Bill Amendment: IL HB0264 | 2015-2016 | 99th General Assembly
NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: MUNI CD-VENDING MACHINES
Status: 2015-10-10 - Senate Committee Amendment No. 2 Pursuant to Senate Rule 3-9(b) / Referred to Assignments [HB0264 Detail]
Download: Illinois-2015-HB0264-Senate_Amendment_002.html
Bill Title: MUNI CD-VENDING MACHINES
Status: 2015-10-10 - Senate Committee Amendment No. 2 Pursuant to Senate Rule 3-9(b) / Referred to Assignments [HB0264 Detail]
Download: Illinois-2015-HB0264-Senate_Amendment_002.html
| |||||||
| |||||||
| |||||||
| 1 | AMENDMENT TO HOUSE BILL 264
| ||||||
| 2 | AMENDMENT NO. ______. Amend House Bill 264 on page 1, | ||||||
| 3 | immediately before line 4, by inserting the following:
| ||||||
| 4 | "Section 3. The Township Code is amended by changing | ||||||
| 5 | Section 205-140 as follows:
| ||||||
| 6 | (60 ILCS 1/205-140)
| ||||||
| 7 | Sec. 205-140.
Initiating proceedings for particular | ||||||
| 8 | locality; rates
and charges; lien.
| ||||||
| 9 | (a) A township board may initiate proceedings under | ||||||
| 10 | Sections 205-130 through
205-150 in the manner provided by | ||||||
| 11 | Section 205-20.
| ||||||
| 12 | (b) The township board may establish the monthly rate or | ||||||
| 13 | charge to all users each
user of the waterworks system or | ||||||
| 14 | sewerage system, or combined waterworks
and sewerage system, or | ||||||
| 15 | improvement or extension at a rate that will be
sufficient to | ||||||
| 16 | pay for the operation, maintenance, and necessary upgrades or | ||||||
| |||||||
| |||||||
| 1 | improvements of the system, the principal and interest of any | ||||||
| 2 | bonds issued to pay
the cost of any necessary upgrades or | ||||||
| 3 | improvements to the system, and improvement, or extension and | ||||||
| 4 | the maintenance and
operation of the system, improvement, or | ||||||
| 5 | extension and may provide an adequate
depreciation fund for the | ||||||
| 6 | bonds. Monthly Charges or rates shall be established,
revised, | ||||||
| 7 | and maintained by ordinance and become payable as the township | ||||||
| 8 | board
determines by ordinance. | ||||||
| 9 | For any user outside of the township's geographical | ||||||
| 10 | boundaries and outside the township's facility planning area, | ||||||
| 11 | the township may impose a 25% surcharge above the monthly user | ||||||
| 12 | rates charged to all users within the township or the | ||||||
| 13 | township's facility planning area. For purposes of this | ||||||
| 14 | Section, "facility planning area" has the same meaning as that | ||||||
| 15 | term is defined under subsection (c) of Section 2.08 of the | ||||||
| 16 | Wastewater Land Treatment Site Regulation Act.
| ||||||
| 17 | (b-5) The township board of a township that operates a | ||||||
| 18 | water or sewerage system may by ordinance collect a fair and | ||||||
| 19 | reasonable fee, which shall not include the cost of labor and | ||||||
| 20 | materials, for connection to any such system for the connection | ||||||
| 21 | of a new service line from the new user's building or | ||||||
| 22 | development to the township's main water or sewer line located | ||||||
| 23 | in the adjoining utility easement. The standard used in order | ||||||
| 24 | to determine a fair and reasonable connection fee shall be | ||||||
| 25 | based solely on the size of the water meter to be installed for | ||||||
| 26 | the service of the building or development. The fee shall not | ||||||
| |||||||
| |||||||
| 1 | exceed, but may be less than, the connection fee for the | ||||||
| 2 | applicable connection type, as described below. The | ||||||
| 3 | restriction on fees imposed by this subsection shall not limit | ||||||
| 4 | the right of the township to recover the actual cost of field | ||||||
| 5 | labor and materials incurred by the township to connect the new | ||||||
| 6 | user's building or development to the township's main water or | ||||||
| 7 | sewer line in the adjoining utility easement. The actual cost | ||||||
| 8 | of field labor shall not include wages that exceed one and | ||||||
| 9 | one-half times the employees' normal hourly pay rate. The | ||||||
| 10 | actual cost of materials shall not exceed one and one-quarter | ||||||
| 11 | times the township's acquisition cost of materials actually | ||||||
| 12 | used and provided by the township to make the connection. The | ||||||
| 13 | connection fee shall not change the terms of any existing | ||||||
| 14 | recapture agreement between a developer and a township.
| ||||||
| 15 | Sewer Connection Fees | ||||||
| 16 | Size of water meter Amount of fee | ||||||
| 17 | Single family residential..............................$1,000 | ||||||
| 18 | Multifamily residential..................$1,000 per residence | ||||||
| 19 | Planned unit multifamily.......Applicable commercial size fee | ||||||
| 20 | 3/4 inch & smaller commercial..........................$1,000 | ||||||
| 21 | 1 inch commercial......................................$1,669 | ||||||
| 22 | 1 1/2 inch commercial..................................$3,031 | ||||||
| 23 | 2 inch commercial......................................$4,736 | ||||||
| 24 | 3 inch commercial......................................$8,744 | ||||||
| 25 | 4 inch commercial.....................................$14,711 | ||||||
| |||||||
| |||||||
| 1 | 6 inch commercial.....................................$28,351 | ||||||
| 2 | 8 inch commercial.....................................$51,368 | ||||||
| 3 | 10 inch commercial....................................$82,655 | ||||||
| 4 | 12 inch & larger commercial..........Set by resolution of the | ||||||
| 5 | township board
| ||||||
| 6 | Water Main Connection Fees | ||||||
| 7 | Size of water meter............................Amount of fee | ||||||
| 8 | 3/4 inch & smaller....................................$1,000 | ||||||
| 9 | 1 inch.................................................$1,600 | ||||||
| 10 | 1 1/2 inch.............................................$2,300 | ||||||
| 11 | 2 inch.................................................$3,900 | ||||||
| 12 | 3 inch.................................................$8,600 | ||||||
| 13 | 4 inch................................................$15,400 | ||||||
| 14 | 6 inch................................................$34,300 | ||||||
| 15 | 8 inch................................................$41,100 | ||||||
| 16 | 10 inch & larger meters..............................$154,000 | ||||||
| 17 | Unmetered & Main Extension.............................$2,000 | ||||||
| 18 | Landscaping sprinkler meter............................$1,000
| ||||||
| 19 | The plan review fee charged by the township to review the | ||||||
| 20 | building or development plans for the new connection, | ||||||
| 21 | regardless of type, may not exceed $100. | ||||||
| 22 | The inspection fee charged by the township to inspect the | ||||||
| 23 | new service line connection to the township's main line in the | ||||||
| 24 | adjoining utility easement may not exceed $100. | ||||||
| |||||||
| |||||||
| 1 | The township may not charge a new user an acreage fee as | ||||||
| 2 | part of or in addition to the connection fee. | ||||||
| 3 | The township may charge a new user outside of the | ||||||
| 4 | township's geographical boundaries or the township's facility | ||||||
| 5 | planning area up to an additional 25% surcharge above the | ||||||
| 6 | connection fees indicated above. | ||||||
| 7 | As used in this Section, "multifamily residential" means | ||||||
| 8 | the connection fee for a residential building to be constructed | ||||||
| 9 | on an individual platted lot, which has at least 2 and not more | ||||||
| 10 | than 4 separate residential units, and which is not part of a | ||||||
| 11 | multifamily planned unit development. | ||||||
| 12 | As used in this Section, "multifamily planned unit | ||||||
| 13 | development" means the connection fee for a development using | ||||||
| 14 | one main water meter to service one or more buildings within a | ||||||
| 15 | planned unit development. A multifamily planned unit | ||||||
| 16 | development shall be charged a single connection fee according | ||||||
| 17 | to the above schedules, without regard to the number of | ||||||
| 18 | residential units within the development. | ||||||
| 19 | (c) The charges or rates are liens upon the real estate | ||||||
| 20 | upon or for which
sewerage service is supplied whenever the | ||||||
| 21 | charges or rates become delinquent as
provided by the ordinance | ||||||
| 22 | of the board fixing a delinquency date.
| ||||||
| 23 | (Source: P.A. 82-783; 88-62.)".
| ||||||
