENT TO HOUSE BILL 4803 | ||||||
| 2 | AMENDMENT NO. ______. Amend House Bill 4803 by replacing | ||||||
| 3 | everything after the enacting clause with the following: | ||||||
| 4 | "Section 1. Short title. This Act may be cited as the | ||||||
| 5 | Electric Transmission Colocation and Siting Priority Act. | ||||||
| 6 | Section 5. Definitions. As used in this Section: | ||||||
| 7 | "Authority" means the Illinois State Toll Highway | ||||||
| 8 | Authority. | ||||||
| 9 | "Commission" means the Illinois Commerce Commission. | ||||||
| 10 | "Department" means the Illinois Department of | ||||||
| 11 | Transportation. | ||||||
| 12 | "Electric transmission facility" means an electrical | ||||||
| 13 | transmission system designed and constructed with the | ||||||
| 14 | capability of being safely and reliably energized at 69 | ||||||
| 15 | kilovolts or more, including transmission lines, transmission | ||||||
| 16 | towers, conductors, insulators, foundations, grounding | ||||||
| |||||||
| |||||||
| 1 | systems, access roads, and all associated transmission | ||||||
| 2 | facilities, including transmission substations. "Electric | ||||||
| 3 | transmission facility" does not include a project located on | ||||||
| 4 | the electric generating side of a facility's point of | ||||||
| 5 | interconnection. | ||||||
| 6 | "Highway" has the meaning given to that term in Section | ||||||
| 7 | 2-202 of the Illinois Highway Code. | ||||||
| 8 | "High-voltage transmission line" means any line for the | ||||||
| 9 | transmission of electric current with a nominal voltage of at | ||||||
| 10 | least 115 kilovolts that is colocated longitudinally in a | ||||||
| 11 | public right-of-way or a corridor, including all supporting | ||||||
| 12 | structures and accessories necessary for such line. | ||||||
| 13 | "High-voltage transmission line" does not include any line for | ||||||
| 14 | the transmission of electric current that crosses through but | ||||||
| 15 | is not wholly contained within a State highway right-of-way. | ||||||
| 16 | "Public utility" has the meaning given to that term in | ||||||
| 17 | Section 3-105 of the Public Utilities Act. | ||||||
| 18 | "Public utility corridor" means the land, or interest | ||||||
| 19 | therein, acquired for or devoted to a public utility to place | ||||||
| 20 | and maintain infrastructure for electricity, water, gas, or | ||||||
| 21 | Internet service. | ||||||
| 22 | "Secretary" means the Secretary of Transportation. | ||||||
| 23 | "State highway corridor" means the land, or interest | ||||||
| 24 | therein, acquired for or devoted to a State highway. | ||||||
| 25 | "Transmission developer" means any company that (i) has | ||||||
| 26 | been issued a certificate of public convenience and necessity | ||||||
| |||||||
| |||||||
| 1 | in this State that authorizes the company to own and operate an | ||||||
| 2 | electric transmission line and (ii) is a State electric | ||||||
| 3 | utility, as defined in Section 16-102 of the Public Utilities | ||||||
| 4 | Act, or an affiliate of a State electric utility through a | ||||||
| 5 | common ownership structure. | ||||||
| 6 | Section 10. Electric transmission siting priorities. | ||||||
| 7 | (a) In the siting of new electric transmission facilities, | ||||||
| 8 | including high-voltage transmission lines, available corridors | ||||||
| 9 | shall be considered in the following order of priority: | ||||||
| 10 | (1) Existing public utility corridors. | ||||||
| 11 | (2) State highway corridors. | ||||||
| 12 | (3) New corridors. | ||||||
| 13 | (b) Consideration of the corridors listed in subsection | ||||||
| 14 | (a) shall be done, to the greatest extent possible, in a manner | ||||||
| 15 | that accounts for economic and engineering considerations, the | ||||||
| 16 | reliability of the electric system, and the protection of the | ||||||
| 17 | environment. The order of priority under subsection (a) shall | ||||||
| 18 | not apply to projects that have been sited on or before the | ||||||
| 19 | effective date of this Act. | ||||||
| 20 | Section 15. High-voltage transmission line colocation | ||||||
| 21 | requests. | ||||||
| 22 | (a) A public utility or transmission developer may | ||||||
| 23 | construct, place, or maintain a high-voltage transmission line | ||||||
| 24 | on a public right-of-way or along a highway if (i) the public | ||||||
| |||||||
| |||||||
| 1 | utility or transmission developer submits to the Secretary or | ||||||
| 2 | the Authority a colocation request for the high-voltage | ||||||
| 3 | transmission line and (ii) the Secretary or the Authority | ||||||
| 4 | reviews and approves the colocation request. | ||||||
| 5 | (b) The Secretary or the Authority may deny a colocation | ||||||
| 6 | request under this Section if the Secretary or the Authority | ||||||
| 7 | determines that the construction, placement, or maintenance of | ||||||
| 8 | a high-voltage transmission line on a public right-of-way or | ||||||
| 9 | along a highway would endanger public safety or would | ||||||
| 10 | interfere with the proper function of the highway. | ||||||
| 11 | (c) If the Secretary or the Authority denies a colocation | ||||||
| 12 | request under this Section, the Secretary or the Authority | ||||||
| 13 | shall submit the reasons for the denial to the Director of the | ||||||
| 14 | Environmental Protection Agency, the Executive Director of the | ||||||
| 15 | Commission, and the Director of Commerce and Economic | ||||||
| 16 | Opportunity within 90 days after the issuance of the denial. | ||||||
| 17 | Section 20. Consultation and constructability report. | ||||||
| 18 | (a) A public utility or transmission developer may submit | ||||||
| 19 | a written request to the Department or the Authority for an | ||||||
| 20 | evaluation of the corridors described in subsection (a) of | ||||||
| 21 | Section 10 for possible locations for a high-voltage | ||||||
| 22 | transmission line. Within 30 days after receipt of a written | ||||||
| 23 | request under this subsection (a), the Secretary or the | ||||||
| 24 | Authority shall assign a project coordinator to the request. A | ||||||
| 25 | project coordinator, upon assignment to a request, shall begin | ||||||
| |||||||
| |||||||
| 1 | the evaluation in coordination with the applicable public | ||||||
| 2 | utility or transmission developer. | ||||||
| 3 | (b) The Department or the Authority shall inform a public | ||||||
| 4 | utility or transmission developer about any of the | ||||||
| 5 | Department's or the Authority's current plans or projects that | ||||||
| 6 | could impact the public utility's or transmission developer's | ||||||
| 7 | potential construction or placement of a high-voltage | ||||||
| 8 | transmission line within a corridor. | ||||||
| 9 | (c) After an evaluation under subsection (a) identifies an | ||||||
| 10 | acceptable location within a corridor, a public utility or | ||||||
| 11 | transmission developer, in consultation with the Department or | ||||||
| 12 | the Authority, shall develop a constructability report. The | ||||||
| 13 | constructability report shall include (i) the terms and | ||||||
| 14 | conditions for the siting of the high-voltage transmission | ||||||
| 15 | line and (ii) an agreed-upon time frame during which the | ||||||
| 16 | Department or the Authority may not request the relocation of | ||||||
| 17 | the high-voltage transmission line. The Department or the | ||||||
| 18 | Authority shall issue a permit to the public utility or | ||||||
| 19 | transmission developer for the use of a public right-of-way | ||||||
| 20 | within the corridor for the siting of a high-voltage | ||||||
| 21 | transmission line only after a constructability report is | ||||||
| 22 | approved by both the Department or the Authority and the | ||||||
| 23 | public utility or transmission developer. | ||||||
| 24 | (d) A public utility or transmission developer and the | ||||||
| 25 | Department or the Authority shall follow the terms and | ||||||
| 26 | conditions of the approved constructability report during the | ||||||
| |||||||
| |||||||
| 1 | planning and approval process for the siting of a high-voltage | ||||||
| 2 | transmission line. If the Department or the Authority requires | ||||||
| 3 | the relocation of a high-voltage transmission line on a public | ||||||
| 4 | right-of-way by a specific date, the Department or the | ||||||
| 5 | Authority shall give the applicable public utility or | ||||||
| 6 | transmission developer notice of the required relocation at | ||||||
| 7 | the time the Department or the Authority becomes aware of the | ||||||
| 8 | need for the relocation. | ||||||
| 9 | Section 25. Project labor agreements. Electric | ||||||
| 10 | transmission facilities constructed or placed on a public | ||||||
| 11 | right-of-way or along a highway in accordance with this Act | ||||||
| 12 | shall be built by general contractors who have entered into a | ||||||
| 13 | project labor agreement prior to construction. | ||||||
| 14 | Section 99. Effective date. This Act takes effect upon | ||||||
| 15 | becoming law.". | ||||||