Bill Title: USE/OCC TAX-DATA CENTERS
Status: 2019-03-29 - House Committee Amendment No. 1 Rule 19(c) / Re-referred to Rules Committee [HB3412 Detail]
Download: Illinois-2019-HB3412-House_Amendment_001.html
Bill Title: USE/OCC TAX-DATA CENTERS
Status: 2019-03-29 - House Committee Amendment No. 1 Rule 19(c) / Re-referred to Rules Committee [HB3412 Detail]
Download: Illinois-2019-HB3412-House_Amendment_001.html
| |||||||
| |||||||
| |||||||
| 1 | AMENDMENT TO HOUSE BILL 3412
| ||||||
| 2 | AMENDMENT NO. ______. Amend House Bill 3412 on page 1, | ||||||
| 3 | immediately below line 16, by inserting the following:
| ||||||
| 4 | ""ASHRAE Standard 90.4-2016" means the Energy Standard | ||||||
| 5 | for Data Centers published by the American Society of | ||||||
| 6 | Heating, Refrigerating, and Air-Conditioning Engineers."; | ||||||
| 7 | and
| ||||||
| 8 | on page 5, immediately below line 12, by inserting the | ||||||
| 9 | following: | ||||||
| 10 | "(d) New and existing data centers seeking a certificate of | ||||||
| 11 | exemption for new or existing facilities shall submit, with | ||||||
| 12 | respect to each application, a response in a form and manner | ||||||
| 13 | specified by the Department, which includes the following: | ||||||
| 14 | (1) An energy usage plan that provides the following | ||||||
| 15 | information: | ||||||
| 16 | (A) the expected quantity of electrical energy, in | ||||||
| 17 | kilowatt-hours, needed to fulfill 100% of the | ||||||
| |||||||
| |||||||
| 1 | anticipated electrical energy needs of the data | ||||||
| 2 | center: | ||||||
| 3 | (i) over the course of the first 12 consecutive | ||||||
| 4 | months of operation; and | ||||||
| 5 | (ii) on average, over the course of 12 | ||||||
| 6 | consecutive months, excluding the first 12 months | ||||||
| 7 | of operation; and | ||||||
| 8 | (B) documentation of the expected quantity of | ||||||
| 9 | renewable energy to be generated on site or purchased | ||||||
| 10 | by the data center through renewable energy credits or | ||||||
| 11 | otherwise delivered to the site. | ||||||
| 12 | (2) A water resources plan that provides the following | ||||||
| 13 | information: | ||||||
| 14 | (A) the expected volume of water, in kiloliters, | ||||||
| 15 | needed to fulfill 100% of the anticipated water | ||||||
| 16 | consumption needs of the data center over the course of | ||||||
| 17 | 12 consecutive months; and | ||||||
| 18 | (B) the data center's policy for sustainable water | ||||||
| 19 | use and water conservation. | ||||||
| 20 | (e) To maintain its certificate of exemption, a qualifying | ||||||
| 21 | data center shall provide the following to the Department each | ||||||
| 22 | calendar year by June 1: | ||||||
| 23 | (1) An energy usage report that provides the following | ||||||
| 24 | information: | ||||||
| 25 | (A) the actual quantity of electrical energy, in | ||||||
| 26 | kilowatt-hours, consumed annually by the qualifying | ||||||
| |||||||
| |||||||
| 1 | data center during the previous calendar year; | ||||||
| 2 | (B) any alterations the qualifying data center | ||||||
| 3 | proposes to undertake to improve the facility's | ||||||
| 4 | electrical energy consumption; and | ||||||
| 5 | (C) documentation of any energy efficiency | ||||||
| 6 | upgrades that were completed on the facility. | ||||||
| 7 | (2) A water resources report that provides the | ||||||
| 8 | following information: | ||||||
| 9 | (A) the actual volume of water, in kiloliters, | ||||||
| 10 | consumed by the qualifying data center over the course | ||||||
| 11 | of 12 consecutive months during the previous calendar | ||||||
| 12 | year; and | ||||||
| 13 | (B) any alterations the qualifying data center | ||||||
| 14 | will undertake to improve the data center's water | ||||||
| 15 | consumption. | ||||||
| 16 | (f) Beginning 180 days after the effective date of this | ||||||
| 17 | amendatory Act of the 101st General Assembly, all qualifying | ||||||
| 18 | data centers in the State shall meet or exceed the requirements | ||||||
| 19 | in the ASHRAE Standard 90.4-2016. The Department may replace | ||||||
| 20 | the ASHRAE Standard 90.4-2016 identified in this subsection by | ||||||
| 21 | adopting rules consistent with the requirements of the Illinois | ||||||
| 22 | Administrative Procedure Act. Whenever the provisions of any | ||||||
| 23 | energy efficiency standard imposed or adopted by the Department | ||||||
| 24 | are revised by the standard publishing body, including, but not | ||||||
| 25 | limited to, ASHRAE, the Department shall, not later than 12 | ||||||
| 26 | months after the date of such revision, publish a notice of | ||||||
| |||||||
| |||||||
| 1 | determination of whether such revision will improve energy | ||||||
| 2 | efficiency in data centers in Illinois. If the Department | ||||||
| 3 | publishes an affirmative determination, then, not later than 6 | ||||||
| 4 | months after the determination, the Department shall, by rule, | ||||||
| 5 | adopt the revised energy efficiency standard for qualifying | ||||||
| 6 | data centers and immediately notify all qualifying data centers | ||||||
| 7 | in the State. Existing qualifying data centers shall be subject | ||||||
| 8 | to the revised energy efficiency standard within 24 months | ||||||
| 9 | after the Department adopts the revised standard. The | ||||||
| 10 | Department shall provide data centers with technical | ||||||
| 11 | assistance concerning implementation of the energy efficiency | ||||||
| 12 | standard under this Section. The Department shall determine | ||||||
| 13 | procedures for compliance with the energy efficiency standard. | ||||||
| 14 | These procedures may include, but need not be limited to, | ||||||
| 15 | certification by a national, State, or local accredited energy | ||||||
| 16 | conservation program or inspections from private certified | ||||||
| 17 | inspectors using the ASHRAE Standard 90.4-2016. | ||||||
| 18 | (g) A qualifying data center shall ensure that renewable | ||||||
| 19 | energy sources fulfill 100% of the facility's electrical energy | ||||||
| 20 | consumption. A qualifying data center shall do so through one | ||||||
| 21 | or more of the following: | ||||||
| 22 | (1) on-site renewable generation; | ||||||
| 23 | (2) renewable energy credits purchased by the | ||||||
| 24 | facility; | ||||||
| 25 | (3) subscription in a renewable energy program by the | ||||||
| 26 | provider of electricity to the qualifying facility; or | ||||||
| |||||||
| |||||||
| 1 | (4) any combination of (1), (2) and (3) so that | ||||||
| 2 | renewable energy sources fulfill 100% of the facility's | ||||||
| 3 | electrical energy consumption. | ||||||
| 4 | (h) After the first 12 consecutive months of operation, a | ||||||
| 5 | qualifying data center shall reuse at least 50% of wastewater | ||||||
| 6 | generated by the data center. The Department, in consultation | ||||||
| 7 | with the Illinois Environmental Protection Agency, shall adopt | ||||||
| 8 | rules to carry out the provisions of this subsection. | ||||||
| 9 | (i) No later than 2 years after the effective date of this | ||||||
| 10 | amendatory Act of the 101st General Assembly, and at least | ||||||
| 11 | every 2 years thereafter, the Department, in consultation with | ||||||
| 12 | the Illinois Commerce Commission, shall make publicly | ||||||
| 13 | available a report that contains: | ||||||
| 14 | (1) an analysis of the state of data centers in | ||||||
| 15 | Illinois and their expected growth; | ||||||
| 16 | (2) the total energy usage of qualifying data centers | ||||||
| 17 | in the State; | ||||||
| 18 | (3) a comparison of energy efficiency of data centers | ||||||
| 19 | in the State versus that of data centers in other states; | ||||||
| 20 | (4) a review of the energy efficiency reporting | ||||||
| 21 | requirements this Section and a determination of whether | ||||||
| 22 | the Department will revise the requirements; | ||||||
| 23 | (5) a review of the energy efficiency standard in this | ||||||
| 24 | Section and a determination of whether the Department will | ||||||
| 25 | revise the standard; and | ||||||
| 26 | (6) other recommendations for improving energy | ||||||
| |||||||
| |||||||
| 1 | efficiency of the data centers in the State. | ||||||
| 2 | The Department shall provide this report to all qualifying | ||||||
| 3 | data centers in the State and make the report available to the | ||||||
| 4 | public through means similar to which the Department makes | ||||||
| 5 | other reports available to the public."; and
| ||||||
| 6 | on page 5, line 13, by replacing "(d) Beginning" with "(j) In | ||||||
| 7 | addition, beginning".
| ||||||