Bill Text: IA SF122 | 2015-2016 | 86th General Assembly | Introduced
Bill Title: A bill for an act concerning access to documents during the competitive bidding process for public improvement contracts. (Formerly SSB 1036.)
Spectrum: Committee Bill
Status: (Introduced - Dead) 2015-02-24 - Withdrawn. S.J. 358. [SF122 Detail]
Download: Iowa-2015-SF122-Introduced.html
Senate File 122 - Introduced SENATE FILE BY COMMITTEE ON COMMERCE (SUCCESSOR TO SSB 1036) A BILL FOR 1 An Act concerning access to documents during the competitive 2 bidding process for public improvement contracts. 3 BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF IOWA: TLSB 1096SV (2) 86 ad/sc PAG LIN 1 1 Section 1. Section 26.3, subsection 2, Code 2015, is amended 1 2 to read as follows: 1 3 2. A governmental entity shall have an engineer licensed 1 4 under chapter 542B, a landscape architect licensed under 1 5 chapter 544B, or an architect registered under chapter 544A 1 6 prepare plans and specifications, and calculate the estimated 1 7 total cost of a proposed public improvement. A governmental 1 8 entity shall ensure that a sufficient number of paper copies, 1 9 and if available, electronic and digital copies of the 1 10 project's contract documents, including all drawings, plans, 1 11 specifications, and estimated total costs of the proposed 1 12 public improvement are made available for distribution at 1 13 no charge to prospective bidders, subcontractor bidders, 1 14 suppliers, andcontractorplan room services. If a deposit is 1 15 required as part of a paper contract documents distribution 1 16 policy by the public owner, the deposit shall not exceed two 1 17 hundred fifty dollars per set which shall be refunded upon 1 18 return of the contract documents within fourteen days after 1 19 award of the project. If the contract documents are not 1 20 returned in a timely manner and in a reusable condition, the 1 21 deposit shall be forfeited. The governmental entity shall 1 22 reimburse the landscape architect, architect, or professional 1 23 engineer for the actual costs of preparation and distribution 1 24 of plans and specifications. 1 25 EXPLANATION 1 26 The inclusion of this explanation does not constitute agreement with 1 27 the explanation's substance by the members of the general assembly. 1 28 This bill prohibits governmental entities from charging 1 29 a fee for electronic and digital copies of project contract 1 30 documents relating to public improvements when providing those 1 31 documents electronically. LSB 1096SV (2) 86 ad/sc