Bill Texts: RI S2506 | 2024 | Regular Session

Bill Title: Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.

Spectrum: Partisan Bill (Republican 3-0)

Status: (Introduced) 2024-04-30 - Committee recommended measure be held for further study [S2506 Detail]

Bill Drafts

RevisionDateFormatSourceView
Introduced2024-03-01PDFLinkView

Amendments

AmendmentDateDispositionFormatSourceView
No bill amendments currently on file for Rhode Island S2506

Supplemental Documents

TitleDescriptionDateFormatSourceView
No supplemental documents for Rhode Island S2506 currently on file.

Social Comments on RI S2506

feedback