Bill Text: CA AB222 | 2025-2026 | Regular Session | Amended
Bill Title: Data centers: power usage effectiveness: cost shifts.
Sponsorship: Partisan Bill (Democrat 1)
Status: (Engrossed) 2025-08-29 - In committee: Held under submission. [AB222 Detail]
Download: California-2025-AB222-Amended.html
|
Amended
IN
Senate
July 07, 2025 |
|
Amended
IN
Assembly
May 23, 2025 |
|
Amended
IN
Assembly
May 05, 2025 |
|
Amended
IN
Assembly
April 07, 2025 |
| Introduced by Assembly Member Bauer-Kahan |
January 08, 2025 |
LEGISLATIVE COUNSEL'S DIGEST
Existing law, on or before January 1, 2026, and before each time thereafter that a generative artificial intelligence system or service, as defined, or a substantial modification to a generative artificial intelligence system or service, released on or after January 1, 2022, is made available to Californians for use, regardless of whether the terms of that use include compensation, requires a developer of the system or service to post on the developer’s internet website documentation regarding the data used to train the generative artificial intelligence system or service.
This bill would require a developer, before using a covered model commercially or before making a covered model available for use by a third party, to estimate the total energy used to develop the covered model and the percentage of the total energy used to develop the
covered model that was generated in California. The bill would also require a developer, on or before February 1, 2027, and annually thereafter, to estimate the total energy used by the developer to operate the covered model during the previous calendar year and the percentage of the estimated total energy that was generated in California. The bill would require the developer to publish on its internet website that energy usage data, as provided.
This bill would require the Energy Commission to include energy consumption trends for data centers in its integrated energy policy reports.
This bill would require the PUC to determine whether those costs and expenses in an application by an electrical corporation to recover costs and expenses arising from, or incurred as a result of, the construction of a new data center or a substantial alteration to an existing data center are just and reasonable. The bill would require the PUC to minimize the shifting of costs attributable to the construction or alteration of the data center to ratepayers who do not directly benefit from the data center.
