RI S2506 | 2024 | Regular Session
Status
Spectrum: Partisan Bill (Republican 3-0)
Status: Introduced on March 1 2024 - 25% progression
Action: 2024-04-30 - Committee recommended measure be held for further study
Pending: Senate Commerce Committee
Text: Latest bill text (Introduced) [PDF]
Status: Introduced on March 1 2024 - 25% progression
Action: 2024-04-30 - Committee recommended measure be held for further study
Pending: Senate Commerce Committee
Text: Latest bill text (Introduced) [PDF]
Summary
PUBLIC UTILITIES AND CARRIERS -- PUBLIC UTILITIES COMMISSION - Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Title
Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Sponsors
Roll Calls
2024-04-30 - Senate - Senate Committee on Commerce: Be held for further study (Y: 8 N: 0 NV: 0 Abs: 1) [PASS]
History
Date | Chamber | Action |
---|---|---|
2024-04-30 | Senate | Committee recommended measure be held for further study |
2024-04-26 | Senate | Scheduled for hearing and/or consideration (04/30/2024) |
2024-03-01 | Senate | Introduced, referred to Senate Commerce |