Bill Amendment: IL HB4615 | 2023-2024 | 103rd General Assembly
NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: CAMPGROUND HOT TUBS
Status: 2024-07-01 - Effective Date July 1, 2024 [HB4615 Detail]
Download: Illinois-2023-HB4615-Senate_Amendment_002.html
Bill Title: CAMPGROUND HOT TUBS
Status: 2024-07-01 - Effective Date July 1, 2024 [HB4615 Detail]
Download: Illinois-2023-HB4615-Senate_Amendment_002.html
| |||||||
| |||||||
| 1 | AMENDMENT TO HOUSE BILL 4615 | ||||||
| 2 | AMENDMENT NO. ______. Amend House Bill 4615, AS AMENDED, | ||||||
| 3 | by replacing everything after the enacting clause with the | ||||||
| 4 | following:
| ||||||
| 5 | "Section 5. The Illinois Administrative Procedure Act is | ||||||
| 6 | amended by renumbering and changing Section 5-45.35 as added | ||||||
| 7 | by Public Act 103-568 as follows:
| ||||||
| 8 | (5 ILCS 100/5-45.52) | ||||||
| 9 | (Section scheduled to be repealed on December 8, 2024) | ||||||
| 10 | Sec. 5-45.52 5-45.35. Emergency rulemaking; Public Act | ||||||
| 11 | 103-568 this amendatory Act of the 103rd General Assembly. To | ||||||
| 12 | provide for the expeditious and timely implementation of | ||||||
| 13 | Public Act 103-568 this amendatory Act of the 103rd General | ||||||
| 14 | Assembly, emergency rules implementing Public Act 103-568 this | ||||||
| 15 | amendatory Act of the 103rd General Assembly may be adopted in | ||||||
| 16 | accordance with Section 5-45 by the Department of Financial | ||||||
| |||||||
| |||||||
| 1 | and Professional Regulation. The adoption of emergency rules | ||||||
| 2 | authorized by Section 5-45 and this Section is deemed to be | ||||||
| 3 | necessary for the public interest, safety, and welfare. | ||||||
| 4 | This Section is repealed on August 4, 2025 one year after | ||||||
| 5 | the effective date of this amendatory Act of the 103rd General | ||||||
| 6 | Assembly. | ||||||
| 7 | (Source: P.A. 103-568, eff. 12-8-23; revised 12-22-23.)
| ||||||
| 8 | Section 10. The Department of Professional Regulation Law | ||||||
| 9 | of the Civil Administrative Code of Illinois is amended by | ||||||
| 10 | changing Section 2105-380 as follows:
| ||||||
| 11 | (20 ILCS 2105/2105-380) | ||||||
| 12 | (Section scheduled to be repealed on December 8, 2024) | ||||||
| 13 | Sec. 2105-380. Extension of expiration dates or renewal | ||||||
| 14 | periods for specified licenses, registrations, or | ||||||
| 15 | certificates. | ||||||
| 16 | (a) If the Secretary finds that there is a significant | ||||||
| 17 | operational need to do so or that it is necessary to do so to | ||||||
| 18 | avoid undue hardship on a class of individuals whose | ||||||
| 19 | professional licenses, registrations, or certificates are | ||||||
| 20 | issued by the Department, then the Secretary shall extend the | ||||||
| 21 | expiration date or renewal period of the license, | ||||||
| 22 | registration, or certificate of those individuals for a period | ||||||
| 23 | not to exceed the standard renewal period for those licenses, | ||||||
| 24 | registrations, or certificates. Factors that may be considered | ||||||
| |||||||
| |||||||
| 1 | by the Secretary when determining whether to extend the | ||||||
| 2 | expiration date or renewal period shall include, but are not | ||||||
| 3 | limited to: | ||||||
| 4 | (1) the number of applications pending; | ||||||
| 5 | (2) the percentage of applicants or licensees, | ||||||
| 6 | registrants, or certificate holders waiting for Department | ||||||
| 7 | action on their applications compared to the number of | ||||||
| 8 | licensees, registrants, or certificate holders in the | ||||||
| 9 | profession; | ||||||
| 10 | (3) the number of licenses, registrations, or | ||||||
| 11 | certificates that have expired while pending Department | ||||||
| 12 | action on renewal; | ||||||
| 13 | (4) whether there is a shortage of licensees, | ||||||
| 14 | registrants, or certificate holders providing the | ||||||
| 15 | professional service; | ||||||
| 16 | (5) the potential impact on the Department's | ||||||
| 17 | operational budget; and | ||||||
| 18 | (6) any other licensing-related factors that are | ||||||
| 19 | deemed relevant by the Department and are prescribed by | ||||||
| 20 | rule. | ||||||
| 21 | (b) The Secretary shall waive the payment of late fees for | ||||||
| 22 | a licensee, registrant, or certificate holder in a profession | ||||||
| 23 | whose expiration date or renewal period has been extended | ||||||
| 24 | under this Section and in those cases where Department | ||||||
| 25 | processing delays result in the expiration of a license, | ||||||
| 26 | registration, or certificate. | ||||||
| |||||||
| |||||||
| 1 | (c) The Department may adopt rules or emergency rules to | ||||||
| 2 | implement and administer this Section. | ||||||
| 3 | (d) This Section is repealed January 1, 2026 one year | ||||||
| 4 | after the effective date of this amendatory Act of the 103rd | ||||||
| 5 | General Assembly. | ||||||
| 6 | (Source: P.A. 103-568, eff. 12-8-23.)
| ||||||
| 7 | Section 15. The Illinois Grant Funds Recovery Act is | ||||||
| 8 | amended by changing Section 5.1 as follows:
| ||||||
| 9 | (30 ILCS 705/5.1) | ||||||
| 10 | (Section scheduled to be repealed on July 31, 2024) | ||||||
| 11 | Sec. 5.1. Restoration of grant award. | ||||||
| 12 | (a) A grantee who received an award pursuant to the Open | ||||||
| 13 | Space Lands Acquisition and Development Act who was unable to | ||||||
| 14 | complete the project within the 2 years required by Section 5 | ||||||
| 15 | due to the COVID-19 public health emergency, and whose grant | ||||||
| 16 | agreement expired between January 1, 2021 and July 29, 2021, | ||||||
| 17 | shall be eligible for an award under the same terms as the | ||||||
| 18 | expired grant agreement, subject to the availability of | ||||||
| 19 | appropriated moneys in the fund from which the original | ||||||
| 20 | disbursement to the grantee was made. The grantee must | ||||||
| 21 | demonstrate prior compliance with the terms and conditions of | ||||||
| 22 | the expired award to be eligible for funding under this | ||||||
| 23 | Section. | ||||||
| 24 | (b) Any grant funds not expended or legally obligated by | ||||||
| |||||||
| |||||||
| 1 | the expiration of the newly executed agreement must be | ||||||
| 2 | returned to the grantor agency within 45 days, if the funds are | ||||||
| 3 | not already on deposit with the grantor agency or the State | ||||||
| 4 | Treasurer. Such returned funds shall be deposited into the | ||||||
| 5 | fund from which the original grant disbursement to the grantee | ||||||
| 6 | was made. | ||||||
| 7 | (c) This Section is repealed on July 1, 2025 July 31, 2024. | ||||||
| 8 | (Source: P.A. 102-699, eff. 4-19-22.)
| ||||||
| 9 | Section 20. The Small Wireless Facilities Deployment Act | ||||||
| 10 | is amended by changing Sections 15, 25, and 90 as follows:
| ||||||
| 11 | (50 ILCS 840/15) (was 50 ILCS 835/15) | ||||||
| 12 | (Section scheduled to be repealed on December 31, 2024) | ||||||
| 13 | Sec. 15. Regulation of small wireless facilities. | ||||||
| 14 | (a) This Section applies to activities of a wireless | ||||||
| 15 | provider within or outside rights-of-way. | ||||||
| 16 | (b) Except as provided in this Section, an authority may | ||||||
| 17 | not prohibit, regulate, or charge for the collocation of small | ||||||
| 18 | wireless facilities. | ||||||
| 19 | (c) Small wireless facilities shall be classified as | ||||||
| 20 | permitted uses and subject to administrative review in | ||||||
| 21 | conformance with this Act, except as provided in paragraph (5) | ||||||
| 22 | of subsection (d) of this Section regarding height exceptions | ||||||
| 23 | or variances, but not subject to zoning review or approval if | ||||||
| 24 | they are collocated (i) in rights-of-way in any zone, or (ii) | ||||||
| |||||||
| |||||||
| 1 | outside rights-of-way in property zoned exclusively for | ||||||
| 2 | commercial or industrial use. | ||||||
| 3 | (d) An authority may require an applicant to obtain one or | ||||||
| 4 | more permits to collocate a small wireless facility. An | ||||||
| 5 | authority shall receive applications for, process, and issue | ||||||
| 6 | permits subject to the following requirements: | ||||||
| 7 | (1) An authority may not directly or indirectly | ||||||
| 8 | require an applicant to perform services unrelated to the | ||||||
| 9 | collocation for which approval is sought, such as in-kind | ||||||
| 10 | contributions to the authority, including reserving fiber, | ||||||
| 11 | conduit, or utility pole space for the authority on the | ||||||
| 12 | wireless provider's utility pole. An authority may reserve | ||||||
| 13 | space on authority utility poles for future public safety | ||||||
| 14 | uses or for the authority's electric utility uses, but a | ||||||
| 15 | reservation of space may not preclude the collocation of a | ||||||
| 16 | small wireless facility unless the authority reasonably | ||||||
| 17 | determines that the authority utility pole cannot | ||||||
| 18 | accommodate both uses. | ||||||
| 19 | (2) An applicant shall not be required to provide more | ||||||
| 20 | information to obtain a permit than the authority requires | ||||||
| 21 | of a communications service provider that is not a | ||||||
| 22 | wireless provider that requests to attach facilities to a | ||||||
| 23 | structure; however, a wireless provider may be required to | ||||||
| 24 | provide the following information when seeking a permit to | ||||||
| 25 | collocate small wireless facilities on a utility pole or | ||||||
| 26 | wireless support structure: | ||||||
| |||||||
| |||||||
| 1 | (A) site specific structural integrity and, for an | ||||||
| 2 | authority utility pole, make-ready analysis prepared | ||||||
| 3 | by a structural engineer, as that term is defined in | ||||||
| 4 | Section 4 of the Structural Engineering Practice Act | ||||||
| 5 | of 1989; | ||||||
| 6 | (B) the location where each proposed small | ||||||
| 7 | wireless facility or utility pole would be installed | ||||||
| 8 | and photographs of the location and its immediate | ||||||
| 9 | surroundings depicting the utility poles or structures | ||||||
| 10 | on which each proposed small wireless facility would | ||||||
| 11 | be mounted or location where utility poles or | ||||||
| 12 | structures would be installed; | ||||||
| 13 | (C) specifications and drawings prepared by a | ||||||
| 14 | structural engineer, as that term is defined in | ||||||
| 15 | Section 4 of the Structural Engineering Practice Act | ||||||
| 16 | of 1989, for each proposed small wireless facility | ||||||
| 17 | covered by the application as it is proposed to be | ||||||
| 18 | installed; | ||||||
| 19 | (D) the equipment type and model numbers for the | ||||||
| 20 | antennas and all other wireless equipment associated | ||||||
| 21 | with the small wireless facility; | ||||||
| 22 | (E) a proposed schedule for the installation and | ||||||
| 23 | completion of each small wireless facility covered by | ||||||
| 24 | the application, if approved; | ||||||
| 25 | (F) certification that the collocation complies | ||||||
| 26 | with paragraph (6) to the best of the applicant's | ||||||
| |||||||
| |||||||
| 1 | knowledge; and | ||||||
| 2 | (G) the wireless provider's certification from a | ||||||
| 3 | radio engineer that it operates the small wireless | ||||||
| 4 | facility within all applicable FCC standards. | ||||||
| 5 | (3) Subject to paragraph (6), an authority may not | ||||||
| 6 | require the placement of small wireless facilities on any | ||||||
| 7 | specific utility pole, or category of utility poles, or | ||||||
| 8 | require multiple antenna systems on a single utility pole; | ||||||
| 9 | however, with respect to an application for the | ||||||
| 10 | collocation of a small wireless facility associated with a | ||||||
| 11 | new utility pole, an authority may propose that the small | ||||||
| 12 | wireless facility be collocated on an existing utility | ||||||
| 13 | pole or existing wireless support structure within 200 | ||||||
| 14 | feet of the proposed collocation, which the applicant | ||||||
| 15 | shall accept if it has the right to use the alternate | ||||||
| 16 | structure on reasonable terms and conditions and the | ||||||
| 17 | alternate location and structure does not impose technical | ||||||
| 18 | limits or additional material costs as determined by the | ||||||
| 19 | applicant. The authority may require the applicant to | ||||||
| 20 | provide a written certification describing the property | ||||||
| 21 | rights, technical limits or material cost reasons the | ||||||
| 22 | alternate location does not satisfy the criteria in this | ||||||
| 23 | paragraph (3). | ||||||
| 24 | (4) Subject to paragraph (6), an authority may not | ||||||
| 25 | limit the placement of small wireless facilities mounted | ||||||
| 26 | on a utility pole or a wireless support structure by | ||||||
| |||||||
| |||||||
| 1 | minimum horizontal separation distances. | ||||||
| 2 | (5) An authority may limit the maximum height of a | ||||||
| 3 | small wireless facility to 10 feet above the utility pole | ||||||
| 4 | or wireless support structure on which the small wireless | ||||||
| 5 | facility is collocated. Subject to any applicable waiver, | ||||||
| 6 | zoning, or other process that addresses wireless provider | ||||||
| 7 | requests for an exception or variance and does not | ||||||
| 8 | prohibit granting of such exceptions or variances, the | ||||||
| 9 | authority may limit the height of new or replacement | ||||||
| 10 | utility poles or wireless support structures on which | ||||||
| 11 | small wireless facilities are collocated to the higher of: | ||||||
| 12 | (i) 10 feet in height above the tallest existing utility | ||||||
| 13 | pole, other than a utility pole supporting only wireless | ||||||
| 14 | facilities, that is in place on the date the application | ||||||
| 15 | is submitted to the authority, that is located within 300 | ||||||
| 16 | feet of the new or replacement utility pole or wireless | ||||||
| 17 | support structure and that is in the same right-of-way | ||||||
| 18 | within the jurisdictional boundary of the authority, | ||||||
| 19 | provided the authority may designate which intersecting | ||||||
| 20 | right-of-way within 300 feet of the proposed utility pole | ||||||
| 21 | or wireless support structures shall control the height | ||||||
| 22 | limitation for such facility; or (ii) 45 feet above ground | ||||||
| 23 | level. | ||||||
| 24 | (6) An authority may require that: | ||||||
| 25 | (A) the wireless provider's operation of the small | ||||||
| 26 | wireless facilities does not interfere with the | ||||||
| |||||||
| |||||||
| 1 | frequencies used by a public safety agency for public | ||||||
| 2 | safety communications; a wireless provider shall | ||||||
| 3 | install small wireless facilities of the type and | ||||||
| 4 | frequency that will not cause unacceptable | ||||||
| 5 | interference with a public safety agency's | ||||||
| 6 | communications equipment; unacceptable interference | ||||||
| 7 | will be determined by and measured in accordance with | ||||||
| 8 | industry standards and the FCC's regulations | ||||||
| 9 | addressing unacceptable interference to public safety | ||||||
| 10 | spectrum or any other spectrum licensed by a public | ||||||
| 11 | safety agency; if a small wireless facility causes | ||||||
| 12 | such interference, and the wireless provider has been | ||||||
| 13 | given written notice of the interference by the public | ||||||
| 14 | safety agency, the wireless provider, at its own | ||||||
| 15 | expense, shall take all reasonable steps necessary to | ||||||
| 16 | correct and eliminate the interference, including, but | ||||||
| 17 | not limited to, powering down the small wireless | ||||||
| 18 | facility and later powering up the small wireless | ||||||
| 19 | facility for intermittent testing, if necessary; the | ||||||
| 20 | authority may terminate a permit for a small wireless | ||||||
| 21 | facility based on such interference if the wireless | ||||||
| 22 | provider is not making a good faith effort to remedy | ||||||
| 23 | the problem in a manner consistent with the abatement | ||||||
| 24 | and resolution procedures for interference with public | ||||||
| 25 | safety spectrum established by the FCC including 47 | ||||||
| 26 | CFR 22.970 through 47 CFR 22.973 and 47 CFR 90.672 | ||||||
| |||||||
| |||||||
| 1 | through 47 CFR 90.675; | ||||||
| 2 | (B) the wireless provider comply with requirements | ||||||
| 3 | that are imposed by a contract between an authority | ||||||
| 4 | and a private property owner that concern design or | ||||||
| 5 | construction standards applicable to utility poles and | ||||||
| 6 | ground-mounted equipment located in the right-of-way; | ||||||
| 7 | (C) the wireless provider comply with applicable | ||||||
| 8 | spacing requirements in applicable codes and | ||||||
| 9 | ordinances concerning the location of ground-mounted | ||||||
| 10 | equipment located in the right-of-way if the | ||||||
| 11 | requirements include a waiver, zoning, or other | ||||||
| 12 | process that addresses wireless provider requests for | ||||||
| 13 | exception or variance and do not prohibit granting of | ||||||
| 14 | such exceptions or variances; | ||||||
| 15 | (D) the wireless provider comply with local code | ||||||
| 16 | provisions or regulations concerning undergrounding | ||||||
| 17 | requirements that prohibit the installation of new or | ||||||
| 18 | the modification of existing utility poles in a | ||||||
| 19 | right-of-way without prior approval if the | ||||||
| 20 | requirements include a waiver, zoning, or other | ||||||
| 21 | process that addresses requests to install such new | ||||||
| 22 | utility poles or modify such existing utility poles | ||||||
| 23 | and do not prohibit the replacement of utility poles; | ||||||
| 24 | (E) the wireless provider comply with generally | ||||||
| 25 | applicable standards that are consistent with this Act | ||||||
| 26 | and adopted by an authority for construction and | ||||||
| |||||||
| |||||||
| 1 | public safety in the rights-of-way, including, but not | ||||||
| 2 | limited to, reasonable and nondiscriminatory wiring | ||||||
| 3 | and cabling requirements, grounding requirements, | ||||||
| 4 | utility pole extension requirements, acoustic | ||||||
| 5 | regulations, and signage limitations; and shall comply | ||||||
| 6 | with reasonable and nondiscriminatory requirements | ||||||
| 7 | that are consistent with this Act and adopted by an | ||||||
| 8 | authority regulating the location, size, surface area | ||||||
| 9 | and height of small wireless facilities, or the | ||||||
| 10 | abandonment and removal of small wireless facilities; | ||||||
| 11 | (F) the wireless provider not collocate small | ||||||
| 12 | wireless facilities on authority utility poles that | ||||||
| 13 | are part of an electric distribution or transmission | ||||||
| 14 | system within the communication worker safety zone of | ||||||
| 15 | the pole or the electric supply zone of the pole; | ||||||
| 16 | however, the antenna and support equipment of the | ||||||
| 17 | small wireless facility may be located in the | ||||||
| 18 | communications space on the authority utility pole and | ||||||
| 19 | on the top of the pole, if not otherwise unavailable, | ||||||
| 20 | if the wireless provider complies with applicable | ||||||
| 21 | codes for work involving the top of the pole; for | ||||||
| 22 | purposes of this subparagraph (F), the terms | ||||||
| 23 | "communications space", "communication worker safety | ||||||
| 24 | zone", and "electric supply zone" have the meanings | ||||||
| 25 | given to those terms in the National Electric Safety | ||||||
| 26 | Code as published by the Institute of Electrical and | ||||||
| |||||||
| |||||||
| 1 | Electronics Engineers; | ||||||
| 2 | (G) the wireless provider comply with the | ||||||
| 3 | applicable codes and local code provisions or | ||||||
| 4 | regulations that concern public safety; | ||||||
| 5 | (H) the wireless provider comply with written | ||||||
| 6 | design standards that are generally applicable for | ||||||
| 7 | decorative utility poles, or reasonable stealth, | ||||||
| 8 | concealment, and aesthetic requirements that are | ||||||
| 9 | identified by the authority in an ordinance, written | ||||||
| 10 | policy adopted by the governing board of the | ||||||
| 11 | authority, a comprehensive plan, or other written | ||||||
| 12 | design plan that applies to other occupiers of the | ||||||
| 13 | rights-of-way, including on a historic landmark or in | ||||||
| 14 | a historic district; | ||||||
| 15 | (I) subject to subsection (c) of this Section, and | ||||||
| 16 | except for facilities excluded from evaluation for | ||||||
| 17 | effects on historic properties under 47 CFR | ||||||
| 18 | 1.1307(a)(4), reasonable, technically feasible and | ||||||
| 19 | non-discriminatory design or concealment measures in a | ||||||
| 20 | historic district or historic landmark; any such | ||||||
| 21 | design or concealment measures, including restrictions | ||||||
| 22 | on a specific category of poles, may not have the | ||||||
| 23 | effect of prohibiting any provider's technology; such | ||||||
| 24 | design and concealment measures shall not be | ||||||
| 25 | considered a part of the small wireless facility for | ||||||
| 26 | purposes of the size restrictions of a small wireless | ||||||
| |||||||
| |||||||
| 1 | facility; this paragraph may not be construed to limit | ||||||
| 2 | an authority's enforcement of historic preservation in | ||||||
| 3 | conformance with the requirements adopted pursuant to | ||||||
| 4 | the Illinois State Agency Historic Resources | ||||||
| 5 | Preservation Act or the National Historic Preservation | ||||||
| 6 | Act of 1966, 54 U.S.C. Section 300101 et seq., and the | ||||||
| 7 | regulations adopted to implement those laws; and | ||||||
| 8 | (J) When a wireless provider replaces or adds a | ||||||
| 9 | new radio transceiver or antennas to an existing small | ||||||
| 10 | wireless facility, certification by the wireless | ||||||
| 11 | provider from a radio engineer that the continuing | ||||||
| 12 | operation of the small wireless facility complies with | ||||||
| 13 | all applicable FCC standards. | ||||||
| 14 | (7) Within 30 days after receiving an application, an | ||||||
| 15 | authority must determine whether the application is | ||||||
| 16 | complete and notify the applicant. If an application is | ||||||
| 17 | incomplete, an authority must specifically identify the | ||||||
| 18 | missing information. An application shall be deemed | ||||||
| 19 | complete if the authority fails to provide notification to | ||||||
| 20 | the applicant within 30 days after when all documents, | ||||||
| 21 | information, and fees specifically enumerated in the | ||||||
| 22 | authority's permit application form are submitted by the | ||||||
| 23 | applicant to the authority. Processing deadlines are | ||||||
| 24 | tolled from the time the authority sends the notice of | ||||||
| 25 | incompleteness to the time the applicant provides the | ||||||
| 26 | missing information. | ||||||
| |||||||
| |||||||
| 1 | (8) An authority shall process applications as | ||||||
| 2 | follows: | ||||||
| 3 | (A) an application to collocate a small wireless | ||||||
| 4 | facility on an existing utility pole or wireless | ||||||
| 5 | support structure shall be processed on a | ||||||
| 6 | nondiscriminatory basis and deemed approved if the | ||||||
| 7 | authority fails to approve or deny the application | ||||||
| 8 | within 90 days; however, if an applicant intends to | ||||||
| 9 | proceed with the permitted activity on a deemed | ||||||
| 10 | approved basis, the applicant must notify the | ||||||
| 11 | authority in writing of its intention to invoke the | ||||||
| 12 | deemed approved remedy no sooner than 75 days after | ||||||
| 13 | the submission of a completed application; the permit | ||||||
| 14 | shall be deemed approved on the latter of the 90th day | ||||||
| 15 | after submission of the complete application or the | ||||||
| 16 | 10th day after the receipt of the deemed approved | ||||||
| 17 | notice by the authority; the receipt of the deemed | ||||||
| 18 | approved notice shall not preclude the authority's | ||||||
| 19 | denial of the permit request within the time limits as | ||||||
| 20 | provided under this Act; and | ||||||
| 21 | (B) an application to collocate a small wireless | ||||||
| 22 | facility that includes the installation of a new | ||||||
| 23 | utility pole shall be processed on a nondiscriminatory | ||||||
| 24 | basis and deemed approved if the authority fails to | ||||||
| 25 | approve or deny the application within 120 days; | ||||||
| 26 | however, if an applicant intends to proceed with the | ||||||
| |||||||
| |||||||
| 1 | permitted activity on a deemed approved basis, the | ||||||
| 2 | applicant must notify the authority in writing of its | ||||||
| 3 | intention to invoke the deemed approved remedy no | ||||||
| 4 | sooner than 105 days after the submission of a | ||||||
| 5 | completed application; the permit shall be deemed | ||||||
| 6 | approved on the latter of the 120th day after | ||||||
| 7 | submission of the complete application or the 10th day | ||||||
| 8 | after the receipt of the deemed approved notice by the | ||||||
| 9 | authority; the receipt of the deemed approved notice | ||||||
| 10 | shall not preclude the authority's denial of the | ||||||
| 11 | permit request within the time limits as provided | ||||||
| 12 | under this Act. | ||||||
| 13 | (9) An authority shall approve an application unless | ||||||
| 14 | the application does not meet the requirements of this | ||||||
| 15 | Act. If an authority determines that applicable codes, | ||||||
| 16 | local code provisions or regulations that concern public | ||||||
| 17 | safety, or the requirements of paragraph (6) require that | ||||||
| 18 | the utility pole or wireless support structure be replaced | ||||||
| 19 | before the requested collocation, approval may be | ||||||
| 20 | conditioned on the replacement of the utility pole or | ||||||
| 21 | wireless support structure at the cost of the provider. | ||||||
| 22 | The authority must document the basis for a denial, | ||||||
| 23 | including the specific code provisions or application | ||||||
| 24 | conditions on which the denial was based, and send the | ||||||
| 25 | documentation to the applicant on or before the day the | ||||||
| 26 | authority denies an application. The applicant may cure | ||||||
| |||||||
| |||||||
| 1 | the deficiencies identified by the authority and resubmit | ||||||
| 2 | the revised application once within 30 days after notice | ||||||
| 3 | of denial is sent to the applicant without paying an | ||||||
| 4 | additional application fee. The authority shall approve or | ||||||
| 5 | deny the revised application within 30 days after the | ||||||
| 6 | applicant resubmits the application or it is deemed | ||||||
| 7 | approved; however, the applicant must notify the authority | ||||||
| 8 | in writing of its intention to proceed with the permitted | ||||||
| 9 | activity on a deemed approved basis, which may be | ||||||
| 10 | submitted with the resubmitted application. Any subsequent | ||||||
| 11 | review shall be limited to the deficiencies cited in the | ||||||
| 12 | denial. However, this revised application cure does not | ||||||
| 13 | apply if the cure requires the review of a new location, | ||||||
| 14 | new or different structure to be collocated upon, new | ||||||
| 15 | antennas, or other wireless equipment associated with the | ||||||
| 16 | small wireless facility. | ||||||
| 17 | (10) The time period for applications may be further | ||||||
| 18 | tolled by: | ||||||
| 19 | (A) the express agreement in writing by both the | ||||||
| 20 | applicant and the authority; or | ||||||
| 21 | (B) a local, State, or federal disaster | ||||||
| 22 | declaration or similar emergency that causes the | ||||||
| 23 | delay. | ||||||
| 24 | (11) An applicant seeking to collocate small wireless | ||||||
| 25 | facilities within the jurisdiction of a single authority | ||||||
| 26 | shall be allowed, at the applicant's discretion, to file a | ||||||
| |||||||
| |||||||
| 1 | consolidated application and receive a single permit for | ||||||
| 2 | the collocation of up to 25 small wireless facilities if | ||||||
| 3 | the collocations each involve substantially the same type | ||||||
| 4 | of small wireless facility and substantially the same type | ||||||
| 5 | of structure. If an application includes multiple small | ||||||
| 6 | wireless facilities, the authority may remove small | ||||||
| 7 | wireless facility collocations from the application and | ||||||
| 8 | treat separately small wireless facility collocations for | ||||||
| 9 | which incomplete information has been provided or that do | ||||||
| 10 | not qualify for consolidated treatment or that are denied. | ||||||
| 11 | The authority may issue separate permits for each | ||||||
| 12 | collocation that is approved in a consolidated | ||||||
| 13 | application. | ||||||
| 14 | (12) Collocation for which a permit is granted shall | ||||||
| 15 | be completed within 180 days after issuance of the permit, | ||||||
| 16 | unless the authority and the wireless provider agree to | ||||||
| 17 | extend this period or a delay is caused by make-ready work | ||||||
| 18 | for an authority utility pole or by the lack of commercial | ||||||
| 19 | power or backhaul availability at the site, provided the | ||||||
| 20 | wireless provider has made a timely request within 60 days | ||||||
| 21 | after the issuance of the permit for commercial power or | ||||||
| 22 | backhaul services, and the additional time to complete | ||||||
| 23 | installation does not exceed 360 days after issuance of | ||||||
| 24 | the permit. Otherwise, the permit shall be void unless the | ||||||
| 25 | authority grants an extension in writing to the applicant. | ||||||
| 26 | (13) The duration of a permit shall be for a period of | ||||||
| |||||||
| |||||||
| 1 | not less than 5 years, and the permit shall be renewed for | ||||||
| 2 | equivalent durations unless the authority makes a finding | ||||||
| 3 | that the small wireless facilities or the new or modified | ||||||
| 4 | utility pole do not comply with the applicable codes or | ||||||
| 5 | local code provisions or regulations in paragraphs (6) and | ||||||
| 6 | (9). If this Act is repealed as provided in Section 90, | ||||||
| 7 | renewals of permits shall be subject to the applicable | ||||||
| 8 | authority code provisions or regulations in effect at the | ||||||
| 9 | time of renewal. | ||||||
| 10 | (14) An authority may not prohibit, either expressly | ||||||
| 11 | or de facto, the (i) filing, receiving, or processing | ||||||
| 12 | applications, or (ii) issuing of permits or other | ||||||
| 13 | approvals, if any, for the collocation of small wireless | ||||||
| 14 | facilities unless there has been a local, State, or | ||||||
| 15 | federal disaster declaration or similar emergency that | ||||||
| 16 | causes the delay. | ||||||
| 17 | (15) Applicants shall submit applications, supporting | ||||||
| 18 | information, and notices by personal delivery or as | ||||||
| 19 | otherwise required by the authority. An authority may | ||||||
| 20 | require that permits, supporting information, and notices | ||||||
| 21 | be submitted by personal delivery at the authority's | ||||||
| 22 | designated place of business, by regular mail postmarked | ||||||
| 23 | on the date due, or by any other commonly used means, | ||||||
| 24 | including electronic mail, as required by the authority. | ||||||
| 25 | (e) Application fees are subject to the following | ||||||
| 26 | requirements: | ||||||
| |||||||
| |||||||
| 1 | (1) An authority may charge an application fee of up | ||||||
| 2 | to $650 for an application to collocate a single small | ||||||
| 3 | wireless facility on an existing utility pole or wireless | ||||||
| 4 | support structure and up to $350 for each small wireless | ||||||
| 5 | facility addressed in an application to collocate more | ||||||
| 6 | than one small wireless facility on existing utility poles | ||||||
| 7 | or wireless support structures. | ||||||
| 8 | (2) An authority may charge an application fee of | ||||||
| 9 | $1,000 for each small wireless facility addressed in an | ||||||
| 10 | application that includes the installation of a new | ||||||
| 11 | utility pole for such collocation. | ||||||
| 12 | (3) Notwithstanding any contrary provision of State | ||||||
| 13 | law or local ordinance, applications pursuant to this | ||||||
| 14 | Section must be accompanied by the required application | ||||||
| 15 | fee. | ||||||
| 16 | (4) Within 2 months after the effective date of this | ||||||
| 17 | Act, an authority shall make available application fees | ||||||
| 18 | consistent with this subsection, through ordinance, or in | ||||||
| 19 | a written schedule of permit fees adopted by the | ||||||
| 20 | authority. | ||||||
| 21 | (5) Notwithstanding any provision of this Act to the | ||||||
| 22 | contrary, an authority may charge recurring rates and | ||||||
| 23 | application fees up to the amount permitted by the Federal | ||||||
| 24 | Communication Commission in its Declaratory Ruling and | ||||||
| 25 | Third Report and Order adopted on September 26, 2018 in WT | ||||||
| 26 | Docket Nos. 17-70, 17-84 and cited as 33 FCC Rcd 9088, | ||||||
| |||||||
| |||||||
| 1 | 9129, or any subsequent ruling, order, or guidance issued | ||||||
| 2 | by the Federal Communication Commission regarding fees and | ||||||
| 3 | recurring rates. | ||||||
| 4 | (f) An authority shall not require an application, | ||||||
| 5 | approval, or permit, or require any fees or other charges, | ||||||
| 6 | from a communications service provider authorized to occupy | ||||||
| 7 | the rights-of-way, for: (i) routine maintenance; (ii) the | ||||||
| 8 | replacement of wireless facilities with wireless facilities | ||||||
| 9 | that are substantially similar, the same size, or smaller if | ||||||
| 10 | the wireless provider notifies the authority at least 10 days | ||||||
| 11 | prior to the planned replacement and includes equipment | ||||||
| 12 | specifications for the replacement of equipment consistent | ||||||
| 13 | with the requirements of subparagraph (D) of paragraph (2) of | ||||||
| 14 | subsection (d) of this Section; or (iii) the installation, | ||||||
| 15 | placement, maintenance, operation, or replacement of micro | ||||||
| 16 | wireless facilities that are suspended on cables that are | ||||||
| 17 | strung between existing utility poles in compliance with | ||||||
| 18 | applicable safety codes. However, an authority may require a | ||||||
| 19 | permit to work within rights-of-way for activities that affect | ||||||
| 20 | traffic patterns or require lane closures. | ||||||
| 21 | (g) Nothing in this Act authorizes a person to collocate | ||||||
| 22 | small wireless facilities on: (1) property owned by a private | ||||||
| 23 | party or property owned or controlled by a unit of local | ||||||
| 24 | government that is not located within rights-of-way, subject | ||||||
| 25 | to subsection (j) of this Section, or a privately owned | ||||||
| 26 | utility pole or wireless support structure without the consent | ||||||
| |||||||
| |||||||
| 1 | of the property owner; (2) property owned, leased, or | ||||||
| 2 | controlled by a park district, forest preserve district, or | ||||||
| 3 | conservation district for public park, recreation, or | ||||||
| 4 | conservation purposes without the consent of the affected | ||||||
| 5 | district, excluding the placement of facilities on | ||||||
| 6 | rights-of-way located in an affected district that are under | ||||||
| 7 | the jurisdiction and control of a different unit of local | ||||||
| 8 | government as provided by the Illinois Highway Code; or (3) | ||||||
| 9 | property owned by a rail carrier registered under Section | ||||||
| 10 | 18c-7201 of the Illinois Vehicle Code, Metra Commuter Rail or | ||||||
| 11 | any other public commuter rail service, or an electric utility | ||||||
| 12 | as defined in Section 16-102 of the Public Utilities Act, | ||||||
| 13 | without the consent of the rail carrier, public commuter rail | ||||||
| 14 | service, or electric utility. The provisions of this Act do | ||||||
| 15 | not apply to an electric or gas public utility or such | ||||||
| 16 | utility's wireless facilities if the facilities are being | ||||||
| 17 | used, developed, and maintained consistent with the provisions | ||||||
| 18 | of subsection (i) of Section 16-108.5 of the Public Utilities | ||||||
| 19 | Act. | ||||||
| 20 | For the purposes of this subsection, "public utility" has | ||||||
| 21 | the meaning given to that term in Section 3-105 of the Public | ||||||
| 22 | Utilities Act. Nothing in this Act shall be construed to | ||||||
| 23 | relieve any person from any requirement (1) to obtain a | ||||||
| 24 | franchise or a State-issued authorization to offer cable | ||||||
| 25 | service or video service or (2) to obtain any required | ||||||
| 26 | permission to install, place, maintain, or operate | ||||||
| |||||||
| |||||||
| 1 | communications facilities, other than small wireless | ||||||
| 2 | facilities subject to this Act. | ||||||
| 3 | (h) Agreements between authorities and wireless providers | ||||||
| 4 | that relate to the collocation of small wireless facilities in | ||||||
| 5 | the right-of-way, including the collocation of small wireless | ||||||
| 6 | facilities on authority utility poles, that are in effect on | ||||||
| 7 | the effective date of this Act remain in effect for all small | ||||||
| 8 | wireless facilities collocated on the authority's utility | ||||||
| 9 | poles pursuant to applications submitted to the authority | ||||||
| 10 | before the effective date of this Act, subject to applicable | ||||||
| 11 | termination provisions. Such agreements entered into after the | ||||||
| 12 | effective date of the Act shall comply with the Act. | ||||||
| 13 | (i) An authority shall allow the collocation of small | ||||||
| 14 | wireless facilities on authority utility poles subject to the | ||||||
| 15 | following: | ||||||
| 16 | (1) An authority may not enter into an exclusive | ||||||
| 17 | arrangement with any person for the right to attach small | ||||||
| 18 | wireless facilities to authority utility poles. | ||||||
| 19 | (2) The rates and fees for collocations on authority | ||||||
| 20 | utility poles shall be nondiscriminatory regardless of the | ||||||
| 21 | services provided by the collocating person. | ||||||
| 22 | (3) An authority may charge an annual recurring rate | ||||||
| 23 | to collocate a small wireless facility on an authority | ||||||
| 24 | utility pole located in a right-of-way that equals (i) | ||||||
| 25 | $270 $200 per year or (ii) the actual, direct, and | ||||||
| 26 | reasonable costs related to the wireless provider's use of | ||||||
| |||||||
| |||||||
| 1 | space on the authority utility pole. Rates for collocation | ||||||
| 2 | on authority utility poles located outside of a | ||||||
| 3 | right-of-way are not subject to these limitations. In any | ||||||
| 4 | controversy concerning the appropriateness of a cost-based | ||||||
| 5 | rate for an authority utility pole located within a | ||||||
| 6 | right-of-way, the authority shall have the burden of | ||||||
| 7 | proving that the rate does not exceed the actual, direct, | ||||||
| 8 | and reasonable costs for the applicant's proposed use of | ||||||
| 9 | the authority utility pole. Nothing in this paragraph (3) | ||||||
| 10 | prohibits a wireless provider and an authority from | ||||||
| 11 | mutually agreeing to an annual recurring rate of less than | ||||||
| 12 | $270 $200 to collocate a small wireless facility on an | ||||||
| 13 | authority utility pole. | ||||||
| 14 | (4) Authorities or other persons owning or controlling | ||||||
| 15 | authority utility poles within the right-of-way shall | ||||||
| 16 | offer rates, fees, and other terms that comply with | ||||||
| 17 | subparagraphs (A) through (E) of this paragraph (4). | ||||||
| 18 | Within 2 months after the effective date of this Act, an | ||||||
| 19 | authority or a person owning or controlling authority | ||||||
| 20 | utility poles shall make available, through ordinance or | ||||||
| 21 | an authority utility pole attachment agreement, license or | ||||||
| 22 | other agreement that makes available to wireless | ||||||
| 23 | providers, the rates, fees, and terms for the collocation | ||||||
| 24 | of small wireless facilities on authority utility poles | ||||||
| 25 | that comply with this Act and with subparagraphs (A) | ||||||
| 26 | through (E) of this paragraph (4). In the absence of such | ||||||
| |||||||
| |||||||
| 1 | an ordinance or agreement that complies with this Act, and | ||||||
| 2 | until such a compliant ordinance or agreement is adopted, | ||||||
| 3 | wireless providers may collocate small wireless facilities | ||||||
| 4 | and install utility poles under the requirements of this | ||||||
| 5 | Act. | ||||||
| 6 | (A) The rates, fees, and terms must be | ||||||
| 7 | nondiscriminatory, competitively neutral, and | ||||||
| 8 | commercially reasonable, and may address, among other | ||||||
| 9 | requirements, the requirements in subparagraphs (A) | ||||||
| 10 | through (I) of paragraph (6) of subsection (d) of this | ||||||
| 11 | Section; subsections (e), (i), and (k) of this | ||||||
| 12 | Section; Section 30; and Section 35, and must comply | ||||||
| 13 | with this Act. | ||||||
| 14 | (B) For authority utility poles that support | ||||||
| 15 | aerial facilities used to provide communications | ||||||
| 16 | services or electric service, wireless providers shall | ||||||
| 17 | comply with the process for make-ready work under 47 | ||||||
| 18 | U.S.C. 224 and its implementing regulations, and the | ||||||
| 19 | authority shall follow a substantially similar process | ||||||
| 20 | for make-ready work except to the extent that the | ||||||
| 21 | timing requirements are otherwise addressed in this | ||||||
| 22 | Act. The good-faith estimate of the person owning or | ||||||
| 23 | controlling the authority utility pole for any | ||||||
| 24 | make-ready work necessary to enable the pole to | ||||||
| 25 | support the requested collocation shall include | ||||||
| 26 | authority utility pole replacement, if necessary. | ||||||
| |||||||
| |||||||
| 1 | (C) For authority utility poles that do not | ||||||
| 2 | support aerial facilities used to provide | ||||||
| 3 | communications services or electric service, the | ||||||
| 4 | authority shall provide a good-faith estimate for any | ||||||
| 5 | make-ready work necessary to enable the authority | ||||||
| 6 | utility pole to support the requested collocation, | ||||||
| 7 | including pole replacement, if necessary, within 90 | ||||||
| 8 | days after receipt of a complete application. | ||||||
| 9 | Make-ready work, including any authority utility pole | ||||||
| 10 | replacement, shall be completed within 60 days of | ||||||
| 11 | written acceptance of the good-faith estimate by the | ||||||
| 12 | applicant at the wireless provider's sole cost and | ||||||
| 13 | expense. Alternatively, if the authority determines | ||||||
| 14 | that applicable codes or public safety regulations | ||||||
| 15 | require the authority utility pole to be replaced to | ||||||
| 16 | support the requested collocation, the authority may | ||||||
| 17 | require the wireless provider to replace the authority | ||||||
| 18 | utility pole at the wireless provider's sole cost and | ||||||
| 19 | expense. | ||||||
| 20 | (D) The authority shall not require more | ||||||
| 21 | make-ready work than required to meet applicable codes | ||||||
| 22 | or industry standards. Make-ready work may include | ||||||
| 23 | work needed to accommodate additional public safety | ||||||
| 24 | communications needs that are identified in a | ||||||
| 25 | documented and approved plan for the deployment of | ||||||
| 26 | public safety equipment as specified in paragraph (1) | ||||||
| |||||||
| |||||||
| 1 | of subsection (d) of this Section and included in an | ||||||
| 2 | existing or preliminary authority or public service | ||||||
| 3 | agency budget for attachment within one year of the | ||||||
| 4 | application. Fees for make-ready work, including any | ||||||
| 5 | authority utility pole replacement, shall not exceed | ||||||
| 6 | actual costs or the amount charged to communications | ||||||
| 7 | service providers for similar work and shall not | ||||||
| 8 | include any consultants' fees or expenses for | ||||||
| 9 | authority utility poles that do not support aerial | ||||||
| 10 | facilities used to provide communications services or | ||||||
| 11 | electric service. Make-ready work, including any pole | ||||||
| 12 | replacement, shall be completed within 60 days of | ||||||
| 13 | written acceptance of the good-faith estimate by the | ||||||
| 14 | wireless provider, at its sole cost and expense. | ||||||
| 15 | (E) A wireless provider that has an existing | ||||||
| 16 | agreement with the authority on the effective date of | ||||||
| 17 | the Act may accept the rates, fees, and terms that an | ||||||
| 18 | authority makes available under this Act for the | ||||||
| 19 | collocation of small wireless facilities or the | ||||||
| 20 | installation of new utility poles for the collocation | ||||||
| 21 | of small wireless facilities that are the subject of | ||||||
| 22 | an application submitted 2 or more years after the | ||||||
| 23 | effective date of the Act as provided in this | ||||||
| 24 | paragraph (4) by notifying the authority that it opts | ||||||
| 25 | to accept such rates, fees, and terms. The existing | ||||||
| 26 | agreement remains in effect, subject to applicable | ||||||
| |||||||
| |||||||
| 1 | termination provisions, for the small wireless | ||||||
| 2 | facilities the wireless provider has collocated on the | ||||||
| 3 | authority's utility poles pursuant to applications | ||||||
| 4 | submitted to the authority before the wireless | ||||||
| 5 | provider provides such notice and exercises its option | ||||||
| 6 | under this subparagraph. | ||||||
| 7 | (5) Notwithstanding any provision of this Act to the | ||||||
| 8 | contrary, an authority may charge recurring rates and | ||||||
| 9 | application fees up to the amount permitted by the Federal | ||||||
| 10 | Communication Commission in its Declaratory Ruling and | ||||||
| 11 | Third Report and Order adopted on September 26, 2018 in WT | ||||||
| 12 | Docket Nos. 17-70, 17-84 and cited as 33 FCC Rcd 9088, | ||||||
| 13 | 9129, or any subsequent ruling, order, or guidance issued | ||||||
| 14 | by the Federal Communication Commission regarding fees and | ||||||
| 15 | recurring rates. | ||||||
| 16 | (j) An authority shall authorize the collocation of small | ||||||
| 17 | wireless facilities on utility poles owned or controlled by | ||||||
| 18 | the authority that are not located within rights-of-way to the | ||||||
| 19 | same extent the authority currently permits access to utility | ||||||
| 20 | poles for other commercial projects or uses. The collocations | ||||||
| 21 | shall be subject to reasonable and nondiscriminatory rates, | ||||||
| 22 | fees, and terms as provided in an agreement between the | ||||||
| 23 | authority and the wireless provider. | ||||||
| 24 | (k) Nothing in this Section precludes an authority from | ||||||
| 25 | adopting reasonable rules with respect to the removal of | ||||||
| 26 | abandoned small wireless facilities. A small wireless facility | ||||||
| |||||||
| |||||||
| 1 | that is not operated for a continuous period of 12 months shall | ||||||
| 2 | be considered abandoned and the owner of the facility must | ||||||
| 3 | remove the small wireless facility within 90 days after | ||||||
| 4 | receipt of written notice from the authority notifying the | ||||||
| 5 | owner of the abandonment. The notice shall be sent by | ||||||
| 6 | certified or registered mail, return receipt requested, by the | ||||||
| 7 | authority to the owner at the last known address of the owner. | ||||||
| 8 | If the small wireless facility is not removed within 90 days of | ||||||
| 9 | such notice, the authority may remove or cause the removal of | ||||||
| 10 | the facility pursuant to the terms of its pole attachment | ||||||
| 11 | agreement for authority utility poles or through whatever | ||||||
| 12 | actions are provided for abatement of nuisances or by other | ||||||
| 13 | law for removal and cost recovery. An authority may require a | ||||||
| 14 | wireless provider to provide written notice to the authority | ||||||
| 15 | if it sells or transfers small wireless facilities subject to | ||||||
| 16 | this Act within the jurisdictional boundary of the authority. | ||||||
| 17 | Such notice shall include the name and contact information of | ||||||
| 18 | the new wireless provider. | ||||||
| 19 | (l) Nothing in this Section requires an authority to | ||||||
| 20 | install or maintain any specific utility pole or to continue | ||||||
| 21 | to install or maintain utility poles in any location if the | ||||||
| 22 | authority makes a non-discriminatory decision to eliminate | ||||||
| 23 | above-ground utility poles of a particular type generally, | ||||||
| 24 | such as electric utility poles, in all or a significant | ||||||
| 25 | portion of its geographic jurisdiction. For authority utility | ||||||
| 26 | poles with collocated small wireless facilities in place when | ||||||
| |||||||
| |||||||
| 1 | an authority makes a decision to eliminate above-ground | ||||||
| 2 | utility poles of a particular type generally, the authority | ||||||
| 3 | shall either (i) continue to maintain the authority utility | ||||||
| 4 | pole or install and maintain a reasonable alternative utility | ||||||
| 5 | pole or wireless support structure for the collocation of the | ||||||
| 6 | small wireless facility, or (ii) offer to sell the utility | ||||||
| 7 | pole to the wireless provider at a reasonable cost or allow the | ||||||
| 8 | wireless provider to install its own utility pole so it can | ||||||
| 9 | maintain service from that location. | ||||||
| 10 | (Source: P.A. 102-9, eff. 6-3-21; 102-21, eff. 6-25-21.)
| ||||||
| 11 | (50 ILCS 840/25) (was 50 ILCS 835/25) | ||||||
| 12 | (Section scheduled to be repealed on December 31, 2024) | ||||||
| 13 | Sec. 25. Dispute resolution. A circuit court has | ||||||
| 14 | jurisdiction to resolve all disputes arising under this Act. | ||||||
| 15 | Pending resolution of a dispute concerning rates for | ||||||
| 16 | collocation of small wireless facilities on authority utility | ||||||
| 17 | poles within the right-of-way, the authority shall allow the | ||||||
| 18 | collocating person to collocate on its poles at annual rates | ||||||
| 19 | of no more than $270 $200 per year per authority utility pole, | ||||||
| 20 | with rates to be determined upon final resolution of the | ||||||
| 21 | dispute. | ||||||
| 22 | (Source: P.A. 102-21, eff. 6-25-21.)
| ||||||
| 23 | (50 ILCS 840/90) (was 50 ILCS 835/90) | ||||||
| 24 | (Section scheduled to be repealed on December 31, 2024) | ||||||
| |||||||
| |||||||
| 1 | Sec. 90. Repeal. This Act is repealed on January 1, 2030 | ||||||
| 2 | December 31, 2024. | ||||||
| 3 | (Source: P.A. 102-9, eff. 6-3-21; 102-21, eff. 6-25-21.)
| ||||||
| 4 | Section 25. The Illinois Municipal Code is amended by | ||||||
| 5 | changing Sections 8-3-14b and 8-3-14c as follows:
| ||||||
| 6 | (65 ILCS 5/8-3-14b) | ||||||
| 7 | (Section scheduled to be repealed on January 1, 2025) | ||||||
| 8 | Sec. 8-3-14b. Municipal hotel operators' tax in DuPage | ||||||
| 9 | County. For any municipality located within DuPage County that | ||||||
| 10 | belongs to a not-for-profit organization headquartered in | ||||||
| 11 | DuPage County that is recognized by the Department of Commerce | ||||||
| 12 | and Economic Opportunity as a certified local tourism and | ||||||
| 13 | convention bureau entitled to receive State tourism grant | ||||||
| 14 | funds, not less than 75% of the amounts collected pursuant to | ||||||
| 15 | Section 8-3-14 shall be expended by the municipality to | ||||||
| 16 | promote tourism and conventions within that municipality or | ||||||
| 17 | otherwise to attract nonresident overnight visitors to the | ||||||
| 18 | municipality, and the remainder of the amounts collected by a | ||||||
| 19 | municipality within DuPage County pursuant to Section 8-3-14 | ||||||
| 20 | may be expended by the municipality for economic development | ||||||
| 21 | or capital infrastructure. | ||||||
| 22 | This Section is repealed on January 1, 2027 2025. | ||||||
| 23 | (Source: P.A. 101-204, eff. 8-2-19; 102-699, eff. 4-19-22.)
| ||||||
| |||||||
| |||||||
| 1 | (65 ILCS 5/8-3-14c) | ||||||
| 2 | (Section scheduled to be repealed on January 1, 2025) | ||||||
| 3 | Sec. 8-3-14c. Municipal hotel use tax in DuPage County. | ||||||
| 4 | For any municipality located within DuPage County that belongs | ||||||
| 5 | to a not-for-profit organization headquartered in DuPage | ||||||
| 6 | County that is recognized by the Department of Commerce and | ||||||
| 7 | Economic Opportunity as a certified local tourism and | ||||||
| 8 | convention bureau entitled to receive State tourism grant | ||||||
| 9 | funds, not less than 75% of the amounts collected pursuant to | ||||||
| 10 | Section 8-3-14a shall be expended by the municipality to | ||||||
| 11 | promote tourism and conventions within that municipality or | ||||||
| 12 | otherwise to attract nonresident overnight visitors to the | ||||||
| 13 | municipality, and the remainder of the amounts collected by a | ||||||
| 14 | municipality within DuPage County pursuant to Section 8-3-14a | ||||||
| 15 | may be expended by the municipality for economic development | ||||||
| 16 | or capital infrastructure. | ||||||
| 17 | This Section is repealed on January 1, 2027 2025. | ||||||
| 18 | (Source: P.A. 101-204, eff. 8-2-19; 102-699, eff. 4-19-22.)
| ||||||
| 19 | Section 30. The School Code is amended by changing Section | ||||||
| 20 | 17-2A as follows:
| ||||||
| 21 | (105 ILCS 5/17-2A) (from Ch. 122, par. 17-2A) | ||||||
| 22 | Sec. 17-2A. Interfund transfers. | ||||||
| 23 | (a) The school board of any district having a population | ||||||
| 24 | of less than 500,000 inhabitants may, by proper resolution | ||||||
| |||||||
| |||||||
| 1 | following a public hearing set by the school board or the | ||||||
| 2 | president of the school board (that is preceded (i) by at least | ||||||
| 3 | one published notice over the name of the clerk or secretary of | ||||||
| 4 | the board, occurring at least 7 days and not more than 30 days | ||||||
| 5 | prior to the hearing, in a newspaper of general circulation | ||||||
| 6 | within the school district and (ii) by posted notice over the | ||||||
| 7 | name of the clerk or secretary of the board, at least 48 hours | ||||||
| 8 | before the hearing, at the principal office of the school | ||||||
| 9 | board or at the building where the hearing is to be held if a | ||||||
| 10 | principal office does not exist, with both notices setting | ||||||
| 11 | forth the time, date, place, and subject matter of the | ||||||
| 12 | hearing), transfer money from (1) the Educational Fund to the | ||||||
| 13 | Operations and Maintenance Fund or the Transportation Fund, | ||||||
| 14 | (2) the Operations and Maintenance Fund to the Educational | ||||||
| 15 | Fund or the Transportation Fund, (3) the Transportation Fund | ||||||
| 16 | to the Educational Fund or the Operations and Maintenance | ||||||
| 17 | Fund, or (4) the Tort Immunity Fund to the Operations and | ||||||
| 18 | Maintenance Fund of said district, provided that, except | ||||||
| 19 | during the period from July 1, 2003 through June 30, 2026 2024, | ||||||
| 20 | such transfer is made solely for the purpose of meeting | ||||||
| 21 | one-time, non-recurring expenses. Except during the period | ||||||
| 22 | from July 1, 2003 through June 30, 2026 and except as otherwise | ||||||
| 23 | provided in subsection (b) of this Section, any other | ||||||
| 24 | permanent interfund transfers authorized by any provision or | ||||||
| 25 | judicial interpretation of this Code for which the transferee | ||||||
| 26 | fund is not precisely and specifically set forth in the | ||||||
| |||||||
| |||||||
| 1 | provision of this Code authorizing such transfer shall be made | ||||||
| 2 | to the fund of the school district most in need of the funds | ||||||
| 3 | being transferred, as determined by resolution of the school | ||||||
| 4 | board. | ||||||
| 5 | (b) (Blank). | ||||||
| 6 | (c) Notwithstanding subsection (a) of this Section or any | ||||||
| 7 | other provision of this Code to the contrary, the school board | ||||||
| 8 | of any school district (i) that is subject to the Property Tax | ||||||
| 9 | Extension Limitation Law, (ii) that is an elementary district | ||||||
| 10 | servicing students in grades K through 8, (iii) whose | ||||||
| 11 | territory is in one county, (iv) that is eligible for Section | ||||||
| 12 | 7002 Federal Impact Aid, and (v) that has no more than $81,000 | ||||||
| 13 | in funds remaining from refinancing bonds that were refinanced | ||||||
| 14 | a minimum of 5 years prior to January 20, 2017 (the effective | ||||||
| 15 | date of Public Act 99-926) may make a one-time transfer of the | ||||||
| 16 | funds remaining from the refinancing bonds to the Operations | ||||||
| 17 | and Maintenance Fund of the district by proper resolution | ||||||
| 18 | following a public hearing set by the school board or the | ||||||
| 19 | president of the school board, with notice as provided in | ||||||
| 20 | subsection (a) of this Section, so long as the district meets | ||||||
| 21 | the qualifications set forth in this subsection (c) on January | ||||||
| 22 | 20, 2017 (the effective date of Public Act 99-926). | ||||||
| 23 | (d) Notwithstanding subsection (a) of this Section or any | ||||||
| 24 | other provision of this Code to the contrary, the school board | ||||||
| 25 | of any school district (i) that is subject to the Property Tax | ||||||
| 26 | Extension Limitation Law, (ii) that is a community unit school | ||||||
| |||||||
| |||||||
| 1 | district servicing students in grades K through 12, (iii) | ||||||
| 2 | whose territory is in one county, (iv) that owns property | ||||||
| 3 | designated by the United States as a Superfund site pursuant | ||||||
| 4 | to the federal Comprehensive Environmental Response, | ||||||
| 5 | Compensation and Liability Act of 1980 (42 U.S.C. 9601 et | ||||||
| 6 | seq.), and (v) that has an excess accumulation of funds in its | ||||||
| 7 | bond fund, including funds accumulated prior to July 1, 2000, | ||||||
| 8 | may make a one-time transfer of those excess funds accumulated | ||||||
| 9 | prior to July 1, 2000 to the Operations and Maintenance Fund of | ||||||
| 10 | the district by proper resolution following a public hearing | ||||||
| 11 | set by the school board or the president of the school board, | ||||||
| 12 | with notice as provided in subsection (a) of this Section, so | ||||||
| 13 | long as the district meets the qualifications set forth in | ||||||
| 14 | this subsection (d) on August 4, 2017 (the effective date of | ||||||
| 15 | Public Act 100-32). | ||||||
| 16 | (Source: P.A. 101-643, eff. 6-18-20; 102-671, eff. 11-30-21; | ||||||
| 17 | 102-895, eff. 5-23-22.)
| ||||||
| 18 | Section 35. The Public Utilities Act is amended by | ||||||
| 19 | changing Sections 13-1200 and 21-1601 as follows:
| ||||||
| 20 | (220 ILCS 5/13-1200) | ||||||
| 21 | (Section scheduled to be repealed on December 31, 2026) | ||||||
| 22 | Sec. 13-1200. Repealer. This Article is repealed January | ||||||
| 23 | 1, 2030 December 31, 2026. | ||||||
| 24 | (Source: P.A. 101-639, eff. 6-12-20; 102-9, eff. 6-3-21.)
| ||||||
| |||||||
| |||||||
| 1 | (220 ILCS 5/21-1601) | ||||||
| 2 | Sec. 21-1601. Repealer. Sections 21-101 through 21-1501 of | ||||||
| 3 | this Article are repealed January 1, 2030 December 31, 2026. | ||||||
| 4 | (Source: P.A. 101-639, eff. 6-12-20; 102-9, eff. 6-3-21.)
| ||||||