Bill Text: RI H7810 | 2024 | Regular Session | Introduced


Bill Title: Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.

Spectrum: Slight Partisan Bill (Republican 6-2)

Status: (Introduced) 2024-03-21 - Committee recommended measure be held for further study [H7810 Detail]

Download: Rhode_Island-2024-H7810-Introduced.pdf
It appears your computer is unable to display this document, however you can download the file from the links above.
feedback